13_Amd0008 SKC-CU527.pdf
PDF 149 KB Posted
- Attached to
- FY21 MCON PROJECT P-649 GUAM JOINT COMMUNICATIONS UPGRADE MARINE CORPS BASE CAMP BLAZ, GUAM
- Solicitation number
- N6274225R1319
About this file
This file contains waterline trench details and thrust block notes from Amendment 0008 for a Navy construction project in Guam. The document includes two main sections of technical specifications.
The waterline trench details specify requirements for pavement restoration to match existing or new AC pavement details (D1/CR501), installation of warning tape over pipe centerlines, and proper trench backfill/bedding installation procedures. It includes specific requirements for situations involving fill material, cohesive material, or in-filled cavities within 2 feet of the water table. The thrust block specifications require 2500 PSI concrete per section 03 30 00, minimum 2-inch cover over reinforcement, prohibit AWA C153 fittings, and mandate ASTM A615 Grade 6 reinforcing bars unless otherwise noted. The document is prepared for the Department of the Navy Naval Facilities Engineering Command Pacific located at 258 Makalapa Drive in Pearl Harbor, HI.
View the file
Other files
Show 40 more
Latest 50 of 131 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WATERLINE TRENCH DETAILS NOTES
TYPICAL THRUST BLOCK AT VERTICAL
BENDS NOTES
BL
01/14/25
AMENDMENT 0008
| Sheets and Views |
| SKC-CU527 |
File details come from the government source that posted it. Updated .