23R1316_AMD6.pdf
PDF 3 MB Posted
- Attached to
- FY22 MCAF PAF180700 SQUADRON OPERATIONS FACILITY, ROYAL AUSTRALIAN AIR FORCE BASE TINDAL, AUSTRALIA
- Solicitation number
- N6274223R1316
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23R1316 Note 6.pdf | ||
| 23R1316_AMD5.pdf | ||
| 23R1316 Note 5.pdf | ||
| 23R1316_AMD4.pdf | ||
| 23R1316 Note 4.pdf | ||
| 23R1316 AMD3.pdf | ||
| 23R1316_AMD2.pdf | ||
| 23R1316 Note 3.pdf | ||
| P700 SV Sign-in.pdf | ||
| 23R1316_AMD1.pdf | ||
| 23R1316 Note 2.pdf | ||
| 23R1316 Note 1.pdf | ||
| 1665827-P700 Specification_Signed_REV_MAY2023.pdf | ||
| 1665827-P-700 Drawings - 2 of 2.pdf | ||
| 1665827-P-700 Drawings - 1 of 2.pdf | ||
| 23R1316-RFP.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. N6274223R1316 Amendment No. 0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SOLICITATION, OFFER AND AWARD (SF1442)
Delete pages 1 through 5 and insert the attached SF1442 (pages 1 through 5).
DOCUMENT 00 70 00, NEGOTIATED CONTRACT CLAUSES
Remove in its entirety, and replace with the attached Document 00 70 00, Negotiated Contract Clauses.
See Doc 002116 2:00 PM HST
See Doc 002116
SOLICITATION, OFFER AND AWARD (SF 1442), CONTINUED
PRICE PROPOSAL SCHEDULE FOR
RFP NO. N62742-23-R-1316
FY22 MCAF PAF180700, SQUADRON OPERATIONS FACILITY
ROYAL AUSTRALIAN AIR FORCE BASE TINDAL, AUSTRALIA
N62742-23-R-1316 SF 1442 (Continued)
Item No. Description Qty Unit Unit Price Amount
0001 BASE ITEM (PAF 180700)
0001AA The basis for SLIN 0001AA is the price for the entire work for WON 1665827 complete in accordance with the drawings and specifications, excluding all other CLINs.
1 LS =$
0001AB The basis for SLIN 0001AB is the price for all labor, material and equipment to excavate, remove, haul, and dispose of asbestos impacted soil off site.
100 m3 @ $_____/ m3 =$
0001AC The basis for SLIN 0001AC is the price for all labor, material and equipment to excavate, remove, haul, and dispose of lead impacted soil off site.
0001AD The basis for SLIN 0001AD is the price for all labor, material and equipment to excavate, remove, haul, and dispose of PFAS impacted soil on site at an approved PFAS impacted soil stockpile.
50 m3 @ $_____/ m3 =$
0001AE The basis for SLIN 0001AE is the price for all labor, material and equipment to excavate, remove, haul, and dispose of unsuitable excavated clean soils discovered by excavation for foundations or utilities at an approved stockpile location on base.
0001AF The basis for SLIN 0001AF is the price for all labor, material and equipment to supply, import and place clean suitable fill to replace unsuitable excavated clean soils discovered by excavation for foundations or utilities or asbestos, lead or PFAS impacted soils.
350 m3 @ $_____/ m3 =$
0001AG The basis for SLIN 0001AG is the price for all labor, material
RFP NO. N62742-23-R-1316
0002 COLLATERAL EQUIPMENT (CEQ)
000201 Planned Modification: Collateral Equipment Gov’t Estimated
Amount $340,034.26
000202 Handling Administration Rate (HAR) NTE 5% % $
CLIN
TOTAL
NOTES:
1. See Document 002200 for the Price Evaluation. The total proposed price for CLINs 0001 and 0002 will form the basis for the evaluation noted in Document 002200.
2. The Offeror SHALL include a price for ALL CLINs. The Government will not adjust the quantities noted in the schedule at time of award (Ref: FAR 52.215-1(f)(5)).
3. Multiple awards will not be made (Ref: FAR 52.215-1(f)(6)).
4. The following notes apply to CLIN 0002, Collateral Equipment (CEQ):
a. Government Estimated Amount for CEQ. The Government Estimate for CEQ, as shown above (SLIN 000201), includes the material cost, freight and installation charges. The Government Estimate has been identified to provide offerors with and equipment to supply, import and place engineered fill to fill voids and/or voids created by limestone karst.
0001AH The basis for SLIN 0001AH is the price for all labor, material and equipment to run/pull 3,000m of communications cabling to Building 390 in existing infrastructure.
3,000 m @ $_____/ m3 =$
0001AI The basis for SLIN 0001AI is the price for all labor, material and equipment to excavate rock as defined in Specification 31 23 00.00 20
50 m3 @ $_____/ m3 =$
Total CLIN 0001 (SLINs 0001AA through 0001AI)
RFP NO. N62742-23-R-1316
Amendment No. 0006 the projected magnitude of effort for CEQ. The Government Estimate includes the actual material cost including freight and installation charges and Prime Contractor’s proposed Handling and Administrative Rate (HAR).
b. Prime Contractor Handling and Administration Rate (HAR). Offerors may propose a HAR fee in SLIN 000202, up to but not to exceed 5%, for the handling and administration of the CEQ. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontractors, profit and any other costs associated with and related to the coordination and processing of the procurement and installation of the CEQ. The prime contractor’s proposed HAR mark-up shall be applied to the Government Estimate to derive a total proposed price for CLIN 0002.
c. The prime contractor’s HAR percentage rate will be incorporated into the contract as proposed and will not be adjusted regardless of fluctuations in the Government Estimate. The HAR is a fixed percentage rate. The HAR percentage shall be a whole number up to 5% (e.g. proposal rate shall not be 2.3999%). When the final CEQ package is priced, the contractor’s HAR percentage rate, as incorporated into the contract, shall be applied to the supplier/vendor quotes to derive a total proposed price for final negotiation of the planned modification.
d. The modification will be awarded at least nine months prior to the contract completion date after receipt of appropriate funding. A minimum of nine months is required for the contractor to purchase, deliver and install the FF&E without impacting the overall completion date of the project. No schedule extensions will be granted if the modification is executed at least nine months prior to the contract completion date. If the Government decides to negotiate and award the modification with less than nine months prior to the contract completion date, the contractor may be entitled to a contract extension.
5. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended offer and the extended total recomputed accordingly. If the offer provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
6. Payment for SLINs 0001AB through 0001AI shall be for actual quantities only. The unit prices will be used to adjust the contract price for any increase or decrease in the estimated quantities subject to FAR 52.211-18 Variation in Estimated Quantity.
7. The total price for CLIN 0001 shall be exclusive of the Australian Goods and Services Tax. See Section 01 20 00 Price and Payment Procedures, paragraph 1.10 GST, for tax reimbursement procedures.
8. DFARS 252.247-7023, TRANSPORTATION OF SUPPLIES BY SEA. Within 30 days of each shipment, the Contractor is required to provide an electronic copy of the carrier’s bill of lading to the Contracting Officer and to MARAD via email.
MARAD email: Cargo.MARAD@dot.gov. In addition, the Contractor shall notify the Contracting Officer when oceanic shipments have been initiated within 3 working days of shipment.
9. CONTRACTOR LICENSING REQUIREMENTS FOR WORK OUTSIDE THE UNITED STATES.
Contractors must be duly authorized to operate and conduct business in any host country and must fully comply with all laws, decrees, labor standards, and regulations of the host country during the performance of the contract. The United States may have a Status of Forces Agreement (SOFA), Force Posture Agreement, and other agreements with some countries and those agreements must be complied with. Unless explicitly provided in the RFP, the U.S. Government will not offer “United States Official Contractor,” “Technical Representative,” or similar status under any SOFA; nor will the U.S. Government certify any employees of a contractor as “Members of the Civilian Component” under a SOFA. Offerors are expected to familiarize themselves with the laws of host nations whether or not the United States Government provides notice of the existence of such requirements.
FY22 MCAF PAF180700, Squadron Operations Facility WON 1665827 Royal Australia Air Force Base Tindal, Australia
DOCUMENT 00 70 00 (ADVERTISE)
Amendment No. 0006
DOCUMENT 00 70 00
NEGOTIATED
CONTRACT CLAUSES
2/23
1.1 FAR 52.252-2, CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:
FAR: https://www.acquisition.gov/browse/index/far DFARS: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
1.2 FAR 52.202-1, DEFINITIONS (JUN 2020)
1.3 FAR 52.203-3, GRATUITIES (APR 1984)
1.4 FAR 52.203-5, COVENANT AGAINST CONTINGENT FEES (MAY 2014)
1.5 FAR 52.203-6, RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
1.6 FAR 52.203-7, ANTI-KICKBACK PROCEDURES (JUN 2020)
1.7 FAR 52.203-8, CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
1.8 FAR 52.203-10, PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY
2014)
1.9 FAR 52.203-12, LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (JUN 2020)
1.10 FAR 52.203-13, CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (NOV 2021)
1.11 FAR 52.203-17, CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO
INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (JUN 2020)
1.12 FAR 52.203-19, PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
1.13 FAR 52.204-2, SECURITY REQUIREMENTS (MAR 2021) ALTERNATE II (APR 1984)
1.14 FAR 52.204-4, PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT
PAPER (MAY 2011)
1.15 FAR 52.204-9, PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
1.16 FAR 52.204-10, REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
1.17 FAR 52.204-13, SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
1.18 FAR 52.204-18, COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
(a) Definition. As used in this clause–
Commercial and Government Entity (CAGE) code means–
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
Amendment No. 0006
(b) Contractors shall ensure that the CAGE code is maintained throughout the life of the contract for each location of contract, including subcontract, performance. For contractors registered in the System for Award Management (SAM), the DLA Commercial and Government Entity (CAGE) Branch shall only modify data received from SAM in the CAGE master file if the contractor initiates those changes via update of its SAM registration. Contractors undergoing a novation or change-of-name agreement shall notify the contracting officer in accordance with subpart
42.12. The contractor shall communicate any change to the CAGE code to the contracting officer within 30 days after the change, so that a modification can be issued to update the CAGE code on the contract.
(c) Contractors located in the United States or its outlying areas that are not registered in SAM shall submit written change requests to the DLA Commercial and Government Entity (CAGE) Branch. Requests for changes shall be provided at https://cage.dla.mil. Change requests to the CAGE master file are accepted from the entity identified by the code.
(d) Contractors located outside the United States and its outlying areas that are not registered in SAM shall contact the appropriate National Codification Bureau (points of contact available at http://www.nato.int/structur/AC/135/main/links/contacts.htm) or NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx to request CAGE changes.
(e) Additional guidance for maintaining CAGE codes is available at https://cage.dla.mil.
(f) If the contract includes Federal Acquisition Regulation clause 52.204-2, Security Requirements, the contractor shall ensure that subcontractors maintain their CAGE code(s) throughout the life of the contract.
1.19 FAR 52.204-19, INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
The Contractor’s representations and certification, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
1.20 FAR 52.204-21, BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(NOV 2021)
(a) Definitions. As used in this clause—
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
Amendment No. 0006
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products or commercial services, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
1.21 FAR 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND
SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES
(NOV 2021)
1.22 FAR 52.204-25, PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
1.23 FAR 52.204-27, PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUNE 2023)
(a) Definitions. As used in this clause—
Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.
Information technology, as defined in 40 U.S.C. 11101(6)—
(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use—
(i) Of that equipment; or
(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;
(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but
(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.
(b) Prohibition. Section 102 of Division R of the Consolidated Appropriations Act, 2023 (Pub. L. 117–328), the No TikTok on Government Devices Act, and its implementing guidance under Office of Management and Budget (OMB) Memorandum M–23–13, dated February 27, 2023, ‘‘No TikTok on Government Devices” Implementation Guidance, collectively prohibit the presence or use of a covered application on executive agency information technology, including certain equipment used by Federal contractors. The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the
Amendment No. 0006
Contractor’s employees; however, this prohibition does not apply if the Contracting Officer provides written notification to the Contractor that an exception has been granted in accordance with OMB Memorandum M–23–13.
(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts, including subcontracts for the acquisition of commercial products or commercial services.
1.24 FAR 52.209-6, PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (NOV 2021)
1.25 FAR 52.209-9, UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
1.26 FAR 52.209-10, PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2015)
1.27 FAR 52.210-1, MARKET RESEARCH (NOV 2021)
1.28 FAR 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to
(a) Commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed,
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than 540 calendar days after notice to proceed.
The time stated for completion shall include final cleanup of the premises.
A "Notice to Proceed" is deemed to be given by the Government to the Contractor 21 calendar days after the contract award date. No formal written notice will be issued by the Government. Within 21 calendar days following the contract award date, the Contractor is obligated to submit performance and payment bonds in a form acceptable to the Government. The Government shall notify the Contractor of the acceptability of the performance and payment bonds within 5 working days of receipt of these documents. If these documents are not submitted in their proper form acceptable to the Government within 21 calendar days of contract award, any delays resulting thereby will be at the sole expense of the Contractor. The contract completion date will not be extended due to the Government's review of the acceptability of the Contractor's bonds, except where the Government's review of said documents extends beyond 5 working days.
1.29 FAR 52.211-12, LIQUIDATED DAMAGES—CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,432 for each calendar day of delay until the work is completed or accepted.
1.30 FAR 52.211-13, TIME EXTENSIONS (SEP 2000)
1.31 FAR 52.211-15, DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
1.32 FAR 52.211-18, VARIATION IN ESTIMATED QUANTITY (APR 1984)
1.33 FAR 52.215-2, AUDIT AND RECORDS--NEGOTIATION (JUN 2020)
1.34 FAR 52.215-11, PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA--
MODIFICATIONS (DEVIATION 2022-O0001) (OCT 2021)
1.35 FAR 52.215-13, SUBCONTRACTOR CERTIFIED COST OR PRICING DATA--MODIFICATIONS
(DEVIATION 2022-O0001) (OCT 2021)
(a) The requirements of paragraphs (b) and (c) of this clause shall—
(1) Become operative only for any modification to this contract involving a pricing adjustment expected to exceed $2 million on the date of execution of the modification; and
(2) Be limited to such modifications.
(b) Before awarding any subcontract expected to exceed $2 million on the date of agreement on price or the date of award, whichever is later; or before pricing any subcontract modification involving a pricing adjustment expected to exceed $2 million, the Contractor shall require the subcontractor to submit certified cost or pricing data (actually or by specific identification in writing), in accordance with FAR 15.408, Table 15-2 (to include any information reasonably required to explain the subcontractor's estimating process such as the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data, and the nature and amount of any contingencies included in the price), unless an exception under FAR 15.403-1(b) applies.
If the $2 million threshold for submission of certified cost or pricing data is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.
(c) The Contractor shall require the subcontractor to certify in substantially the form prescribed in FAR 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph (b) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.
(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in each subcontract that exceeds $2 million on the date of agreement on price or the date of award, whichever is later.
1.36 FAR 52.215-18, REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS
(PRB) OTHER THAN PENSIONS (JUL 2005)
1.37 FAR 52.215-19, NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
1.38 FAR 52.215-21, REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER
THAN CERTIFIED COST OR PRICING DATA—MODIFICATIONS (NOV 2021)
1.39 FAR 52.222-1, NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
1.40 FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
1.41 FAR 52.222-26, EQUAL OPPORTUNITY (SEP 2016)
1.42 FAR 52.222-27, AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION
(APR 2015)
1.43 FAR 52.222-29, NOTIFICATION OF VISA DENIAL (APR 2015)
1.44 FAR 52.222-50, COMBATING TRAFFICKING IN PERSON (NOV 2021)
1.45 FAR 52.223-2, AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS (SEP 2013)
1.46 FAR 52.223-3, HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB
2021)
1.47 FAR 52.223-5, POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
1.48 FAR 52.223-6, DRUG-FREE WORKPLACE (MAY 2001)
1.49 FAR 52.223-9, ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-
DESIGNATED ITEMS (MAY 2008)
1.50 FAR 52.223-15, ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (MAY 2020)
1.51 FAR 52.223-17, AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND
CONSTRUCTION CONTRACTS (AUG 2018)
1.52 FAR 52.223-18, ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING (JUN 2020)
1.53 FAR 52.223-21, FOAMS (JUN 2016)
1.54 FAR 52.224-1, PRIVACY ACT NOTIFICATION (APR 1984)
1.55 FAR 52.224-2, PRIVACY ACT (APR 1984)
1.56 FAR 52.225-13, RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
Amendment No. 0006
1.57 FAR 52.227-4, PATENT INDEMNITY -- CONSTRUCTION CONTRACTS (DEC 2007)
1.58 FAR 52.228-1, BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds,
(1) to unsuccessful bidders as soon as practicable after the opening of bids, and
(2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 21 days after award of the contract, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
1.59 FAR 52.228-2, ADDITIONAL BOND SECURITY (OCT 1997)
1.60 FAR 52.228-3, WORKERS’ COMPENSATION INSURANCE (DEFENSE BASE ACT) (JUL 2014)
1.61 FAR 52.228-4, WORKER’S COMPENSATION AND WAR HAZARD INSURANCE OVERSEAS (APR
1984)
1.62 FAR 52.228-5, INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
1.63 FAR 52.228-11, PLEDGES OF ASSETS (FEB 2021) (DEVIATION 2020-O0016)
(a) The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and
(2) Standard Form 28, Affidavit of Individual Surety, except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the Standard Form 28 is not required to be sworn and notarized in block 12.
(b) The Contracting Officer may release a portion of the security interest on the individual surety's assets based upon substantial performance of the Contractor's obligations under its performance bond. The security interest in support of a performance bond shall be maintained--
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.
(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.
(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.
(c) A surety's assets pledged in support of a payment bond may be released to a subcontractor or supplier upon Government receipt of a Federal district court judgment, or a sworn statement by the subcontractor or supplier that the claim is correct along with a notarized authorization of the release by the surety stating that it approves of such release. The security interest on the individual surety's assets in support of a payment bond shall be maintained—
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 which require performance and payment bonds (40 U.S.C. 3131). For 1 year following final payment, or until resolution of all pending claims filed against the payment bond during the 1-year period following final payment, whichever is later.
(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.
(3) Other contracts not subject to the requirements of paragraph (c)(1) of this clause. For 90 days following final payment.
(d) The Contracting Officer may allow the Contractor to substitute an individual surety, for a performance or payment bond, after contract award. The Contractor shall comply with the requirements of paragraph (a) of this clause within the timeframe established by the Contracting Officer.
1.64 FAR 52.228-12, PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (DEC 2022)
1.65 FAR 52.228-14, IRREVOCABLE LETTER OF CREDIT (NOV 2014)
1.66 FAR 52.228-15, PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)
(DEVIATION 2020-O0016)
(a) Definitions. As used in this clause-
Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection. (i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
Amendment No. 0006
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:
U.S. Department of the Treasury, Financial Management, Service Surety Bond Branch, 3700 East West Highway, Room 6 F01, Hyattsville, MD 20782.
Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
1.67 FAR 52.229-6, TAXES – FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)
1.68 FAR 52.232-5, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
1.69 FAR 52.232-17, INTEREST (MAY 2014)
1.70 FAR 52.232-27, PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
1.71 FAR 52.232-33, PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
1.72 FAR 52.232-39, UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
1.73 FAR 52.232-40, PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (NOV 2021)
1.74 FAR 52.233-1, DISPUTES (MAY 2014)
1.75 FAR 52.233-3, PROTEST AFTER AWARD (AUG 1996)
1.76 FAR 52.233-4, APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
1.77 FAR 52.236-1, PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty (20) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
1.78 FAR 52.236-2, DIFFERING SITE CONDITIONS (APR 1984)
1.79 FAR 52.236-3, SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
1.80 FAR 52.236-4, PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Douglas Partners dated September 2020 and Survey by Cross Solutions dated September 2020.
(b) Weather conditions refer to Australian Government Bureau of Meteorology ( http://www.bom.gov.au/)
Amendment No. 0006
Dry tropical savanna climate with distinct wet and dry seasons. The wet season (November through April) features large thunderstorms and heavy downpours. Tindal is rated as an A4 Wind Region, which does not experience cyclonic activity.
(c) Transportation facilities Nil – Contractor to arrange all transportation required. Access to RAAF Tindal is via road from Darwin only – an approximately 3½ hours drive by ground transportation. Avoid travel around dusk or dawn due to the presence of wildlife.
1.81 FAR 52.236-5, MATERIAL AND WORKMANSHIP (APR 1984)
1.82 FAR 52.236-6, SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
1.83 FAR 52.236-7, PERMITS AND RESPONSIBILITIES (NOV 1991)
1.84 FAR 52.236-8, OTHER CONTRACTS (APR 1984)
1.85 FAR 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (APR 1984)
1.86 FAR 52.236-10, OPERATIONS AND STORAGE AREAS (APR 1984)
1.87 FAR 52.236-11, USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
1.88 FAR 52.236-12, CLEANING UP (APR 1984)
1.89 FAR 52.236-13, ACCIDENT PREVENTION (NOV 1991) ALTERNATE I (NOV 1991)
1.90 FAR 52.236-14, AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
1.91 FAR 52.236-15, SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
1.92 FAR 52.236-16, QUANTITY SURVEYS (APR 1984)
1.93 FAR 52.236-17, LAYOUT OF WORK (APR 1984)
1.94 FAR 52.236-21, SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
ALTERNATE I (APR 1984)
1.95 FAR 52.236-26, PRECONSTRUCTION CONFERENCE (FEB 1995)
1.96 FAR 52.242-13, BANKRUPTCY (JUL 1995)
1.97 FAR 52.242-14, SUSPENSION OF WORK (APR 1984)
1.98 FAR 52.243-4, CHANGES (JUN 2007)
1.99 FAR 52.243-6, CHANGE ORDER ACCOUNTING (APR 1984)
1.100 FAR 52.244-6, SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(DEC 2022)
1.101 FAR 52.246-12, INSPECTION OF CONSTRUCTION (AUG 1996)
1.102 FAR 52.246-21, WARRANTY OF CONSTRUCTION (MAR 1994) ALTERNATE I (APR 1984)
1.103 FAR 52.248-3, VALUE ENGINEERING -- CONSTRUCTION (OCT 2020)
1.104 FAR 52.249-2, TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED – PRICE)
(APR 2012) ALTERNATE I (SEP 1996)
1.105 FAR 52.249-10, DEFAULT (FIXED - PRICE CONSTRUCTION) (APR 1984)
1.106 FAR 52.251-1, GOVERNMENT SUPPLY SOURCES (APR 2012)
1.107 FAR 52.252-4, ALTERATIONS IN CONTRACT (APR 1984)
Portions of this contract are altered as follows:
FAR 52.211-10, Commencement, Prosecution, and Completion of Work (APR 1984): Supplemental clarification of “Notice to Proceed.”
1.108 FAR 52.253-1, COMPUTER GENERATED FORMS (JAN 1991)
1.109 DFARS 252.201-7000, CONTRACTING OFFICER’S REPRESENTATIVE (DEC 1991)
1.110 DFARS 252.203-7000, REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD
OFFICIALS (SEP 2011)
1.111 DFARS 252.203-7001, PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER
DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)
1.112 DFARS 252.203-7002, REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC
2022)
1.113 DFARS 252.203-7003, AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)
Amendment No. 0006
1.114 DFARS 252.203-7004, DISPLAY OF FRAUD HOTLINE POSTER(S) (JAN 2023)
1.115 DFARS 252.204-7000, DISCLOSURE OF INFORMATION (OCT 2016)
1.116 DFARS 252.204-7003, CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
1.117 DFARS 252.204-7004, ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN
2023)
1.118 DFARS 252-204-7009, LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY
CONTRACTOR REPORTED CYBER INCIDENT INFORMATION (JAN 2023)
1.119 DFARS 252.204-7012, SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER
INCIDENT REPORTING (JAN 2023)
1.120 DFARS 252.204-7015, NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR
LITIGATION SUPPORT (JAN 2023)
1.121 DFARS 252.204-7018, PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)
1.122 DFARS 252.204-7020, NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (JAN 2023)
(a) Definitions.
Basic Assessment” means a contractor’s self-assessment of the contractor’s implementation of NIST SP 800-171 that—
(1) Is based on the Contractor’s review of their system security plan(s) associated with covered contractor information system(s);
(2) Is conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology; and
(3) Results in a confidence level of “Low” in the resulting score, because it is a self-generated score.
“Covered contractor information system” has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.
“High Assessment” means an assessment that is conducted by Government personnel using NIST SP 800-171A, Assessing Security Requirements for Controlled Unclassified Information that—
(1) Consists of—
(i) A review of a contractor’s Basic Assessment;
(ii) A thorough document review;
(iii) Verification, examination, and demonstration of a Contractor’s system security plan to validate that NIST SP 800-171 security requirements have been implemented as described in the contractor’s system security plan; and
(iv) Discussions with the contractor to obtain additional information or clarification, as needed; and
(2) Results in a confidence level of “High” in the resulting score.
“Medium Assessment” means an assessment conducted by the Government that—
(1) Consists of—
(i) A review of a contractor’s Basic Assessment;
Amendment No. 0006
(ii) A thorough document review; and
(iii) Discussions with the contractor to obtain additional information or clarification, as needed; and
(2) Results in a confidence level of “Medium” in the resulting score.
(b) Applicability. This clause applies to covered contractor information systems that are required to comply with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, in accordance with Defense Federal Acquisition Regulation System (DFARS) clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.
(c) Requirements. The Contractor shall provide access to its facilities, systems, and personnel necessary for the Government to conduct a Medium or High NIST SP 800-171 DoD Assessment, as described in NIST SP 800-171 DoD Assessment Methodology at https://www.acq.osd.mil/asda/dpc/cp/cyber/safeguarding.html#nistSP800171 , if necessary.
(d) Procedures. Summary level scores for all assessments will be posted in the Supplier Performance Risk System (SPRS) () to provide DoD Components visibility into the summary level scores of strategic assessments.
(1) Basic Assessments. A contractor may submit, via encrypted email, summary level scores of Basic Assessments conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology to for posting to
SPRS.
(i) The email shall include the following information:
(A) Version of NIST SP 800-171 against which the assessment was conducted.
(B) Organization conducting the assessment (e.g., Contractor self-assessment).
(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract—
(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and
(2) A brief description of the system security plan architecture, if more than one plan exists.
(D) Date the assessment was completed.
(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).
(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.
(ii) If multiple system security plans are addressed in the email described at paragraph (b)(1)(i) of this section, the Contractor shall use the following format for the report:
Amendment No. 0006
System security plan
CAGE codes supported by this plan
Brief description of the plan architecture
Date of assessment
Total score Date score of 110 will achieved
(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system security plan assessed:
(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).
(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).
(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.
(iv) A brief description of the system security plan architecture, if more than one system security plan exists.
(v) Date and level of the assessment, i.e., medium or high.
(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).
(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.
(e) Rebuttals.
(1) DoD will provide Medium and High Assessment summary level scores to the Contractor and offer the opportunity for rebuttal and adjudication of assessment summary level scores prior to posting the summary level scores to SPRS (see SPRS User’s Guide https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf).
(2) Upon completion of each assessment, the contractor has 14 business days to provide additional information to demonstrate that they meet any security requirements not observed by the assessment team or to rebut the findings that may be of question.
(f) Accessibility.
(1) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).
(2) Authorized representatives of the Contractor for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User’s Guide for Awardees/Contractors available at .
(3) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this clause. DoD will retain and protect any such documentation as “Controlled Unclassified Information (CUI)” and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4
Amendment No. 0006 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).
(g) Subcontracts.
(1) The Contractor shall insert the substance of this clause, including this paragraph (g), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services (excluding commercially available off-the-shelf).
(2) The Contractor shall not award a subcontract or other contractual instrument, that is subject to the implementation of NIST SP 800-171 security requirements, in accordance with DFARS clause 252.204-7012 of this contract, unless the subcontractor has completed, within the last 3 years, at least a Basic NIST SP 800-171 DoD Assessment, as described in https://www.acq.osd.mil/asda/dpc/cp/cyber/safeguarding.html#nistSP800171 , for all covered contractor information systems relevant to its offer that are not part of an information technology service or system operated on behalf of the Government.
(3) If a subcontractor does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the subcontractor may conduct and submit a Basic Assessment, in accordance with the NIST SP 800-171 DoD Assessment Methodology, to mailto:webptsmh@navy.mil for posting to SPRS along with the information required by paragraph (d) of this clause.
1.123 DFARS 252.205-7000, PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT
HOLDERS (DEC 1991)
1.124 DFARS 252.209-7004, SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED
BY THE GOVERNMENT OF A COUNTRY THAT IS STATE SPONSOR OF TERRORISM (MAY
2019)
1.125 DFARS 252.211-7003, ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)
1.126 DFARS 252.215-7016, NOTIFICATION TO OFFERORS – POSTAWARD DEBRIEFINGS (DEC 2022)
(a) Definition. As used in this provision—
" Nontraditional defense contractor " means an entity that is not currently performing and has not performed any contract or subcontract for DoD that is subject to full coverage under the cost accounting standards prescribed pursuant to 41 U.S.C. 1502 and the regulations implementing such section, for at least the 1-year period preceding the solicitation of sources by DoD for the procurement (10 U.S.C. 3014).
(b) Postaward debriefing.
(1) Upon timely request, the Government will provide a written or oral postaward debriefing to successful or unsuccessful offerors for contract awards valued at $10 million or more, while protecting the confidential and proprietary information of other offerors. The request is considered timely if received within 3 days of notification of contract award.
(2) When required, the minimum postaward debriefing information will include the following:
(i) For contracts in excess of $10 million and not in excess of $100 million with a small business or nontraditional defense contractor, an option for the small business or nontraditional defense contractor to request disclosure of the agency's written source selection decision document, redacted to protect the confidential and proprietary information of other offerors for the contract award.
Amendment No. 0006
(ii) For contracts in excess of $100 million, disclosure of the agency's written source selection decision document, redacted to protect the confidential and proprietary information of other offerors for the contract award.
(3) If a required postaward debriefing is provided—
(i) The debriefed Offeror may submit additional written questions related to the debriefing not later than 2 business days after the date of the debriefing;
(ii) The agency will respond in writing to timely submitted additional questions within 5 business days after receipt by the contracting officer; and
(iii) The postaward debriefing will not be considered to be concluded until the later of—
(A) The date that the postaward debriefing is delivered, orally or in writing; or
(B) If additional written questions related to the debriefing are timely received, the date the agency delivers its written response.
(c) Contract performance. The Government may suspend performance of or terminate the awarded contract upon notice from the Government Accountability Office of a…