01_25R1319_Amd0009.pdf
PDF 2 MB Posted
- Attached to
- FY21 MCON PROJECT P-649 GUAM JOINT COMMUNICATIONS UPGRADE MARINE CORPS BASE CAMP BLAZ, GUAM
- Solicitation number
- N6274225R1319
About this file
This is Amendment 0009 to RFP N62742-25-R-1319 for the FY21 MCON Project P-649 Guam Joint Communications Upgrade at Marine Corps Base Camp Blaz, Guam. The amendment revises Document 00 21 16 Instructions to Proposers and Document 00 01 15 List of Drawings, including updated proposal submission dates and requirements.
Key changes include: Price proposals are due February 18, 2025 at 2:00 PM HST; non-price proposals for Factors 1, 2, and 4 are due February 18, 2025 at 2:00 PM HST; and Factor 3 (Small Business) and subcontracting plan are due February 19, 2025 at 2:00 PM HST. The amendment adds new plumbing riser diagrams for the North and South warehouses and revises multiple architectural, plumbing and other drawings. Technical specification changes include updates to galvanized reinforcement requirements, switchboard specifications, and asphalt paving materials. The amendment also provides detailed instructions for site visit access requests, which must be submitted by October 31, 2024 at 2:00 PM HST.
View the file
Other files
Show 40 more
Latest 50 of 131 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
21RXXX3
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RFP N62742-25-R-1319, NAVFAC WORK ORDER NUMBER 1614533, FY21 MCON P-649 JOINT COMMUNICATIONS UPGRADE, JOINT REGION
MARIANAS NAVAL BASE, GUAM
Amendment No. 0009 is continued on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274225R1319
X 9B. DATED (SEE ITEM 11)
17-Oct-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-JAN-25
CODE
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (CODE ACQ33)
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL: TEL:
X
RFP No. N62742-25-R-1319 Amendment No. 0009
FY21 MCON PROJECT P-649 GUAM JOINT COMMUNICATIONS UPGRADE
MARINE CORPS BASE CAMP BLAZ, GUAM
SECTION SF30 BLOCK 14 CONTINUATION PAGE
This amendment is issued to revise the following:
DOCUMENT 00 21 16, INSTRUCTIONS TO PROPOSERS
DOCUMENT 00 21 16, INSTRUCTIONS TO PROPOSERS (Amendment No. 0007), is deleted in its entirety and DOCUMENT 00 21 16, INSTRUCTIONS TO PROPOSERS (Amendment No. 0009) is added and accompanies this Amendment.
DOCUMENT 00 01 15 LIST OF DRAWINGS
1.2 CONTRACT DRAWINGS
ADDED DRAWINGS
The following drawings are added to the list as of January 15, 2025.
DWG
NO.
NAVFAC
DWG NO.
REVISION
NO
TITLE
P-601B 17261372 0 NORTH WAREHOUSE – PLUMBING SANITARY RISER DIAGRAM
PP601B 17261373 0 NORTH WAREHOUSE – PLUMBING DOMESTIC WATER RISER
DIAGRAM
P-601C 17261510 0 SOUTH WAREHOUSE – PLUMBING SANITARY RISER DIAGRAM
PP601C 17261511 0 SOUTH WAREHOUSE – PLUMBING DOMESTIC WATER RISER
DIAGRAM
REVISED DRAWINGS
The following drawings are revised as of January 15, 2025.
DWG
NO.
NAVFAC
DWG NO.
REVISION
NO
TITLE
A-201A 17260476 2 COMM BLDG EXTERIOR ELEVATIONS
A-202A 17260477 2 COMM BLDG EXTERIOR ELEVATIONS
A-404A 17260488 2 LEVEL 2 FLOOR PLAN AREA A2
A-406A 17260490 2 LEVEL 3 FLOOR PLAN AREA A1
A-407A 17260491 2 LEVEL 3 FLOOR PLAN AREA A2
A-512 17260564 3 DOOR SCHEDULE
A-513 17260565 3 DOOR SCHEDULE (CONT’D)
A-514 17260566 3 DOOR SCHEDULE (CONT’D)
A-515 17260567 3 DOOR SCHEDULE (CONT’D)
A-532 17260570 3 ROOM FINISH SCHEDULE
A-533 17260571 3 ROOM FINISH SCHEDULE
A-541 17260572 2 MATERIAL SCHEDULE
A-651 17260596 2 LOUVER TYPES AND DETAILS
A-602B 17261314 2 ROOM FINISH SCHEDULE, WINDOW SCHEDULE AND LOUVER
SCHEDULE
I-101B 17261321 2 GROUND FLOOR FURNITURE PLAN
A-504C 17261453 2 WINDOW & LOUVER DETAILS
A-602C 17261456 2 ROOM FINISH SCHEDULE, WINDOW SCHEDULE AND LOUVER
SCHEDULE
GI081 17261256 1 DRAWING INDEX
GI091 17261402 1 DRAWING INDEX
XD001 17261250 1 POLE REMOVAL PLAN
XE601 17261248 1 POLE REMOVAL SINGLE LINE DIAGRAM
ET301 17274613 1 DUCT BANK SECTIONS
XE301 17261222 1 DUCTBANK SECTIONS
P-502A 17260680 1 COMM – PLUMBING DETAILS SHEET 2
PL601A 17260686 2 COMM – PLUMBING FIXTURE SCHEDULES SHEET 1
PP402A 17260692 1 COMM – PLUMBING PIPING PARTIAL ENLARGED FIRST FLOOR
PLAN A2
P-502B 17261331 1 NORTH WAREHOUSE – PLUMBING DETAILS SHEET 2
PP101B 17261333 1 NORTH WAREHOUSE – PLUMBING PIPING UNDERGROUND PLAN
PP102B 17261334 1 NORTH WAREHOUSE – PLUMBING PIPING ABOVEGROUND PLAN
P-502C 17261469 1 SOUTH WAREHOUSE – PLUMBING DETAILS SHEET 2
PP101C 17261471 1 SOUTH WAREHOUSE – PLUMBING PIPING UNDERGROUND PLAN
PP102C 17261472 1 SOUTH WAREHOUSE – PLUMBING PIPING ABOVEGROUND PLAN
These revised Drawings accompany this Amendment 0009.
PROJECT SPECIFICATIONS
Changes as directed below shall be made to the respective specifications. Specification incorporating the directed changes are not issued with this amendment, unless stated otherwise.
Division 0-Procurement and Contracting Requirements
Section 00 01 15 LIST OF DRAWINGS, 1.2 added the following sheets:
SHEET NUMBER NAVFAC DRAWING NUMBER SHEET NAME
A-605B 1721317 DOOR SCHEDULE AND TYPES
P-601B 17261372 PLUMBING SANTIARY RISER DIAGRAM
PP601B 17261373 PLUMBING DOMESTIC WATER DIAGRAM
A-605C 17261459 DOOR SCHEDULE AND TYPES
P-601C 17261510 PLUMBING SANTIARY RISER DIAGRAM
PP601C 17261511 PLUMBING DOMESTIC WATER DIAGRAM
Division 01 – General Requirements
Section 01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES, delete section in its entirety.
Division 03 – CONCRETE
Section 03 42 13.00 GALVANIZED REINFORCEMENT (OSP), deleted section 2.2.2.5
Section 03 42 13.00 GALVANIZED REINFORCEMENT (Comm Building), deleted section 2.2.2.5
Division 26 – ELECTRICAL Section 26 24 13 SWITCHBOARDS 2.2.3.1a updated voltage to 480 volts.
Section 26 24 13 SWITCHBOARDS 2.2.3.1 Power Circuit Breaker, removed section in its entirety.
Section 26 24 13 SWITCHBOARDS 2.2.3.1 Molded-Case Breaker, clarified requirements apply to branch circuit breakers only.
Section 26 24 13 SWITCHBOARDS 2.2.3.2 Insulated Case Breaker, added section in its entirety.
Division 32 – EXTERIOR IMPROVEMENTS
Section 32 12 16.16 ROAD-MIX ASPHALT PAVING, 2.3 ASPHALT CEMENT BINDER, Updated AR-1600 to
AR-16000.
Division 33 – UTILITIES
Section 33 16 15 WATER STORAGE STEEL TANKS, 3.3 edited section reference for cathodic protection to 26 42 15.
