This document is a Notice No. 1 related to Request for Proposal (RFP) N62742-25-R-1301 for the FY25 MCON P-693 Pacific Deterrence Initiative: Guam Defense System Command Center project in Guam. The project involves the construction of a command center, power generation facility, switchgear building, fuel storage facility, entry control facility, and associated equipment. It is a design-bid-build contract with a construction value estimated between $250-500 million. The RFP will be issued on or around October 30, 2024, with a pre-proposal site visit scheduled for December 11, 2024. The contract will be awarded on a best-value, trade-off basis, with technical factors, past performance, and price being evaluated. Relevant construction experience requirements include new construction of administrative, secure, and essential facilities in moderate to high seismic areas. This is an unrestricted procurement open to full and open competition.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1301
Notice No. 1
Notice No. 1
30 October 2024
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-25-R-1301
FY25 MCON P-693 PACIFIC DETERRENCE INITIATIVE: GUAM DEFENSE SYSTEM
COMMAND CENTER,
JOINT REGION MARIANAS, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The
RFP remains unchanged unless it is amended in writing on a Standard Form 30.
1. Sources Sought Notice, N62742GDSCC
a. The requirement states that the construction company must have an FCL. While we do not hold an FCL, our JV partner does. If we pursue this opportunity as a joint venture, would their FCL satisfy the requirement?
b. Additionally, what percentage of the JV must be held by the FCL holder for compliance?
ANSWER:
a. See Section 01 14 00.00 14, Construction Security Plan
b. See Section 01 14 00.00 14, Construction Security Plan
2. Are you going to publish the names of the Primes that responded to the draft or will share those companies?
ANSWER: No.
3. It appears this is construction only, so is NAVFAC planning to utilize their present communication equipment to fill the new command center, or will they look to procure separately?
ANSWER: Communication equipment is not part this requirement. The equipment will be procured separately by MDA with a contract that NAVFAC does not execute.
4. My team members have their DBIS for Naval Base Guam but do not have it for AAFB. In this case, do we need to fill out the Base Access Affidavit?
ANSWER: Yes.
5. Is it possible to get a camera access pass for AAFB for this site visit?
ANSWER: A camera access pass is not required. Taking pictures of the site is allowed at the site visit.