This document is a pre-solicitation notice for a federal contract opportunity for the construction (design-bid-build) of a Guam Defense Radar System Command Center, power generation facility, and associated infrastructure. The project includes demolition, civil site work, concrete construction, antenna tower installation, seismic isolation, security infrastructure, control system integration, and other electrical, telecommunications, and utility work. The solicitation number is N6274225R1301 and the contract is estimated to be between $250-500 million. The NAICS code is 236220 with an average annual receipts threshold of $45 million. The contract completion period is anticipated to be 1,323 calendar days. The procurement will be a best-value tradeoff using technical factors including experience, small business utilization, safety, management plan, and past performance. The Request for Proposal is anticipated to be available around October 30, 2024, and a pre-proposal site visit is scheduled for December 11, 2024. Award will be made to the responsible offeror whose proposal meets or exceeds the acceptability standards for the technical factors and has the lowest evaluated price.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
VOLUME II of II
(DIV 23-34)
NAVFAC CONTRACT NO. N62742-25-C-1301
A-E CONTRACT NO. N62478-20-D-5036
Date: 10/7/2024
Project 693 EIAMD Site 14 (Final Design Submittal) Work Order No. 1812861
Project 693 EIAMD SITE 14 (100% Submittal) 43393SITE14
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15.00 14 02/11, CHG 1: 08/14 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 14 02/24 SUMMARY OF WORK
01 14 00.00 14 11/22, CHG 2: 05/24 WORK RESTRICTIONS
01 20 00.00 14 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES
01 30 00.00 14 11/20, CHG 3: 08/23 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 14 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
01 32 17.20 14 11/23 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 14 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 13.04 14 CES 04/23 INDUSTRIAL CONTROL SYSTEMS PROCUREMENT
FOR AIR FORCE CONTROL SYSTEMS
01 35 26.00 14 05/24 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 14 08/23, CHG 1: 05/24 QUALITY CONTROL
01 45 35.00 14 05/24 SPECIAL INSPECTIONS
01 50 00.00 14 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 14 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 14 08/21 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS
01 57 19.03 14 08/22 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS MUNITIONS RESPONSE EXPLOSIVES
SAFETY SUBMISSION (MRESS) GUAM
CONSTRUCTION SUPPORT
01 58 00.00 14 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19.00 14 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00.00 14 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23.00 14 05/23 OPERATION AND MAINTENANCE DATA
01 78 24.20 14 05/23, CHG 1: 11/23 FACILITY DATA WORKBOOK (FDW)
01 91 00.15 14 05/23, CHG 2: 11/23 BUILDING COMMISSIONING
01 91 19.00 14 05/23 BUILDING ENCLOSURE COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00.00 14 08/22 DEMOLITION
02 61 13.00 14 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL
02 81 00.00 14 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00.00 14 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 83 00.00 14 11/18 LEAD REMEDIATION
02 84 16.00 14 11/22 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 84 33.00 14 11/22 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
PROJECT TABLE OF CONTENTS Page 1
03 30 00.00 14 02/19, CHG 7: 02/24 CAST-IN-PLACE CONCRETE
03 45 00.00 14 05/16, CHG 2: 11/21 PRECAST ARCHITECTURAL CONCRETE
03 45 33.00 14 05/16, CHG 1: 11/21 PRECAST PRESTRESSED STRUCTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00.00 14 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20.00 14 05/22 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.16 14 08/18 STRUCTURAL WELDING
05 12 00.00 14 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 40 00.00 14 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13.00 14 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 00.00 14 08/23 METAL STAIRS
05 52 00.00 14 08/23 METAL RAILINGS
05 72 00.00 14 08/23 DECORATIVE METAL SPECIALTIES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00.00 14 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 20 00.00 14 08/16 FINISH CARPENTRY
06 41 16.10 14 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16.00 14 08/20 SOLID SURFACING FABRICATIONS
06 73 01.00 14 08/23 FIBERGLASS REINFORCED PLASTIC (FRP)
GRATING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00.00 14 08/23 FLUID-APPLIED WATERPROOFING
07 21 13.00 14 08/23 BOARD AND BLOCK INSULATION
07 27 10.00 14 08/23 BUILDING AIR BARRIER SYSTEM
07 27 36.00 14 08/23 SPRAY FOAM INSULATION
07 57 12.00 14 03/20 LIQUID APPLIED ELASTOMERIC SILICONE
ROOFING COATING
07 60 00.00 14 08/23 FLASHING AND SHEET METAL
07 84 00.00 14 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00.00 14 08/23 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13.00 14 08/20 STEEL DOORS AND FRAMES
08 11 14.00 14 05/24 HARDENED EXTERIOR DOOR SYSTEMS
08 11 16.00 14 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 14 00.00 14 08/16, CHG 1: 08/18 WOOD DOORS
08 31 00.00 14 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 34 01.00 14 02/24 FORCED ENTRY RESISTANT COMPONENTS
08 34 02.00 14 08/09 BULLET-RESISTANT COMPONENTS
08 34 73.00 14 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 41 13.00 14 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 71 00.00 14 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00.00 14 05/19 GLAZING
08 91 00.00 14 08/20 METAL WALL AND DOOR LOUVERS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 09 - FINISHES
09 22 00.00 14 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00.00 14 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10.00 14 08/20 CERAMIC AND PORCELAIN TILING
09 51 00.00 14 08/20 ACOUSTICAL CEILINGS
09 62 38.00 14 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 65 00.00 14 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00.00 14 11/17, CHG 2: 08/20 CARPETING
09 69 13.00 14 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING
09 84 20.00 14 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS
09 90 00.00 14 02/21 PAINTS AND COATINGS
09 96 00.00 14 11/14 HIGH-PERFORMANCE COATINGS
09 96 53.13 14 06/20 SILICONE ELASTOMERIC COATINGS
DIVISION 10 - SPECIALTIES
10 11 00.00 14 08/20 VISUAL DISPLAY UNITS
10 14 00.10 14 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 14 08/20 INTERIOR SIGNAGE
10 21 13.00 14 08/20 TOILET COMPARTMENTS
10 22 13.00 14 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS
10 22 39.00 14 08/20 FOLDING PANEL PARTITIONS
10 26 00.00 14 08/20 WALL AND DOOR PROTECTION
10 28 13.00 14 08/20 TOILET ACCESSORIES
10 44 16.00 14 11/19 FIRE EXTINGUISHERS AND CABINETS
10 51 13.00 14 05/11 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 00 01.20 14 02/23 FURNITURE, FIXTURES AND EQUIPMENT
(FF&E) PACKAGE
12 48 13.00 14 08/23 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 14 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION
12 59 00.00 14 08/17, CHG 1: 08/18 SYSTEMS FURNITURE
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 60.00 14 06/24 SEISMIC ISOLATION SYSTEM (SIS)
13 48 73.00 14 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
EQUIPMENT
13 49 20.00 14 10/07 RF SHIELDING
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 14 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 22 00.00 14 05/11 CLEAN AGENT FIRE EXTINGUISHING SYSTEM
DIVISION 22 - PLUMBING
22 00 00.00 14 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 31 00.00 14 02/09 WATER SOFTENERS, CATION-EXCHANGE
(SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 48.19 14 05/18, CHG 2: 08/20 SEISMIC BRACING FOR MECHANICAL
23 05 93.00 14 11/15 TESTING, ADJUSTING, AND BALANCING FOR
PROJECT TABLE OF CONTENTS Page 3
HVAC
23 07 00.00 14 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00.00 14 05/23 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00.00 14 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13.00 14 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 14 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 21 23.00 14 08/17 HYDRONIC PUMPS
23 25 00.00 14 05/21 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00.00 14 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 64 10.00 14 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26.00 14 08/09, CHG 7: 02/24 CHILLED WATER PIPING SYSTEM
23 81 00.00 14 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23.00 14 11/20 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.71 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - FIRE AND LIFE SAFETY
SYSTEM
25 05 11.72 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - BUILDING CONTROL
SYSTEM
25 05 11.73 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - POWER CONTROL
MONITORING SYSTEM
25 05 11.74 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - POWER QUALITY
MONITORING SYSTEM
25 05 11.75 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - UTILITY CONTROL
SYSTEM
25 05 11.76 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - PETROLEUM OIL AND
LUBRICANTS DISTRIBUTION AND STORAGE
SYSTEM
25 05 11.77 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - FUEL LEAK DETECTION
SYSTEM
25 10 10.00 14 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
25 10 11.00 14 04/06 POWER QUALITY MONITORING SYSTEM (PQMS)
25 10 12.00 14 04/06 POWER CONTROL AND MONITORING SYSTEM
(PCMS)
DIVISION 26 - ELECTRICAL
26 05 48.00 14 10/07 SEISMIC PROTECTION FOR ELECTRICAL
26 05 73.00 14 08/23 POWER SYSTEM STUDIES
26 08 00.00 14 11/22 APPARATUS INSPECTION AND TESTING
26 11 10.00 14 POWER SYSTEMS SEQUENCE OF OPERATIONS
26 12 19.10 14 05/19, CHG 2: 11/23 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 13 00.00 14 05/21, CHG 1: 05/22 HIGH-FIREPOINT FLUIDS INSULATED
PAD-MOUNTED SWITCHGEAR
PROJECT TABLE OF CONTENTS Page 4
26 13 13.00 14 11/21 METAL-CLAD SWITCHGEAR
26 20 00.00 14 08/23 INTERIOR DISTRIBUTION SYSTEM
26 20 02.00 14 02/24 POWER DISTRIBUTION UNIT (PDU)
26 23 00.00 14 02/24 LOW-VOLTAGE SWITCHGEAR
26 24 13.00 14 08/21 SWITCHBOARDS
26 27 14.20 14 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 29 23.00 14 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15.00 14 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 32 34.00 14 10/07 INVERTER SYSTEM ABOVE 15 KVA CAPACITY
26 33 53.00 14 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 35 43.00 14 08/21 400-HERTZ (HZ) SOLID STATE FREQUENCY
CONVERTER
26 36 23.00 14 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 40 00.00 14 01/24 STATIC TRANSFER SWITCH WITH BYPASS
(STATIC AUTOMATIC BUS TRANSFER (SABT)
SWITCH) 100 AMP - 600 AMP
26 41 00.00 14 08/23 LIGHTNING PROTECTION SYSTEM
26 51 00.00 14 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 55 53.00 14 11/23 SECURITY LIGHTING
26 56 00.00 14 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00.00 14 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 41 00.00 14 11/21 AUDIO-VISUAL SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05.00 14 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 70.00 14 08/20 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
28 31 76.00 14 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
28 31 80.00 14 08/20 WIDE AREA MASS NOTIFICATION SYSTEM
EXPANSION
DIVISION 31 - EARTHWORK
31 00 00.00 14 08/23 EARTHWORK
31 21 13.00 14 11/18 RADON MITIGATION
31 31 16.19 14 08/22 TERMITE CONTROL BARRIERS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 14 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33.00 14 08/17 LANDSCAPE ESTABLISHMENT
32 11 20.00 14 05/22 BASE COURSE FOR RIGID PAVING AND
SUBBASE FOR FLEXIBLE PAVING
32 11 23.00 14 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING
32 12 13.00 14 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 14 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 14 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 13 73.19 14 11/19 COMPRESSION CONCRETE PAVING JOINT
PROJECT TABLE OF CONTENTS Page 5
SEALANT
32 15 00.00 14 05/17 AGGREGATE SURFACING
32 16 19.00 14 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23.00 14 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13.00 14 11/21 CHAIN LINK SECURITY FENCES AND GATES
32 31 13.53 14 11/21 RESTRICTED AREA SECURITY FENCE
32 84 24.00 14 08/11, CHG 1: 05/17 TEMPORARY IRRIGATION SPRINKLER SYSTEMS
32 92 19.00 14 08/17, CHG 1: 08/21 SEEDING
32 93 00.00 14 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 01 50.31 14 02/20 LEAK DETECTION FOR FUELING SYSTEMS
33 08 55.00 14 08/19 FUEL DISTRIBUTION SYSTEM START-UP
(NON-HYDRANT)
33 09 52.00 14 11/18 FUEL PUMP CONTROL AND ANNUNCIATION
SYSTEM (NON-HYDRANT)
33 11 00.00 14 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING
33 30 00.00 14 05/18 SANITARY SEWERAGE
33 40 00.00 14 11/21 STORMWATER UTILITIES
33 52 23.15 14 11/18 POL SERVICE PIPING WELDING
33 52 40.00 14 11/18, CHG 2: 11/20 FUEL SYSTEMS PIPING (NON-HYDRANT)
33 56 10.00 14 05/19, CHG 1: 11/20 FACTORY-FABRICATED FUEL STORAGE TANKS
33 57 55.00 14 11/18, CHG 1: 11/20 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 71 02.00 14 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 71 04.00 14 03/22 SELF SUPPORT TOWER
33 82 00.00 14 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 - TRANSPORTATION
34 75 13.13 14 02/22 CRASH RATED ACTIVE AND PASSIVE VEHICLE
BARRIERS AND CONTROLS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 6
SECTION 23 05 48.19 14
SEISMIC BRACING FOR MECHANICAL
05/18, CHG 2: 08/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 355.2 (2007) Qualification of Post-Installed Mechanical Anchors in Concrete and Commentary
ACI 355.4 (2011) Qualification of Post-Installed Adhesive Anchors in Concrete (ACI 355.4) and Commentary
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 325 (2017) Steel Construction Manual
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C105/A21.5 (2018) Polyethylene Encasement for Ductile-Iron Pipe Systems
AWWA C116/A21.16 (2015) Protective Fusion-Bonded Coatings for the Interior and Exterior Surfaces of Ductile-Iron and Gray Iron Fittings
AWWA C153/A21.53 (2019) Ductile-Iron Compact Fittings for Water Service
AWWA C213 (2022) Fusion-Bonded Epoxy Coatings and Linings for Steel Water Pipe and Fittings
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A53/A53M (2024) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A153/A153M (2023) Standard Specification for Zinc
SECTION 23 05 48.19 14 Page 1
Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A325 (2014) Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength
ASTM A490 (2014a) Standard Specification for Structural Bolts, Alloy Steel, Heat Treated, 150 ksi Minimum Tensile Strength
ASTM A500/A500M (2023) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A536 (1984; R 2019; E 2019) Standard Specification for Ductile Iron Castings
ASTM A563 (2021; E 2022a) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A603 (2019) Standard Specification for Zinc-Coated Steel Structural Wire Rope
ASTM D1785 (2015; E 2018) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
ASTM D2665 (2014) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings
ASTM E488/E488M (2022) Standard Test Methods for Strength of Anchors in Concrete Elements
ASTM F891 (2023) Standard Specification for Coextruded Poly (Vinyl Chloride) (PVC) Plastic Pipe with a Cellular Core
ASTM F1554 (2020) Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength
FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA)
FEMA P-414 (January 2004) Installing Seismic Restraints for Duct and Pipe
ICC EVALUATION SERVICE, INC. (ICC-ES)
ICC ES AC156 (2012) Acceptable Criteria for Seismic Certification by Shake-Table Testing of Nonstructural Components
ICC ES AC193 (2012) Acceptance Criteria for Mechanical Anchors in Concrete Elements
SECTION 23 05 48.19 14 Page 2
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2024) International Building Code
METAL FRAMING MANUFACTURERS ASSOCIATION (MFMA)
MFMA-4 (2004) Metal Framing Standards Publication
NSF INTERNATIONAL (NSF)
NSF/ANSI 61 (2022) Drinking Water System Components - Health Effects
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1981 (2008) Seismic Restraint Manual Guidelines for Mechanical Systems, 3rd Edition
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-301-01 (2023; with Change 1, 2023) Structural Engineering
UFC 4-010-01 (2018; with Change 3, 2024) DoD Minimum Antiterrorism Standards for Buildings
VIBRATION ISOLATION AND SEISMIC CONTROL MANUFACTURERS ASSOCIATION
(VISCMA)
VISCMA 412 (2014) Installing Seismic Restraints for Mechanical Equipment
1.2 SYSTEM DESCRIPTION
1.2.1 General Requirements
Apply the requirements for seismic protection measures described in this section and on the drawings to the mechanical equipment and mechanical systems both inside and outside of the building along with exterior utilities and systems listed below. Where there is a conflict between the specifications and the drawings, the specifications will take precedence.
Accomplish resistance to lateral forces induced by earthquakes without consideration of friction resulting from gravity loads.
1.2.2 Mechanical Equipment
Install the following mechanical systems as required on the drawings and other sections of these specifications and seismically protect them in accordance with this specification. In addition to being braced for life safety, mechanical systems with an Ip greater than 1.0 must be required to perform post-earthquake conditions.
Equipment/Components/Systems with Ip = 1.0
Command Center
Water Heaters Non-DSS Exhaust Fans
SECTION 23 05 48.19 14 Page 3
Domestic Water Booster Pumps Domestic Water Hydro-Pneumatic Tank Water Softener Potable Water Sanitary Sewer
Power Plant
Lube Oil System Radon Piping
Equipment/Components/Systems with Ip = 1.5 (Designated Seismic Systems -
DSS).
Command Center Storage Tanks for Water Chillers Fan Coil Units Condensing Unit Energy Wheel
Battery Exhaust Fans Clean Agent Exhaust Fans Air Handling Units Chilled Water Pumps Expansion Tanks Air Separators VAV Boxes Computer Room Air Conditioners Chilled Water Supply Air Underfloor Air Fire Protection Sprinkler
Power Plant Storage Tanks for Fuel Oil Fan Coil Units Fan Coil Unit Condensing Unit Exhaust Fans Air Handling Units Air Handling Unit Condensing Unit Pumps Computer Room Air Conditioners Generators Generator Accessories Fuel Coolers Lube Oil System Fuel Oil System
Air Handling System Exhaust System Refrigerant System Fire Protection Sprinkler System
UL
Fuel Conveyance System Pumps
1.2.3 Contractor Designed Bracing
Submit copies of the Contractor Designed Bracing for CC, and Contractor Designed Bracing for PP design calculations with the drawings.
SECTION 23 05 48.19 14 Page 4
Calculations must be approved, certified, stamped and signed by a registered Professional Structural Engineer. Calculations must verify the capability of structural members to which bracing is attached for carrying the load from the brace. Design the bracing in accordance with UFC 3-301-01 , UFC 4-010-01 , and additional data furnished by the Contracting Officer. For the equipment and systems installed above the Seismic Isolation System interface in the Command Center, the horizontal force may be determined using Attachment A Command Center In-Structure Response Spectra to Section 13 48 73.00 14 SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT and Section 13.3.1.4 of ASCE 7-16 with an Ip=1.0 and the vertical force to be determined using +/- (0.67)*(Sds)*(Wp).
Resistance to lateral forces induced by earthquakes must be accomplished without consideration of friction resulting from gravity loads.
UFC 3-301-01 uses parameters for the building, not for the equipment in the building; therefore, corresponding adjustments to the formulas must be required. Loadings determined using UFC 3-301-01 are based on strength design; therefore, AISC 325 Specifications must be used for the design.
The bracing for the mechanical equipment designated in paragraph 1.2.2 and systems designated in paragraph 1.2.3 must be developed by the Contractor.
1.2.4 Contractor Designed Bracing and Anchorage
Seismic bracing is required for all mechanical systems and equipment, and other nonstructural building components as required by UFC 3-301-01 .
Bracing supports not shown on the drawings must be designed, detailed, fabricated, constructed, and inspected according to UFC 3-301-01 and all reference standard contained herein. Submit details for the following equipment:
Contractor Designed Bracing and Anchorage for Command Center (CC) Contractor Designed Bracing and Anchorage for Domestic Water Booster
Pumps (CC) Contractor Designed Bracing and Anchorage for Domestic Water
Hydro-Pneumatic Tank (CC) Contractor Designed Bracing and Anchorage for Water Softener(CC) Contractor Designed Bracing and Anchorage forNon-DSS Exhaust Fans (CC) Contractor Designed Bracing and Anchorage for Exhaust System (PP) Contractor Designed Bracing and Anchorage for Fuel Conveyance System
(UL)
Contractor Designed Bracing and Anchorage for Potable Water (CC) Contractor Designed Bracing and Anchorage for Potable Water (PP) Contractor Designed Bracing and Anchorage for Pumps (PP) Contractor Designed Bracing and Anchorage for Pumps (UL) Contractor Designed Bracing and Anchorage for Radon Piping (PP) Contractor Designed Bracing and Anchorage for Refrigerant System (PP) Contractor Designed Bracing and Anchorage for Sanitary Sewer (CC) Contractor Designed Bracing and Anchorage for Sanitary Sewer (PP) Contractor Designed Bracing and Anchorage for Storage Tanks for Fuel
Oil (PP) Contractor Designed Bracing and Anchorage for Water Heaters (CC)
Contractor Designed Bracing and Anchorage for Air Exhaust Duct (CC) Contractor Designed Bracing and Anchorage for Air
Handling/Distribution (CC) Contractor Designed Bracing and Anchorage for Air Handling (PP) Contractor Designed Bracing and Anchorage for Air Handling Unit
Condensing Unit (PP)
SECTION 23 05 48.19 14 Page 5
Contractor Designed Bracing and Anchorage for Air Handling Units (CC) Contractor Designed Bracing and Anchorage for Air Handling Units (PP)
Contractor Designed Bracing and Anchorage for Air Separators (CC) Contractor Designed Bracing and Anchorage for Battery Exhaust Fans (CC) Contractor Designed Bracing and Anchorage for Chilled Water (CC) Contractor Designed Bracing and Anchorage for Chilled Water Pumps (CC) Contractor Designed Bracing and Anchorage for Chillers (CC) Contractor Designed Bracing and Anchorage for Clean Agent Exhaust Fans
(CC)
Contractor Designed Bracing and Anchorage for Computer Room Air
Conditioners (CC) Contractor Designed Bracing and Anchorage for Condensing Unit (CC) Contractor Designed Bracing and Anchorage for Energy Wheel (CC) Contractor Designed Bracing and Anchorage for Exhaust Fans (PP) Contractor Designed Bracing and Anchorage for Exhaust System (PP) Contractor Designed Bracing and Anchorage for Expansion Tanks (CC) Contractor Designed Bracing and Anchorage for Fan Coil Unit Condensing
Unit (PP) Contractor Designed Bracing and Anchorage for Fan Coil Units (CC) Contractor Designed Bracing and Anchorage for Fan Coil Units (PP) Contractor Designed Bracing and Anchorage for Fire Protection
Sprinkler System (CC) Contractor Designed Bracing and Anchorage for Fire Protection
Sprinkler System (PP) Contractor Designed Bracing and Anchorage for Fuel Oil (PP) Contractor Designed Bracing and Anchorage for Fuel Oil Pumps (PP) Contractor Designed Bracing and Anchorage for Generator Accessories
(PP)
Contractor Designed Bracing and Anchorage for Generators (PP) Contractor Designed Bracing and Anchorage for Radon Piping (PP) Contractor Designed Bracing and Anchorage for Refrigerant System (PP) Contractor Designed Bracing and Anchorage for Storage Tanks for Fuel
Oil (PP) Contractor Designed Bracing and Anchorage for Supply Air Duct (CC) Contractor Designed Bracing and Anchorage for Underfloor Air
Distribution (CC) Contractor Designed Bracing and Anchorage for VAV Boxes (CC)
Equipment Requirements for Command Center (CC) Equipment Requirements for Domestic Water Booster Pumps (CC) Equipment Requirements for Domestic Water Hydro-Pneumatic Tank Equipment Requirements for Water Softener (CC) Equipment Requirements for Non-DSS Exhaust Fans (CC) Equipment Requirements for Exhaust System (PP) Equipment Requirements for Fuel Conveyance System (UL) Equipment Requirements for Potable Water (CC) Equipment Requirements for Potable Water (PP) Equipment Requirements for Pumps (UL) Equipment Requirements for Pumps (PP) Equipment Requirements for Radon Piping (PP) Equipment Requirements for Refrigerant System (PP) Equipment Requirements for Sanitary Sewer (CC) Equipment Requirements for Sanitary Sewer (PP) Equipment Requirements for Water Heaters (CC)
Equipment Requirements for Air Exhaust Duct (CC) Equipment Requirements for Air Handling (PP)
SECTION 23 05 48.19 14 Page 6
Equipment Requirements for Air Handing/Distribution (CC) Equipment Requirements for Air Handling Unit Condensing Unit (PP) Equipment Requirements for Air Handling Units (CC) Equipment Requirements for Air Handling Units (PP) Equipment Requirements for Air Separators (CC) Equipment Requirements for Battery Exhaust Fans (CC) Equipment Requirements for Chilled Water (CC) Equipment Requirements for Chilled Water Pumps (CC) Equipment Requirements for Chillers (CC) Equipment Requirements for Clean Agent Exhaust Fans (CC) Equipment Requirements for Computer Room Air Conditioners (CC) Equipment Requirements for Condensing Unit (CC) Equipment Requirements for Energy Wheel (CC) Equipment Requirements for Expansion Tanks (CC) Equipment Requirements for Exhaust Fans (PP) Equipment Requirements for Exhaust System(PP ) Equipment Requirements for Fan Coil Unit Condensing Unit (PP) Equipment Requirements for Fan Coil Units (CC) Equipment Requirements for Fan Coil Units (PP) Equipment Requirements for Fire Protection Sprinkler System (CC) Equipment Requirements for Fire Protection Sprinkler System (PP) Equipment Requirements for Fuel Coolers (PP) Equipment Requirements for Fuel Oil (PP) Equipment Requirements for Fuel Oil Pumps (PP) Equipment Requirements for Generator Accessories (PP) Equipment Requirements for Generators (PP) Equipment Requirements for Radon Piping (PP) Equipment Requirements for Refrigerant System (CC) Equipment Requirements for Storage Tanks for Fuel Oil (PP) Equipment Requirements for Storage Tanks for Water (CC) Equipment Requirements for Supply Air Duct (CC) Equipment Requirements for Underfloor Air Distribution (CC) Equipment Requirements for VAV Boxes (CC)
Component Qualification Documentation Air Exhaust Duct (CC) Component Qualification Documentation Air Handling (PP) Component Qualification Documentation Air Handing/Distribution (CC) Component Qualification Documentation Air Handling Unit Condensing Unit (PP) Component Qualification Documentation Air Handling Units (CC) Component Qualification Documentation Air Handling Units (PP) Component Qualification Documentation Air Separators (CC) Component Qualification Documentation Battery Exhaust Fans (CC) Component Qualification Documentation Chilled Water (CC) Component Qualification Documentation Chilled Water Pumps (CC) Component Qualification Documentation Chillers (CC) Component Qualification Documentation Clean Agent Exhaust Fans (CC) Component Qualification Documentation Computer Room Air Conditioners (CC) Component Qualification Documentation Condensing Unit (CC) Component Qualification Documentation Energy Wheel (CC) Component Qualification Documentation Exhaust Fans (PP) Component Qualification Documentation Exhaust System (PP) Component Qualification Documentation Expansion Tanks (CC) Component Qualification Documentation Fan Coil Unit Condensing Unit
(PP)
Component Qualification Documentation Fan Coil Units (CC) Component Qualification Documentation Fan Coil Units (PP)
SECTION 23 05 48.19 14 Page 7
Component Qualification Documentation Fire Protection Sprinkler System (CC) Component Qualification Documentation Fire Protection Sprinkler System (PP) Component Qualification Documentation Fuel Coolers (PP) Component Qualification Documentation Fuel Oil (PP) Component Qualification Documentation Fuel Oil Pumps (PP) Component Qualification Documentation Generator Accessories (PP) Component Qualification Documentation Generators (PP) Component Qualification Documentation Refrigerant System (PP) Component Qualification Documentation Storage Tanks for Fuel Oil
(PP)
Component Qualification Documentation Storage Tanks for Water (CC) Component Qualification Documentation Supply Air Duct (CC) Component Qualification Documentation Underfloor Air Distribution
(CC)
Component Qualification Documentation VAV Boxes (CC) Component Qualification Documentation Pumps (UL) Component Qualification Documentation Fuel Conveyance System (UL)
1.2.5 Items Not Covered By This Section
1.2.5.1 Fire Protection Systems
Install seismic protection of piping for fire protection systems as specified in Section 21 13 13.00 14 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION, and Section 21 22 00.00 14 CLEAN AGENT FIRE EXTINGUISHING
SYSTEM.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Coupling and Bracing for CC Coupling and Bracing for PP
Flexible Couplings or Joints for CC Flexible Couplings or Joints for PP
Equipment Restraint for CC Equipment Restraint for PP
Contractor Designed Bracing for CC; G Contractor Designed Bracing for PP; G
Contractor Designed Bracing and Anchorage for Command Center; G
(CC)
Contractor Designed Bracing and Anchorage for Domestic Water Booster Pumps; G (CC) Contractor Designed Bracing and Anchorage for Domestic Water Hydro-Pneumatic Tank; G (CC)
SECTION 23 05 48.19 14 Page 8
Contractor Designed Bracing and Anchorage for Water Softener; G
(CC)
Contractor Designed Bracing and Anchorage for Non-DSS Exhaust Fans;
G (CC)
Contractor Designed Bracing and Anchorage for Exhaust Fans; G (PP) Contractor Designed Bracing and Anchorage for Fuel Conveyance System; G (UL) Contractor Designed Bracing and Anchorage for Potable Water; G
(CC)
Contractor Designed Bracing and Anchorage for Potable Water; G
(PP)
Contractor Designed Bracing and Anchorage for Pumps; G (PP) Contractor Designed Bracing and Anchorage for Pumps; G (UL) Contractor Designed Bracing and Anchorage for Radon Piping; G (PP) Contractor Designed Bracing and Anchorage for Sanitary Sewer; G
(CC)
Contractor Designed Bracing and Anchorage for Sanitary Sewer; G
(PP)
Contractor Designed Bracing and Anchorage for Storage Tanks for Fuel Oil; G (PP) Contractor Designed Bracing and Anchorage for Water Heaters; G
(CC)
Contractor Designed Bracing and Anchorage for Air Exhaust Duct; G
(CC)
Contractor Designed Bracing and Anchorage for Air Handling; G (PP) Contractor Designed Bracing and Anchorage for Air Handling/Distribution; G (CC) Contractor Designed Bracing and Anchorage for Air Handling Unit Condensing Unit; G (PP) Contractor Designed Bracing and Anchorage for Air Handling Units;
G (CC)
Contractor Designed Bracing and Anchorage for Air Handling Units;
G (PP)
Contractor Designed Bracing and Anchorage for Air Separators; G
(CC)
Contractor Designed Bracing and Anchorage for Battery Exhaust Fans;
G (CC)
Contractor Designed Bracing and Anchorage for Chilled Water; G
(CC)
Contractor Designed Bracing and Anchorage for Chilled Water Pumps;
G (CC)
Contractor Designed Bracing and Anchorage for Chillers; G (CC) Contractor Designed Bracing and Anchorage for Clean Agent Exhaust Fans; G (CC) Contractor Designed Bracing and Anchorage for Computer Room Air Conditioners; G (CC) Contractor Designed Bracing and Anchorage for Computer Room Air Conditioners; G (PP) Contractor Designed Bracing and Anchorage for Condensing Unit; G
(CC)
Contractor Designed Bracing and Anchorage for Energy Wheel; G (CC) Contractor Designed Bracing and Anchorage for Exhaust Fans; G (PP) Contractor Designed Bracing and Anchorage for Exhaust System; G
(PP)
Contractor Designed Bracing and Anchorage for Expansion Tanks; G
(CC)
Contractor Designed Bracing and Anchorage for Fan Coil Unit
SECTION 23 05 48.19 14 Page 9
Condensing Unit; G (PP) Contractor Designed Bracing and Anchorage for Fan Coil Units; G
(CC)
Contractor Designed Bracing and Anchorage for Fan Coil Units; G
(PP)
Contractor Designed Bracing and Anchorage for Fire Protection sprinkler System; G (CC) Contractor Designed Bracing and Anchorage for Fire Protection sprinkler System; G (PP) Contractor Designed Bracing and Anchorage for Fuel Oil; G (PP) Contractor Designed Bracing and Anchorage for Fuel Oil Pumps; G
(PP)
Contractor Designed Bracing and Anchorage for Generator Accessories; G (PP) Contractor Designed Bracing and Anchorage for Generators; G (PP) Contractor Designed Bracing and Anchorage for Radon Piping; G (PP) Contractor Designed Bracing and Anchorage for Refrigerant System;
G (PP)
Contractor Designed Bracing and Anchorage for Storage Tanks for Fuel Oil; G (PP) Contractor Designed Bracing and Anchorage for Supply Air Duct; G
(CC)
Contractor Designed Bracing and Anchorage for Underfloor Air Distribution; G (CC) Contractor Designed Bracing and Anchorage for VAV Boxes; G (CC)
Equipment Requirements for Command Center; G (CC) Equipment Requirements for Domestic Water Booster Pumps; G (CC) Equipment Requirements for Domestic Water Hydro-Pneumatic Tank; G
(CC)
Equipment Requirements for Non-DSS Exhaust Fans; G (CC) Equipment Requirements for Exhaust System; G (PP) Equipment Requirements for Fuel Conveyance System; G (UL) Equipment Requirements for Potable Water; G (CC) Equipment Requirements for Pumps; G (UL) Equipment Requirements for Pumps; G (PP) Equipment Requirements for Radon Piping; G (PP) Equipment Requirements for Refrigerant System; G (PP) Equipment Requirements for Sanitary Sewer; G (CC) Equipment Requirements for Water Heaters; G (CC) Equipment Requirements for Water Softener; G (CC)
Equipment Requirements for Air Exhaust Duct; G (CC) Equipment Requirements for Air Handling; G (PP) Equipment Requirements for Air Handing/Distribution; G (CC) Equipment Requirements for Air Handling Unit Condensing Unit; G
(PP)
Equipment Requirements for Air Handling Units; G (CC) Equipment Requirements for Air Handling Units; G (PP) Equipment Requirements for Air Separators; G (CC) Equipment Requirements for Battery Exhaust Fans; G (CC) Equipment Requirements for Chilled Water; G (CC) Equipment Requirements for Chilled Water Pumps; G (CC) Equipment Requirements for Chillers; G (CC) Equipment Requirements for Clean Agent Exhaust Fans; G (CC) Equipment Requirements for Computer Room Air Conditioners; G (CC)
SECTION 23 05 48.19 14 Page 10
Equipment Requirements for Computer Room Air Conditioners; G (PP) Equipment Requirements for Condensing Unit; G (CC) Equipment Requirements for Energy Wheel; G (CC) Equipment Requirements for Expansion Tanks; G (CC) Equipment Requirements for Exhaust Fans; G (PP) Equipment Requirements for Exhaust System; G (PP) Equipment Requirements for Fan Coil Unit Condensing Unit; G (PP) Equipment Requirements for Fan Coil Units; G (CC) Equipment Requirements for Fan Coil Units; G (PP) Equipment Requirements for Fire Protection Sprinkler System; G (CC) Equipment Requirements for Fire Protection Sprinkler System; G (PP) Equipment Requirements for Fuel Coolers; G (PP) Equipment Requirements for Fuel Oil; G (PP) Equipment Requirements for Fuel Oil Pumps; G (PP) Equipment Requirements for Generator Accessories; G (PP) Equipment Requirements for Generators; G (PP) Equipment Requirements for Radon Piping; G (PP) Equipment Requirements for Refrigerant System; G (CC) Equipment Requirements for Storage Tanks for Fuel Oil; G (PP) Equipment Requirements for Storage Tanks for Water; G (CC) Equipment Requirements for Supply Air Duct; G (CC) Equipment Requirements for Underfloor Air Distribution; G (CC) Equipment Requirements for VAV Boxes; G (CC)
SD-03 Product Data
Coupling and Bracing for CC Coupling and Bracing for PP
Flexible Couplings or Joints for CC; G Flexible Couplings or Joints for PP; G
Equipment Restraint for CC; G Equipment Restraint for PP; G
Contractor Designed Bracing for CC; G Contractor Designed Bracing for PP; G
Anchor Bolts for CC Anchor Bolts for PP
Vibration Isolators
Equipment Requirements for Command Center; G (CC) Equipment Requirements for Domestic Water Booster Pumps; G (CC) Equipment Requirements for Domestic Water Hydro-Pneumatic Tank; G
(CC)
Equipment Requirements for Non-DSS Exhaust Fans; G (CC) Equipment Requirements for Exhaust System; G (PP) Equipment Requirements for Fuel Conveyance System; G (UL)
Equipment Requirements for Potable Water; G (CC) Equipment Requirements for Potable Water; G (PP) Equipment Requirements for Pumps ; G (UL) Equipment Requirements for Pumps; G (PP) Equipment Requirements for Radon Piping; G (PP) Equipment Requirements for Refrigerant System; G (PP) Equipment Requirements for Sanitary Sewer; G (CC)
SECTION 23 05 48.19 14 Page 11
Equipment Requirements for Sanitary Sewer; G (PP) Equipment Requirements for Water Heaters; G (CC)
Equipment Requirements for Air Exhaust Duct; G (CC) Equipment Requirements for Air Handling; G (PP) Equipment Requirements for Air Handing/Distribution; G (CC) Equipment Requirements for Air Handling Unit Condensing Unit; G
(PP)
Equipment Requirements for Air Handling Units; G (CC) Equipment Requirements for Air Handling Units; G (PP) Equipment Requirements for Air Separators; G (CC) Equipment Requirements for Air Separators; G (PP) Equipment Requirements for Battery Exhaust Fans; G (CC) Equipment Requirements for Chilled Water; G (CC) Equipment Requirements for Chilled Water Pumps; G (CC) Equipment Requirements for Chillers; G (CC) Equipment Requirements for Clean Agent Exhaust Fans; G (CC) Equipment Requirements for Computer Room Air Conditioners; G (CC) Equipment Requirements for Computer Room Air Conditioners; G (PP) Equipment Requirements for Condensing Unit; G (CC) Equipment Requirements for Energy Wheel; G (CC) Equipment Requirements for Expansion Tanks; G (CC) Equipment Requirements for Exhaust Fans; G (PP) Equipment Requirements for Exhaust System; G (PP) Equipment Requirements for Fan Coil Unit Condensing Unit; G (PP) Equipment Requirements for Fan Coil Units; G (CC) Equipment Requirements for Fan Coil Units; G (PP) Equipment Requirements for Fire Protection Sprinkler System; G (CC) Equipment Requirements for Fire Protection Sprinkler System; G (PP) Equipment Requirements for Fuel Coolers; G (PP) Equipment Requirements for Fuel Oil; G (PP) Equipment Requirements for Fuel Oil Pumps; G (PP) Equipment Requirements for Generator Accessories; G (PP) Equipment Requirements for Generators; G (PP)
Equipment Requirements for Radon Piping; G (PP) Equipment Requirements for Refrigerant System; G (CC) Equipment Requirements for Storage Tanks for Fuel Oil; G (PP) Equipment Requirements for Storage Tanks for Water; G (CC) Equipment Requirements for Supply Air Duct; G (CC) Equipment Requirements for Underfloor Air Distribution; G (CC) Equipment Requirements for VAV Boxes; G (CC)
Component Qualification Documentation Air Exhaust Duct; G (CC) Component Qualification Documentation Air Handling; G (PP) Component Qualification Documentation Air Handing/Distribution; G
(CC)
Component Qualification Documentation Air Handling Unit Condensing Unit; G (PP) Component Qualification Documentation Air Handling Units; G (CC) Component Qualification Documentation Air Handling Units; G (PP) Component Qualification Documentation Air Separators; G (CC) Component Qualification Documentation Air Separators; G (PP) Component Qualification Documentation Battery Exhaust Fans; G (CC) Component Qualification Documentation Chilled Water; G (CC) Component Qualification Documentation Chilled Water Pumps; G (CC) Component Qualification Documentation Chillers; G (CC)
SECTION 23 05 48.19 14 Page 12
Component Qualification Documentation Clean Agent Exhaust Fans; G
(CC)
Component Qualification Documentation Computer Room Air Conditioners; G (CC) Component Qualification Documentation Computer Room Air Conditioners; G (PP) Component Qualification Documentation Condensing Unit; G (CC) Component Qualification Documentation Energy Wheel; G (CC) Component Qualification Documentation Exhaust Fans; G (PP) Component Qualification Documentation Exhaust System; G (PP) Component Qualification Documentation Expansion Tanks; G (CC) Component Qualification Documentation Fan Coil Unit Condensing Unit;
G (PP)
Component Qualification Documentation Fan Coil Units; G (CC) Component Qualification Documentation Fan Coil Units; G (PP) Component Qualification Documentation Fire Protection Sprinkler System; G (CC) Component Qualification Documentation Fire Protection Sprinkler System; G (PP) Component Qualification Documentation Fuel Coolers; G (PP) Component Qualification Documentation Fuel Oil; G (PP) Component Qualification Documentation Fuel Oil Pumps; G (PP) Component Qualification Documentation Generator Accessories; G (PP) Component Qualification Documentation Generators; G (PP) Component Qualification Documentation Refrigerant System; G (PP) Component Qualification Documentation Storage Tanks for Fuel Oil; G
(PP)
Component Qualification Documentation Storage Tanks for Water; G
(CC)
Component Qualification Documentation Supply Air Duct; G (CC) Component Qualification Documentation Underfloor Air Distribution;
G (CC)
Component Qualification Documentation VAV Boxes; G (CC) Component Qualification Documentation Pumps; G (UL) Component Qualification Documentation Fuel Conveyance System; G
(UL)
SD-05 Design Data
Design Calculations
SD-06 Test Reports
Anchor Bolts for CC; G Anchor Bolts for PP; G
PART 2 PRODUCTS
2.1 GENERAL DESIGN REQUIREMENTS
Submit detailed seismic restraint drawings for mechanical equipment, duct systems, piping systems and any other mechanical systems along with calculations, catalog cuts, templates, and erection and installation details, as appropriate, for the items listed below. Indicate thickness, type, grade, class of metal, and dimensions; and show construction details, reinforcement, anchorage, and installation with relation to the building construction. Calculations must be stamped, by a registered structural engineer, and verify the capability of structural members to which bracing is attached for carrying the load from the brace. Include
SECTION 23 05 48.19 14 Page 13 drawing for Mission Critical Equipment indicating the equipment location in the facility sufficient to be used for the installation. Design must be based on actual equipment and system layout. Design must include calculated dead loads, static seismic loads and capacity of materials utilized for the connection of the equipment or system to the structure.
Analysis must detail anchoring methods.
2.2 EQUIPMENT RESTRAINT
Equipment Restraint for CC and Equipment Restraint for PP
Equipment must be rigidly or flexibly mounted as indicated in the specifications and/or drawings depending on vibration isolation requirements as follows below.
Roof mounted equipment such as cooling towers and condensers, both vibration isolated and nonisolated, must have support members designed and anchored to building structural steel or concrete as required for seismic restraint and wind loads.
2.2.1 Rigidly (Base and Suspended) Mounted Equipment
HVAC equipment furnished under this contract must be rigidly mounted using cast-in-place anchor bolts or post-installed anchors that are qualified for earthquake loading in accordance with ACI 355.2 and ACI 355.4 . Anchor bolts must conform to ASTM F1554. For any rigid equipment which is rigidly anchored, provide flexible joints for piping, ductwork, electrical conduit, etc., that are capable of accommodating displacements equal to the full width of the joint in both orthogonal directions. Suspended equipment bracing attachments should be located just above the center of gravity to minimize swinging. Use the ratio of the overturning moment from seismic forces to the resisting moment due to gravity loads to determine if overturning forces need to be considered in the sizing of anchor bolts. Provide calculations to verify the adequacy of the anchor bolts for combined shear and overturning.
Roof mounted HVAC equipment roof curbs, framing and attachment to equipment and structure must be designed and braced to withstand seismic loads. Designated Seismic Systems (DSS) assigned to Seismic Design Category (SDC) C, D, E, or F and Risk Category IV components needed for continued operation after an earthquake must have two nuts provided on each anchor bolt.
2.2.2 Nonrigid or Flexibly-Mounted Equipment
Select vibration isolation devices so that the maximum movement of equipment from the static deflection point is 1/4 inch. Equipment flexibly mounted on vibration isolators must have a bumper restraint or snubber in each horizontal direction and vertical restraints must be provided where required to resist overturning. Isolator housing and restraints must be constructed of ductile materials. A viscoelastic pad or similar material of appropriate thickness must be used between the bumper and components to limit the impact load. Restraints must be designed to resist the calculated horizontal lateral and vertical forces.
Spring vibration isolators must be seismically rated, restrained isolators for equipment subject to load variations and large external forces. The seismically rated housing must be sized to meet or exceed the force requirements applicable to the project and meet the required isolation
SECTION 23 05 48.19 14 Page 14 criteria. Spring vibration isolator manufacturer's will be a member of VISCMA. Design force, Fp, must be doubled for vibration isolators with an air gap greater than 0.25 inches as specified in ASCE 7-16 , Chapter 13.
Housed springs must not be used for seismic restraint applications because they cannot resist uplift.
2.3 BOLTS AND NUTS
Hex head bolts, and heavy hexagon nuts must be ASTM A325 or ASTM A490 bolts and ASTM A563 nuts. Provide bolts and nuts galvanized in accordance with ASTM A153/A153M when used underground or exposed to weather.
2.4 FLEXIBLE JOINTS
Flexible joints must have same pressure and temperature ratings as adjoining pipe. Braided hoses must not be used where there is torsional or axial movement unless manufacturer allows it.
2.4.1 Braided Hose Expansion Joint
Braided hose expansion joint(s) must be installed in the locations indicated on the drawings and as required to accommodate any thermal expansion, contraction or seismic movement of the piping system. Joints must consist of two parallel sections of corrugated metal hose, compatible braid, and 180 degree return bend with inlet and outlet connections. Field fabricated loops are not acceptable. Braided hose expansion joint(s) must be installed in the locations indicated on the drawings and as required to accommodate any thermal expansion, contraction or seismic movement of the piping system. Joints must consist of two parallel sections of corrugated metal hose, compatible braid, and 180 degree return bend with inlet and outlet connections. Field fabricated loops must not be acceptable.
Braided hose in a 60 degree flexible V loop arrangement must be used for small diameter pipe connections to coils in variable-air-volume (VAV) terminal units and fan coil units installed in suspended ductwork whether braced or unbraced.
All braided hose expansion joints must be manufactured in accordance with the documented manufacturers weld procedure specifications. The procedure qualification record must be used to document the execution of this procedure and must follow the general "guidelines" of ASME Section IX.
Each individual welder must conform to the in-house procedure qualification record and be qualified prior to each production lot. The testing of each individual welder must be documented in a welding procedure qualification record.
2.4.1.1 Corrugated Hose
Corrugated hose must be Type 316 stainless steel. Braid must be Type 304 stainless steel for any series 300 stainless steel hose. Fittings materials of construction and end fitting type must be consistent with pipe material and equipment / pipe connection fittings. Copper fittings must not be attached to stainless steel hose.
2.4.1.2 Flexible Hose Expansion Loops
Flexible hose expansion loops must have a factory supplied, hanger / support lug located at the bottom of the 180deg return. Flexible hose expansion loop(s) must be furnished with a plugged FPT to be used for a drain or air release vent. Flexible hose expansion loop(s) must be rated
SECTION 23 05 48.19 14 Page 15 with an operating pressure which is the same as the adjoining pipe. The operating pressure must be based on burst pressure with a 4 to 1 safety factor.
2.4.2 Double Ball Flexible Expansion Joint
Install flexible expansion joints manufactured of ductile iron conforming to the material requirements of ASTM A536 and AWWA C153/A21.53 in the locations indicated on the drawings. Provide foundry certification of material upon request. Each flexible expansion joint must be pressure tested prior to shipment against its own restraint to a minimum of 350 psi (250 psi for flexible expansion joints 2 inch and 30 inches diameter and larger.) A minimum 2:1 safety factor, determined from the published pressure rating, must apply. Factory Mutual Approval for the 3 inch through 12 inch sizes is required. Each flexible expansion joint must consist of an expansion joint designed and cast as an integral part of a ball and socket type flexible joint, having a minimum per ball deflection of: 20º, 2"-12"; 15º, 14"-36"; 12º, 42"-48" and 4-inches minimum expansion. Additional expansion sleeves must be available and easily added or removed at the factory or in the field. Both standardized mechanical joint and flange end connections must be available.
2.4.2.1 Internal Surfaces
Line all internal surfaces (wetted parts) with a minimum of 15 mils of fusion bonded epoxy conforming to the applicable requirements of AWWA C213.
Sealing gaskets must be constructed of EPDM. The coating must meet
NSF/ANSI 61 .
2.4.2.2 Exterior Surfaces
Coat exterior surfaces with a minimum of…