-- End of Amendment 0009 –
FY21 MCON PROJECT P-649 GUAM JOINT COMMUNICATIONS
UPGRADE MARINE CORPS BASE CAMP BLAZ, GUAM WON 1614533
RFP N62742-25-R-1319
AMENDMENT 0009
DOCUMENT 00 21 16
DOCUMENT 00 21 16
INSTRUCTIONS TO PROPOSERS
9/23
1.1 NUMBER OF COPIES/TIME OF RECEIPT
a. PRICE PROPOSAL (PAPER): An original paper and one (1) paper copy of the price proposal shall be submitted on 0418 February 2025, 2:00 p.m., H.S.T. in a sealed envelope and marked in the bottom right corner "PRICE PROPOSAL SUBMITTED UNDER RFP N62742-25-R-1319 - DO NOT OPEN IN MAILROOM." The PRICE PROPOSAL shall include the following:
(1) Manually (wet signature) signed and completed SF 1442 (Solicitation, Offer and Award) (NOTE: SF1442 Block 14 shall include the offeror’s name and physical address exactly as shown in the System for Award Management registration. If mailing address is different from physical address, both addresses may be shown in Block 14, however both addresses shall be EXACTLY as shown in SAM)
(2) Signed and completed Bid Guarantee
(3) Representations and Certifications (See Document 00 45 00) (COMPLETE ALL PROVISIONS)
(4) Information required by paragraph 1.5, Pre-Award Survey/Responsibility Determination
(5) Information required by paragraph 1.6, Partnerships, Joint Ventures (JV), Limited Liability Companies (LLC), Limited Partnerships (LP), Etc.
(6) Information required by paragraph 1.8, Complementary Pricing Information
b. NON-PRICE PROPOSAL (FACTORS 1, 2, AND 4) (PAPER): An original paper and three (3) paper copies of the non-price proposal for Factors 1, 2, and 4 shall be submitted on 04 18 February 2025, 2:00 p.m., H.S.T. in a sealed envelope/package/box and marked in the bottom right corner "NON-PRICE PROPOSAL SUBMITTED UNDER RFP N62742-25-R-1319 - DO NOT OPEN IN MAILROOM." Identify the original proposal as "Original" on the cover of the proposal. The NON-PRICE PROPOSAL shall be submitted in a three-ring binder with table of contents and tabbed. The NON-PRICE PROPOSAL shall include the following:
(1) All information required by Factor 1, Experience
(2) All information required by Factor 2, Safety
(3) All information required by Factor 4, Past Performance
c. NON-PRICE PROPOSAL (FACTOR 3) AND SUBCONTRACTING PLAN (PAPER): An original paper and one (1) paper copy of Factor 3 and the subcontracting plan shall be submitted by 0519 February 2025, 2:00 p.m., H.S.T. in a sealed envelope/package/box and marked in the bottom right corner "SMALL BUSINESS AND
SUBCONTRACTING PLAN SUBMITTED UNDER RFP N62742-25-R-1319 - DO NOT OPEN IN
MAILROOM." Identify the original proposal as "Original" on the cover of the proposal.
(1) All information required by Factor 3, Small Business Utilization and Participation
(2) All information required by 1.7, Small Business Subcontracting Plan
d. PRICE AND NON-PRICE PROPOSAL PROPOSALS (ELECTRONIC): An electronic copy of the price and non-price proposal proposals shall be submitted in .pdf format on a CD-ROM with the paper copy of the
RFP N62742-25-R-1319
AMENDMENT 0009
DOCUMENT 00 21 16
subcontracting plan. The offeror is responsible for ensuring that all original paper and electronic copies are identical. Should there be a discrepancy between the paper and electronic versions, the paper copy shall govern.
e. Proposals shall be submitted as follows:
(1) If sent via U. S. Postal Mail/Express Courier:
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC
Construction Contracts Branch (CON33) 258 Makalapa Drive, Suite 100 Pearl Harbor, HI 96860-3134
(2) If hand-carried (Delivery hours between 7:00 AM and 2:00 PM, Monday through Friday except Federal Holidays)
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC
Construction Contracts Branch (CON33) 4256 Radford Drive, Building 62 (if facing the building office is on the right. DO NOT drop off at the Navy Federal Credit Union) Honolulu, HI 96818-3296
1.2 INSTRUCTIONS FOR OBTAINING THE REQUEST FOR PROPOSAL
The RFP can be accessed at https://sam.gov. Printed copies of the RFP will not be issued. There are two volumes of specifications and drawings issued for this RFP. Volume 1 for the construction of the entire facility, and Volume 2 is for the construction of a secure space within the facility. Consequently, the Volume 2 specifications and drawings are marked “CONTROLLED UNCLASSIFIED INFORMATION” and will only be released to the U.S.
Citizens of U.S. firms.
RFP Volume 2
Volume 2 will only be released as an amendment to U.S. Citizens of a U.S. Firm. All contractor personnel handling and accessing the Volume 2 documents must be vetted as a U.S. Citizen prior to receiving any Volume 2 documents.
Submit U.S. Citizen Certifications with proof of U.S. Citizenship and signed Non-Disclosure Agreements to Ms.
Merbby Corpuz at merbbyjoyce.n.corpuz.civ@us.navy.mil and Ms. Adele Murakami at adele.m.murakami.civ@us.navy.mil.
Approved individuals must register at the SAM website to obtain access to the RFP. Registration instructions can be found on the SAM website. Once registered in SAM, approved individuals who received email notification of their vetting being approved must request explicit access to view the documents. NOTE: Requests for explicit access to controlled documents on the SAM website, shall only be submitted after receipt of email notification of approved vetting. A request for explicit access may be rejected if the individual’s vetting is pending or has not yet been submitted. An email from SAM.gov will be forwarded once the contracting office has approved or declined the request. Approved individuals may view and/or download the RFP Volume 2 documents.
The NAVFAC drawings and specifications are marked "CONTROLLED UNCLASSIFIED INFORMATION"; therefore, the NAVFAC drawings and specifications are considered "Covered Defense Information.”
Additionally, all subcontractors (at any tier) and suppliers intending to submit a quote for the Volume 2 work on the secure space must be vetted as a U.S. Firm and personnel vetted as U.S. citizens before receiving any Volume 2 documents. Submit the U.S. Firm Certification form and the U.S. Citizen Certification form with proof of U.S.
RFP N62742-25-R-1319
AMENDMENT 0009
DOCUMENT 00 21 16
Citizenship and signed Non-Disclosure Agreement to Prime Contractor Point-of-Contact and send to Ms. Merbby Corpuz at merbbyjoyce.n.corpuz.civ@us.navy.mil and Ms. Adele Murakami at adele.m.murakami.civ@us.navy.mil.
Firms and personnel may not be vetted if forms are submitted less than seven (7) calendar days prior to the proposal due date. Late submission of vetting forms may result in delays in receiving the Volume 2 documents. Prime contractor proposal manager shall be responsible for distributing the RFP to eligible subcontractors and suppliers whose forms have been received and who have been vetted.
Note: Prime Contractor shall designate a primary Point-of-Contact who will be responsible for managing and submitting the required forms and proof of U.S. Citizenship for its employees and subcontractor/supplier firms and employees and to liaison with the Government. Forms shall be submitted in alphabetical order first by Firm Name and then alphabetically by Last Name of individuals of the firm. Also, a List of Personnel for each shall be submitted.
1.3 INSTRUCTIONS FOR SUBMITTING QUESTIONS REGARDING SOLICITATION
Questions regarding the solicitation shall be submitted in writing in WORD format via electronic mail to Ms.
Merbby Corpuz at merbbyjoyce.n.corpuz.civ@us.navy.mil and Ms. Adele Murakami at adele.m.murakami.civ@us.navy.mil. Questions shall be separated between the non-CUI and the Fixed Facility (CUI) and reference the drawing/detail and/or the specification section including paragraph number. Verbal queries will not be entertained. Responses to the questions will be provided in the form of a Notice and posted to the web site https://sam.gov. The Government may not respond to questions submitted less than 10 business days before the proposal receipt due date.
1.4 AMENDMENTS
Amendments will be posted to https://sam.gov. It is highly recommended that firms register on the SAM website as an interested vendor as this will be the only planholder’s list available. It is the offeror's responsibility to check the website periodically for any amendments to the solicitation.
1.5 PREAWARD SURVEY/RESPONSIBILITY DETERMINATION
FAR §9.104 requires prospective contractors to demonstrate, among other things, that they have adequate financial resources to perform the contract or the ability to obtain them, capability to comply with the required performance schedule, a satisfactory performance record, and be otherwise eligible to receive an award under applicable laws and regulations. The pre-award survey is not a part of the technical evaluation. The following information shall be submitted:
a. The offeror shall submit a document that appoints, in writing, one or more individuals, by name, each of whom will have full and independent authority to bind the offeror with respect to any act connected with this solicitation, including but not limited to: the submission and revisions of a proposal or proposals by the company, the conduct of discussion or negotiations, the submission of a Final Proposal Revision (FPR), and the execution of a contract and associated documents including bonds. Documents of appointment by a supporting resolution of the board of directors in the case of a corporation and by an instrument of similarly binding character in the case of an unincorporated entity. If bonds are not signed manually (wet signature), documents of appointment must include specific authorization and corporate approval for the use of electronic and facsimile signatures by the appointed individual(s).
b. Company financial statements (balance sheets and income statements) for past three years.
RFP N62742-25-R-1319
AMENDMENT 0009
DOCUMENT 00 21 16
c. Financial resources available to perform the contract. Submit evidence of availability of working/operating capital that will be used for the performance of the contract. If the offeror plans to rely on financial support from other sources, identify the maximum lines of credit that will be available to include documentation to support the amounts. The maximum lines of credit should be based upon the inclusion of this contract effort. For joint ventures discuss the financial responsibilities for each partner.
d. Newly-formed entities (e.g. limited liability companies (“LLC’s”), limited partnerships (“LTD’s”) and newly-created corporate subsidiaries) that is the entity liable for the contract ordinarily have no financial capability to support a responsibility determination. In such cases, the offeror may rely on the resources of the LLC member, parent, limited partner, or other entities related to the offeror for responsibility purposes where the offer submits a guaranty from the entity providing the resources. The offeror shall provide a guaranty agreement (See Form DCMA Form 1620 attached) for the contract price.
e. A list of existing commercial and government business commitments to include contract numbers, names of Contracting Officers, telephone numbers, value of contract, completion date and percent complete. If the list of existing commitments is extensive, provide the required information on at least five projects of similar dollar value and a summary of the existing commitments to include number of contracts, total dollar value of all contracts, and total dollar value of work remaining.
f. Copy of the email confirmation of receipt notification of successful submission of the VETS-4212.
g. As a part of the pre-award survey, the contracting officer will verify that summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) are posted in the Supplier Performance Risk Assessment (SPRS) (https://www.sprs.csd.disa.mil/) (see DFARS 252.204-7019, Notice of NIST SP 800-171 DoD Assessment Requirements (MAR 2022)) prior to award.
At minimum, a current Basic NIST SP 800-171 DoD Assessment is required prior to award.
The information submitted for the pre-award survey will not be considered in the non-price proposal evaluation unless separately submitted pursuant to the non-price proposal evaluation factor submission requirements.
1.6 PARTNERSHIPS, JOINT VENTURES (JV), LIMITED LIABILITY COMPANIES (LLC), LIMITED
PARTNERSHIPS (LP), ETC.
Partnerships, Joint Ventures, Limited Liability Companies, Limited Partnerships and Mentor-Protégé arrangements shall submit the following documentation regarding their business entities:
a. A copy of the Partnership Agreement, JV Agreement(s), LLC Operating Agreement(s), LP Agreement(s), and/or Mentor-Protégé Agreement(s). Contractor shall provide an updated copy whenever any change is made to the agreement.
b. The proposal and each bond or other document submitted by or on behalf of the joint venture shall be executed by each joint venture partner and shall be accompanied by evidence of the authority of the signer. That authority shall be evidenced by a document satisfactory to the Contracting Officer, which would ordinarily be, in the case of a corporate joint venture partner, a certified copy of a resolution of the board of directors, and in the case of an unincorporated joint venture partner, an instrument of similarly binding character duly executed by that entity. If one individual signs for more than one partner, the individual must sign separately for each partner which he or she represents, and must state under each signature the capacity in which he or she is signing (See FAR 4.102).
c. Identify (by name and title) the personnel having the authority to legally bind the Offeror (including authority to execute the contract documents and bonds).
RFP N62742-25-R-1319
AMENDMENT 0009
DOCUMENT 00 21 16
d. Procedures in the event the entity is dissolved.
e. A detailed statement outlining the following in terms of percentages where appropriate:
(1) The relationship of the partners/parties in terms of business ownership, capital contribution, profit distribution or loss sharing.
(2) The management approach in terms of who will conduct, direct, supervise, control, and the controlling partner’s authority to obligate the entity.
(3) The structure and decision-making responsibilities of the partners/parties in terms of who will control the manner and method of performance of work.
f. Joint Ventures shall submit the following additional documentation regarding their business entities:
(1) Together with its proposal, each corporate joint venture partner shall submit evidence satisfactory to the Contracting Officer that its board of directors has approved its participation in the joint venture. Such evidence shall be in the form of a copy of a resolution of the board of directors, certified by the Secretary of the Corporation.
(2) Together with its proposal, each joint venture partner which is an unincorporated entity shall submit evidence satisfactory to the Contracting Officer that all persons or entities which must approve decisions affecting the joint venture partner have approved the participation of the joint venture partner in the joint venture.
1.7 SUBCONTRACTING PLAN
NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition.
Offerors representing as other than small businesses shall establish Small Business Subcontracting Plan goals that are consistent with their Small Business Participation Commitment Document submitted for evaluation under the Small Business Participation source selection factor in this solicitation and shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.
SB 40%
SDB 5%
HUBZone SB 3%
WOSB 9%
SDVOSB 3%
Small businesses identified by name in offerors’ Small Business Participation Commitment Document and considered in the evaluation shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with 252.219-7003(e). There shall be no discrepancies between the Small Business Participation Commitment Document (Document 00 22 00, Non-Price Evaluation Factor 3, Small Business Utilization and Participation, Attachment D) and small business subcontracting plan.
c. See the Small Business Subcontracting Plan (Template) at the end of Document 00 21 16 for format.
1.8 COMPLEMENTARY PRICING INFORMATION
Offeror’s are requested to submit the attached Complementary Pricing Information (Template) at the end of Document 00 21 16 with its proposal. The Complementary Pricing Information is for Government information only and will not be used for the Price Evaluation specified in Document 00 22 00.
RFP N62742-25-R-1319
AMENDMENT 0009
DOCUMENT 00 21 16
1.9 FAR 52.204-7, SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(a) Definitions. As used in this provision—
“Electronic Funds Transfer (EFT) indicator” means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) means that–
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into the SAM;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record “Active”.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b) (1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “Unique Entity Identifier” followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in the SAM.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
RFP N62742-25-R-1319
AMENDMENT 0009
DOCUMENT 00 21 16
(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.
1.10 FAR 52.204-16, COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)
(a) Definition. As used in this provision –
Commercial and Government Entity (CAGE) code means–
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
(b) The Offeror shall provide its CAGE code with its offer with its name and location address or otherwise include it prominently in its proposal. The CAGE code must be for that name and location address. Insert the word “CAGE” before the number. The CAGE code is required prior to award.
(c) CAGE codes may be obtained via–
(1) Registration in the System for Award Management (SAM) at www.sam.gov. If the Offeror is located in the United States or its outlying areas and does not already have a CAGE code assigned, the DLA Commercial and Government Entity (CAGE) Branch will assign a CAGE code as a part of the SAM registration process. SAM registrants located outside the United States and its outlying areas shall obtain a NCAGE code prior to registration in SAM (see paragraph (c)(3) of this provision).
(2) The DLA Contractor and Government Entity (CAGE) Branch. If registration in SAM is not required for the subject procurement, and the Offeror does not otherwise register in SAM, an Offeror located in the United States or its outlying areas may request that a CAGE code be assigned by submitting a request at https://cage.dla.mil.
(3) The appropriate country codification bureau. Entities located outside the United States and its outlying areas may obtain an NCAGE code by contacting the Codification Bureau in the foreign entity's country if that country is a member of NATO or a sponsored nation. NCAGE codes may be obtained from the NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx if the foreign entity’s country is not a member of NATO or a sponsored nation. Points of contact for codification bureaus, as well as additional information on obtaining NCAGE codes, are available at http://www.nato.int/structur/AC/135/main/links/contacts.htm.
(d) Additional guidance for establishing and maintaining CAGE codes is available at https://cage.dla.mil.
(e) When a CAGE code is required for the immediate owner and/or the highest-level owner by Federal Acquisition Regulation (FAR) 52.204-17 or 52.212-3(p), the Offeror shall obtain the respective CAGE code from that entity to supply the CAGE code to the Government.
(f) Do not delay submission of the offer pending receipt of a CAGE code.
(g) If the solicitation includes FAR clause 52.204-2, Security Requirements, a subcontractor requiring access to classified information under a contract shall be identified with a CAGE code on the DD Form 254. The Contractor
RFP N62742-25-R-1319
AMENDMENT 0009
DOCUMENT 00 21 16
shall require a subcontractor requiring access to classified information to provide its CAGE code with its name and location address or otherwise include it prominently in the proposal. Each location of subcontractor performance listed on the DD Form 254 is required to reflect a corresponding unique CAGE code for each listed location unless the work is being performed at a Government facility, in which case the agency location code shall be used. The CAGE code must be for that name and location address. Insert the word “CAGE” before the number. The CAGE code is required prior to award.
1.11 FAR 52.211-6, BRAND NAME OR EQUAL (AUG 1999)
(a) If an item in this solicitation is identified as “brand name or equal,” the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation.
(b) To be considered for award, offers of “equal” products, including “equal” products of the brand name manufacturer, must—
(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;
(2) Clearly identify the item by—
(i) Brand name, if any; and
(ii) Make or model number;
(3) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and
(4) Clearly describe any modification the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modification.
(c) The Contracting Officer will evaluate “equal” products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.
(d) Unless the offeror clearly indicates in its offer that the product being offered is an “equal” product, the offeror shall provide the brand name product referenced in the solicitation.
1.12 FAR 52.211-14, NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY
PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be _ DX rated order; X DO-C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.
1.13 FAR 52.214-34, SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.
1.14 FAR 52.214-35, SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
RFP N62742-25-R-1319
AMENDMENT 0009
DOCUMENT 00 21 16
Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.
dollars shall be rejected.
1.15 FAR 52.215-1, INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)
(a) Definitions. As used in this provision-
Discussions are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
In writing, "writing," or "written" means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
Proposal modification is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
Proposal revision is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
Time, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show–
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
RFP N62742-25-R-1319
AMENDMENT 0009
DOCUMENT 00 21 16
(3) Submission, modification, revision, and withdrawal of proposals. (i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii) (A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
RFP N62742-25-R-1319
AMENDMENT 0009
DOCUMENT 00 21 16
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall-
(1) Mark the title page with the following legend:
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed-in whole or in part-for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of-or in connection with-the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award. (1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government’s interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial products, the make and model of the product to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
1.16 FAR 52.215-22, LIMITATIONS ON PASS-THROUGH CHARGES – IDENTIFICATION OF
SUBCONTRACT EFFORT (OCT 2009)
(a) Definitions. “Added value, excessive pass-through charge, subcontract, and subcontractor,” as used in this provision, are defined in the clause of this solicitation entitled “Limitations on Pass-Through Charges” (FAR 52.215-23).
(b) General. The offeror’s proposal shall exclude excessive pass-through charges.
(c) Performance of work by the Contractor or a subcontractor.
(1) The offeror shall identify in its proposal the total cost of the work to be performed by the offeror, and the total cost of the work to be performed by each subcontractor, under the contract, task order, or delivery order.
(2) If the offeror intends to subcontract more than 70 percent of the total cost of work to be performed under the contract, task order, or delivery order, the offeror shall identify in its proposal—
(i) The amount of the offeror’s indirect costs and profit/fee applicable to the work to be performed by the subcontractor(s); and
(ii) A description of the added value provided by the offeror as related to the work to be performed by the subcontractor(s).
(3) If any subcontractor proposed under the contract, task order, or delivery order intends to subcontract to a lower-tier subcontractor more than 70 percent of the total cost of work to be performed under its subcontract, the offeror shall identify in its proposal—
(i) The amount of the subcontractor’s indirect costs and profit/fee applicable to the work to be performed by the lower-tier subcontractor(s); and
(ii) A description of the added value provided by the subcontractor as related to the work to be performed by the lower-tier subcontractor(s).
1.17 FAR 52.216-1, TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm-fixed price contract resulting from this solicitation.
1.18 FAR 52.217-5, EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
1.19 FAR 52.222-23, NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offerors attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation Goals for female for each trade participation for each trade
0 6.9
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246 as amended, and the regulations in 41 CFR 60.4 shall be based on its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. T he Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .