P693_Drawings_Final_Vol14.2_20241007-Part1.pdf

PDF 40 MB Posted

Attached to
FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM
Solicitation number
N6274225R1301
Issued by

About this file

This document is a pre-solicitation notice for a federal contract opportunity with the Department of the Navy Naval Facilities Engineering Command (NAVFAC) to construct a Guam Defense Radar System Command Center, power generation facility, and associated infrastructure.

The project includes the design-bid-build construction of a command center, power generation facility, switchgear building, fuel storage facility, entry control facility, and related equipment. The project has a magnitude estimated between $250,000,000 and $500,000,000 and a performance period of 1,323 calendar days. The work will require specialized construction techniques such as seismic isolation, coordination of multiple control systems, and accommodation of long lead times for major equipment. The contract will be awarded on a best-value trade-off basis, with technical factors including experience, small business utilization, safety, management plan, and past performance being evaluated. The RFP is expected to be released on or around October 30, 2024, and a pre-proposal site visit is scheduled for December 11, 2024.

View the file

Other files

File Type Posted
25R1301 CmdCtrl Notice1.pdf PDF
P693_Drawings_Final_Vol14.4_20241007-Part4.pdf PDF
P693_Specs_Final_Vol01_20241007.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part5.pdf PDF
P693_Drawings_Final_Vol14.4_20241007-Part2.pdf PDF
P693_Drawings_Final_Vol14.8_20241007.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.1_20241007-Part1.pdf PDF
P693_Drawings_Final_Vol14.4_20241007-Part5.pdf PDF
P693_Drawings_Final_Vol14.1_20241007-Part2.pdf PDF
P693_Drawings_Final_Vol14.5_20241007.pdf PDF
P693_Specs_Final_Vol02_20241007.pdf PDF
P693_Drawings_Final_Vol14.1_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part2.pdf PDF
P693_Drawings_Final_Vol14.4_20241007-Part1.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part4.pdf PDF
P693_Drawings_Final_Vol14.4_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.6_20241007.pdf PDF
25-1301 P-693 RFP.pdf PDF
P693_Drawings_Final_Vol14.7_20241007.pdf PDF
P693_Drawings_Final_Vol14.3_20241007.pdf PDF
P-693-SV5_Contractor Policy Update Memo.pdf PDF
P-693-SV2_III Log.pdf PDF
P-693-SV3_Base Access Affidavit 2020.pdf PDF
P-693-SV4_Foreign National Access Request Form.pdf PDF
P-693-SV2a_Interstate Identification Index (III) Log Instructions.pdf PDF
P-693-SV1_Base Access Request - Contractor Memo.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .