P693_Drawings_Final_Vol14.1_20241007-Part1.pdf
PDF 43 MB Posted
- Solicitation number
- N6274225R1301
About this file
This document is a pre-solicitation notice for a federal contract opportunity to construct a Guam Defense Radar System Command Center, power generation facility, and associated infrastructure. The work includes site demolition, civil site work, concrete construction, an antenna tower, seismic isolation, security infrastructure, and complex integration of multiple control systems. The estimated contract value is between $250,000,000 and $500,000,000. The contract completion period is anticipated to be 1,323 calendar days. The procurement will be solicited on an unrestricted basis with full and open competition. Offers will be evaluated on a best-value tradeoff basis considering technical factors and price. Technical factors include experience, small business utilization, safety, management plan, and past performance. The Request for Proposal is anticipated to be available on or around October 30, 2024, with a pre-proposal site visit scheduled for December 11, 2024. The contracting agency is the Department of the Navy, Naval Facilities Engineering Command.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07-OCT-2024
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
10/17/2024
07-OCT-2024
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4 via email
D oD
D oD
D oD D oD
D oD
D oD
DoD
DoD
DoD
DoD
DoD
DoD
DoD
DoD
DoD
DoD
DoD
DoDDoD
DoD
DoD
DoD
D oD
DoD
D oD
SS
SS
ROUTE 9
NORTH GATE
ACCESS
PROJECT AREA
CONSTRUCTION
LAYDOWN AREA
ACCESS TO ANDERSEN
AIR FORCE BASE
EAM
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
1812861
AWK/DMK
KYM
JC
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
OF
EPROJECT NO.:
DRAWFORM REVISION: 25 AUGUST 2020
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E CONTRACT NO. N62478-20-D-5036
A/E Task Order No. N6274223F0328
14CC-A-101
SITE #
BUILDING ID DISCIPLINE
CONSECUTIVE NUMBERS
SITE #
SITE 01
SITE 02
SITE 14
BUILDING ID
AC - ACCESS CONTROL POINT
CC - COMMAND CENTER
FP - FIRE PUMP BUILDING
GI - GENERAL
PP - POWER PLANT
SF - SECURITY FORCE
ST - SITE
AS NOTED
TFPSMMJDB
17323182
H A
U L
R O
U T
E A
N D
C O
N S
T R
U C
T
IO
N E
N T
R A
N C
E P
L A
N
A1
HAUL ROUTE AND CONSTRUCTION ENTRANCE PLAN
SCALE: 1" = 400'
800 16000
B O
N N
IS
B
L V
D
A. SEE SHEET 14GI-G-022 FOR CONSTRUCTION PLANNING.
B. SEE SHEET 14GI-G-023 FOR CONSTRUCTION LIMITS.
C. SEE SHEET 14GI-C-001 FOR CIVIL GENERAL NOTES.
D. SEE SHEET 14GI-C-002 FOR CIVIL LEGEND.
E. SEE SHEET 14GI-C-003 FOR CIVIL ABBREVIATIONS.
F. HAUL ROUTES ARE NOT FOR THE CONTRACTOR'S SOLE
USE AND WILL REQUIRE COORDINATION WITH THE
GOVERNMENT AND OTHER USERS
G. HAUL ROUTES MUST BE AS DIRECTED BY THE
CONTRACTING OFFICER. HAUL ROUTES SHOWN ON
THIS DRAWING ARE FOR INFORMATION ONLY AND MUST
BE VERIFIED WITH THE CONTRACTING OFFICER PRIOR
TO USE.
POWERS AVE
5TH ST
A R
C
LI
G H
T B
L V
D
MARIANAS BLVD
ARCLIG
HT BLVD
5TH ST
5TH ST
M A
R
IA
N A
S B
L V
D
M A
R
IA
N A
S B
LV
D
14GI-G-023
14GI-C-001
14GI-C-002
14GI-C-003
10/04/24
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
E
IS
EIS EIS EIS EIS EIS EIS EIS EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EISEIS
EIS
EIS
E
IS
EIS
EIS
EIS
E
IS
E
IS
E
IS
EISEISEISEISEIS
E
IS
E
IS
E
IS
EIS EIS EIS EIS EIS
EIS
EIS
EIS
EIS
E
IS
EIS
EIS
E
IS
EI
S
E
IS
E
IS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
E
IS
E
IS
E
IS
E
IS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
E
IS
E
IS
E
IS
E
IS
E
IS
EIS
EIS
EIS
EIS
EIEISEISEIS
E I S
E
IS
EISEISEISEIS
EDB
EDB
E D
B
EDB
EDB
EDB
EDB
S S
S S
S S
S S
S S
S S
S S
UHH
UHH
UHH
UHH
UHH
UHH
S TOP
S TOP
ST OP
ST OP
ST OP
S TOP
YIE LD
ST OP
S TO P
UHH
BURIED
CABL E
BCM
UHH
UHH
BCM
BCM
CONSTRUCTION ENTRANCE
SECURE STORAGE
AREA 0.9 ACRES
MINIMUM, SEE NOTE G.
SWITCHGEAR BUILDING
COMMAND CENTER
PO
W
ERS AVE
SANTA ROSA BLVD
BONNIS
B
LV
D
BONNIS BLVD
PO
W
ERS AVE
OMALLEY AVE
SECURITY FENCE WITH
BARBED WIRE (FE-6).
SEE SHEETS 14ST-C-506
THROUGH 14ST-C-507
FOR DETAILS
SECURITY FENCE WITHOUT BARB WIRE
(FE-5).SEE SHEETS 14ST-C-506 THROUGH
14ST-C-507 FOR DETAILS
MOBILE AVE.
NEW YORK AVE.
F
IF
T H
S T
F O
U R
T H
S T
GOVERNMENT
LAYDOWN AREA
SEE NOTE F.
MISSION SYSTEMS CONTRACTOR
LAYDOWN AREA SEE NOTE F.
CONTRACTOR
LAYDOWN AREA
SEE NOTE F.
FUTURE GENERAL PURPOSE
WAREHOUSE (BY OTHERS)
APPROXIMATE LOCATION FOR CONNECTION TO EXISTING
ELECTRIC AT MH 169-1. PROVIDE 250kva @208V
SECONDARY TRANSFORMER AND NEW SWITCHGEAR TO
CONNECT MEDIUM VOLTAGE LINES. FED FROM FEEDER 65.
CONNECTION TO EXISTING FIRE
HYDRANT FOR TEMPORARY WATER
SUPPLY
DIESEL GENERATOR YARD
FUEL TANKS
ENTRY CONTROL CANOPY
CONSTRUCTION TRAILER AREA FOR
GENERAL CONTRACTOR AND
CONSTRUCTION GOVERNMENT CONTRACT
ADMINISTRATION. SEE SPECIFICATIONS
FOR REQUIREMENTS. COORDINATE FINAL
LOCATION WITH CONTRACTING OFFICER.
W W
W W
W W W
EDB EDB EDB EDB EDB
E D
B E
D B
PROVIDE TEMPORARY ELECTRICAL
CONNECTION
PROVIDE A TEMPORARY WATER
CONNECTION
PROVIDE TEMPORARY ELECTRICAL
CONNECTION
PROVIDE A TEMPORARY
WATER CONNECTION
FUTURE FUEL TANKS
(BY OTHERS)
W
EDB
EDB
APPROXIMATE LOCATION FOR CONNECTION TO EXISTING
ELECTRIC. PROVIDE 250kva @208V SECONDARY
TRANSFORMER AND NEW SWITCHGEAR TO CONNECT
MEDIUM VOLTAGE LINES. FED FROM FEEDER 65.
PROVIDE TEMPORARY ELECTRICAL
CONNECTION
CONNECTION TO EXISTING FIRE
HYDRANT FOR TEMPORARY WATER
SUPPLY
PROVIDE A TEMPORARY
WATER CONNECTION
SECURITY FENCE WITH
BARB WIRE (FE-6). SEE
SHEETS 14ST-C-506
THROUGH 507 FOR
DETAILS
SECURE ENTRANCE
GATE
ENTRY CONTROL LOCATION. CONTRACTOR MUST PROVIDE
GRADING AND PERIMETER FENCING TO SUPPRORT THE
ENTRY CONTROL STRUCTURE.
SECURE GATE TO BE LOCATED ANY
WHERE ALONG INDICATED PERIMETER
DETENTION
BOUNDARY
DETENTION
PERIMETER
FENCE
OFF-SITE LAYDOWN AREA
EAM
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
JC
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
OF
EPROJECT NO.:
DRAWFORM REVISION: 25 AUGUST 2020
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E CONTRACT NO. N62478-20-D-5036
A/E Task Order No. N6274223F0328
14CC-A-101
SITE #
BUILDING ID DISCIPLINE
CONSECUTIVE NUMBERS
SITE #
SITE 01
SITE 02
SITE 14
BUILDING ID
AC - ACCESS CONTROL POINT
CC - COMMAND CENTER
FP - FIRE PUMP BUILDING
GI - GENERAL
PP - POWER PLANT
SF - SECURITY FORCE
ST - SITE
A1 SCALE:
CONSTRUCTION PLANNING
1" = 150'
AS NOTED
TFPSMMJDB
17323183
C O
N S
T R
U C
T
IO
N P
L A
N N
IN
G
A. SEE SHEET 14GI-G-021 FOR HAUL ROUTE.
B. SEE SHEET 14GI-G-023 FOR CONSTRUCTION LIMITS.
C. SEE SHEET 14GI-C-001 FOR CIVIL GENERAL NOTES.
D. SEE SHEET 14GI-C-002 FOR CIVIL LEGEND.
E. SEE SHEET 14GI-C-003 FOR CIVIL ABBREVIATIONS.
F. OFF-SITE LAYDOWN AREA: CONTRACTOR MUST
PROVIDE THREE SEPARATE FENCED AREAS. PROVIDE
ONE (1) GATE FOR EACH AREA (TOTAL OF THREE (3)
GATES). THE AREA DEDICATED FOR GOVERNMENT AND
THE MISSION SYSTEMS CONTRACTOR MUST BE A
MINIMUM OF 2 ACRES EACH. THESE AREAS WILL BE
USED BY OTHERS DURING CONSTRUCTION. THE THIRD
AREA WILL BE FOR THE CONTRACTOR. CONTRACTOR
MUST PROVIDE AN AGGREGATE SURFACE FOR ALL
LAYDOWN AREAS THAT WILL SUPPORT PLANNED
EQUIPMENT AND MATERIALS REQUIRED FOR
CONSTRUCTION.
G. COORDINATE AND PREPARE THE SECURE STORAGE
AREA FOR THE SPECIAL USE SPACE CONSTRUCTION
SECURITY PLAN (CSP) REQUIREMENTS. PROVIDE A
SECURITY FENCE WITH BARBED WIRE (FE-6) AROUND
THE PERIMETER OF THE SECURE STORAGE AREA AND
PROVIDE TWO (2) GATES. COORDINATE THE FINAL
LOCATION OF THE GATES WITH THE CONTRACTING
OFFICER. PROVIDE A MATERIAL ON THE FENCE THAT
COMPLETELY OBSCURES VISION FROM THE OUTSIDE.
VISION SCREENING CAN BE ACCOMPLISHED WITH
PRIVACY SLATS INSTALLED, ALUMINUM SHEETING OR
OTHER MATERIAL THAT CAN COMPLETELY OBSCURES
VISION ONTO THE AREA. THIS AREA MUST BE GRADED
PER THE FINISH GRADE SHOWN ON THE GRADING
DRAWINGS. PROVIDE AN AGGREGATE SURFACE FOR
THE AREA TO SUPPORT HEAVY CONSTRUCTION
TRAFFIC. THIS AREA WILL BE USED BY OTHERS DURING
THE DURATION OF CONSTRUCTION. COORDINATE THE
WORK FOR THE SPECIAL USE SPACE WITHIN THE
COMMAND CENTER TO ALLOW A SHARED SPACE
WITHIN THE SECURE STORAGE AREA.
H. FENCE ALIGNMENTS AND COORDINATES FOR LAYDOWN
AREAS ARE SHOWN FOR REFERENCE ONLY. FINAL
ALIGNMENT MUST BE COORDINATED AND APPROVED
WITH THE CONTRACTING OFFICER.
I. RESTORE THE OFF-SITE LAYDOWN AREA BACK TO
PRE-DEVELOPMENT CONDITIONS AFTER
CONSTRUCTION IS COMPLETE. THE AGGREGATE
SURFACING FOR THE SECURE LAYDOWN AREA MUST
BE REMOVED AND AREA SEEDED AFTER
CONSTRUCTION IS COMPLETE.
J. CONTRACTOR MUST PROVIDE PROTECTION AND
SUFFICIENT COVER FOR TEMPORARY UTILITIES THAT
WILL ENCOUNTER HEAVY LOADS.
K. CONTRACTOR MUST PROVIDE A METER FOR
TEMPORARY UTILITIES.
L. AN APPLICATION MUST BE SUBMITTED AND APPROVED
PRIOR TO CONNECTION FOR TEMPORARY UTILITIES.
ALLOW 90 DAYS FOR THE APPROVAL PROCESS.
M. CONTRACTOR MUST PROVIDE A PERIMETER SECURITY
FENCE AROUND THE PROJECT SITE. THE FINAL GATE
LOCATIONS INDICATED ON THE PLAN MUST BE
COORDINATED WITH THE CONTRACTING OFFICER.
PROVIDE A MATERIAL ON THE FENCE THAT
COMPLETELY OBSCURES VISION FROM THE OUTSIDE.
VISION SCREENING CAN BE ACCOMPLISHED WITH
PRIVACY SLATS INSTALLED, ALUMINUM SHEETING OR
OTHER MATERIAL THAT CAN COMPLETELY OBSCURES
VISION ONTO THE AREA.
150 3000
14GI-G-021
14GI-G-023
14GI-C-001
14GI-C-002
14GI-C-003
14ST-C-506
14ST-C-506
14ST-C-506
14ST-C-507
14ST-C-507
10/04/24
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
FUTURE GENERAL PURPOSE
WAREHOUSE (BY OTHERS)+
COMMAND CENTER
POWER PLANT
CONSTRUCTION LIMITS
107 108
111 112
119120
143144
179180
184 185
CONSTRUCTION LIMIT TABLE
Point #
Northing
680280.69
679886.29
680086.42
680071.76
680112.32
680127.22
680366.35
680310.93
680335.24
680412.82
680521.03
681203.75
681445.76
Easting
391639.46
392442.27
392559.92
392589.25
392610.22
392589.58
392809.05
392901.40
392913.86
392855.61
392964.02
392402.29
392697.23
CONSTRUCTION LIMIT TABLE
Point #
Northing
682188.42
682394.83
682575.76
682288.72
682909.23
682877.82
683007.73
682981.89
682707.33
682647.36
682627.43
682690.38
682246.91
Easting
393156.74
392757.04
392576.03
391924.08
391648.48
391579.66
391521.08
391470.12
391609.88
391498.51
391518.44
391635.35
391830.90
CONSTRUCTION LIMIT TABLE
Point #
Northing
681915.59
681825.96
681873.13
681885.45
682486.93
682351.20
682306.44
682283.39
682327.73
682292.04
682216.66
682177.51
682260.33
Easting
391100.78
391182.36
391283.41
391278.20
392612.27
392749.61
392726.28
392779.29
392799.23
392886.59
392852.42
392926.41
392962.64
CONSTRUCTION LIMIT TABLE
Point #
Northing
682200.83
681630.93
681653.13
681594.07
681573.42
681515.19
681543.25
681500.25
681470.90
681240.54
680349.73
680536.80
680689.16
Easting
393109.58
392775.63
392738.41
392701.59
392738.49
392704.04
392674.60
392629.87
392657.70
392372.03
391622.55
391232.01
391291.38
CONSTRUCTION LIMIT TABLE
Point #
Northing
680719.81
680599.89
680620.90
680662.23
680683.48
680610.45
680711.39
681264.43
680898.10
680363.70
680685.90
680649.69
680560.38
Easting
391249.14
391194.49
391144.40
391161.74
391114.23
391080.70
390822.55
390590.74
389787.44
390033.38
390765.48
390793.79
391057.71
CONSTRUCTION LIMIT TABLE
Point #
Northing
680509.42
680436.67
680461.58
680283.39
680263.37
680206.85
679830.62
679391.61
678830.92
678918.37
679327.72
679832.10
679766.33
Easting
391034.31
391190.01
391200.46
391518.68
391507.06
391570.38
391422.93
391329.72
391310.54
390884.78
389911.12
388864.84
388790.84
CONSTRUCTION LIMIT TABLE
Point #
Northing
679795.07
679778.33
679718.72
679679.15
679724.07
679737.70
679698.71
679786.75
679300.33
678892.10
678797.95
679385.36
679824.75
Easting
388729.97
388393.89
388324.17
388365.20
388420.88
388717.97
388800.56
388894.54
389906.09
390878.51
391338.43
391356.41
391449.68
EAM
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
JC
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
OF
EPROJECT NO.:
DRAWFORM REVISION: 25 AUGUST 2020
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E CONTRACT NO. N62478-20-D-5036
A/E Task Order No. N6274223F0328
14CC-A-101
SITE #
BUILDING ID DISCIPLINE
CONSECUTIVE NUMBERS
SITE #
SITE 01
SITE 02
SITE 14
BUILDING ID
AC - ACCESS CONTROL POINT
CC - COMMAND CENTER
FP - FIRE PUMP BUILDING
GI - GENERAL
PP - POWER PLANT
SF - SECURITY FORCE
ST - SITE
AS NOTED
TFPSMMJDB
17323184
C O
N S
T R
U C
T
IO
N L
IM
IT
S
A1
CONSTRUCTION LIMITS
SCALE: 1" = 300'
300 6000
SANTA ROSA BLVD
P O
W E
R S
A V
E
SANTA ROSA BLVD
BONNIS BLVD
BONNIS
B
LVD
A. SEE SHEET 14GI-G-021 FOR HAUL ROUTE.
B. SEE SHEET 14GI-G-022 FOR CONSTRUCTION PLANNING.
C. SEE SHEET 14GI-C-001 FOR CIVIL GENERAL NOTES.
D. SEE SHEET 14GI-C-002 FOR CIVIL LEGEND.
F. SEE SHEET 14GI-C-003 FOR CIVIL ABBREVIATIONS.
C A
R O
LIN
E
S A
V E
N U
E
14GI-G-021
14GI-G-022
14GI-C-001
14GI-C-002
14GI-C-003
10/04/24
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
EDB
EDB
EDB
EDB
EDB
EDB
EDB
E D
B EDB
EDB
EDB
EDB
EDB EDB EDB EDB EDB EDB EDB
FIRE HYDRANT (TYP)
POWER PLANT
COMMAND CENTER
FUTURE GENERAL PURPOSE
WAREHOUSE (BY OTHERS)
FIRE DEPARTMENT
ENTRANCE (TYP)
FIRE DEPARTMENT
CONNECTION (TYP)
DESIGNATED MUSTER LOCATION
FIRE DEPARTMENT SITE
ACCESS
FDFIRE DEPARTMENT ENTRANCE
P O
W E
R S
A V
E
BONNIS BLVD
OMALLEY AVE
278'
288'
76'237'
132'
WWWWWWWW
W
W W
W W
W W
W W
W
W W W W W W W
FF
F
21'
21'
37'
13'
POST INDICATOR VALVE (PIV)
21'
21'
FIRE
F
IR
E
R48'
R48'
R52'
R60'
R48'
R58'
R42'
R52'
33'
5'
5' 10'
TYPE IIB
CONSTRUCTION
T Y
P E
I
IB
C O
N S
T R
U C
T
IO
N
'-0
350'-0"
12'
ACCESS CONTROL POINT
EXIT DISCHARGE PATH TO
MUSTER LOCATION (TYP)
FUTURE BULK FUEL
STORAGE TANKS
FIRE DEPARTMENT SITE ACCESS
HYDRANT TO FDC: 142'-5"
293'-9"
BULK FUEL STORAGE TANKS
(30,000 GALLONS EACH)
HOSE LAY
DISTANCE (TYP)
TRANSFORMER
TRANSFORMER23'
5.5'
GENERATOR
ENCLOSURE
BUILDING CODE
PROPERTY LINE (TYP)
W W W
W
W
W W
W
W
W
BUILDING CODE
PROPERTY LINE (TYP)
TRANSFORMER
TRANSFORMER
5.5'
EAM
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
JC
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
OF
EPROJECT NO.:
DRAWFORM REVISION: 25 AUGUST 2020
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E CONTRACT NO. N62478-20-D-5036
A/E Task Order No. N6274223F0328
14CC-A-101
SITE #
BUILDING ID DISCIPLINE
CONSECUTIVE NUMBERS
SITE #
SITE 01
SITE 02
SITE 14
BUILDING ID
AC - ACCESS CONTROL POINT
CC - COMMAND CENTER
FP - FIRE PUMP BUILDING
GI - GENERAL
PP - POWER PLANT
SF - SECURITY FORCE
ST - SITE
A1 SCALE:
FIRE PROTECTION CODE COMPLIANCE SITE PLAN
1" = 50'
AS NOTED
TFPSMMJDB
17323185
F
IR
E P
R O
T E
C T
IO
N
C O
D E
C O
M P
LI
A
N C
E S
IT
E
P L
A N
A. SEE SHEET 14GI-G-022 FOR CONSTRUCTION
PLANNING.
B. SEE SHEET 14GI-G-023 FOR CONSTRUCTION LIMITS.
C. SEE SHEET 14GI-C-001 FOR CIVIL GENERAL NOTES.
D. SEE SHEET 14GI-C-002 FOR CIVIL LEGEND.
E. SEE SHEET 14GI-C-003 FOR CIVIL ABBREVIATIONS.
F. DESIGNATED MUSTER AREA PROVIDED WITHIN THE
SECURE FENCE. MUSTER AREA OF 2,226 SF
PROVIDED, WHICH PROVIDES OVER 5 SF PER
PERSON OF CALCULATED OCCUPANT LOAD OF
SWITCHGEAR BUILDING AND COMMAND CENTER.
G. REQUIRED FIRE SEPARATION DISTANCE BETWEEN
GENERATOR ENCLOSURES:
NFPA 30: MINIMUM 5 FEET
NFPA 37: MINIMUM 5 FEET
IBC GROUP U: SEPARATION GREATER THAN 10
FEET, NO RATED CONSTRUCTION REQUIRED
PROVIDED: 5 FEET
H. REQUIRED BULK FUEL STORAGE TANK SEPARATION:
NFPA 30: MINIMUM 5 FEET
PROVIDED: 5 FEET
I. TRANSFORMER SEPARATION DISTANCE
REQUIREMENTS:
LESS FLAMMABLE LIQUID TYPE LESS THAN 10,000
GALLONS: 5 FEET FROM NON-COMBUSTIBLE WALL
ACTUAL DISTANCE (WORST CASE): 5 FEET 6 INCHES.
J. ALL FACILITIES MEET OR EXCEED THE FIRE
SEPARATION DISTANCES OF THE APPLICABLE IBC
OCCUPANCY GROUP:
COMMAND CENTER: 37 FEET FROM POWER PLANT.
SEPARATION DISTANCE GREATER THAN 30 FEET
FOR GROUP B AND GROUP F-1 OCCUPANCIES,
EXTERIOR RATED WALLS NOT REQUIRED.
POWER PLANT: 23 FEET FROM NEAREST
GENERATOR ENCLOSURE. SEPARATION DISTANCE
GREATER THAN 10 FEET FOR GROUP F-1
OCCUPANCIES, EXTERIOR RATED WALLS NOT
REQUIRED.
GENERATOR ENCLOSURE: 12 FEET FROM
ADJACENT GENERATOR ENCLOSURE. SEPARATION
DISTANCE GREATER THAN 10 FEET FOR GROUP U
OCCUPANCIES, EXTERIOR RATED WALLS NOT
REQUIRED.
50 1000
14GI-G-022
14GI-G-023
14GI-C-001
14GI-C-002
14GI-C-003
10/17/2024
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
A. LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE
PLOTTED FROM RECORD DRAWINGS AND INTERPOLATION
OF PHYSICAL EVIDENCE ON THE SITE AND ARE SUBJECT TO
FIELD VERIFICATION. SEE GENERAL NOTES A AND C.
B. LOCATIONS FOR WORK MUST BE CHECKED AND
COORDINATED WITH EXISTING CONDITIONS IN THE FIELD
BEFORE COMMENCING CONSTRUCTION UNDER THIS
SECTION OR OTHER SECTIONS.
C. THE WORKING DRAWINGS ARE GENERALLY DIAGRAMMATIC.
THEY DO NOT SHOW EVERY OFFSET, BEND, OR ELBOW
REQUIRED FOR INSTALLATION IN THE SPACE PROVIDED.
THEY DO NOT SHOW EVERY DIMENSION, COMPONENT
PIECE, OR FITTING REQUIRED TO COMPLETE THE PROJECT.
PROVIDE A COMPLETE AND WORKING SYSTEM.
D. COORDINATE A UTILITY LOCATE 7 DAYS PRIOR TO
BEGINNING ANY UTILITY CONSTRUCTION FOR LOCATION
MARK-UP OF EXISTING UTILITIES. ALSO COORDINATE THE
UTILITY LOCATE WITH CONTRACTING OFFICER FOR UTILITY
WORK. INFORM CONTRACTING OFFICER IMMEDIATELY IF
LOCATE INDICATES THAT EXISTING TYPE AND LOCATION OF
EXISTING UTILITIES ARE DIFFERENT THAN SHOWN ON
DRAWINGS.
E. LOCATE, PROTECT, AND AVOID DISRUPTION OF ABOVE AND
BELOW GRADE UTILITIES DURING CONSTRUCTION.
F. CONCRETE THRUST BLOCKING IS REQUIRED ON PRESSURE
LINE BENDS AND FITTINGS.
G. EXISTING UTILITIES AND TIE-IN POINTS ARE CONSIDERED
ACTIVE UNLESS OTHERWISE NOTED.
H. CONFIRM UTILITY VALVE VAULTS, VALVES, METERS, AND
OTHER PUBLIC UTILITY APPURTENANCES WITH
CONTRACTING OFFICER PRIOR TO BEGINNING WORK.
I. CENTER FULL PIPE SECTION OF EACH TYPE AT UTILITY
CROSSINGS.
J. PERFORM AND MAINTAIN INCIDENTAL SEWAGE BYPASS
PUMPING OR DIVERSION WORK THAT WILL BE REQUIRED
TO ACCOMPLISH THE CONSTRUCTION WORK.
K. ALL EXISTING UTILITIES, WHETHER OR NOT SHOWN ON THE
DRAWINGS, MUST BE PROTECTED AT ALL TIMES BY THE
CONTRACTOR DURING CONSTRUCTION. THE CONTRACTOR
IS RESPONSIBLE FOR DAMAGE TO GOVERNMENT UTILITY
SYSTEM RESULTING FROM CONSTRUCTION OPERATIONS:
DAMAGE MUST BE REPORTED IMMEDIATELY TO THE
CONTRACTING OFFICER APPROPRIATE GOVERNMENT
REPRESENTATIVE. DAMAGE TO THE EXISTING UTILITY
SYSTEMS MUST BE REPAIRED BY THE CONTRACTOR AT
THE CONTRACTOR'S EXPENSE WITH NO COST TO THE
GOVERNMENT. SEWER REPAIR PERFORMED BY THE
CONTRACTOR MUST BE INSPECTED BY THE NAVFACMAR
PWD UTILITIES VIA THE CONTRACTING OFFICER'S
REPRESENTATIVE PRIOR TO BACKFILLING.
L. THE CONTRACTOR IS RESPONSIBLE FOR REGULATORY
FINES OR PENALTIES THAT MAY BE IMPOSED BY
ENVIRONMENTAL REGULATORY AGENCIES (NAVFACMAR EV
AND/OR EPA) IN THE EVENT OF SEWAGE OVERFLOW OR
SPILL RESULTING FROM CONSTRUCTION OPERATIONS.
M. REIMBURSE THE GOVERNMENT FOR EMERGENCY
RESPONSE EFFORT THAT MAY BE REQUIRED BY
GOVERNMENT FORCES TO MITIGATE THE ADVERSE
EFFECTS OF SEWAGE OVERFLOW OR SPILL RESULTING
FROM THE CONTRACTOR'S OPERATIONS.
N. THE CONTRACTOR MUST ENSURE THAT LOOSE MATERIAL,
TOOLS AND EQUIPMENT FROM CONSTRUCTION
OPERATIONS ARE APPROPRIATELY REMOVED FROM THE
SEWER COLLECTION SYSTEM. DAMAGE TO DOWNSTREAM
LIFT STATION EQUIPMENT RESULTING FROM NEGLIGENCE
WILL BE ASSESSED TO THE CONTRACTOR.
O. PRIOR TO SECURING POTABLE WATER OUTAGES IN MAINS
OR SERVICE CONNECTIONS, THE CONTRACTOR MUST
FIRST PROVIDE AND MAINTAIN A BACKUP SEAL WATER
PROVISION TO LUBRICATE PUMP SEALS AT THE AFFECTED
SEWER LIFT STATION SHOWN ON THE PLAN. COORDINATE
ACCESS TO THE AFFECTED LIFT STATION, AT LEAST 3 DAYS
IN ADVANCE OF THE OUTAGE, WITH THE NAVFACMAR BOSC
WASTEWATER MANAGER (PHONE: 671-339-1794) VIA THE
CONTRACTING OFFICER'S REPRESENTATIVE.
P. ADJUST MANHOLE FRAMES AND COVERS TO THE DESIGN
FINISH GRADE AND ENSURE THE ADJUSTMENTS PREVENT
SURFACE RUNOFF INFLOW. MARK COVERS AS SEWER.
Q. UPON COMPLETION OF THE SEWER CONSTRUCTION, MAKE
ADVANCE ARRANGEMENTS (3 WORKING DAYS MINIMUM),
THROUGH THE CONTRACTING OFFICER'S
REPRESENTATIVE, WITH NAVFACMAR PWD UTILITIES
WATER/WASTEWATER SUPERINTENDENT (PHONE:
671-339-2397) FOR FINAL ACCEPTANCE INSPECTION OF THE
SEWER CONSTRUCTION.
R. CONSTRUCTION DEWATERING INTO THE SEWER
COLLECTION SYSTEM IS PROHIBITED.
S. UPON COMPLETION OF CONSTRUCTION, SEDIMENT FROM
SWALES AND BASINS MUST BE REMOVED PRIOR TO
CONSTRUCTION OF PERMANENT BMPS.
T. A TRACER WIRE AND TEST STATION MUST BE PROVIDED
FOR ALL NON METALLIC UTILITIES EXCEPT FOR STORM AND
SANITARY SEWER LINES.
U. VALVE COVER COLLARS THAT ARE IN PAVEMENT MUST
MATCH THE PAVEMENT DETAIL SECTION.
V. UTILITIES MUST REMAIN IN SERVICE AND MUST BE
REROUTED PRIOR TO DEMOLITION.
A. CONTOUR INTERVAL IS 1.0 FT.
B. CATCH BASINS MUST HAVE INLET PROTECTION DURING
CONSTRUCTION ACTIVITIES.
C. PROVIDE EROSION CONTROL MEASURES AS INDICATED ON
THE PLANS AND AS FIELD CONDITIONS WARRANT PRIOR TO
COMMENCING CONSTRUCTION ACTIVITIES. REPAIRS OR
MODIFICATIONS TO THE MEASURES MUST BE MADE IF
CONTROL MEASURES PROVE INEFFECTIVE OR IF
ADDITIONAL CONTROL MEASURES ARE NECESSARY.
D. MINIMIZE UNNECESSARY CLEARING AND GRADING FROM
CONSTRUCTION SITES. CLEARING AND GRADING MUST
ONLY BE PERFORMED WITHIN AREAS NEEDED TO BUILD
THE PROJECT, INCLUDING STRUCTURES, UTILITIES, ROADS,
RECREATIONAL AMENITIES, POST-CONSTRUCTION STORM
WATER MANAGEMENT FACILITIES, AND RELATED
INFRASTRUCTURE. CLEARING MUST ONLY BE SCHEDULED
DURING THE DRY SEASON IF POSSIBLE. MASS CLEARING
DURING THE WET SEASON MUST BE AVOIDED.
E. WHENEVER PRACTICABLE AND FEASIBLE, CONSTRUCTION
MUST BE PHASED TO LIMIT DISTURBANCE TO ONLY ONE
AREA OF ACTIVE CONSTRUCTION AT A TIME.
F. DISTURBED AREAS MUST BE STABILIZED AS SOON AS
FEASIBLY POSSIBLE AFTER CONSTRUCTION IS COMPLETED
WITHIN A DESIGNATED CONSTRUCTION AREA, AND ON NO
CASE LONGER THAN 14 DAYS AFTER COMPLETION OF
ACTIVE CONSTRUCTION.
G. PERIMETER SEDIMENT CONTROLS MUST BE APPLIED TO
RETAIN OR FILTER CONCENTRATED RUNOFF FROM
DISTURBED AREAS TO TRAP OR RETAIN SEDIMENT BEFORE
IT LEAVES THE CONSTRUCTION SITE. UPLAND RUNOFF
MUST BE DIVERTED AROUND EXCAVATIONS WHERE
POSSIBLE.
H. SEDIMENT TRAPPING AND SETTLING DEVICES MUST BE
EMPLOYED TO TRAP AND/OR RETAIN SUSPENDED
SEDIMENTS AND ALLOW TIME FOR THEM TO SETTLE OUT IN
CASES WHERE PERIMETER SEDIMENT CONTROLS (E.G. SILT
FENCE) ARE DEEMED INEFFECTIVE IN TRAPPING
SUSPENDED SEDIMENTS ON-SITE.
I. CONSTRUCTION SITE MANAGERS (OR SUPERINTENDENTS)
MUST PROVIDE DOCUMENTATION THAT THEY HAVE
RECEIVED ADEQUATE TRAINING IN THE APPLICATION AND
MAINTENANCE OF EROSION AND SEDIMENT CONTROL
PRACTICES.
J. CONSTRUCTION SITE MANAGERS MUST PARTICIPATE IN A
PRE-CONSTRUCTION MEETING WITH APPLICABLE
AUTHORITY TO REVIEW THE PROVISIONS OF THE EROSION
AND SEDIMENT CONTROL PLAN AND MAKE ANY FIELD
ADJUSTMENT NECESSARY TO IMPLEMENT THE INTENT OF
THE PLAN TO MINIMIZE EROSION AND MAXIMIZE SEDIMENT
RETENTION ON-SITE THROUGHOUT THE CONSTRUCTION
PROCESS.
K. CONSTRUCTION MUST BE SCHEDULED TO MINIMIZE SOIL
EXPOSURE IN THE RAINY SEASON (JULY 1 - NOV. 30) AND
DURING PERIODS OF CORAL SPAWNING.
L. EROSION AND SEDIMENT CONTROL PRACTICES MUST BE
AGGRESSIVELY MAINTAINED THROUGHOUT PHASES OF
CONSTRUCTION. EROSION AND SEDIMENT CONTROL PLANS
MUST HAVE AN ENFORCEABLE OPERATION AND
MAINTENANCE AGREEMENT TO ENSURE THAT PRACTICES
ARE MAINTAINED DURING THE CONSTRUCTION PROCESS.
UTILITY NOTESGENERAL NOTES
A. IT IS EXPECTED THAT THE ACTUAL LOCATION OF EXISTING
UTILITIES MAY VARY FROM THAT SHOWN ON THE PLANS.
VARIATIONS IN LOCATION AND DEPTH MUST BE BROUGHT TO
THE ATTENTION OF THE CONTRACTING OFFICER IMMEDIATELY
SO THAT THE LOCATION OF UTILITIES MAY BE CHECKED WITH
THE DESIGN. NOTIFY CONTRACTING OFFICER PRIOR TO ANY
WORK COMMENCING FOR ANY EXCAVATION OR POTHOLING.
B. UPON COMPLETION OF THE CONSTRUCTION PROJECT, THE
PROJECT AREA MUST BE FREE OF DEBRIS AND UNUSED
MATERIAL. DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES
MUST BE RESTORED TO AN "AS GOOD" CONDITION AS
DETERMINED BY THE CONTRACTING OFFICER.
C. THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE
CONTRACTING OFFICER OF ANY DISCREPANCY OR CONFLICT
FOUND IN THE FIELD PRIOR TO OR DURING THE COURSE OF
CONSTRUCTION AND MUST NOT PROCEED WITH
CONSTRUCTION UNTIL THE CONTRACTING OFFICER
RESOLVES THE SAID DISCREPANCY OR CONFLICT. THE
CONTRACTOR MUST VERIFY AND CHECK ALL DIMENSIONS AND
DETAILS SHOWN ON THE DRAWING PRIOR TO THE START OF
CONSTRUCTION. ANY DISCREPANCIES MUST BE IMMEDIATELY
BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER
FOR CLARIFICATION.
D. UNLESS OTHERWISE NOTED, ALL EXISTING PAVEMENT,
UTILITY LINES, AND OTHER IMPROVEMENTS DAMAGED OR
UNDERMINED AS A RESULT OF THE CONTRACTOR'S
OPERATIONS, MUST BE RECONSTRUCTED OR REPLACED BY
THE CONTRACTOR AT HIS OWN EXPENSE TO MATCH EXISTING
CONDITIONS.
E. THE CONTRACTOR MUST OBTAIN AN EXCAVATION PERMIT
PRIOR TO COMMENCING ANY EXCAVATIONS.
F. ALL DISTURBED AREAS MUST BE RETURNED TO PRE-EXISTING
CONDITIONS UNLESS OTHERWISE NOTED.
G. PROVIDE ADVANCED NOTIFICATION/APPROVAL FROM THE
INSTALLATION PRIOR TO CLOSING/INTERRUPTING
ROADS/TRAFFIC/UTILITIES, ETC. A MINIMUM OF 30 DAYS
NOTICE MUST BE PROVIDED.
H. CLEAR AND GRUB AND REMOVE ALL WEEDS, STUMPS, ROOTS,
ROCKS, CONCRETE DEBRIS AND TRASH.
I. ALL GREEN WASTE GENERATED FROM CLEARING AND
GRUBBING TASKS AND CONSTRUCTION ACTIVITIES SHALL BE
MANAGED, PROCESSED, AND REUSED ON SITE. CONTRACTOR
WILL BE REQUIRED TO PREPARE A GREEN WASTE
MANAGEMENT PLAN THAT WILL BE INCLUDED IN THEIR
OVERALL WASTE MANAGEMENT PLAN. CONTRACTOR IS
REQUIRED TO MONITOR GREEN WASTE PILES WEEKLY FOR
CRB INFESTATION. IF THERE IS AN INFESTATION, THE PILES
MUST GO THROUGH A GRINDER/SHREDDER PRIOR TO
RESUMING COMPOSTING ACTIVITIES.
J. CONTRACTOR SHALL OBTAIN ANY NECESSARY DIG PERMITS
15 CALENDAR DAYS PRIOR TO THE START OF EXCAVATION.
K. TO AID IN THE PREVENTION OF ACCIDENTAL INTRODUCTIONS
OF NON-NATIVE SPECIES OR INVASIVE SPECIES,
CONTRACTORS WILL BE REQUIRED TO DEVELOP A HAZARD
ANALYSIS AND CRITICAL CONTROL POINT (HACCP) PLAN
WHICH WILL IDENTIFY RISKS AND POTENTIAL PATHWAYS FOR
INVASIVE SPECIES AND WILL OUTLINE PROCEDURES FOR
CONTROLLING AND REMOVING RISKS IDENTIFIED. THIS PLAN
WILL BE APPROVED BY THE INSTALLATION'S NATURAL
RESOURCE MANAGER OR BIOLOGICAL MONITOR.
EROSION CONTROL NOTES
A. CONSTRUCTION STAKING MUST BE PERFORMED BY A
LICENSED SURVEYOR.
B. GRADES BETWEEN SPOT ELEVATIONS MUST HAVE UNIFORM
SLOPE UNLESS OTHERWISE INDICATED. MAINTAIN POSITIVE
DRAINAGE AWAY FROM BUILDING WALLS AND DOORS.
C. SAFE CONSTRUCTION PRACTICES MUST BE UTILIZED.
ADEQUATE SHORING, BRACING, TIES, AND SUPPORTS MUST
BE USED TO PROVIDE PROPER TEMPORARY INTEGRITY
DURING CONSTRUCTION.
D. LOCATIONS OF UNDERGROUND UTILITIES ARE FROM
RECORD INFORMATION AND AS-BUILT DRAWINGS AND
SURVEY. FIELD-VERIFY LOCATIONS AND INVERTS PRIOR TO
BEGINNING CONSTRUCTION.
E. DITCHES, SWALES, GUTTERS, ETC. ARE CONSIDERED
ACTIVE STORM CONVEYANCES UNLESS OTHERWISE
INDICATED. ADDRESS STORM WATER DRAINAGE AND
DEWATERING OF WORK AREAS DURING CONSTRUCTION.
F. DURING WET WEATHER PERIODS, SEQUENCE
CONSTRUCTION IN A MANNER THAT MINIMIZES IMPACT ON
OPEN EARTHWORK AND COMPACTION OPERATIONS.
G. SEED DISTURBED AREAS IN ACCORDANCE WITH SPEC
SECTION 32 92 19. AREAS THAT ARE SEEDED MUST BE
WATERED AT INTERVALS TO OBTAIN A MOIST SOIL
CONDITION. FREQUENCY OF WATERING AND QUANTITY OF
WATER MUST BE SUCH THAT IT PROVIDES AN ADEQUATE
AMOUNT FOR ESTABLISHING A GOOD STAND OF GRASS.
RUN-OFF, PUDDLING, AND WILTING MUST BE PREVENTED.
GRADING NOTES
UTILITY NOTES (CONT'D)
A. PROVIDE PIS MANAGEMENT INCLUDING RELOCATION PER
SECTION 02 61 13.00 14 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL.
B. SECTION 02 61 13.00 14 PROVIDES A SOIL INVESTIGATION
REPORT. CONDUCT ADDITIONAL SOIL SAMPLING AND
ANALYSIS AT THE CONTRACTOR'S DISCRETION AND
EXPENSE IF NECESSARY. ASSUME THE PIS IS ALSO
IMPACTED WITH LEAD.
C. UNLESS THE SOIL INVESTIGATION REPORT OR
CONTRACTOR'S ADDITIONAL SOIL TESTING RESULTS
INDICATE OTHERWISE, THE MINIMUM PIS BOUNDARY IS AS
FOLLOWS:
1. SOILS BELOW EXISTING BUILDING SLABS AT 0-2 FT
BELOW BUILDING FOUNDATION.
2. 0-10 FT LATERAL DISTANCE AREAS FROM THE EDGE OF
BUILDING FOOTPRINTS AT 0-2 FT BELOW GROUND
SURFACE (BGS).
D. RELOCATE THE PIS AS SHOWN IN DRAWINGS 14ST-CG104,
14ST-CG106, 14ST-CG107 & 14ST-CG109. PROVIDE SOIL
WRAP WITH 20-MIL GEOMEMBRANE AND COVER IMPACTED
SOIL, REFER TO A4/14ST-C-543. PROVIDE A HARDSCAPE
OR CLEAN SOIL CAP AS FOLLOWS:
1. ASPHALT OR CONCRETE COVERED AREAS: NO
MINIMUM; NO CLEAN SOIL COVER REQUIREMENT.
2. LANDSCAPE AREAS: MINIMUM 0.5 FT OF CLEAN SOIL
WITH VEGETATED COVER.
3. DO NOT BACKFILL/RELOCATE PIS IN AREAS WITH
UTILITIES WHERE FUTURE EXCAVATION OR TRENCHING
ACTIVITIES WILL INADVERTENTLY EXPOSE WORKERS
TO PIS.
E. PROVIDE MINIMUM 0.5 FT OF CLEAN SOIL OR MATERIAL
COVER FOR ALL LANDSCAPE AREAS AND INFILTRATION
BASIN. AFTER FINAL GRADING IS COMPLETED, CONDUCT A
CONFIRMATION MULTI-INCREMENTAL SOIL SAMPLING FOR
ALL LANDSCAPED AREAS AND STORMWATER DETENTION
BASIN. THE SAMPLING DEPTH WILL BE LIMITED TO 0-0.5 FT
BGS.
F. PROVIDE A SUMMARY OF SOIL TESTING RESULTS
INCLUDING CONFIRMATION SAMPLING WITH SAMPLING
LOCATIONS WITHIN 5 WORKING DAYS UPON RECEIVING THE
LABORATORY ANALYTICAL RESULTS. IF CONFIRMATION
RESULTS ARE ABOVE THE SOIL SCREENING LEVELS, THE
CONTRACTOR MUST BE RESPONSIBLE FOR COMPLETING
NECESSARY WORKS INCLUDING EXCAVATION AND
RELOCATION OF THE IMPACTED SOIL AND ADDITIONAL
GRADING WORK.
G. SUBMIT A CLOSURE REPORT WITHIN 14 CALENDAR DAYS OF
COMPLETING WORK AT THE SITE. INCLUDE ANY SAMPLING
RESULTS, DRAWINGS FOR LOCATIONS AND DEPTHS WHERE
PIS HAVE BEEN DEPOSITED, AND ANY UPDATES TO
MITIGATION MEASURES NEEDED BASED ON THE
CONFIRMATION SOIL RESULTS.
PESTICIDE IMPACTED SOIL (PIS) NOTES
A. PROTECT THE ENVIRONMENTAL RESOURCES DURING THE
ENTIRE DURATION OF THE CONTRACT. COMPLY WITH
FEDERAL, STATE, AND LOCAL REGULATIONS AND
INSTALLATION REQUIREMENTS PERTAINING TO
ENVIRONMENTAL PROTECTION, INCLUDING WATER, AIR,
SOLID WASTE, HAZARDOUS WASTE AND SUBSTANCES,
SILICA, OILY SUBSTANCES, AND NOISE POLLUTION.
B. COMPLY WITH ALL REQUIREMENTS SPECIFIED IN SECTION
01 57 19.00 14 TEMPORARY ENVIRONMENTAL CONTROLS, 01
57 19.01 14 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS, AND SECTION 01 74 19.00 14 CONSTRUCTION
WASTE MANAGEMENT AND DISPOSAL.
C. BUILDINGS OR STRUCTURES TO BE DEMOLISHED CONTAIN
HAZARDOUS MATERIALS, MOLD, AND CONTAMINATED SOIL.
PROVIDE HAZARD COMMUNICATION AND TRAINING TO THE
WORKERS AND SUBCONTRACTORS. SITE WORKERS MUST
BE INFORMED OF THE PRESENCE OF HAZARDOUS
MATERIALS, MOLD, AND CONTAMINATED SOIL. ANTICIPATE
SILICA HAZARDS FOR CONCRETE WORK..
ENVIRONMENTAL AND WORKER PROTECTION
AS NOTED
TFPSMMJDB
17323188
C
IV
IL
G
E N
E R
A L
N O
T E
S
EAM
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
JC
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
OF
EPROJECT NO.:
DRAWFORM REVISION: 25 AUGUST 2020
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E CONTRACT NO. N62478-20-D-5036
A/E Task Order No. N6274223F0328
14CC-A-101
SITE #
BUILDING ID DISCIPLINE
CONSECUTIVE NUMBERS
SITE #
SITE 01
SITE 02
SITE 14
BUILDING ID
AC - ACCESS CONTROL POINT
CC - COMMAND CENTER
FP - FIRE PUMP BUILDING
GI - GENERAL
10/04/202410/00/04/2024
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
TOP - SECTION IDENTIFICATION
BOTTOM - DRAWING ON WHICH SECTION IS DRAWN
TOP - SECTION IDENTIFICATION LETTER
TOP - DETAIL OR ASSEMBLY IDENTIFICATION
BOTTOM - DRAWING ON WHICH DETAIL IS DRAWN
GENERAL SYMBOLS:
SECTION CUT
SECTION TITLE
DETAIL INDICATION
DETAIL TITLE
TOP - DETAIL OR ASSEMBLY IDENTIFICATION NUMBER
SCALE: 1' = 10'
DETAIL TITLE
SCALE: 1'=30'
SECTION TITLE
FIRE HYDRANT
ISOLATION VALVE
DOUBLE CLEANOUT
SPOT ELEVATION
LEGEND, CONT.
EXISTING NEW
COORDINATE LOCATION CALLOUT
SURVEY CONTROL POINTS
SANITARY SEWER MANHOLE
LEGEND:
EXISTING NEW
CONSTRUCTION LIMITS
MAJOR CONTOUR
MINOR CONTOUR
OVERHEAD ELECTRIC LINE
SANITARY SEWER LINE
UNDERGROUND ELECTRIC LINE
FLOW DIRECTION ARROW/ BUILDING ACCESS PATH
STORM DRAIN
STORM SEWER MANHOLE
WATER METER
WATER VALVE
SS SS
OE
BORE HOLE
D
STORM SEWER INLET CB
ROADWAY CENTERLINE
RESTRICTED AREA BOUNDARY FENCE W/ CABLE REINFORCEMENT
SILT FENCE SF
STRAW WATTLE
BUILDING FOOTPRINT OUTLINE
UTILITY BOX
TREE
VEGETATION LINE
WATER LINE W
E
HELECTRICAL HANDHOLE
A
C -5
E1 C-311
CLEAR ZONE
TRANSFORMER
LIGHTPOLE
S
SDX
OUTLET STRUCTURE
CO CO
COMMUNICATIONS MANHOLE
E1
F1
FFIRE PROTECTION LINE
COMMUNICATIONS HANDHOLE T
CMH
POST INDICATOR VALVE
SSx
NON-POTABLE WATER
SURVEY LIMITS
TREE REMOVAL & CLEAR AND GRUB
S
NPW
RIP RAP
SUBGRADE
GRADED CRUSHED AGGREGATE
ASPHALT PAVEMENT
AGGREGATE PAVEMENT
COMPACTED SOIL ACCESS ROAD/95% COMPACTED SUBGRADE
RESTRICTED AREA BOUNDARY FENCE
CJB
FIELD CAMERA TOWER
FIXED CAMERA
CAMERA JUNCTION BOX
CARD READER
BUILDING/FOUNDATION OUTLINE
ELECTRICAL MANHOLE EMH
ENVIRONMENTAL STUDY AREA (EIS) BOUNDARY (PROVIDED FOR REFERENCE ONLY) EIS
SD
SINGLE CLEANOUT CO
CONCRETE PAVEMENT/ SIDEWALK
LIGHT CIRCUIT DUCTBANK
POWER DUCTBANK PDB
LDB
ELECTRICAL DUCTBANK EDB
COMMUNICATIONS DUCTBANK CDB
SECURITY DUCTBANK XDB
PIPE HEADWALL
SECURITY FENCE
WIDE AREA MNS SPEAKER
UTILITY LINE REMOVAL
BULK SAMPLING LOCATION
CUX
X X X XX X X X
WATER MANHOLE
EUx
Wx
EMH
EBBx
AS NOTED
TFPSMMJDB
17323189
C
IV
IL
L
E G
E N
D
EAM
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
JC
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
OF
EPROJECT NO.:
DRAWFORM REVISION: 25 AUGUST 2020
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E CONTRACT NO. N62478-20-D-5036
A/E Task Order No. N6274223F0328
SHEET NAMING CONVENTION
14CC-A-101
SITE #
BUILDING ID DISCIPLINE
CONSECUTIVE NUMBERS
SITE #
SITE 01
SITE 02
SITE 14
BUILDING ID
AC - ACCESS CONTROL POINT
CC - COMMAND CENTER
FP - FIRE PUMP BUILDING
GI - GENERAL
10/04/24
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
AS NOTED
TFPSMMJDB
17323190
C
IV
IL
A
B B
R E
V
IA
T
IO
N S
EAM
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
JC
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
OF
EPROJECT NO.:
DRAWFORM REVISION: 25 AUGUST 2020
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E CONTRACT NO. N62478-20-D-5036
A/E Task Order No. N6274223F0328
ABBREVIATIONS
L ANGLE
A/C AIR CONDITIONING
A/C UNIT AIR CONDITIONING UNIT
AB ANCHOR BOLT
ABV ABOVE
AC ALTERNATING CURRENT
ACC ACCESSIBLE
ACI AMERICAN CONCRETE INSTITUTE
ACR ACRYLIC PLASTIC
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACSR ALUMINUM CABLE STEEL REINFORCED
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
ADDM ADDENDUM
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, ADJUSTABLE
ADO AUTOMATIC DOOR OPERATOR
AFF ABOVE FINISHED FLOOR
AGGR AGGREGATE
AHR ANCHOR
AHU AIR HANDLING UNIT
AI AREA INLET
AIC AMPERE INTERRUPTING CAPACITY
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
A.L. ACTIVE LEAF
ALT ALTERNATE
ALUM ALUMINUM
AMB AMBIENT
AMP AMPERE
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECT
ARI AMERICAN REFRIGERATION INSTITUTE
ASB ASBESTOS
ASC ABOVE SUSPENDED CEILING
ASPH ASPHALT
ATC ACOUSTICAL TILE CEILING
AUTO AUTOMATIC
AVG AVERAGE
AWG AMERICAN WIRE GAUGE
AWT ACOUSTICAL WALL TREATMENT
BB BULLETIN BOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BEJ BRICK EXPANSION JOINT
BEV BEVEL
BITUM BITUMINOUS
BJT BED JOINT
BL BUILDING LINE
BLDG BUILDING
BLW BELOW
BM BENCHMARK
BO BOTTOM OF
BOT BOTTOM
BP BACK PLASTER(ED)
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRG PL BEARING PLATE
BRK BRICK
BRKT BRACKET
BRZ BRONZE
BS BOTH SIDES
BSMT BASEMENT
Btu BRITISH THERMAL UNIT BtuH BTU PER HOUR
BTWN BETWEEN
BUR BUILT-UP ROOFING
BW BOTH WAYS
CAB CABINET
CAP CAPACITY
CB CATCH BASIN
CCT CUBICLE CURTAIN TRACK
CCTV CLOSED CIRCUIT TELEVISION
CE COVER ELEVATION
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CFI CONDUCTIVE FLOORING
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CH BD CHALKBOARD
CHFR CHAMFER
CHIM CHIMNEY
CHK CHECK
CHR PL CHROME PLATED
CI CAST IRON
CI CURB INLET
CIP CAST-IN-PLACE
CIRC CIRCULAR
CJ CONTROL JOINT
CJ CONSTRUCTION JOINT
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLGL CLEAR GLASS
CLL CONTRACT LIMIT LINE
CLO CLOSET
CLOS CLOSURE
CLR CLEAR(ANCE)
CLWG CLEAR WIRED GLASS
cm CENTIMETER(S)
CMP CORRUGATED METAL PIPE
CMPST COMPOSITE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CNL CONDUCTIVE NEOPRENE LATEX
CNR CORNER
CNTR COUNTER
CO CLEANOUT
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBUSTION
COMPT COMPARTMENT
CONC CONCRETE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
CORR CORRIDOR
COV COVER
CPRS COMPRESSIBLE
CPT CARPET
CRCMF CIRCUMFERENCE
CRES CORROSIVE RESISTANT STEEL
CRG CROSS GRAIN
CRS COURSE(S)
CS CAST STONE
CSK COUNTERSUNK
CSMT CASEMENT
CT CERAMIC TILE
CT CURRENT TRANSFORMER
C TO C CENTER TO CENTER
CTR CENTER
CU CONDENSING UNIT
Cu COPPER
CU FT CUBIC FEET
CUH CABINET UNIT HEATER
CU YD CUBIC YARDS
CV CEILING VENT
CVH CONDUCTIVE VINYL HOMOGENEOUS (SHEET TYPE)
CW COLD WATER
CYL CYLINDER
d PENNY (AS IN NAIL - 10D)
DAT DATUM
DB DRY BULB
DBL DOUBLE
DBL ACT DR DOUBLE ACTING DOOR
DCJ DOWELED CONTROL JOINT
DCJT DUMMY CONTROL JOINT
DEG DEGREE
DEMO DEMOLITION
DEPR DEPRESSION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DH DUCT HEATER
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISC DISCONNECT
DISP DISPENSER
DISTR PNL DISTRIBUTION PANEL
DIV DIVISION
DL DEAD LOAD
DMPF DAMPPROOFING
DMPR DAMPER
DMT DEMOUNTABLE
DN DOWN
DR DOOR
DR DRAIN
DRB DRAINBOARD
DR CL DOOR CLOSER
DS DOUBLE STRENGTH (GLASS)
DS DOWNSPOUT
DT DRAIN TILE
DVTL DOVETAIL
DWG DRAWING
DWLS DOWELS
DWR DRAWER
DWTR DUMBWAITER
DX DIRECT EXPANSION
E EAST
EA EACH
EAT ENTERING AIR TEMPERATURE
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION - GRADE OR BUILDING
ELEC ELECTRIC
EM EXPANDED METAL
EMD ESTIMATED MAXIMUM DEMAND
EMER EMERGENCY
ENCL ENCLOSE(URE)
ENTR ENTRANCE, ENTERING
EP ELECTRICAL PANELBOARD
EPRF EXPLOSION PROOF
EPY EPOXY COATING
EQ EQUAL
EQUIP EQUIPMENT
ESCAL ESCALATOR
EST ESTIMATE(D)
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EXC EXCAVATE
EXH EXHAUST
EXH A EXHAUST AIR
EXST EXISTING
EXP EXPANSION
EXP EXPOSED
EXP BT EXPANSION BOLT
EXT EXTERIOR
F FAHRENHEIT
FA FIRE ALARM
FA FRESH AIR
FAC FIRE APPARATUS CLOSET
FAI FRESH AIR INTAKE
F BRK FIRE BRICK
FC FOOT CANDLE
FC BRK FACE BRICK
FCG FACING
FCJ FLOOR CONSTRUCTION JOINT
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDMPR FIRE DAMPER
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEB FIRE EXTINGUISHER BRACKET
FEC FIRE EXTINGUISHER CABINET
FF FACTORY FINISH
FGL FIBERGLASS
FH FIRE HYDRANT
FH FLAT HEAD
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHR FIRE HOSE RACK
FHS FIRE HOSE STATION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIN FINISH
FIN FLR FINISH FLOOR
FIXT FIXTURE
FJT FLUSH JOINT
FLASH FLASHING
FLR FLOOR
FLEX FLEXIBLE
FLG FLOORING
FLR PL FLOOR PLATE
FLUOR FLUORESCENT
FN FENCE
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FP FIRE PARTITION
FP FIREPROOF
FPM FEET PER MINUTE
FR FIRE RESISTANT
FR FRAME
FRG FORGED
FRMG FRAMING
FRT FIRE-RETARDANT
FS FULL SIZE
FSTNR FASTEN(ER)
FT FEET
FTG FOOTING
FURG FURRING
FUT FUTURE
FW FIRE WATER
FWC FABRIC WALL COVERING
G NATURAL GAS
GA GAGE
GAL GALLON(S)
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERAL
GF GROUND FACE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFE GOVERNMENT-FURNISHED EQUIPMENT
GFE/CI GOVERNMENT-FURNISHED EQUIPMENT CONTRACTOR INSTALLED
GI GALVANIZED IRON
GIP GALVANIZED IRON PIPE
GKT GASKET(ED)
GL GLASS
GL BLK GLASS BLOCK
GLF GLASS FIBER
GLZ GLAZING
GLZ CMU GLAZED CONCRETE MASONRY UNITS
G GROUND
GOVT GOVERNMENT
GPM GALLONS PER MINUTE
GPT GYPSUM TILE
GRAN GRANITE
GR LN GRADE LINE
GRTG GRATING
GST GLAZED STRUCTURAL TILE
GSU GLAZED STRUCTURAL UNITS
GT GROUT
GWT GLAZED WALL TILE
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
HB HOSE BIBB
HC HOLLOW CORE
HCD HALON CONTAINMENT DAMPER
HCP HANDICAPPED
HD HEAD
HD HEAVY DUTY
HDBD HARDBOARD
HD JT HEAD JOINT
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HES HIGH EARLY-STRENGTH CEMENT
HEX HEXAGON
HH HANDHOLE
HK HOOK(S)
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HP HIGH PRESSURE
HP HORSEPOWER
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH
HSGYP HIGH-STRENGTH GYPSUM PLASTER
HSKPG HOUSEKEEPING
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HYDR HYDRAULIC
Hz HERTZ
IC INTERCOM
ID INSIDE DIAMETER
IESNA ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA
ILK INTERLOCK
IN INCH
INCIN INCINERATOR
INCL INCLUDED
INSF INSULATING FILL
INSUL INSULATION
INT INTERIOR
INTM INTERMEDIATE
INV INVERT
IP IRON PIPE
IPS IRON PIPE SIZE
I.P.S. INSIDE PIPE SIZE
J-BOX JUNCTION BOX
JCT JUNCTION
JST JOIST
JT JOINT
KIP KILOPOUND (1000 POUNDS)
KIT KITCHEN
KOP KNOCKOUT PANEL
KPL KICKPLATE
km KILOMETER kV KILOVOLTS kVA KILOVOLT AMPERES kVAR KILOVOLT AMPERES REACTIVE kW KILOWATT
KWY KEYWAY
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAT LEAVING AIR TEMPERATURE
LAU LAUNDRY
LAV LAVATORY
LB LAG BOLT
LB POUND
LBL LABEL
LBR LUMBER
LC LIGHT CONTROL
LD LOAD
LDG LOADING
LG LENGTH
LH LEFT HAND(ED)
LIN LINEAR
LKR LOCKER
LL LIVE LOAD
LLD LEAD-LINED DOOR
LM LUMEN
LMST LIMESTONE
LNTL LINTEL
LONG LONGITUDINAL
LP LIGHTPROOF
LPD LIGHTPROOF DOOR
LPL LIGHTPROOF LOUVER
LPT LOW POINT
LR LIVING ROOM
LS LAWN SPRINKLER
LT LIGHT
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWT LEAVING WATER TEMPERATURE
m METER(S)
M&B MATCHED AND BEADED
MACH MACHINE
MAS MASONRY
MATL MATERIAL(S)
MAX MAXIMUM
MB MACHINE BOLTS
MBR MEMBER
MC MEDICINE CABINET
MCJ MASONRY CONTROL JOINT
MCO METAL-CASED OPENING
MDS METAL DIVIDER STRIP
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDIUM
MEMB MEMBRANE
MES METAL EDGE STRIP
MFD METAL FLOOR DECKING
MFG MANUFACTURING
MFR MANUFACTURER
MG MOTOR GENERATOR
MGT MATTE-GLAZED TILE
MH MANHOLE
MI MALLEABLE IRON
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
ML METAL LATH
ML MONOLITHIC
MLDG MOULDING
MLWK MILLWORK
mm MILLIMETER(S)
MNIC MATERIAL NOT IN CONTRACT (INSTALLATION BY CONTRACTOR)
MO MASONRY OPENING
MOD MODULAR
MOD. MODIFIED
MOT MOTOR
MP MOVABLE PARTITION
MR MOP RECEPTOR
MRB MARBLE BASE
MRD METAL ROOF DECKING
MS MACHINE SCREWS
MT METAL THRESHOLD
MT MOUNT
MTD MOUNTED
MTFR METAL FURRING
MTL METAL
MVBL MOVABLE
MULL MULLION
N NORTH
NAT NATURAL
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
Ni NICKEL
NIC NOT IN CONTRACT
NL NAILABLE
N.L. NEOPRENE LATEX
NM NONMETALLIC
NO NORMALLY OPEN
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OA OUTSIDE AIR
OBSC OBSCURE
OBW OBSERVATION WINDOW
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFC OFFICE
OGL OBSCURE GLASS
OH OVERHEAD
OHMS OVALHEAD MACHINE SCREW
OHWS OVALHEAD WOOD SCREW
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OS & Y OUTSIDE SCREW AND YOKE
OWGL OBSCURE WIRED GLASS
P POLE
PA PUBLIC ADDRESS
PAR PARALLEL
PB PANIC BAR
PBD PARTICLE BOARD
PBS PUSH BUTTON STATION
PC PIECE
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCP CEMENT PLASTER (PORTLAND)
PD PAVEMENT DRAIN
PED PEDESTAL
PERF PERFORATE(D)
PERIM PERIMETER
PH PHASE
PHAR PHARMACY
PI POINT OF INTERSECTION
PIPU PREFAB ISOLATION POWER UNIT
PIV POST INDICATING VALVE
PL PLATE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLAT PLATFORM
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLG PILING
PL GL PLATE GLASS
PLYWD PLYWOOD
PNL PANEL
PT PAINT(ED)
POL POLISHED
PORC PORCELAIN
PORT PORTABLE
PPGL POLISHED PLATE GLASS
PPM PARTS PER MILLION
PR PAIR
PREFAB PREFABRICATE(D)
PREFIN PREFINISHED
PREFMD PREFORMED
PRKG PARKING
PROJ PROJECT
PRV PRESSURE-REGULATING VALVE
PS PIPE SPACE
P.S. PRESSED STEEL
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PNEUMATIC TUBE
PT. POINT
PT CONC POST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PV PAVED
PVC POLYVINYL CHLORIDE
PVG PAVING
PW PASS WINDOW
QT QUARRY TILE
QT. QUART
QTR QUARTER
1/4 RND QUARTER ROUND
QTY QUANTITY
R RADIUS
R RANGE
R RISER
RA RETURN AIR
RAB RABBETED
RA GR RETURN AIR GRILLE
RAR RETURN AIR REGISTER
RB RUBBER BASE, RESILIENT BASE
RBL RUBBLE STONE
RBR RUBBER
RC REMOTE CONTROL
RCP REINFORCED CONCRETE PIPE
RCVR RECEIVER
RD ROOF DRAIN
RDG INS RIGID INSULATION
RECPT RECEPTACLE
REC ROOM RECREATION ROOM
RECT RECTIFIER
REF REFERENCE
REFL REFLECT
REFR REFRIGERATION
REG REGISTER
REG REGLET
REINF REINFORCE
REM REMOVE(ABLE)
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RFG ROOFING
RH RELATIVE HUMIDITY
RH RIGHT HAND
RH ROOF HATCH
RK RACK
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RP RETRACTABLE PARTITION
RPM REVOLUTIONS PER MINUTE
RPRT RAISED PATTERN RUBBER TILE
RTF RUBBER TILE FLOOR
RVS REVERSE
RVT RIVET
RWC RAINWATER CONDUCTOR
S SOUTH
SA SUPPLY AIR
SB SPLASH BLOCK
S.B. SECURITY BARS
SC SOLID CORE
SCHED SCHEDULE
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SD STORM DRAIN
SDI STEEL DOOR INSTITUTE
SECT SECTION
SEQ SEQUENCE
SFGL SAFETY GLASS
SFTU STRUCTURAL FACING TILE UNIT
SFU STRUCTURAL FACING UNIT
SG SHEET GLASS
SHLDR SHOULDER
SHT SHEET
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SKLT SKYLIGHT
SLNT SEALANT
SLV SLEEVE
SM SHEET METAL
SMS SHEET METAL SCREWS
SOV SHUT OFF VALVE
SPC SPACER
SPCL SPECIAL
SPD SOUNDPROOF DOOR
SPEC SPECIFICATION
SPF SOUNDPROOF
SP FIN SPECIAL FINISH
SPH SPACE HEATER
SPKR SPEAKER
SQ SQUARE
SQHD SQUARE HEAD
S&R SHELF AND ROD
SS SERVICE SINK
SS STANDING SEAM (ROOF)
SST STAINLESS STEEL
STA STATION
STD STANDARD
STG SEATING
STL STEEL
STOR STORAGE
ST PR STATIC PRESSURE
STR STRINGER
STRUCT STRUCTURAL
STWY STAIRWAY
SUB FL SUBFLOOR
SUSP SUSPENDED
SV SHEET VINYL
SW SWITCH
SWBD SWITCHBOARD
SYMM SYMMETRICAL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
TAN TANGENT
TB TOWEL BAR
TC TERRA COTTA
TEL TELEPHONE
TEMP TEMPERATURE
TEMP TEMPORARY
TER TERRAZZO
TERM TERMINAL
T&G TONGUE AND GROOVE
TGL TOGGLE
TH TRUSS HEAD
THK THICK(NESS)
THRES THRESHOLD
TK BD TACKBOARD
TKS TACKSTRIP
TO TOP OF
TOL TOLERANCE
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPTN TOILET PARTITION
TRANS TRANSOM
TRANS TRANSVERSE
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
UC UNIT COOLER
UGND UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
UNEX UNEXCAVATED
UNFIN UNFINISHED
UPS UNINTERRUPTABLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV UNIT VENTILATOR
V VOLT
VAR VARNISH
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VCT VITRIFIED CLAY TILE
VD VAULT DOOR
VENT VENTILATOR(TION)
VERT VERTICAL
VEST VESTIBULE
VF VINYL FABRIC
VG VERTICAL GRAIN
VH VINYL HOMOGENEOUS
VJ V-JOINT(ED)
VNR VENEER
VOL VOLUME
VR VAPOR RETARDER
VRM VERMICULITE
VS VENT STACK
V.T. VOLTAGE TRANSFORMER
VTR VENT THRU ROOF
VWC VINYL WALL COVERING
W WEST
W/ WITH
WB WET BULB
WBL WOOD BLOCKING
WC WATER CLOSET
W/C WHEELCHAIR
WCO WOOD-CASED OPENING
WD WOOD
WD WOOD DOOR
WDSP WASTE DISPOSER
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WALL HUNG
WH WATER HEATER
WHB WHEEL BUMPER
WHM WATT-HOUR METER
WI WROUGHT IRON
WKSH WORK SHOP
WM WIRE MESH
W/O WITHOUT
WP WATERPROOF(ING)
WP WEATHERPROOF
WP WORKING POINT
WR WASTE RECEPTACLE
WRB WARDROBE
WS WATERSTOP
W.S. WASTE STACK
WSCT WAINSCOT
WT WEIGHT
WTH WIDTH
W/W WALL TO WALL
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
WWR WELDED WIRE REINFORCEMENT
XFMR TRANSFORMER
YD YARD
YD YARD DRAIN
POV PRIVATELY OWNED VEHICLE
BMP BEST MANAGEMENT PRACTICE
EIS ENVIRONMENTAL IMPACT STUDY
AVE AVENUE
BLVD BOULEVARD
FDC FIRE DEPARTMENT CONNECTION
ST STREET
SHEET NAMING CONVENTION
14CC-A-101
SITE #
BUILDING ID DISCIPLINE
CONSECUTIVE NUMBERS
SITE #
SITE 01
SITE 02
SITE 14
BUILDING ID
AC - ACCESS CONTROL POINT
CC - COMMAND CENTER
FP - FIRE PUMP BUILDING
GI - GENERAL
REU REMOVABLE EQUIPMENT UNITS
10/04/24
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
10-04-202410-04-
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
10/03/2024
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
S T
A T E
O F M I SSO
U R I
P R O F E
SS ION A L E N
G I N
E E R
NUMBER
028892
RANDALL
SCOTT
KENT
10/03/2024
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
S T
A T E
OF M I SSO
U R I
P R O F E
SS I ON A L E N
G
IN
E E R
NUMBER
028892
RANDALL
SCOTT
KENT
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
10/03/202410/0//00/0//0/0003///////////20220002020200202202002002 2424242222424242424222242242424410100000000000/0//0//00000000/00003/33/3/33333//333////202022202002020002222000000242
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
COMM
COMM
COMM
COMM
COMM
COMM COMM COMM COMM COMM COMM
COMM
COMM
COMM
CO
M
M
COM
M
CO
M
M
CO
M
M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM COMM
C O
M M
C O
M M
CO
M
MCOMMCOMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COM
M
COM
M
COMM
COMM
COMM
COMM
COMM
O M
M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M M
O M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMMCOMM
COMM
COMM
COMM
C O
M M
C O
M M
COM
M
D B x
E D
B x EDBx
EDBx
E D
B x
DBx
EDBx x
EDBx
EDBx
EDBx
E D
B x
E D
B x
E D
B x
E D
B x
E D
B x
EDBx
EDBx
E D
B x
E D
B x
E D
B x
E D
B x
E D
B x
ED
Bx
D Bx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
E D
B x
E D
B x
ED
Bx
ED
Bx
E D
B x
E D
B x
EDBx
E D
B x
E D
B x
EDB
EDB
EDB
E D
B x
E D
B x
E D
B x
E D
B x
E D
B x
E D
B EDB EDB EDB EDB EDB EDB
E
E
E E
E E
E E
E E E
E E
E E
E E
E E
E E
E E
EDBx EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
E
EIS
E
ISE
I S
E
IS
EISEISEISEIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
E
IS
E
IS
E
IS
EIS
EIS
EIS
EIS
EIS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS EIS
EIS
E
IS
EIS
EIS
E
IS
E
IS
EIS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
EIS EIS EIS EIS
EIS
EIS
TMH
TMH
CMH
CMH
CMH
CMH
GTA HH
GTAHH
CHH
TP
TPE D
S TOP
S TOP
STOP
STOP
STOP
STOP
YIELD
STOP
STOP
TPE D
TM H
CROS S-WA LK
TP
CUX
CUX
CUX
CUX
EU X
EU X
EU XCU X
CU X
CU X
CU X
CU X
CUX
E D
B x
E D
B x
E D
B x
E D
B x
EDBx
EDBx
EDBx
E D
B x
E D
B x
E D
B x
EDBx
EDBx
EDBx
EDBx
EDBx
EAM
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
JC
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
OF
EPROJECT NO.:
DRAWFORM REVISION: 25 AUGUST 2020
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E CONTRACT NO. N62478-20-D-5036
A/E Task Order No. N6274223F0328
14CC-A-101
SITE #
BUILDING ID DISCIPLINE
CONSECUTIVE NUMBERS
SITE #
SITE 01
SITE 02
SITE 14
BUILDING ID
AC - ACCESS CONTROL POINT
CC - COMMAND CENTER
FP - FIRE PUMP BUILDING
GI - GENERAL
PP - POWER PLANT
SF - SECURITY FORCE
ST - SITE
AS NOTED
KAHKQPATG
17323210
S
IT
E E
L E
C T
R
IC
A L
U T
IL
IT
Y D
E M
O
LI
T
IO
N P
L A
N
O V
E R
A
LL
SITE ELECTRICAL UTILITY DEMOLITION KEY PLAN
1" = 100'SCALE: A1 0 100 200
A. MAINTAIN ELECTRICAL SERVICE TO STRUCTURES
OUTSIDE THIS SCOPE OF WORK. COORDINATE UTILITY
OUTAGES WITH 36TH CIVIL ENGINEER SQUADRON, IN
WRITING, AT LEAST 15 DAYS PRIOR TO ANY SCHEDULED
OUTAGE.
B. LOCATIONS OF EXISTING PATHWAYS AND FEATURES
ARE BASED ON EXISTING RECORDS. CONFIRM
PATHWAYS AND FEATURES PRIOR TO COMMENCEMENT
OF WORK.
C. CONSULT WITH CONTRACTING OFFICER FOR DISPOSAL
OR RETURN OF EQUIPMENT THAT IS DEMOLISHED
WITHIN THIS SCOPE OF WORK.
D. REFER TO DRAWINGS 14GI-E-001 THROUGH 14GI-E-003
FOR ELECTRICAL LEGENDS, ABBREVIATIONS, AND
GENERAL NOTES.
E. REFER TO SHEETS 14ST-CD100 - 14ST-CD109 FOR CIVIL
DEMOLITION PLANS AND FULL EXTENTS OF DEMOLITION
SCOPE.
PANEL A02
ED112
PANEL B01
ED114
PANEL B03
ED116
PANEL C01
ED117
PANEL C02
ED118
PANEL C03
ED119
PANEL A03
ED113
PANEL A01
ED111
PANEL B02
ED115
ANDREW T. GARDNER
OF TE XASS
TATE
ALNOISSE
F O
R P
ENGIN
E
E R
NSEDECIL
130901
XASA
S
TA
TEXAS REGISTERED ENGINEERING FIRM F-2966
10-04-2024
14ST-CD100 14ST-CD109
14GI-E-001 14GI-E-003
Approved By
CAPT Troy Brown, JRM J4 via email
9/24/2024
Approved By
CAPT Troy Brown, JRM J4
CDB
CDB
CDB
CDB
CDB
CDB
CDB
CDB
CDB
CDB
CDB
CDB
CDB
CDB
CDB
CDB
CDB
C
CDB
CDB
C D
B
C D
B
C D
B
C D
B
C D
B
C D
B C
D B
C D
B C
D B
C D
B C
D B
C D
B C
D B
C D
B C
D B
EDB
EDB
EDB
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N S
A N
S A
N
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SA
N
S D x
S D x
SDx SDx
SD
x
SD
x
S D x
S D x
S D x
SDx
SDx
SDx
SDx
SDx
SDx
SDx x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
SDx
SDx
E D
B x
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EIS
EISE
IS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
E
IS
IS
EIS
EIS
EIS
EIS
E
IS
E
IS
E
E D
B
E D
B
E D
B
E D
B
E D
B
E D
B
E D
B
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDBx
EDB
EDB
EDB
EDB
EDB
EDB
EDB
EDB
E D
B E
D B
E D
B E
D B
E D
B E
D B
E D
B E
D B
E D
B E
D
B BURIE
CABL
S D
X
S D
X
S D
X
S D
X
SDX
SDX
SDX
SDX
SDX
SDX
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
E U
X
S S
X
S S
X
W X
W X
W X
W X
W X
W X
S X
S S
X
S S
X
S S
X
SS X
EAM
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
JC
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
OF
EPROJECT NO.:
DRAWFORM REVISION: 25 AUGUST 2020
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E CONTRACT NO. N62478-20-D-5036
A/E Task Order No. N6274223F0328
14CC-A-101
SITE #
BUILDING ID DISCIPLINE
CONSECUTIVE NUMBERS
SITE #
SITE 01
SITE 02
SITE 14
BUILDING ID
AC - ACCESS CONTROL POINT
CC - COMMAND CENTER
FP - FIRE PUMP BUILDING
GI - GENERAL
PP - POWER PLANT
SF - SECURITY FORCE
ST - SITE
AS NOTED
KAHKQPATG
17323211
S
IT
E E
L E
C T
R
IC
A L
U T
IL
IT
Y D
E M
O
LI
T
IO
N P
L A
N
P A
N E
L A
SITE ELECTRICAL UTILITY DEMOLITION PLAN - PANEL A01
1" = 20'SCALE: A1 0 20 40
SEE A1/14ST-ED112 FOR CONTINUATION
A. MAINTAIN ELECTRICAL SERVICE TO STRUCTURES
OUTSIDE THIS SCOPE OF WORK. COORDINATE UTILITY
OUTAGES WITH 36TH CIVIL ENGINEER…