24R1312 Note 5.pdf

PDF 230 KB Posted

Attached to
FY24 MCON P-406, RECREATION CENTER, US NAVSUPPACT MCB GUAM, FINEGAYAN, GUAM
Solicitation number
N6274224R1312
Issued by

About this file

This document provides the fifth notice and answers to pre-proposal questions for solicitation N62742-24-R-1312 from the Department of the Navy Naval Facilities Engineering Command. The notice extends the proposal submission deadline by three weeks to December 19, 2023 for a construction project to build a recreation center at Marine Corps Base Guam in Finegayan, Guam. One question and answer confirms that mini theater seats are government-furnished equipment while projector screens must be supplied and installed by the contractor. Another question and answer instructs offerors to refer to interior design drawings for a list of additional government-furnished equipment.

View the file

Other files

File Type Posted
24R1312_AMD08.pdf PDF
24R1312_AMD07.pdf PDF
P-406 DRAWINGS AMD06.pdf PDF
24R1312_AMD06.pdf PDF
24R1312 Note 7.pdf PDF
24R1312 Note 6.docx DOCX document
P-406 DRAWINGS AMD05.pdf PDF
241312_AMD05.pdf PDF
24R1312_AMD04.pdf PDF
24R1312 Note 4.pdf PDF
24R1312 Note 3.pdf PDF
24R1312_AMD0003.pdf PDF
24R1312 Note 2.pdf PDF
24R1312_AMD02.pdf PDF
P-406 Site Visit Sign In Sheet.pdf PDF
24R1312_AMD01.pdf PDF
24R1312 Note 1.pdf PDF
3_P406 Drawings_Part2.pdf PDF
4_P406 Drawings_Part3.pdf PDF
24R1312-JA.ZIP ZIP file
2_P406 Drawings_Part1.pdf PDF
1_P406 Specs.pdf PDF
0_24R1312-RFP.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notice No. 5

16 November 2023

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-24-R-1312

FY24 MCON P-406 RECREATION CENTER,

US NAVSUPPACT MCB GUAM, FINEGAYAN, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

NOTICE NO. 5

23. Due to the recent Veterans Day and the forthcoming Thanksgiving Day, our Suppliers and Sub-Contractors are having hard time providing us their quotes in a timely manner. Because of this we are requesting a five-week time extension for the bid submission. This will allow us to provide a competitive bid.

ANSWER: The proposal submission deadline will be extended, by three (3) weeks, to 19 December 2023 in a forthcoming amendment.

24. Are the mini theater seats and projector screens part of Government FF&E or to be supplied and installed by Contractor? Please advise.

ANSWER: The Mini Theater seats are Government FF&E. The Projector Screen is to be supplied and installed by the Contractor.

25. Please provide us a list of Government FF&E on that way we can determine the associated works and accessories that may affected our cost.

ANSWER: Please see Interior Design drawing sheets ID001 to ID005.

End of Notice

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC

258 MAKALAPA DRIVE, SUITE 100

JOINT BASE PEARL HARBOR HICKAM, HAWAII 96860-3134

DEPARTMENT OF THE NAVY
JOINT BASE PEARL HARBOR HICKAM, HAWAII 96860-3134

File details come from the government source that posted it. Updated .