P693_Specs_Final_Vol02_20241007.pdf

PDF 10 MB Posted

Attached to
FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM
Solicitation number
N6274225R1301
Issued by

About this file

This document is a pre-solicitation notice for a federal contract opportunity for the construction (design-bid-build) of a Guam Defense Radar System Command Center, power generation facility, and associated infrastructure. The project includes demolition, civil site work, concrete construction, antenna tower installation, seismic isolation, security infrastructure, control system integration, and other electrical, telecommunications, and utility work. The solicitation number is N6274225R1301 and the contract is estimated to be between $250-500 million. The NAICS code is 236220 with an average annual receipts threshold of $45 million. The contract completion period is anticipated to be 1,323 calendar days. The procurement will be a best-value tradeoff using technical factors including experience, small business utilization, safety, management plan, and past performance. The Request for Proposal is anticipated to be available around October 30, 2024, and a pre-proposal site visit is scheduled for December 11, 2024. Award will be made to the responsible offeror whose proposal meets or exceeds the acceptability standards for the technical factors and has the lowest evaluated price.

View the file

Other files

File Type Posted
25R1301 CmdCtrl Notice1.pdf PDF
P693_Drawings_Final_Vol14.4_20241007-Part4.pdf PDF
P693_Specs_Final_Vol01_20241007.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part5.pdf PDF
P693_Drawings_Final_Vol14.4_20241007-Part2.pdf PDF
P693_Drawings_Final_Vol14.8_20241007.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.1_20241007-Part1.pdf PDF
P693_Drawings_Final_Vol14.4_20241007-Part5.pdf PDF
P693_Drawings_Final_Vol14.1_20241007-Part2.pdf PDF
P693_Drawings_Final_Vol14.5_20241007.pdf PDF
P693_Drawings_Final_Vol14.1_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part1.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part2.pdf PDF
P693_Drawings_Final_Vol14.4_20241007-Part1.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part4.pdf PDF
P693_Drawings_Final_Vol14.4_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.6_20241007.pdf PDF
25-1301 P-693 RFP.pdf PDF
P693_Drawings_Final_Vol14.7_20241007.pdf PDF
P693_Drawings_Final_Vol14.3_20241007.pdf PDF
P-693-SV5_Contractor Policy Update Memo.pdf PDF
P-693-SV2_III Log.pdf PDF
P-693-SV3_Base Access Affidavit 2020.pdf PDF
P-693-SV4_Foreign National Access Request Form.pdf PDF
P-693-SV2a_Interstate Identification Index (III) Log Instructions.pdf PDF
P-693-SV1_Base Access Request - Contractor Memo.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

VOLUME II of II

(DIV 23-34)

NAVFAC CONTRACT NO. N62742-25-C-1301

A-E CONTRACT NO. N62478-20-D-5036

Date: 10/7/2024

Project 693 EIAMD Site 14 (Final Design Submittal) Work Order No. 1812861

Project 693 EIAMD SITE 14 (100% Submittal) 43393SITE14

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15.00 14 02/11, CHG 1: 08/14 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.00 14 02/24 SUMMARY OF WORK

01 14 00.00 14 11/22, CHG 2: 05/24 WORK RESTRICTIONS

01 20 00.00 14 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES

01 30 00.00 14 11/20, CHG 3: 08/23 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 14 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

(eCMS)

01 32 17.20 14 11/23 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29.00 14 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 13.04 14 CES 04/23 INDUSTRIAL CONTROL SYSTEMS PROCUREMENT

FOR AIR FORCE CONTROL SYSTEMS

01 35 26.00 14 05/24 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 14 08/23, CHG 1: 05/24 QUALITY CONTROL

01 45 35.00 14 05/24 SPECIAL INSPECTIONS

01 50 00.00 14 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19.00 14 08/22 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 14 08/21 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL

CONTROLS

01 57 19.03 14 08/22 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL

CONTROLS MUNITIONS RESPONSE EXPLOSIVES

SAFETY SUBMISSION (MRESS) GUAM

CONSTRUCTION SUPPORT

01 58 00.00 14 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 74 19.00 14 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00.00 14 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

01 78 23.00 14 05/23 OPERATION AND MAINTENANCE DATA

01 78 24.20 14 05/23, CHG 1: 11/23 FACILITY DATA WORKBOOK (FDW)

01 91 00.15 14 05/23, CHG 2: 11/23 BUILDING COMMISSIONING

01 91 19.00 14 05/23 BUILDING ENCLOSURE COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00.00 14 08/22 DEMOLITION

02 61 13.00 14 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF

CONTAMINATED MATERIAL

02 81 00.00 14 11/18 TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS

02 82 00.00 14 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION

02 83 00.00 14 11/18 LEAD REMEDIATION

02 84 16.00 14 11/22 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

02 84 33.00 14 11/22 REMOVAL AND DISPOSAL OF

POLYCHLORINATED BIPHENYLS (PCBs)

DIVISION 03 - CONCRETE

PROJECT TABLE OF CONTENTS Page 1

03 30 00.00 14 02/19, CHG 7: 02/24 CAST-IN-PLACE CONCRETE

03 45 00.00 14 05/16, CHG 2: 11/21 PRECAST ARCHITECTURAL CONCRETE

03 45 33.00 14 05/16, CHG 1: 11/21 PRECAST PRESTRESSED STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00.00 14 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 20.00 14 05/22 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 05 23.16 14 08/18 STRUCTURAL WELDING

05 12 00.00 14 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 40 00.00 14 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13.00 14 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 00.00 14 08/23 METAL STAIRS

05 52 00.00 14 08/23 METAL RAILINGS

05 72 00.00 14 08/23 DECORATIVE METAL SPECIALTIES

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00.00 14 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 20 00.00 14 08/16 FINISH CARPENTRY

06 41 16.10 14 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16.00 14 08/20 SOLID SURFACING FABRICATIONS

06 73 01.00 14 08/23 FIBERGLASS REINFORCED PLASTIC (FRP)

GRATING

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 14 00.00 14 08/23 FLUID-APPLIED WATERPROOFING

07 21 13.00 14 08/23 BOARD AND BLOCK INSULATION

07 27 10.00 14 08/23 BUILDING AIR BARRIER SYSTEM

07 27 36.00 14 08/23 SPRAY FOAM INSULATION

07 57 12.00 14 03/20 LIQUID APPLIED ELASTOMERIC SILICONE

ROOFING COATING

07 60 00.00 14 08/23 FLASHING AND SHEET METAL

07 84 00.00 14 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00.00 14 08/23 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13.00 14 08/20 STEEL DOORS AND FRAMES

08 11 14.00 14 05/24 HARDENED EXTERIOR DOOR SYSTEMS

08 11 16.00 14 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES

08 14 00.00 14 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00.00 14 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 34 01.00 14 02/24 FORCED ENTRY RESISTANT COMPONENTS

08 34 02.00 14 08/09 BULLET-RESISTANT COMPONENTS

08 34 73.00 14 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES

08 41 13.00 14 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 71 00.00 14 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00.00 14 05/19 GLAZING

08 91 00.00 14 08/20 METAL WALL AND DOOR LOUVERS

PROJECT TABLE OF CONTENTS Page 2

DIVISION 09 - FINISHES

09 22 00.00 14 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00.00 14 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10.00 14 08/20 CERAMIC AND PORCELAIN TILING

09 51 00.00 14 08/20 ACOUSTICAL CEILINGS

09 62 38.00 14 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 65 00.00 14 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 68 00.00 14 11/17, CHG 2: 08/20 CARPETING

09 69 13.00 14 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING

09 84 20.00 14 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS

09 90 00.00 14 02/21 PAINTS AND COATINGS

09 96 00.00 14 11/14 HIGH-PERFORMANCE COATINGS

09 96 53.13 14 06/20 SILICONE ELASTOMERIC COATINGS

DIVISION 10 - SPECIALTIES

10 11 00.00 14 08/20 VISUAL DISPLAY UNITS

10 14 00.10 14 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 14 08/20 INTERIOR SIGNAGE

10 21 13.00 14 08/20 TOILET COMPARTMENTS

10 22 13.00 14 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS

10 22 39.00 14 08/20 FOLDING PANEL PARTITIONS

10 26 00.00 14 08/20 WALL AND DOOR PROTECTION

10 28 13.00 14 08/20 TOILET ACCESSORIES

10 44 16.00 14 11/19 FIRE EXTINGUISHERS AND CABINETS

10 51 13.00 14 05/11 METAL LOCKERS

DIVISION 12 - FURNISHINGS

12 00 01.20 14 02/23 FURNITURE, FIXTURES AND EQUIPMENT

(FF&E) PACKAGE

12 48 13.00 14 08/23 ENTRANCE FLOOR MATS AND FRAMES

12 50 00.13 14 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION

12 59 00.00 14 08/17, CHG 1: 08/18 SYSTEMS FURNITURE

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 60.00 14 06/24 SEISMIC ISOLATION SYSTEM (SIS)

13 48 73.00 14 05/22 SEISMIC CONTROL FOR MISCELLANEOUS

EQUIPMENT

13 49 20.00 14 10/07 RF SHIELDING

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 14 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 22 00.00 14 05/11 CLEAN AGENT FIRE EXTINGUISHING SYSTEM

DIVISION 22 - PLUMBING

22 00 00.00 14 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

22 31 00.00 14 02/09 WATER SOFTENERS, CATION-EXCHANGE

(SODIUM CYCLE)

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 48.19 14 05/18, CHG 2: 08/20 SEISMIC BRACING FOR MECHANICAL

23 05 93.00 14 11/15 TESTING, ADJUSTING, AND BALANCING FOR

PROJECT TABLE OF CONTENTS Page 3

HVAC

23 07 00.00 14 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00.00 14 05/23 COMMISSIONING OF MECHANICAL AND

PLUMBING SYSTEMS

23 09 00.00 14 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13.00 14 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 14 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 21 23.00 14 08/17 HYDRONIC PUMPS

23 25 00.00 14 05/21 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 30 00.00 14 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 64 10.00 14 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26.00 14 08/09, CHG 7: 02/24 CHILLED WATER PIPING SYSTEM

23 81 00.00 14 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 23.00 14 11/20 COMPUTER ROOM AIR CONDITIONING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.71 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - FIRE AND LIFE SAFETY

SYSTEM

25 05 11.72 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - BUILDING CONTROL

SYSTEM

25 05 11.73 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - POWER CONTROL

MONITORING SYSTEM

25 05 11.74 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - POWER QUALITY

MONITORING SYSTEM

25 05 11.75 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - UTILITY CONTROL

SYSTEM

25 05 11.76 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - PETROLEUM OIL AND

LUBRICANTS DISTRIBUTION AND STORAGE

SYSTEM

25 05 11.77 14 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - FUEL LEAK DETECTION

SYSTEM

25 10 10.00 14 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

25 10 11.00 14 04/06 POWER QUALITY MONITORING SYSTEM (PQMS)

25 10 12.00 14 04/06 POWER CONTROL AND MONITORING SYSTEM

(PCMS)

DIVISION 26 - ELECTRICAL

26 05 48.00 14 10/07 SEISMIC PROTECTION FOR ELECTRICAL

26 05 73.00 14 08/23 POWER SYSTEM STUDIES

26 08 00.00 14 11/22 APPARATUS INSPECTION AND TESTING

26 11 10.00 14 POWER SYSTEMS SEQUENCE OF OPERATIONS

26 12 19.10 14 05/19, CHG 2: 11/23 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 13 00.00 14 05/21, CHG 1: 05/22 HIGH-FIREPOINT FLUIDS INSULATED

PAD-MOUNTED SWITCHGEAR

PROJECT TABLE OF CONTENTS Page 4

26 13 13.00 14 11/21 METAL-CLAD SWITCHGEAR

26 20 00.00 14 08/23 INTERIOR DISTRIBUTION SYSTEM

26 20 02.00 14 02/24 POWER DISTRIBUTION UNIT (PDU)

26 23 00.00 14 02/24 LOW-VOLTAGE SWITCHGEAR

26 24 13.00 14 08/21 SWITCHBOARDS

26 27 14.20 14 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 29 23.00 14 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 32 15.00 14 05/20 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES

26 32 34.00 14 10/07 INVERTER SYSTEM ABOVE 15 KVA CAPACITY

26 33 53.00 14 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY

(UPS)

26 35 43.00 14 08/21 400-HERTZ (HZ) SOLID STATE FREQUENCY

CONVERTER

26 36 23.00 14 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

26 40 00.00 14 01/24 STATIC TRANSFER SWITCH WITH BYPASS

(STATIC AUTOMATIC BUS TRANSFER (SABT)

SWITCH) 100 AMP - 600 AMP

26 41 00.00 14 08/23 LIGHTNING PROTECTION SYSTEM

26 51 00.00 14 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 55 53.00 14 11/23 SECURITY LIGHTING

26 56 00.00 14 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00.00 14 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 41 00.00 14 11/21 AUDIO-VISUAL SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 10 05.00 14 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 70.00 14 08/20 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE

28 31 76.00 14 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

28 31 80.00 14 08/20 WIDE AREA MASS NOTIFICATION SYSTEM

EXPANSION

DIVISION 31 - EARTHWORK

31 00 00.00 14 08/23 EARTHWORK

31 21 13.00 14 11/18 RADON MITIGATION

31 31 16.19 14 08/22 TERMITE CONTROL BARRIERS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 14 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33.00 14 08/17 LANDSCAPE ESTABLISHMENT

32 11 20.00 14 05/22 BASE COURSE FOR RIGID PAVING AND

SUBBASE FOR FLEXIBLE PAVING

32 11 23.00 14 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE

PAVING

32 12 13.00 14 05/17 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 14 11/20 ROAD-MIX ASPHALT PAVING

32 13 13.06 14 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 13 73.19 14 11/19 COMPRESSION CONCRETE PAVING JOINT

PROJECT TABLE OF CONTENTS Page 5

SEALANT

32 15 00.00 14 05/17 AGGREGATE SURFACING

32 16 19.00 14 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23.00 14 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 31 13.00 14 11/21 CHAIN LINK SECURITY FENCES AND GATES

32 31 13.53 14 11/21 RESTRICTED AREA SECURITY FENCE

32 84 24.00 14 08/11, CHG 1: 05/17 TEMPORARY IRRIGATION SPRINKLER SYSTEMS

32 92 19.00 14 08/17, CHG 1: 08/21 SEEDING

32 93 00.00 14 08/17, CHG 1: 08/21 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 01 50.31 14 02/20 LEAK DETECTION FOR FUELING SYSTEMS

33 08 55.00 14 08/19 FUEL DISTRIBUTION SYSTEM START-UP

(NON-HYDRANT)

33 09 52.00 14 11/18 FUEL PUMP CONTROL AND ANNUNCIATION

SYSTEM (NON-HYDRANT)

33 11 00.00 14 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING

33 30 00.00 14 05/18 SANITARY SEWERAGE

33 40 00.00 14 11/21 STORMWATER UTILITIES

33 52 23.15 14 11/18 POL SERVICE PIPING WELDING

33 52 40.00 14 11/18, CHG 2: 11/20 FUEL SYSTEMS PIPING (NON-HYDRANT)

33 56 10.00 14 05/19, CHG 1: 11/20 FACTORY-FABRICATED FUEL STORAGE TANKS

33 57 55.00 14 11/18, CHG 1: 11/20 FUEL SYSTEM COMPONENTS (NON-HYDRANT)

33 71 02.00 14 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 71 04.00 14 03/22 SELF SUPPORT TOWER

33 82 00.00 14 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 34 - TRANSPORTATION

34 75 13.13 14 02/22 CRASH RATED ACTIVE AND PASSIVE VEHICLE

BARRIERS AND CONTROLS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 6

SECTION 23 05 48.19 14

SEISMIC BRACING FOR MECHANICAL

05/18, CHG 2: 08/20

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE INSTITUTE (ACI)

ACI 355.2 (2007) Qualification of Post-Installed Mechanical Anchors in Concrete and Commentary

ACI 355.4 (2011) Qualification of Post-Installed Adhesive Anchors in Concrete (ACI 355.4) and Commentary

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 325 (2017) Steel Construction Manual

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA C105/A21.5 (2018) Polyethylene Encasement for Ductile-Iron Pipe Systems

AWWA C116/A21.16 (2015) Protective Fusion-Bonded Coatings for the Interior and Exterior Surfaces of Ductile-Iron and Gray Iron Fittings

AWWA C153/A21.53 (2019) Ductile-Iron Compact Fittings for Water Service

AWWA C213 (2022) Fusion-Bonded Epoxy Coatings and Linings for Steel Water Pipe and Fittings

ASTM INTERNATIONAL (ASTM)

ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel

ASTM A53/A53M (2024) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A153/A153M (2023) Standard Specification for Zinc

SECTION 23 05 48.19 14 Page 1

Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A325 (2014) Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength

ASTM A490 (2014a) Standard Specification for Structural Bolts, Alloy Steel, Heat Treated, 150 ksi Minimum Tensile Strength

ASTM A500/A500M (2023) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

ASTM A536 (1984; R 2019; E 2019) Standard Specification for Ductile Iron Castings

ASTM A563 (2021; E 2022a) Standard Specification for Carbon and Alloy Steel Nuts

ASTM A603 (2019) Standard Specification for Zinc-Coated Steel Structural Wire Rope

ASTM D1785 (2015; E 2018) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120

ASTM D2665 (2014) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings

ASTM E488/E488M (2022) Standard Test Methods for Strength of Anchors in Concrete Elements

ASTM F891 (2023) Standard Specification for Coextruded Poly (Vinyl Chloride) (PVC) Plastic Pipe with a Cellular Core

ASTM F1554 (2020) Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength

FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA)

FEMA P-414 (January 2004) Installing Seismic Restraints for Duct and Pipe

ICC EVALUATION SERVICE, INC. (ICC-ES)

ICC ES AC156 (2012) Acceptable Criteria for Seismic Certification by Shake-Table Testing of Nonstructural Components

ICC ES AC193 (2012) Acceptance Criteria for Mechanical Anchors in Concrete Elements

SECTION 23 05 48.19 14 Page 2

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2024) International Building Code

METAL FRAMING MANUFACTURERS ASSOCIATION (MFMA)

MFMA-4 (2004) Metal Framing Standards Publication

NSF INTERNATIONAL (NSF)

NSF/ANSI 61 (2022) Drinking Water System Components - Health Effects

SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION

(SMACNA)

SMACNA 1981 (2008) Seismic Restraint Manual Guidelines for Mechanical Systems, 3rd Edition

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-301-01 (2023; with Change 1, 2023) Structural Engineering

UFC 4-010-01 (2018; with Change 3, 2024) DoD Minimum Antiterrorism Standards for Buildings

VIBRATION ISOLATION AND SEISMIC CONTROL MANUFACTURERS ASSOCIATION

(VISCMA)

VISCMA 412 (2014) Installing Seismic Restraints for Mechanical Equipment

1.2 SYSTEM DESCRIPTION

1.2.1 General Requirements

Apply the requirements for seismic protection measures described in this section and on the drawings to the mechanical equipment and mechanical systems both inside and outside of the building along with exterior utilities and systems listed below. Where there is a conflict between the specifications and the drawings, the specifications will take precedence.

Accomplish resistance to lateral forces induced by earthquakes without consideration of friction resulting from gravity loads.

1.2.2 Mechanical Equipment

Install the following mechanical systems as required on the drawings and other sections of these specifications and seismically protect them in accordance with this specification. In addition to being braced for life safety, mechanical systems with an Ip greater than 1.0 must be required to perform post-earthquake conditions.

Equipment/Components/Systems with Ip = 1.0

Command Center

Water Heaters Non-DSS Exhaust Fans

SECTION 23 05 48.19 14 Page 3

Domestic Water Booster Pumps Domestic Water Hydro-Pneumatic Tank Water Softener Potable Water Sanitary Sewer

Power Plant

Lube Oil System Radon Piping

Equipment/Components/Systems with Ip = 1.5 (Designated Seismic Systems -

DSS).

Command Center Storage Tanks for Water Chillers Fan Coil Units Condensing Unit Energy Wheel

Battery Exhaust Fans Clean Agent Exhaust Fans Air Handling Units Chilled Water Pumps Expansion Tanks Air Separators VAV Boxes Computer Room Air Conditioners Chilled Water Supply Air Underfloor Air Fire Protection Sprinkler

Power Plant Storage Tanks for Fuel Oil Fan Coil Units Fan Coil Unit Condensing Unit Exhaust Fans Air Handling Units Air Handling Unit Condensing Unit Pumps Computer Room Air Conditioners Generators Generator Accessories Fuel Coolers Lube Oil System Fuel Oil System

Air Handling System Exhaust System Refrigerant System Fire Protection Sprinkler System

UL

Fuel Conveyance System Pumps

1.2.3 Contractor Designed Bracing

Submit copies of the Contractor Designed Bracing for CC, and Contractor Designed Bracing for PP design calculations with the drawings.

SECTION 23 05 48.19 14 Page 4

Calculations must be approved, certified, stamped and signed by a registered Professional Structural Engineer. Calculations must verify the capability of structural members to which bracing is attached for carrying the load from the brace. Design the bracing in accordance with UFC 3-301-01 , UFC 4-010-01 , and additional data furnished by the Contracting Officer. For the equipment and systems installed above the Seismic Isolation System interface in the Command Center, the horizontal force may be determined using Attachment A Command Center In-Structure Response Spectra to Section 13 48 73.00 14 SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT and Section 13.3.1.4 of ASCE 7-16 with an Ip=1.0 and the vertical force to be determined using +/- (0.67)*(Sds)*(Wp).

Resistance to lateral forces induced by earthquakes must be accomplished without consideration of friction resulting from gravity loads.

UFC 3-301-01 uses parameters for the building, not for the equipment in the building; therefore, corresponding adjustments to the formulas must be required. Loadings determined using UFC 3-301-01 are based on strength design; therefore, AISC 325 Specifications must be used for the design.

The bracing for the mechanical equipment designated in paragraph 1.2.2 and systems designated in paragraph 1.2.3 must be developed by the Contractor.

1.2.4 Contractor Designed Bracing and Anchorage

Seismic bracing is required for all mechanical systems and equipment, and other nonstructural building components as required by UFC 3-301-01 .

Bracing supports not shown on the drawings must be designed, detailed, fabricated, constructed, and inspected according to UFC 3-301-01 and all reference standard contained herein. Submit details for the following equipment:

Contractor Designed Bracing and Anchorage for Command Center (CC) Contractor Designed Bracing and Anchorage for Domestic Water Booster

Pumps (CC) Contractor Designed Bracing and Anchorage for Domestic Water

Hydro-Pneumatic Tank (CC) Contractor Designed Bracing and Anchorage for Water Softener(CC) Contractor Designed Bracing and Anchorage forNon-DSS Exhaust Fans (CC) Contractor Designed Bracing and Anchorage for Exhaust System (PP) Contractor Designed Bracing and Anchorage for Fuel Conveyance System

(UL)

Contractor Designed Bracing and Anchorage for Potable Water (CC) Contractor Designed Bracing and Anchorage for Potable Water (PP) Contractor Designed Bracing and Anchorage for Pumps (PP) Contractor Designed Bracing and Anchorage for Pumps (UL) Contractor Designed Bracing and Anchorage for Radon Piping (PP) Contractor Designed Bracing and Anchorage for Refrigerant System (PP) Contractor Designed Bracing and Anchorage for Sanitary Sewer (CC) Contractor Designed Bracing and Anchorage for Sanitary Sewer (PP) Contractor Designed Bracing and Anchorage for Storage Tanks for Fuel

Oil (PP) Contractor Designed Bracing and Anchorage for Water Heaters (CC)

Contractor Designed Bracing and Anchorage for Air Exhaust Duct (CC) Contractor Designed Bracing and Anchorage for Air

Handling/Distribution (CC) Contractor Designed Bracing and Anchorage for Air Handling (PP) Contractor Designed Bracing and Anchorage for Air Handling Unit

Condensing Unit (PP)

SECTION 23 05 48.19 14 Page 5

Contractor Designed Bracing and Anchorage for Air Handling Units (CC) Contractor Designed Bracing and Anchorage for Air Handling Units (PP)

Contractor Designed Bracing and Anchorage for Air Separators (CC) Contractor Designed Bracing and Anchorage for Battery Exhaust Fans (CC) Contractor Designed Bracing and Anchorage for Chilled Water (CC) Contractor Designed Bracing and Anchorage for Chilled Water Pumps (CC) Contractor Designed Bracing and Anchorage for Chillers (CC) Contractor Designed Bracing and Anchorage for Clean Agent Exhaust Fans

(CC)

Contractor Designed Bracing and Anchorage for Computer Room Air

Conditioners (CC) Contractor Designed Bracing and Anchorage for Condensing Unit (CC) Contractor Designed Bracing and Anchorage for Energy Wheel (CC) Contractor Designed Bracing and Anchorage for Exhaust Fans (PP) Contractor Designed Bracing and Anchorage for Exhaust System (PP) Contractor Designed Bracing and Anchorage for Expansion Tanks (CC) Contractor Designed Bracing and Anchorage for Fan Coil Unit Condensing

Unit (PP) Contractor Designed Bracing and Anchorage for Fan Coil Units (CC) Contractor Designed Bracing and Anchorage for Fan Coil Units (PP) Contractor Designed Bracing and Anchorage for Fire Protection

Sprinkler System (CC) Contractor Designed Bracing and Anchorage for Fire Protection

Sprinkler System (PP) Contractor Designed Bracing and Anchorage for Fuel Oil (PP) Contractor Designed Bracing and Anchorage for Fuel Oil Pumps (PP) Contractor Designed Bracing and Anchorage for Generator Accessories

(PP)

Contractor Designed Bracing and Anchorage for Generators (PP) Contractor Designed Bracing and Anchorage for Radon Piping (PP) Contractor Designed Bracing and Anchorage for Refrigerant System (PP) Contractor Designed Bracing and Anchorage for Storage Tanks for Fuel

Oil (PP) Contractor Designed Bracing and Anchorage for Supply Air Duct (CC) Contractor Designed Bracing and Anchorage for Underfloor Air

Distribution (CC) Contractor Designed Bracing and Anchorage for VAV Boxes (CC)

Equipment Requirements for Command Center (CC) Equipment Requirements for Domestic Water Booster Pumps (CC) Equipment Requirements for Domestic Water Hydro-Pneumatic Tank Equipment Requirements for Water Softener (CC) Equipment Requirements for Non-DSS Exhaust Fans (CC) Equipment Requirements for Exhaust System (PP) Equipment Requirements for Fuel Conveyance System (UL) Equipment Requirements for Potable Water (CC) Equipment Requirements for Potable Water (PP) Equipment Requirements for Pumps (UL) Equipment Requirements for Pumps (PP) Equipment Requirements for Radon Piping (PP) Equipment Requirements for Refrigerant System (PP) Equipment Requirements for Sanitary Sewer (CC) Equipment Requirements for Sanitary Sewer (PP) Equipment Requirements for Water Heaters (CC)

Equipment Requirements for Air Exhaust Duct (CC) Equipment Requirements for Air Handling (PP)

SECTION 23 05 48.19 14 Page 6

Equipment Requirements for Air Handing/Distribution (CC) Equipment Requirements for Air Handling Unit Condensing Unit (PP) Equipment Requirements for Air Handling Units (CC) Equipment Requirements for Air Handling Units (PP) Equipment Requirements for Air Separators (CC) Equipment Requirements for Battery Exhaust Fans (CC) Equipment Requirements for Chilled Water (CC) Equipment Requirements for Chilled Water Pumps (CC) Equipment Requirements for Chillers (CC) Equipment Requirements for Clean Agent Exhaust Fans (CC) Equipment Requirements for Computer Room Air Conditioners (CC) Equipment Requirements for Condensing Unit (CC) Equipment Requirements for Energy Wheel (CC) Equipment Requirements for Expansion Tanks (CC) Equipment Requirements for Exhaust Fans (PP) Equipment Requirements for Exhaust System(PP ) Equipment Requirements for Fan Coil Unit Condensing Unit (PP) Equipment Requirements for Fan Coil Units (CC) Equipment Requirements for Fan Coil Units (PP) Equipment Requirements for Fire Protection Sprinkler System (CC) Equipment Requirements for Fire Protection Sprinkler System (PP) Equipment Requirements for Fuel Coolers (PP) Equipment Requirements for Fuel Oil (PP) Equipment Requirements for Fuel Oil Pumps (PP) Equipment Requirements for Generator Accessories (PP) Equipment Requirements for Generators (PP) Equipment Requirements for Radon Piping (PP) Equipment Requirements for Refrigerant System (CC) Equipment Requirements for Storage Tanks for Fuel Oil (PP) Equipment Requirements for Storage Tanks for Water (CC) Equipment Requirements for Supply Air Duct (CC) Equipment Requirements for Underfloor Air Distribution (CC) Equipment Requirements for VAV Boxes (CC)

Component Qualification Documentation Air Exhaust Duct (CC) Component Qualification Documentation Air Handling (PP) Component Qualification Documentation Air Handing/Distribution (CC) Component Qualification Documentation Air Handling Unit Condensing Unit (PP) Component Qualification Documentation Air Handling Units (CC) Component Qualification Documentation Air Handling Units (PP) Component Qualification Documentation Air Separators (CC) Component Qualification Documentation Battery Exhaust Fans (CC) Component Qualification Documentation Chilled Water (CC) Component Qualification Documentation Chilled Water Pumps (CC) Component Qualification Documentation Chillers (CC) Component Qualification Documentation Clean Agent Exhaust Fans (CC) Component Qualification Documentation Computer Room Air Conditioners (CC) Component Qualification Documentation Condensing Unit (CC) Component Qualification Documentation Energy Wheel (CC) Component Qualification Documentation Exhaust Fans (PP) Component Qualification Documentation Exhaust System (PP) Component Qualification Documentation Expansion Tanks (CC) Component Qualification Documentation Fan Coil Unit Condensing Unit

(PP)

Component Qualification Documentation Fan Coil Units (CC) Component Qualification Documentation Fan Coil Units (PP)

SECTION 23 05 48.19 14 Page 7

Component Qualification Documentation Fire Protection Sprinkler System (CC) Component Qualification Documentation Fire Protection Sprinkler System (PP) Component Qualification Documentation Fuel Coolers (PP) Component Qualification Documentation Fuel Oil (PP) Component Qualification Documentation Fuel Oil Pumps (PP) Component Qualification Documentation Generator Accessories (PP) Component Qualification Documentation Generators (PP) Component Qualification Documentation Refrigerant System (PP) Component Qualification Documentation Storage Tanks for Fuel Oil

(PP)

Component Qualification Documentation Storage Tanks for Water (CC) Component Qualification Documentation Supply Air Duct (CC) Component Qualification Documentation Underfloor Air Distribution

(CC)

Component Qualification Documentation VAV Boxes (CC) Component Qualification Documentation Pumps (UL) Component Qualification Documentation Fuel Conveyance System (UL)

1.2.5 Items Not Covered By This Section

1.2.5.1 Fire Protection Systems

Install seismic protection of piping for fire protection systems as specified in Section 21 13 13.00 14 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION, and Section 21 22 00.00 14 CLEAN AGENT FIRE EXTINGUISHING

SYSTEM.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-02 Shop Drawings

Coupling and Bracing for CC Coupling and Bracing for PP

Flexible Couplings or Joints for CC Flexible Couplings or Joints for PP

Equipment Restraint for CC Equipment Restraint for PP

Contractor Designed Bracing for CC; G Contractor Designed Bracing for PP; G

Contractor Designed Bracing and Anchorage for Command Center; G

(CC)

Contractor Designed Bracing and Anchorage for Domestic Water Booster Pumps; G (CC) Contractor Designed Bracing and Anchorage for Domestic Water Hydro-Pneumatic Tank; G (CC)

SECTION 23 05 48.19 14 Page 8

Contractor Designed Bracing and Anchorage for Water Softener; G

(CC)

Contractor Designed Bracing and Anchorage for Non-DSS Exhaust Fans;

G (CC)

Contractor Designed Bracing and Anchorage for Exhaust Fans; G (PP) Contractor Designed Bracing and Anchorage for Fuel Conveyance System; G (UL) Contractor Designed Bracing and Anchorage for Potable Water; G

(CC)

Contractor Designed Bracing and Anchorage for Potable Water; G

(PP)

Contractor Designed Bracing and Anchorage for Pumps; G (PP) Contractor Designed Bracing and Anchorage for Pumps; G (UL) Contractor Designed Bracing and Anchorage for Radon Piping; G (PP) Contractor Designed Bracing and Anchorage for Sanitary Sewer; G

(CC)

Contractor Designed Bracing and Anchorage for Sanitary Sewer; G

(PP)

Contractor Designed Bracing and Anchorage for Storage Tanks for Fuel Oil; G (PP) Contractor Designed Bracing and Anchorage for Water Heaters; G

(CC)

Contractor Designed Bracing and Anchorage for Air Exhaust Duct; G

(CC)

Contractor Designed Bracing and Anchorage for Air Handling; G (PP) Contractor Designed Bracing and Anchorage for Air Handling/Distribution; G (CC) Contractor Designed Bracing and Anchorage for Air Handling Unit Condensing Unit; G (PP) Contractor Designed Bracing and Anchorage for Air Handling Units;

G (CC)

Contractor Designed Bracing and Anchorage for Air Handling Units;

G (PP)

Contractor Designed Bracing and Anchorage for Air Separators; G

(CC)

Contractor Designed Bracing and Anchorage for Battery Exhaust Fans;

G (CC)

Contractor Designed Bracing and Anchorage for Chilled Water; G

(CC)

Contractor Designed Bracing and Anchorage for Chilled Water Pumps;

G (CC)

Contractor Designed Bracing and Anchorage for Chillers; G (CC) Contractor Designed Bracing and Anchorage for Clean Agent Exhaust Fans; G (CC) Contractor Designed Bracing and Anchorage for Computer Room Air Conditioners; G (CC) Contractor Designed Bracing and Anchorage for Computer Room Air Conditioners; G (PP) Contractor Designed Bracing and Anchorage for Condensing Unit; G

(CC)

Contractor Designed Bracing and Anchorage for Energy Wheel; G (CC) Contractor Designed Bracing and Anchorage for Exhaust Fans; G (PP) Contractor Designed Bracing and Anchorage for Exhaust System; G

(PP)

Contractor Designed Bracing and Anchorage for Expansion Tanks; G

(CC)

Contractor Designed Bracing and Anchorage for Fan Coil Unit

SECTION 23 05 48.19 14 Page 9

Condensing Unit; G (PP) Contractor Designed Bracing and Anchorage for Fan Coil Units; G

(CC)

Contractor Designed Bracing and Anchorage for Fan Coil Units; G

(PP)

Contractor Designed Bracing and Anchorage for Fire Protection sprinkler System; G (CC) Contractor Designed Bracing and Anchorage for Fire Protection sprinkler System; G (PP) Contractor Designed Bracing and Anchorage for Fuel Oil; G (PP) Contractor Designed Bracing and Anchorage for Fuel Oil Pumps; G

(PP)

Contractor Designed Bracing and Anchorage for Generator Accessories; G (PP) Contractor Designed Bracing and Anchorage for Generators; G (PP) Contractor Designed Bracing and Anchorage for Radon Piping; G (PP) Contractor Designed Bracing and Anchorage for Refrigerant System;

G (PP)

Contractor Designed Bracing and Anchorage for Storage Tanks for Fuel Oil; G (PP) Contractor Designed Bracing and Anchorage for Supply Air Duct; G

(CC)

Contractor Designed Bracing and Anchorage for Underfloor Air Distribution; G (CC) Contractor Designed Bracing and Anchorage for VAV Boxes; G (CC)

Equipment Requirements for Command Center; G (CC) Equipment Requirements for Domestic Water Booster Pumps; G (CC) Equipment Requirements for Domestic Water Hydro-Pneumatic Tank; G

(CC)

Equipment Requirements for Non-DSS Exhaust Fans; G (CC) Equipment Requirements for Exhaust System; G (PP) Equipment Requirements for Fuel Conveyance System; G (UL) Equipment Requirements for Potable Water; G (CC) Equipment Requirements for Pumps; G (UL) Equipment Requirements for Pumps; G (PP) Equipment Requirements for Radon Piping; G (PP) Equipment Requirements for Refrigerant System; G (PP) Equipment Requirements for Sanitary Sewer; G (CC) Equipment Requirements for Water Heaters; G (CC) Equipment Requirements for Water Softener; G (CC)

Equipment Requirements for Air Exhaust Duct; G (CC) Equipment Requirements for Air Handling; G (PP) Equipment Requirements for Air Handing/Distribution; G (CC) Equipment Requirements for Air Handling Unit Condensing Unit; G

(PP)

Equipment Requirements for Air Handling Units; G (CC) Equipment Requirements for Air Handling Units; G (PP) Equipment Requirements for Air Separators; G (CC) Equipment Requirements for Battery Exhaust Fans; G (CC) Equipment Requirements for Chilled Water; G (CC) Equipment Requirements for Chilled Water Pumps; G (CC) Equipment Requirements for Chillers; G (CC) Equipment Requirements for Clean Agent Exhaust Fans; G (CC) Equipment Requirements for Computer Room Air Conditioners; G (CC)

SECTION 23 05 48.19 14 Page 10

Equipment Requirements for Computer Room Air Conditioners; G (PP) Equipment Requirements for Condensing Unit; G (CC) Equipment Requirements for Energy Wheel; G (CC) Equipment Requirements for Expansion Tanks; G (CC) Equipment Requirements for Exhaust Fans; G (PP) Equipment Requirements for Exhaust System; G (PP) Equipment Requirements for Fan Coil Unit Condensing Unit; G (PP) Equipment Requirements for Fan Coil Units; G (CC) Equipment Requirements for Fan Coil Units; G (PP) Equipment Requirements for Fire Protection Sprinkler System; G (CC) Equipment Requirements for Fire Protection Sprinkler System; G (PP) Equipment Requirements for Fuel Coolers; G (PP) Equipment Requirements for Fuel Oil; G (PP) Equipment Requirements for Fuel Oil Pumps; G (PP) Equipment Requirements for Generator Accessories; G (PP) Equipment Requirements for Generators; G (PP) Equipment Requirements for Radon Piping; G (PP) Equipment Requirements for Refrigerant System; G (CC) Equipment Requirements for Storage Tanks for Fuel Oil; G (PP) Equipment Requirements for Storage Tanks for Water; G (CC) Equipment Requirements for Supply Air Duct; G (CC) Equipment Requirements for Underfloor Air Distribution; G (CC) Equipment Requirements for VAV Boxes; G (CC)

SD-03 Product Data

Coupling and Bracing for CC Coupling and Bracing for PP

Flexible Couplings or Joints for CC; G Flexible Couplings or Joints for PP; G

Equipment Restraint for CC; G Equipment Restraint for PP; G

Contractor Designed Bracing for CC; G Contractor Designed Bracing for PP; G

Anchor Bolts for CC Anchor Bolts for PP

Vibration Isolators

Equipment Requirements for Command Center; G (CC) Equipment Requirements for Domestic Water Booster Pumps; G (CC) Equipment Requirements for Domestic Water Hydro-Pneumatic Tank; G

(CC)

Equipment Requirements for Non-DSS Exhaust Fans; G (CC) Equipment Requirements for Exhaust System; G (PP) Equipment Requirements for Fuel Conveyance System; G (UL)

Equipment Requirements for Potable Water; G (CC) Equipment Requirements for Potable Water; G (PP) Equipment Requirements for Pumps ; G (UL) Equipment Requirements for Pumps; G (PP) Equipment Requirements for Radon Piping; G (PP) Equipment Requirements for Refrigerant System; G (PP) Equipment Requirements for Sanitary Sewer; G (CC)

SECTION 23 05 48.19 14 Page 11

Equipment Requirements for Sanitary Sewer; G (PP) Equipment Requirements for Water Heaters; G (CC)

Equipment Requirements for Air Exhaust Duct; G (CC) Equipment Requirements for Air Handling; G (PP) Equipment Requirements for Air Handing/Distribution; G (CC) Equipment Requirements for Air Handling Unit Condensing Unit; G

(PP)

Equipment Requirements for Air Handling Units; G (CC) Equipment Requirements for Air Handling Units; G (PP) Equipment Requirements for Air Separators; G (CC) Equipment Requirements for Air Separators; G (PP) Equipment Requirements for Battery Exhaust Fans; G (CC) Equipment Requirements for Chilled Water; G (CC) Equipment Requirements for Chilled Water Pumps; G (CC) Equipment Requirements for Chillers; G (CC) Equipment Requirements for Clean Agent Exhaust Fans; G (CC) Equipment Requirements for Computer Room Air Conditioners; G (CC) Equipment Requirements for Computer Room Air Conditioners; G (PP) Equipment Requirements for Condensing Unit; G (CC) Equipment Requirements for Energy Wheel; G (CC) Equipment Requirements for Expansion Tanks; G (CC) Equipment Requirements for Exhaust Fans; G (PP) Equipment Requirements for Exhaust System; G (PP) Equipment Requirements for Fan Coil Unit Condensing Unit; G (PP) Equipment Requirements for Fan Coil Units; G (CC) Equipment Requirements for Fan Coil Units; G (PP) Equipment Requirements for Fire Protection Sprinkler System; G (CC) Equipment Requirements for Fire Protection Sprinkler System; G (PP) Equipment Requirements for Fuel Coolers; G (PP) Equipment Requirements for Fuel Oil; G (PP) Equipment Requirements for Fuel Oil Pumps; G (PP) Equipment Requirements for Generator Accessories; G (PP) Equipment Requirements for Generators; G (PP)

Equipment Requirements for Radon Piping; G (PP) Equipment Requirements for Refrigerant System; G (CC) Equipment Requirements for Storage Tanks for Fuel Oil; G (PP) Equipment Requirements for Storage Tanks for Water; G (CC) Equipment Requirements for Supply Air Duct; G (CC) Equipment Requirements for Underfloor Air Distribution; G (CC) Equipment Requirements for VAV Boxes; G (CC)

Component Qualification Documentation Air Exhaust Duct; G (CC) Component Qualification Documentation Air Handling; G (PP) Component Qualification Documentation Air Handing/Distribution; G

(CC)

Component Qualification Documentation Air Handling Unit Condensing Unit; G (PP) Component Qualification Documentation Air Handling Units; G (CC) Component Qualification Documentation Air Handling Units; G (PP) Component Qualification Documentation Air Separators; G (CC) Component Qualification Documentation Air Separators; G (PP) Component Qualification Documentation Battery Exhaust Fans; G (CC) Component Qualification Documentation Chilled Water; G (CC) Component Qualification Documentation Chilled Water Pumps; G (CC) Component Qualification Documentation Chillers; G (CC)

SECTION 23 05 48.19 14 Page 12

Component Qualification Documentation Clean Agent Exhaust Fans; G

(CC)

Component Qualification Documentation Computer Room Air Conditioners; G (CC) Component Qualification Documentation Computer Room Air Conditioners; G (PP) Component Qualification Documentation Condensing Unit; G (CC) Component Qualification Documentation Energy Wheel; G (CC) Component Qualification Documentation Exhaust Fans; G (PP) Component Qualification Documentation Exhaust System; G (PP) Component Qualification Documentation Expansion Tanks; G (CC) Component Qualification Documentation Fan Coil Unit Condensing Unit;

G (PP)

Component Qualification Documentation Fan Coil Units; G (CC) Component Qualification Documentation Fan Coil Units; G (PP) Component Qualification Documentation Fire Protection Sprinkler System; G (CC) Component Qualification Documentation Fire Protection Sprinkler System; G (PP) Component Qualification Documentation Fuel Coolers; G (PP) Component Qualification Documentation Fuel Oil; G (PP) Component Qualification Documentation Fuel Oil Pumps; G (PP) Component Qualification Documentation Generator Accessories; G (PP) Component Qualification Documentation Generators; G (PP) Component Qualification Documentation Refrigerant System; G (PP) Component Qualification Documentation Storage Tanks for Fuel Oil; G

(PP)

Component Qualification Documentation Storage Tanks for Water; G

(CC)

Component Qualification Documentation Supply Air Duct; G (CC) Component Qualification Documentation Underfloor Air Distribution;

G (CC)

Component Qualification Documentation VAV Boxes; G (CC) Component Qualification Documentation Pumps; G (UL) Component Qualification Documentation Fuel Conveyance System; G

(UL)

SD-05 Design Data

Design Calculations

SD-06 Test Reports

Anchor Bolts for CC; G Anchor Bolts for PP; G

PART 2 PRODUCTS

2.1 GENERAL DESIGN REQUIREMENTS

Submit detailed seismic restraint drawings for mechanical equipment, duct systems, piping systems and any other mechanical systems along with calculations, catalog cuts, templates, and erection and installation details, as appropriate, for the items listed below. Indicate thickness, type, grade, class of metal, and dimensions; and show construction details, reinforcement, anchorage, and installation with relation to the building construction. Calculations must be stamped, by a registered structural engineer, and verify the capability of structural members to which bracing is attached for carrying the load from the brace. Include

SECTION 23 05 48.19 14 Page 13 drawing for Mission Critical Equipment indicating the equipment location in the facility sufficient to be used for the installation. Design must be based on actual equipment and system layout. Design must include calculated dead loads, static seismic loads and capacity of materials utilized for the connection of the equipment or system to the structure.

Analysis must detail anchoring methods.

2.2 EQUIPMENT RESTRAINT

Equipment Restraint for CC and Equipment Restraint for PP

Equipment must be rigidly or flexibly mounted as indicated in the specifications and/or drawings depending on vibration isolation requirements as follows below.

Roof mounted equipment such as cooling towers and condensers, both vibration isolated and nonisolated, must have support members designed and anchored to building structural steel or concrete as required for seismic restraint and wind loads.

2.2.1 Rigidly (Base and Suspended) Mounted Equipment

HVAC equipment furnished under this contract must be rigidly mounted using cast-in-place anchor bolts or post-installed anchors that are qualified for earthquake loading in accordance with ACI 355.2 and ACI 355.4 . Anchor bolts must conform to ASTM F1554. For any rigid equipment which is rigidly anchored, provide flexible joints for piping, ductwork, electrical conduit, etc., that are capable of accommodating displacements equal to the full width of the joint in both orthogonal directions. Suspended equipment bracing attachments should be located just above the center of gravity to minimize swinging. Use the ratio of the overturning moment from seismic forces to the resisting moment due to gravity loads to determine if overturning forces need to be considered in the sizing of anchor bolts. Provide calculations to verify the adequacy of the anchor bolts for combined shear and overturning.

Roof mounted HVAC equipment roof curbs, framing and attachment to equipment and structure must be designed and braced to withstand seismic loads. Designated Seismic Systems (DSS) assigned to Seismic Design Category (SDC) C, D, E, or F and Risk Category IV components needed for continued operation after an earthquake must have two nuts provided on each anchor bolt.

2.2.2 Nonrigid or Flexibly-Mounted Equipment

Select vibration isolation devices so that the maximum movement of equipment from the static deflection point is 1/4 inch. Equipment flexibly mounted on vibration isolators must have a bumper restraint or snubber in each horizontal direction and vertical restraints must be provided where required to resist overturning. Isolator housing and restraints must be constructed of ductile materials. A viscoelastic pad or similar material of appropriate thickness must be used between the bumper and components to limit the impact load. Restraints must be designed to resist the calculated horizontal lateral and vertical forces.

Spring vibration isolators must be seismically rated, restrained isolators for equipment subject to load variations and large external forces. The seismically rated housing must be sized to meet or exceed the force requirements applicable to the project and meet the required isolation

SECTION 23 05 48.19 14 Page 14 criteria. Spring vibration isolator manufacturer's will be a member of VISCMA. Design force, Fp, must be doubled for vibration isolators with an air gap greater than 0.25 inches as specified in ASCE 7-16 , Chapter 13.

Housed springs must not be used for seismic restraint applications because they cannot resist uplift.

2.3 BOLTS AND NUTS

Hex head bolts, and heavy hexagon nuts must be ASTM A325 or ASTM A490 bolts and ASTM A563 nuts. Provide bolts and nuts galvanized in accordance with ASTM A153/A153M when used underground or exposed to weather.

2.4 FLEXIBLE JOINTS

Flexible joints must have same pressure and temperature ratings as adjoining pipe. Braided hoses must not be used where there is torsional or axial movement unless manufacturer allows it.

2.4.1 Braided Hose Expansion Joint

Braided hose expansion joint(s) must be installed in the locations indicated on the drawings and as required to accommodate any thermal expansion, contraction or seismic movement of the piping system. Joints must consist of two parallel sections of corrugated metal hose, compatible braid, and 180 degree return bend with inlet and outlet connections. Field fabricated loops are not acceptable. Braided hose expansion joint(s) must be installed in the locations indicated on the drawings and as required to accommodate any thermal expansion, contraction or seismic movement of the piping system. Joints must consist of two parallel sections of corrugated metal hose, compatible braid, and 180 degree return bend with inlet and outlet connections. Field fabricated loops must not be acceptable.

Braided hose in a 60 degree flexible V loop arrangement must be used for small diameter pipe connections to coils in variable-air-volume (VAV) terminal units and fan coil units installed in suspended ductwork whether braced or unbraced.

All braided hose expansion joints must be manufactured in accordance with the documented manufacturers weld procedure specifications. The procedure qualification record must be used to document the execution of this procedure and must follow the general "guidelines" of ASME Section IX.

Each individual welder must conform to the in-house procedure qualification record and be qualified prior to each production lot. The testing of each individual welder must be documented in a welding procedure qualification record.

2.4.1.1 Corrugated Hose

Corrugated hose must be Type 316 stainless steel. Braid must be Type 304 stainless steel for any series 300 stainless steel hose. Fittings materials of construction and end fitting type must be consistent with pipe material and equipment / pipe connection fittings. Copper fittings must not be attached to stainless steel hose.

2.4.1.2 Flexible Hose Expansion Loops

Flexible hose expansion loops must have a factory supplied, hanger / support lug located at the bottom of the 180deg return. Flexible hose expansion loop(s) must be furnished with a plugged FPT to be used for a drain or air release vent. Flexible hose expansion loop(s) must be rated

SECTION 23 05 48.19 14 Page 15 with an operating pressure which is the same as the adjoining pipe. The operating pressure must be based on burst pressure with a 4 to 1 safety factor.

2.4.2 Double Ball Flexible Expansion Joint

Install flexible expansion joints manufactured of ductile iron conforming to the material requirements of ASTM A536 and AWWA C153/A21.53 in the locations indicated on the drawings. Provide foundry certification of material upon request. Each flexible expansion joint must be pressure tested prior to shipment against its own restraint to a minimum of 350 psi (250 psi for flexible expansion joints 2 inch and 30 inches diameter and larger.) A minimum 2:1 safety factor, determined from the published pressure rating, must apply. Factory Mutual Approval for the 3 inch through 12 inch sizes is required. Each flexible expansion joint must consist of an expansion joint designed and cast as an integral part of a ball and socket type flexible joint, having a minimum per ball deflection of: 20º, 2"-12"; 15º, 14"-36"; 12º, 42"-48" and 4-inches minimum expansion. Additional expansion sleeves must be available and easily added or removed at the factory or in the field. Both standardized mechanical joint and flange end connections must be available.

2.4.2.1 Internal Surfaces

Line all internal surfaces (wetted parts) with a minimum of 15 mils of fusion bonded epoxy conforming to the applicable requirements of AWWA C213.

Sealing gaskets must be constructed of EPDM. The coating must meet

NSF/ANSI 61 .

2.4.2.2 Exterior Surfaces

Coat exterior surfaces with a minimum of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .