About this file

This document is an amendment to a Request for Proposal (RFP) for an Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) to support the Pacific Deterrence Initiative program with various construction projects in the NAVFAC Pacific area of operations. The MACC will encompass a wide range of design-build projects including new facilities, repair/renovation, and upgrades to building facilities, warehouses, bridges, wharves/piers, airfields, and other infrastructure. Key updates in this amendment include revised contract clauses, building permit requirements, and water tank specifications. The proposal due date remains unchanged. The government will award multiple contracts under this solicitation, with work to be performed through individual task orders competed amongst the MACC holders.

View the file

Other files

File Type Posted
24R1328 Note11-Issued.pdf PDF
24R1328 Note10-Issued.pdf PDF
24R1328 Note9.pdf PDF
24R1328-Amd08-Issued.pdf PDF
24R1328-Amd07-Issued.pdf PDF
24R1328 Note8-Issued.pdf PDF
IMACC Seed PPSV Sign-In.pdf PDF
24R1328-Amd06-Issued.pdf PDF
24R1328 Note7-Issued.pdf PDF
24R1328-Amd05-Issued.pdf PDF
24R1328-AMD4.pdf PDF
24R1328 Note6.pdf PDF
24R1328 Note5.pdf PDF
24R1328 Note4.pdf PDF
24R1328-AMD3.pdf PDF
24R1328 Note3.pdf PDF
24R1328 Note2.pdf PDF
24R1328-AMD1.pdf PDF
24R1328 Note1-Issued.pdf PDF
RFPN6274224R1328 IMACC.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

24RXXXX

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REQUEST FOR PROPOSAL N62742-24-R-1328, INDO-PACIFIC MULTIPLE AWARD CONSTRUCTION CONTRACT FOR PROJECTS IN THE

NAVFAC PACIFIC AREA OF OPERATIONS

The proposal due date remains unchanged.

Continued on page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Jul-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274224R1328

X 9B. DATED (SEE ITEM 11)

06-Jun-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Jul-2024

CODE

NAVFAC PACIFIC

A-E CONTRACTS BRANCH (CODE ACQ31)

258 MAKALAPA DR STE 100

JBPHH HI 96860-3134

N62742 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

RFP No. N6274224R1328 Amendment No. 0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

PART 7, SEED PROJECT

DOCUMENT 00 70 00 CONTRACT CLAUSES

Delete Document 00 70 00 Contract Clauses (pages 1 through 10) in its entirety and replace with the attached Document 00 70 00 Contract Clauses (pages 1 through 10).

DOCUMENT 00 73 00 SUPPLEMENTARY CONDITIONS

Delete Document 00 73 00 Supplementary Conditions (pages 1 and 2) in its entirety and replace with the attached Document 00 73 00 Supplementary Conditions (pages 1 and 2).

PART 2 GENERAL REQUIREMENTS

Para 4.g., line 1. Delete “at a minimum…by the USG:” and insert “At minimum the following shall be submitted for review by the USG and Armed Forces of the Philippines (AFP) Camp/Base Commander and HQs Office of the Chief Engineer, Building Official Division”. See Attachment 6, Figure 12, for building permit requirements.

PART 3 STATEMENT OF WORK

Para 3.1, line 4. Delete”Bidder is required to attend the pre-bid site visit” and insert “Prior to the start of work, the Contractor shall”.

Para 3.2 SITE DEVELOPMENT, subpara 9. Delete in its entirety “The Contractor shall..if required.” and insert “The Contractor shall coordinate with the CMDC POC for cutting and removing trees at the project site. A Department of Environment and Natural Resources clearance/certificate is prior to cutting trees.”

Para 4.4 Elevated Water Tank.

Delete item1. in its entirety and insert the following:

“1. The water tank itself will be a modular type stainless steel tank with a capacity of 5,000 liters. The tank will be supported by a reinforced concrete tower with a minimum height of 6 meters for adequate water pressure. A hot-dip galvanized safety access ladder shall be provided and installed on the concrete tower to allow for safe maintenance access. The Contractor shall provide a pump and necessary pipes and fittings to enable filling the water tank from a water truck. The Contractor shall provide a complete water distribution system to deliver water from the storage tank to its designated points of use.”

PART 6 ATTACHMENTS

Add the following:

FIGURE 12: General Headquarters Armed Forces of the Philippines, Office of the Chief Engineer, building Official Division.

D/B UFC PC24-03, COMMAND & CONTROL (C2) FUSION CENTER WON 1795624

CAMP MELCHOR DELA CRUZ, ISABELA, PHILIPPINES

N62742-24-R-1328 –Seed Project

DOCUMENT 00 70 00 (ADVERTISE)

DOCUMENT 00 70 00

NEGOTIATED

CONTRACT CLAUSES

6/24

DOCUMENT 00 70 00, CONTRACT CLAUSES, OF THE BASIC CONTRACT APPLIES TO THIS TASK

ORDER. IN ADDITION, THE FOLLOWING IS PROVIDED AS IT APPLIES TO THIS TASK ORDER:

FAR 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to:

(a) Commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed,

(b) Prosecute the work diligently, and

(c) Complete the entire work ready for use not later than 450 calendar days after notice to proceed.

The time stated for completion shall include final cleanup of the premises.

Definition

(a) Notice to Proceed: A "Notice to Proceed" is the task order award date. No formal written notice will be issued by the Government.

FAR 52.211-12, LIQUIDATED DAMAGES—CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $210.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

FAR 52.217-7, OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within [insert in the clause the period of time in which the Contracting Officer has to exercise the option]. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

FAR 52.236-4, PHYSICAL DATA (APR 1984) *

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

DOCUMENT 00 70 00 (ADVERTISE)

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by: N/A

(b) Weather conditions. Weather Data, for the nearest station (Tuguegarao, Cagayan) from the job site was obtained from https://climate.af.mil/product_locator and, is included in the RFP Part 6.

(c) Transportation facilities. N/A.

(d) Other pertinent information. N/A.

FAR 52.236-21, SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ALTERNATE I

(APR 1984)

(a) The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at its own risk and expense. The Contracting Officer shall furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.

(b) Wherever in the specifications or upon the drawings the words "directed," "required," "ordered," "designated," "prescribed," or words of like import are used, it shall be understood that the "direction," "requirement," "order," "designation," or "prescription," of the Contracting Officer is intended and similarly the words "approved," "acceptable," "satisfactory," or words of like import shall mean "approved by," or "acceptable to," or "satisfactory to" the Contracting Officer, unless otherwise expressly stated.

(c) Where "as shown," "as indicated," "as detailed," or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word "provided" as used herein shall be understood to mean "provide complete in place," that is "furnished and installed."

(d) Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, any lower tier subcontractor pursuant to a construction contract, showing in detail (1) the proposed fabrication and assembly of structural elements and (2) the installation (i.e., form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.

(e) If this contract requires shop drawings, the Contractor shall coordinate all such drawings, and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the Contracting Officer without evidence of the Contractor's approval may be returned for resubmission. The Contracting Officer will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the Government's reasons therefor.

Any work done before such approval shall be at the Contractor's risk. Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with (f) below.

(f) If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission. If the Contracting Officer approves any such

DOCUMENT 00 70 00 (ADVERTISE)

variation, the Contracting Officer shall issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued.

(g) The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. Three sets (unless otherwise indicated) of all shop drawings, will be retained by the Contracting Officer and one set will be returned to the Contractor. Upon completing the work under this contract, the Contractor shall furnish a complete set of all shop drawings as finally approved. These drawings shall show changes and revisions made up to the time the equipment is completed and accepted.

DFARS 252.204-7020, NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)

(a) Definitions.

Basic Assessment” means a contractor’s self-assessment of the contractor’s implementation of NIST SP 800-171 that—

(1) Is based on the Contractor’s review of their system security plan(s) associated with covered contractor information system(s);

(2) Is conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology; and

(3) Results in a confidence level of “Low” in the resulting score, because it is a self-generated score.

“Covered contractor information system” has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.

“High Assessment” means an assessment that is conducted by Government personnel using NIST SP 800-171A, Assessing Security Requirements for Controlled Unclassified Information that—

(1) Consists of—

(i) A review of a contractor’s Basic Assessment;

(ii) A thorough document review;

(iii) Verification, examination, and demonstration of a Contractor’s system security plan to validate that NIST SP 800-171 security requirements have been implemented as described in the contractor’s system security plan; and

(iv) Discussions with the contractor to obtain additional information or clarification, as needed; and

(2) Results in a confidence level of “High” in the resulting score.

“Medium Assessment” means an assessment conducted by the Government that—

(1) Consists of—

(i) A review of a contractor’s Basic Assessment;

(ii) A thorough document review; and

(iii) Discussions with the contractor to obtain additional information or clarification, as needed; and

(2) Results in a confidence level of “Medium” in the resulting score.

DOCUMENT 00 70 00 (ADVERTISE)

(b) Applicability. This clause applies to covered contractor information systems that are required to comply with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, in accordance with Defense Federal Acquisition Regulation System (DFARS) clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.

(c) Requirements. The Contractor shall provide access to its facilities, systems, and personnel necessary for the Government to conduct a Medium or High NIST SP 800–171 DoD Assessment, as described in NIST SP 800–171 DoD Assessment Methodology at https://www.acq.osd.mil/asda/dpc/cp/cyber/docs/safeguarding/NIST-SP-800-171- Assessment-Methodology-Version-1.2.1-6.24.2020.pdf , if necessary.

(d) Procedures. Summary level scores for all assessments will be posted in the Supplier Performance Risk System (SPRS) () to provide DoD Components visibility into the summary level scores of strategic assessments.

(1) Basic Assessments. A contractor may submit, via encrypted email, summary level scores of Basic Assessments conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology to for posting to

SPRS.

(i) The email shall include the following information:

(A) Version of NIST SP 800-171 against which the assessment was conducted.

(B) Organization conducting the assessment (e.g., Contractor self-assessment).

(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract—

(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and

(2) A brief description of the system security plan architecture, if more than one plan exists.

(D) Date the assessment was completed.

(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).

(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST

SP 800-171.

(ii) If multiple system security plans are addressed in the email described at paragraph (b)(1)(i) of this section, the Contractor shall use the following format for the report:

System security plan

CAGE codes supported by this plan

Brief description of the plan architecture

Date of assessment

Total score Date score of 110 will achieved

(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system security plan assessed:

DOCUMENT 00 70 00 (ADVERTISE)

(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).

(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by

Department of Defense Activity Address Code (DoDAAC)).

(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.

(iv) A brief description of the system security plan architecture, if more than one system security plan exists.

(v) Date and level of the assessment, i.e., medium or high.

(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).

(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(e) Rebuttals.

(1) DoD will provide Medium and High Assessment summary level scores to the Contractor and offer the opportunity for rebuttal and adjudication of assessment summary level scores prior to posting the summary level scores to SPRS (see SPRS User’s Guide https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf).

(2) Upon completion of each assessment, the contractor has 14 business days to provide additional information to demonstrate that they meet any security requirements not observed by the assessment team or to rebut the findings that may be of question.

(f) Accessibility.

(1) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).

(2) Authorized representatives of the Contractor for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User’s Guide for Awardees/Contractors available at .

(3) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this clause. DoD will retain and protect any such documentation as “Controlled Unclassified Information (CUI)” and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).

(g) Subcontracts.

(1) The Contractor shall insert the substance of this clause, including this paragraph (g), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services (excluding commercially available off-the-shelf).

(2) The Contractor shall not award a subcontract or other contractual instrument, that is subject to the implementation of NIST SP 800–171 security requirements, in accordance with DFARS clause 252.204–7012 of

DOCUMENT 00 70 00 (ADVERTISE)

this contract, unless the subcontractor has completed, within the last 3 years, at least a Basic NIST SP 800–171 DoD Assessment, as described in https://www.acq.osd.mil/asda/dpc/cp/cyber/docs/safeguarding/NIST-SP-800-171- Assessment-Methodology-Version-1.2.1-6.24.2020.pdf , for all covered contractor information systems relevant to its offer that are not part of an information technology service or system operated on behalf of the Government.

(3) If a subcontractor does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the subcontractor may conduct and submit a Basic Assessment, in accordance with the NIST SP 800-171 DoD Assessment Methodology, to mailto:webptsmh@navy.mil for posting to SPRS along with the information required by paragraph

(d) of this clause.

DFARS 252.223-7998 PROHIBITION ON PROCUREMENT OF CERTAIN ITEMS CONTAINING

PERFLUOROOCTANE SULFONATE OR PERFLUOROOCTANOIC ACID (DEVIATION 2022-O0010) (APR

2023)

(a) Effective April 1, 2023, in accordance with section 333 of the William M. (Mac) Thornberry National Defense Authorization Act for Fiscal Year 2021 (Pub. L. 116-283), the Department of Defense may not procure any covered items that contain perfluorooctane sulfonate (PFOS) or perfluorooctanoic acid (PFOA).

(b) A covered item means the following:

(1) Nonstick cookware or cooking utensils for use in galleys or dining facilities.

(2) Upholstered furniture, carpets, and rugs that have been treated with stain-resistant coatings.

(c) The Contractor shall not provide any covered items containing PFOS or PFOA in performance of this contract, task order, delivery order, or blanket purchase agreement order.

(d) The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts for any covered item, including subcontracts for commercial products (including commercially available off-the-shelf items) and commercial services.

DFARS 252.225-7058, POSTAWARD DISCLOSURE OF EMPLOYMENT OF INDIVIDUALS WHO WORK IN

THE PEOPLE’S REPUBLIC OF CHINA (JAN 2023)

(a) Definitions. As used in this clause—

“Covered contract” means any DoD contract or subcontract with a value in excess of $5 million, not including contracts for commercial products and commercial services. “Covered entity” means any corporation, company, limited liability company, limited partnership, business trust, business association, or other similar entity, including any subsidiary thereof, performing work on a covered contract in the People’s Republic of China, including by leasing or owning real property used in the performance of the covered contract in the People’s Republic of China.

(b) Disclosure requirement.

(1) In accordance with section 855 of the National Defense Authorization Act for Fiscal Year 2022 (Pub. L.

117-81, 10 U.S.C. 4651 note prec.), DoD may not award, extend, or exercise an option on a covered contract with a covered entity unless such covered entity submits each required disclosure of its use of workforce and facilities in the People’s Republic of China, if it employs one or more individuals who perform work in the People’s Republic of China on a covered contract.

DOCUMENT 00 70 00 (ADVERTISE)

(2) If the Contractor is a covered entity, the Contractor shall disclose for the Government’s fiscal years 2023 and 2024, the Contractor’s employment of one or more individuals who perform work in the People’s Republic of China on any covered contract. The disclosures shall include—

(i) The total number of such individuals who perform work in the People’s Republic of China on the covered contracts funded by DoD; and

(ii) A description of the physical presence, including street address or addresses in the People’s Republic of China, where work on the covered contract is performed.

(c) Subcontracts. The Contractor shall insert this clause, including this paragraph (c), without alteration other than to identify the appropriate parties, in all subcontracts that meet the definition of a covered contract.

DFARS 252.225-7060, PROHIBITION ON CERTAIN PROCUREMENTS FROM THE XINJIANG UYGHUR

AUTONOMOUS REGION (JUN 2023)

(a) Definitions. As used in this clause—

“Forced labor” means any work or service that is exacted from any person under the menace of any penalty for its nonperformance and that the worker does not offer to perform (10 U.S.C. 2496).

“XUAR” means the Xinjiang Uyghur Autonomous Region of the People’s Republic of China (10 U.S.C. 2496).

(b) Prohibition. In accordance with 10 U.S.C. 4661, none of the funds appropriated or otherwise made available for DoD may be used to knowingly procure any products mined, produced, or manufactured wholly or in part by forced labor from XUAR or from an entity that has used labor from within or transferred from XUAR.The Contractor shall make a good faith effort to determine that forced labor from XUAR will not be used in the performance of this contract (section 855, Pub. L. 117-263).

(c) Subcontracts. The Contractor shall insert this clause, including this paragraph (c), without alteration other than to identify the appropriate parties, in subcontracts including subcontracts for commercial products, commercial services, and commercially available off-the-shelf items.

DFARS 252.225-7967 PROHIBITION REGARDING RUSSIAN FOSSIL FUEL OPERATIONS (DEVIATION 2024-

O0006, REVISION 1) (FEB 2024)

(a) Definitions. As used in this clause—

“Business operations” means knowingly engaging in commerce in any form, including acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, or any other known apparatus of business or commerce. The term does not include—

(1) Any shipment subject to price caps as specified in the—

(i) “Statement of the G7 and Australia on a Price Cap for Seaborne Russian-Origin Crude Oil”, issued on December 2, 2022, between member countries of that coalition; or

(ii) “Statement of the G7 and Australia on Price Caps for Seaborne Russian-Origin Petroleum Products Berlin, Brussels, Canberra, London, Ottawa, Paris, Rome, Tokyo, Washington”, issued on February 4, 2023, between such members, if such shipment complies with the applicable price caps; or

DOCUMENT 00 70 00 (ADVERTISE)

(A) Actions taken for the benefit of the country of Ukraine, as determined by the Secretary; or

(B) Actions taken to support the suspension or termination of business operations for commercial activities during the period beginning on the effective date and ending on December 31, 2029, including—

(1) Any action to secure or divest from facilities, property, or equipment;

(2) The provision of products or services provided to reduce or eliminate operations in territory internationally recognized as the Russian Federation or to comply with sanctions relating to the Russian Federation; and;

(3) Activities that are incident to liquidating, dissolving, or winding down a subsidiary or legal entity in Russia.

Fossil fuel company means an entity or individual that—

(1) Carries out oil, gas, or coal exploration, development, or production activities;

(2) Processes or refines oil, gas, or coal; or

(3) Transports, or constructs facilities for the transportation of, Russian oil, gas, or coal.

(b) Prohibition. In accordance with section 804 of the National Defense Authorization Act for Fiscal Year 2024 (Pub.

L. 118-31), the Contractor is prohibited from entering into a subcontract or other contractual instrument for the procurement of products or services with any entity or individual that is known to be, or that is known to have fossil fuel business operations with an entity or individual that is, not less than 50 percent owned, individually or collectively, by—

(1) An authority of the government of the Russian Federation; or

(2) A fossil fuel company that operates in the Russian Federation, except if the fossil fuel company transports oil or gas—

(i) Through the Russian Federation for sale outside of the Russian Federation; and

(ii) That was extracted from a country other than the Russian Federation with respect to the energy sector of which the President has not imposed sanctions as of the date on which the contract is awarded.

(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts and other contractual instruments, including those for the acquisition of commercial products or commercial services.

DFARS 252.229-7001, TAX RELIEF—BASIC (APR 2020)

(a) Prices set forth in this contract are exclusive of all taxes and duties from which the United States Government is exempt by virtue of tax agreements between the United States Government and the Contractor’s government. The following taxes or duties have been excluded from the contract price:

NAME OF TAX: Not applicable for this project, DoD has been unable to obtain VAT waivers for contractors performing in this area. All offers should include VAT as applicable.

RATE (PERCENTAGE): Not applicable for this project, DoD has been unable to obtain VAT waivers for contractors performing in this area. All offers should include VAT as applicable.

DOCUMENT 00 70 00 (ADVERTISE)

(b) Invoices submitted in accordance with the terms and conditions of this contract shall be exclusive of all taxes or duties for which relief is available. The Contractor’s invoice shall list separately the gross price, amount of tax deducted, and net price charged.

(c) When items manufactured to United States Government specifications are being acquired, the Contractor shall identify the materials or components intended to be imported in order to ensure that relief from import duties is obtained. If the Contractor intends to use imported products from inventories on hand, the price of which includes a factor for import duties, the Contractor shall ensure the United States Government’s exemption from these taxes.

The Contractor may obtain a refund of the import duties from its government or request the duty-free import of an amount of supplies or components corresponding to that used from inventory for this contract.

DFARS 252.232-7006, WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

NAVCON

DOCUMENT 00 70 00 (ADVERTISE)

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC N68732 Issue By DoDAAC N62742 Admin DoDAAC N62742/THAI Inspect By DoDAAC N62742/THAI Ship To Code N62742/THAI Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) N62742/THAI Service Acceptor (DoDAAC) N62742/THAI Accept at Other DoDAAC N/A LPO DoDAAC N62742/THAI DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

DOCUMENT 00 70 00 (ADVERTISE)

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

NAVFAC_PAC_WAWF_THAI@us.navy.mil

Mr. Rondel Williams Contracting Officer Email: williamsrg@state.gov

Ms. Artitar Udit Contract Specialist Email: artitar@state.gov

Ms. Kannikar Pakkhunthot Administrative Associate Email: Kannikar@state.gov

Mr. Hernando Blacer Contracting Officer’s Representative Email: blacerhv@state.gov

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

Mr. Jason Ho Procurement Analyst Email: Jason.w.ho.civ@us.navy.mil

--End of Document—

N62742-24-R-1328 – Seed Project

DOCUMENT 00 73 00

SUPPLEMENTARY CONDITIONS

1.1 AUTHORITY

1. No person other than the Contracting Officer has authority to bind the Government with respect to this contract.

2. No action or omission of any government employee or representative other than the Contracting Officer shall increase or decrease the scope of this contract or shall otherwise modify the terms and conditions of this contract.

3. In no event shall any of the following be effective or binding on the Government or imputed to the Contracting Officer with respect to this contract:

(a) An understanding or agreement between the Contractor and anyone other than the Contracting Officer;

(b) A purported modification or change order issued by anyone other than the Contracting Officer;

(c) A promise by anyone other than the Contracting Officer to provide additional funding or make payments; or

(d) An order, direction, consent, or permission from anyone other than the Contracting Officer to:

(i) Incur costs in excess of a specified estimated cost, allotment of funds, or other ceiling; or

(ii) Expend hours in excess of a specified level of effort.

1.2 PHASED CONSTRUCTION SCHEDULE

Within the overall project schedule, commence and complete the work in phases. Complete each phase of the work within the number of calendar days stated in the following schedule:

a. Schedule start day: The day designated as the beginning of a particular phase; the number listed is the number of calendar days from the notice to proceed.

b. Completion day: The day designated as the end of a given phase and the day the work in that phase must be completed; the number listed is the number of calendar days from the notice to proceed.

c. Schedule:

PHASE DESCRIPTION SCHEDULE START

DAY

SCHEDULE

COMPLETION DAY

1 Final Design Submittal No later than 15 calendar days after NTP

100 calendar days after

NTP

2 All remaining work. 101 calendar days after

NTP

450 calendar days after

NTP

d. If the work of a particular phase is complete and accepted before the scheduled completion day, immediately begin work on the subsequent phase unless otherwise restricted.

1.3 ENHANCED DEFENSE COOPERATION AGREEMENT (EDCA) BETWEEN THE UNITED STATES AND

THE GOVERNMENT OF THE REPUBLIC OF THE PHILIPPINES

It is the Offeror’s/Contractor’s responsibility to ensure that all requirements of the Enhanced Defense Cooperation

N62742-24-R-1328 – Seed Project

Agreement are adhered to.

The following website provides the Enhanced Defense Cooperation Agreement:

https://www.state.gov/wp-content/uploads/2019/02/14-625-Philippines-Defense-Cooperation.pdf

The following website provides a listing of the major U.S. Philippines international agreements:

https://www.state.gov/treaties-in-force/

1.4 UTILITIES FOR CONSTRUCTION AND TESTING

FAR 52.236-14 does not apply to this task order. The Contractor shall be responsible for obtaining all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used.

1.5 BID, PERFORMANCE AND PAYMENT BONDS

Bid, performance and payment bonds are not required for the seed project.

-- End of Document--

File details come from the government source that posted it. Updated .