1665827-P700 Specification_Signed_REV_MAY2023.pdf
PDF 4 MB Posted
- Attached to
- FY22 MCAF PAF180700 SQUADRON OPERATIONS FACILITY, ROYAL AUSTRALIAN AIR FORCE BASE TINDAL, AUSTRALIA
- Solicitation number
- N6274223R1316
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23R1316 Note 6.pdf | ||
| 23R1316_AMD6.pdf | ||
| 23R1316_AMD5.pdf | ||
| 23R1316 Note 5.pdf | ||
| 23R1316_AMD4.pdf | ||
| 23R1316 Note 4.pdf | ||
| 23R1316 AMD3.pdf | ||
| 23R1316_AMD2.pdf | ||
| 23R1316 Note 3.pdf | ||
| P700 SV Sign-in.pdf | ||
| 23R1316_AMD1.pdf | ||
| 23R1316 Note 2.pdf | ||
| 23R1316 Note 1.pdf | ||
| 1665827-P-700 Drawings - 2 of 2.pdf | ||
| 1665827-P-700 Drawings - 1 of 2.pdf | ||
| 23R1316-RFP.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC PACIFIC
WORK ORDER NO:
1665827
SPECIFICATIONS
For
FY22 MCAF, PAF180700, Squadron Operations Facility
At the
RAAF Base Tindal, Australia
PAF180700
PREPARED BY:
Architectural: Setiadi Architects, LLC.
Mechanical: Thermal Engineering Corporation
Civil: GHD, Inc.
Electrical: GHD, Inc.
Structural: GHD, Inc.
Fire Protection: GHD, Inc.
Geotechnical: Douglas Partners
Safety: GHD, Inc.
03/03/2023
Submitted By: _______________________________ Date: ____________
Tony Petroccitto
APPROVED BY:
For Commander, NAVFAC Pacific: ________________________________________________
Mr. Evan A. Mizue, P.E.
Date: _______________________ 5/4/2023
FY22 MCAF Project PAF180700 Squadron Operations Facility 1665827
RAAF, TINDAL
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15 SUMMARY OF WORK
01 14 00 11/11, CHG 11: 11/20 WORK RESTRICTIONS
01 20 00 11/20, CHG 1: 02/21 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20 ADMINISTRATIVE REQUIREMENTS
01 30 01.00 20 12/21 PROCUREMENT AND INSTALLATION OF
FURNITURE, FIXTURES AND EQUIPMENT (FF&E)
01 31 23.13 20 05/17, CHG 6: 02/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND REPORTING
01 35 13 11/20 SPECIAL PROJECT PROCEDURES
01 35 26 11/20 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 02/14 METRIC MEASUREMENTS
01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15, CHG 4: 08/20 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 2: 11/20 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 1: 08/20 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 1: 11/20 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15, CHG 2: 11/20 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 83 13.07 40 02/18, CHG 1: 02/15 RELIABILITY CENTERED ACCEPTANCE FOR
SUPERSTRUCTURE PERFORMANCE REQUIREMENTS
01 91 00.15 20 02/21 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10, CHG 2: 02/19 DEMOLITION AND DECONSTRUCTION
02 61 13 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF CONTAMINATED
MATERIAL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF HAZARDOUS
MATERIALS
02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 1: 02/21 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
PROJECT TABLE OF CONTENTS Page 1
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 1: 11/18 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16 ROUGH CARPENTRY
06 61 16 08/10 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM
07 41 63 11/16 FABRICATED ROOF PANEL ASSEMBLIES
07 42 63 05/11 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 05/17 FLASHING AND SHEET METAL
07 92 00 08/16 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 02/10 STEEL DOORS AND FRAMES
08 14 00 08/16 WOOD DOORS
08 31 00 05/17 ACCESS DOORS AND PANELS
08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 05/11 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/17 CERAMIC TILING
09 51 00 08/17 ACOUSTICAL CEILINGS
09 62 38 08/17 STATIC-CONTROL FLOORING
09 65 00 08/10 RESILIENT FLOORING
09 68 00 11/17 CARPETING
09 90 00 05/11 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 08/17 VISUAL DISPLAY UNITS
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/17 INTERIOR SIGNAGE
10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE
10 21 13 08/17 TOILET COMPARTMENTS
10 22 39 08/17 FOLDING PANEL PARTITIONS
10 28 13 08/17 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 08/17 ROLLER WINDOW SHADES
PROJECT TABLE OF CONTENTS Page 2
12 32 00 11/16 MANUFACTURED WOOD CASEWORK
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/20, CHG 1: 08/20 SEISMIC CONTROL FOR MECHANICAL EQUIPMENT
DIVISION 22 - PLUMBING
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 11/15 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES FOR
HVAC
23 09 23.02 11/15 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 23 00 10/07 REFRIGERANT PIPING
23 30 00 05/20 HVAC AIR DISTRIBUTION
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 40 08/19 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19.10 10 05/16 INSULATED WIRE AND CABLE
26 05 26.00 40 08/19 EARTHING AND BONDING FOR ELECTRICAL
SYSTEMS
26 09 23.00 40 08/19 LIGHTING CONTROL DEVICES
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 24 13 05/15 SWITCHBOARDS
26 24 16.00 40 08/19 DISTRIBUTION BOARDS
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 50 00 05/16 LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 05/17 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 29.00 10 08/11 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR
SIPRNET COMMUNICATION SYSTEMS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 13 23.00 40 11/14 COMMUNICATIONS OPTICAL BACKBONE CABLING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 66 08/20 INTERIOR MASS NOTIFICATION SYSTEM,
NON-ADDRESSABLE
28 31 76 08/20 FIRE PROTECTION SYSTEM
DIVISION 31 - EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL
31 31 16.19 02/16 TERMITE CONTROL BARRIERS
PROJECT TABLE OF CONTENTS Page 3
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 08/17 AGGREGATE BASE COURSES
32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
DIVISION 33 - UTILITIES
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10, CHG 6: 02/19 STORM DRAINAGE UTILITIES
33 71 02 02/15, CHG 1: 11/19 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
FY22 MCAF PROJECT PAF180700 SQUADRON OPERATIONS FACILITY 1665827
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/ 11, CHG 1: 08/ 14
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING NO. NAVFAC DWG
NO.
TITLE
GENERAL
G-001 17270497 TITLE SHEET
G-002 17270498 INDEX OF DRAWINGS
G-101 17270499 TEST PIT LOGS - SHEET 1 OF 2
G-102 17270500 TEST PIT LOGS - SHEET 2 OF 2
G-103 17270501 TEST PIT TABLES
CIVIL
C-001 17270502 CIVIL GENERAL NOTES AND SURVEY GONTROL
C-101 17270503 SITE DEMOLITION PLAN
C-102 17270504 SITE LAYOUT PLAN
C-111 17270504 LINEMARKING AND SIGNAGE PLAN
C-121 17270506 STORMWATER AND UTILITIES PLAN
C-122 17270507 GRADING AND DRAINAGE PLAN - SHEET 1 OF 2
C-124 17270508 DOMESTIC WATER LINES AND SEWER LINE PROFILES
C-131 17270509 ROAD PLAN AND LONGITUDINAL SECTIONS
C-301 17270510 BULK EARTHWORKS SECTION
C-311 17270511 CIVIL TYPICAL CROSS SECTION
DOCUMENT 00 01 15 Page 1
DRAWING NO. NAVFAC DWG
NO.
TITLE
C-501 17270512 CIVIL AND PAVEMENT DETAILS - SHEET 1 OF 3
C-502 17270513 CIVIL AND PAVEMENT DETAILS - SHEET 2 OF 3
C-503 17270514 CIVIL AND PAVEMENT DETAILS - SHEET 3 OF 3
C-504 17270515 EXTERNAL SLAB AND PATH DETAILS
C-506 17270516 CIVIL SERVICES DETAILS - SHEET 1 OF 3
C-507 17270517 CIVIL SERVICES DETAILS - SHEET 2 OF 3
C-508 17270518 CIVIL SERVICES DETAILS - SHEET 3 OF 3
ARCHITECTURAL
A-001 17270519 GENERAL NOTES, SYMBOL LIST, ABBREVIATIONS
A-101 17270520 FLOOR PLAN
A-102 17270521 REFLECTED CEILING PLAN
A-103 17270522 ROOF PLAN
A-104 17270523 SIGNAGE PLAN AND SCHEDULE
A-201 17270524 BUILDING ELEVATIONS
A-301 17270525 BUILDING SECTIONS
A-401 17270526 ENLARGED PLAN & INTERIOR ELEVATIONS
A-501 17270527 WALL SECTIONS
A-502 17270528 WALL TYPES
A-601 17270529 ROOM FINISH SCHEDULE
A-602 17270530 MOUNTING HEIGHT SCHEDULE
A-603 17270531 DOOR & WINDOW SCHEDULE, TYPES
A-604 17270532 SIGNAGE TYPES
A-701 17270533 MISCELLANEOUS DETAILS
A-801 1727534 DOOR AND WINDOW DETAILS
A-802 17270535 MISCELLANEOUS DETAILS
INTERIOR
DOCUMENT 00 01 15 Page 2
DRAWING NO. NAVFAC DWG
NO.
TITLE
I-101 17270536 FURNITURE & EQUIPMENT PLAN AND SCHEDULE
STRUCTURAL
S-001 17270537 GENERAL AND STRUCTURAL NOTES - SHEET 1 OF 3
S-002 17270538 GENERAL AND STRUCTURAL NOTES - SHEET 2 OF 3
S-003 17270539 GENERAL AND STRUCTURAL NOTES - SHEET 3 OF 3
S-101 17270540 FOOTING AND SLAB PLAN
S-102 17270541 STRUCTURAL WALL PLAN
S-103 17270542 LOWER ROOF FRAMING PLAN
S-104 17270543 UPPER ROOF FRAMING PLAN
S-105 17270544 ROOF PURLIN PLAN
S-201 17270545 FRAMING SECTIONS
S-202 17270546 TRUSS FRAMING SECTIONS
S-301 17270547 CONCRETE DETAILS - SHEET 1
S-401 17270548 WALL AND MASONRY DETAILS
S-501 17270549 STEEL FRAMING DETAILS - SHEET 1
S-502 17270550 STEEL FRAMING DETAILS - SHEET 2
MECHANICAL
M-001 17270551 LEGEND AND ABBREVIATIONS AND SYMBOL LEGEND
M-002 17270552 GENERAL NOTES
M-101 17270553 MECHANICAL PLAN
M-301 17270554 SECTIONS
M-401 17270555 MECHANICAL ENCLOSURE PLAN
M-501 17270556 DETAILS
M-502 17270557 DETAILS
M-601 17270558 AIR CONDITIONING AND VENTILATION SCHEMATIC DIAGRAM
M-602 17270559 SEQUENCE OF OPERATION
DOCUMENT 00 01 15 Page 3
DRAWING NO. NAVFAC DWG
NO.
TITLE
M-603 17270560 DDC SYSTEM RISER DIAGRAM AND CONTROL DIAGRAM
M-604 17270561 DDC SYSTEM POINTS LIST
M-605 17270562 EQUIPMENT SCHEDULES
M-606 17270563 EQUIPMENT SCHEDULE
M-901 17270564 REFRIGERANT PIPING DIAGRAM
PLUMBING
P-001 17270565 LEGEND AND ABBREVIATIONS AND SYMBOL LEGEND
P-002 17270566 GENERAL NOTES
P-101 17270567 PLUMBING PLAN
P-102 17270568 PLUMBING ROOF PLAN
P-501 17270569 DETAILS
P-502 17270570 DETAILS
P-601 17270571 EQUIPMENT SCHEDULE
P-901 17270572 SANITARY PIPING DIAGRAM
P-902 17270573 WATER PIPING DIAGRAM
ELECTRICAL
E-001 17270574 LEGENDS & NOTES
E-101 17270575 ELECTRICAL & COMMUNICATIONS SITE PLAN 1
E-102 17270576 ELECTRICAL & COMMUNICATIONS SITE PLAN 2
E-111 17270577 POWER & SECURITY LAYOUT
E-121 17270578 COMMUNICATIONS LAYOUT
E-131 17270579 LIGHTING AND FIRE LAYOUT
E-132 17270580 EXTERNAL LIGHTING LAYOUT
E-141 17270581 PHOTOMETRICS CALCULATIONS
E-142 17270582 PHOTOMETRICS CALCULATIONS - EXTERNAL
E-151 17270583 LIGHTNING PROTECTION LAYOUT
DOCUMENT 00 01 15 Page 4
DRAWING NO. NAVFAC DWG
NO.
TITLE
E-501 17270584 BUILDING CONNECTION DETAILS
E-601 17270585 MAIN SWITCHBOARD SINGLE LINE DIAGRAM
E-602 17270586 DISTRIBUTION BOARD SINGLE LINE DIAGRAM
E-603 17270587 DIAGRAMS & SCHEMATICS
FIRE PROTETION
F-001 17270588 NOTES AND LEGEND
F-101 17270589 FIRE HYDRANT LAYOUT
F-102 17270590 FIRE PROTECTION LAYOUT
-- End of Document --
DOCUMENT 00 01 15 Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 01 15 Page 6
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 GENERAL REQUIREMENTS
The Contractor acknowledges and agrees that:
a. the Contractor is a party to the contract with the Naval Facilities Engineering Command, Pacific (NAVFAC Pacific) to carry out the Contractor's Activities and Works on the Royal Australian Air Force (RAAF) base;
b. the Contracting Officer is an employee of the Naval Facilities Engineering Command who NAVFAC Pacific has assigned administration and enforcement authority and responsibility for this contract;
c. Australian Requirements are laws, codes, decrees, labor standards, and regulations of the host country, Commonwealth, State and Territory, currently in effect, that the Contractor is required to comply with, including but not limited to the Australian Requirements Schedule attached at the end of this section;
d. The Contractor is responsible for ensuring it complies with all requirements of the contract, including the Division 01 (General Requirements), Australian Requirements, and any other laws, codes, decrees, labor standards, and regulations of the host country, Commonwealth, State and Territory; Federal Acquisition Regulation (FAR) 52.236-7, Permits and Responsibilities; Defense Federal Acquisition Regulation Supplement (DFARS) 252.222-7002, Compliance with Local Labor Laws (Overseas) of the Request For Proposal, Document 00700;
e. If the Contractor identifies any ambiguity, discrepancy or inconsistency between the requirements of the contract, including the requirements of Division 01, Australian Requirements, and any other laws, codes, decrees, labor standards, and regulations of the host country, Commonwealth, State and Territory, the Contractor must immediately submit a Request for Information (RFI) to the Contracting Officer clearly describing the ambiguity, discrepancy and inconsistency and offer a proposed solution;
f. Immediately notify the Contracting Officer if the Commonwealth or any person authorised by the Commonwealth impedes, disrupts, or frustrates
SECTION 01 11 00 Page 1 the Contractor's performance of the Contract, or otherwise causes potential Contractor delay; and
g. When an Australian standard or requirement is offered as an equivalent to a U.S. standard or requirement, the Contractor must furnish documentation proving equivalency.
1.3 STATUATORY REQUIREMENTS
Pursuant to Document 00700, Contract Clauses, Division 01 Specification Section 01 11 00 Paragraph 1.1, FAR 52.236-7, and DFARS 252.225-7042, the Contractor must:
a. comply with all applicable Statutory Requirements; without limiting Paragraph (a):
b. apply for and obtain all Approvals;
c. give all notices and pay all fees and other amounts which it is required to pay in respect of the carrying out of its Contract obligations; and
d. promptly give the Contracting Officer copies of all documents (including Approvals and other notices) that any authority, body, or organisation having jurisdiction over the Site, the Contractor's Activities or the Works issues to the Contractor.
1.4 MANUAL OF FIRE PROTECTION ENGINEERING AND NATIONAL CONSTRUCTION CODE
CERTIFICATION
The Contractor must provide to the Contracting Officer written certification from an Accredited Building Surveyor as a condition precedent to Completion - that the Works comply or the Stage complies (as the case may be) with the MFPE and the National Construction Code, except to the extent of any dispensation granted by the ASEE and identified in the certification. To the extent that there is any inconsistency between the MFPE and the National Construction Code, the MFPE prevails.
1.5 APPLICABLE STANDARDS
a. Subject to paragraph (b) and without limiting the Contractor's obligations under this Contract, the Contractor must comply with the Applicable Standards in performing the Contractor's Activities and executing the Works.
b. Where there is an ambiguity, discrepancy or inconsistency between any Applicable Standard. American Standard, the Contract, any other Project Document, the MFPE or the National Construction Code, the higher standard, quality or quantum will prevail.
(1) The Contracting Officer may, at any time, request that the Contractor provides a certificate from each relevant subcontractor which certifies that (to the extent then applicable) all design carried out by that subcontractor or the Works or any Stage executed by that subcontractor (as the case may be) complies with the Applicable Standards.
c. The Contractor acknowledges that the Government may exercise any of its rights under this Contract to carry out periodic auditing of the
SECTION 01 11 00 Page 2
Contractor's compliance.
1.6 MAINTENANCE DURING DEFECTS LIABILITY PERIOD
To the extent specified in the table below, the Contractor must ensure that during the Defects Liability Period for the works such planned and unplanned maintenance is carried out:
a. as required by the Commissioning and Handover Plan; and
b. as is otherwise necessary to ensure that the works is, throughout and at the end of the Defects Liability Period in a condition fit for their intended purpose.
Maintenance during
DLP
Description
Planned: General:
Termite inspection in the 12th month of the Defects Liability Period.
Civil:
Line marking on asphalt roads 3 months prior to the end of the Defects Liability Period.
Maintenance (particularly cleaning) of drains pits and interceptors prior to the end of the Defects Liability Period (or after high rainfall events).
Mechanical:
Test fire hydrants, hose reels and fire extinguishers as per statutory testing requirements on the 6th and the 12th month during the Defects Liability Period.
Hydraulics:
Safety showers and eye washes are to be inspected annually in accordance with AS 4775 which sets out the annual inspection criteria.
Electrical:
Carry out a test on the emergency lighting installation in accordance with the requirements of AS 2293 six months after the Date of Completion and again prior to the end of the Defects Liability Period.
Operating time and push-button test of all Residual Current Devices at 6 months and prior to the end of the Defects Liability Period (where applicable).
Thermoscan of all electrical switchboards and mechanical services switchboards at end of the Defects Liability Period (where applicable).
Planned: Equipment Test Frequency
SECTION 01 11 00 Page 3
Planned: Static Earth, equipotential bonding installations
Visual inspection Earth continuity
12 months
Planned: Earth continuity and electrode resistance
Visual inspection Earth continuity
12 months
Planned: Insulation resistance of Electrical installation
12 months
Planned: Residual Current Devices
Pushbutton test 6 months
Planned: Operating time and pushbutton test
12 months
Planned: Lightning protection installation
Physical inspection Continuity of down conductors Resistance to earth
12 months
Planned: Lighting Confirm all luminaires illuminate and replace if failed
6 months
Landscaping Maintenance of landscaping works including mowing, watering, fertilising and weeding for the duration of the establishment period in respect of soft landscaping. Mowing of fire breaks for the duration of the establishment period in respect of soft landscaping.
1.7 DEFINITIONS
For the purposes of this Australian Requirements Schedule:
a. ACM means asbestos containing material.
b. Approvals means any licence, permit, consent, approval, determination, certificate, notice or other requirement any authority, body or organisation having any jurisdiction in connection with the Site, the Contractor's Activities or the Works or under any applicable Statutory Requirement, which must be obtained or satisfied to:
(1) carry out the Contractor's Activities or the Works; or
(2) occupy, use, maintain or operate the completed Works.
c. Classified Information includes:
(1) any document marked with a national security classification; and
(2) any information that the Contractor knows or ought to know is subject to, or ought to be treated in accordance with, the provisions of the Defence Security Manual.
SECTION 01 11 00 Page 4
d. Code of Federal Regulations (CFR) means the codification of the general and permanent rules and regulations (administrative law) published in the Federal Register by the executive departments and agencies of the U.S. Government.
e. Commonwealth means the Commonwealth of Australia.
f. Contamination means the presence in, on or under land, air or water of a substance (whether a solid, liquid, gas, odour, heat, sound, vibration or radiation) at a concentration above the concentration at which the substance is normally present in, on or under land, air or water in the same locality, that presents a risk of Environmental Harm, including harm to human health or any other aspect of the Environment, or could otherwise give rise to a risk of non-compliance with any Statutory Requirement for the protection of the Environment.
g. Contracting Officer has the meaning given in the Contract.
h. Contractor has the meaning given in the Contract.
i. Contractor's Activities means all things or tasks which the Contractor is, or may be, required to do to comply with its obligations under the Contract.
j. Contractor HOTO Obligation means any task, function, requirement or obligation relating to the HOTO Process (including commissioning of the Works) required to be performed by the Contractor under this Contract or which a HOTO Requirement allocates, or would reasonably be inferred as allocating, to the Contractor, including those that the HOTO Plan and Checklist expressly allocates to the "Contractor Representative" (as that term is used in the HOTO Plan and Checklist).
k. Dangerous Goods has the meaning given in the Australian Code for the Transport of Dangerous Goods by Road and Rail, 7th edition.
l. Defence means the Commonwealth Department of Defence.
m. Defence Environmental Requirements means the Defence Environmental Management System and Defence Environmental Plan applicable to the Site, the Contractor's Activities or the Works, including any procedures, instructions, requirements and standing orders which have been developed or issued under the Defence Environmental Management System or Defence Environmental Plan.
(q) Defence Environmental Management System means the environmental management system applicable to the Site (if any).
n. Defence Environmental Plan means the environmental plan applicable to the Site (if any).
o. Defence Requirements means all policies, plans, manuals, guidelines, instructions (including departmental procurement policy instructions) and other Commonwealth or Defence requirements which are, or may become, applicable to the Site, the Contractor's Activities or the Works. To the extent that any of the requirements would require or suggest the insertion of provisions into the Contract, then those provisions will be incorporated by reference into the Contract.
p. Defence Security Principles Framework is a reference to that document available at https://www.defence.gov.au/dsvs/dspf.asp , as amended from
SECTION 01 11 00 Page 5 time to time.
q. DEQMS means the Defence Estate Quality Management System website available at www.defence.gov.au/estatemanagement .
r. eDEOP 101 means the document titled "Defence Explosive Ordnance Publication (DEOP) 101 - Department of Defence Explosives Regulations" as amended from time to time.
s. Effective Date means the date shown in Block 31C. AWARD DATE of the Standard Form (SF) 1442, SOLICITATION, OFFER, AND AWARD.
t. EM 385-1-1 means the latest version of the U.S. Army Corps of Engineers manual in effect on the date the solicitation was issued (refer to Block 3. DATE ISSUED on the SF1442) and prescribing the safety and health requirements for construction contract work.
u. Environment includes:
(1) ecosystems and their constituent parts, including people and communities;
(2) natural and physical resources;
(3) the qualities and characteristics of locations, places and areas;
and
(4) the social, economic, aesthetic and cultural aspects of a thing mentioned in paragraphs (i), (ii) or (iii).
v. Environmental Clearance Certificate means the Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities or the Works and any conditions incorporated in that certificate.
w. Environmental Harm means any actual or threatened adverse impact on, or damage to, the Environment.
x. Environmental Incident means any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities or the Works.
y. Environmental Requirements includes the:
(1) Environmental Clearance Certificate; and
(2) Defence Environmental Requirements.
z. Federal Acquisition Regulation means the primary document of the United States Government Federal Acquisition Regulations System for the codification and publication of uniform policies and procedures for acquisition.
aa. GHS means the Globally Harmonised System of Classification and Labelling of Chemicals published by the United Nations, (Rev.8) (2019), as modified by the relevant WHS Legislation.
https://www.unece.org/trans/danger/publi/ghs/ghs_rev08/08files_e.html
ab. GHS Material means material suspected of containing or likely to
SECTION 01 11 00 Page 6 contain a substance defined or listed in the GHS.
ac. GST the tax payable on taxable supplies under the GST Legislation.
ad. GST Legislation means A New Tax System (Goods and Services Tax) Act 1999 (Cth) and any related Act imposing such tax or legislation that is enacted to validate, recapture or recoup such tax.
ae. Hazardous Chemical has the meaning given in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth) and includes:
(1) prohibited carcinogen, as defined in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth);
(2) restricted carcinogen, as defined in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth);
(3) hazardous chemicals the use of which is restricted under regulation 382 of the Work Health and Safety Regulations 2011 (Cth), including polychlorinatedbiphenyls;
(4) Schedule 11 Hazardous Chemicals;
(5) hazardous chemicals listed in Table 14.1 of Schedule 14 of the Work Health and Safety Regulations 2011(Cth);
(6) Schedule 15 Chemicals; and
(7) lead as defined in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth).
af. Hazardous Substances means Ozone Depleting Substances, Synthetic Greenhouse Gases, Hazardous Chemicals or Dangerous Goods.
ag. HOTO Plan and Checklist means the worksheets contained within the excel workbook titled "HOTO Plan & Checklist" available at https://defence.gov.au/estatemanagement/lifecycle/PlanHandoverTakeover/Default.asp, as updated, superseded or replaced from time to time.
HOTO Process means the process for handover and takeover of the Works to the Contracting Officer and the Commonwealth to enable the occupation, use, operation and maintenance of the Works by the Commonwealth and other users including the:
(1) commissioning of the Works (including the inspection and testing process);
(2) handover of the Works; and
(3) occupation, use, operation and maintenance of the Works by the Commonwealth and other users, in accordance with the HOTO Requirements.
HOTO Requirements means the requirements published on DEQMS in respect of the commissioning, handover and takeover of projects on the Defence Estate, including:
(4) the documents set out at https://defence.gov.au/estatemanagement/lifecycle/PlanHandoverTakeover/Default.asp
SECTION 01 11 00 Page 7 and all applicable requirements referred to therein; and
(5) any other requirement published on DEQMS expressed as applying to the commissioning, handover and takeover of projects on the Defence Estate, each as updated, superseded or replaced from time to time.
ah. NATA means National Association of Testing Authorities Australia.
ai MFPE means the Defence Manual of Fire Protection Engineering, as that document is amended from time to time.
aj. National Construction Code means the National Construction Code that applies in the Northern Territory, as amended from time to time, produced and maintained by the Australian Building Codes Board on behalf of the Commonwealth government and each Australian State and Territory government.
ak. Ozone Depleting Substance means any substance identified as having ozone depleting potential in the Ozone Protection and Synthetic Greenhouse Gas Management Act 1989 (Cth) or any regulations made under that Act.
al. Other Contractor means any other contractor, consultant, artist, tradesperson or other person engaged to do work at or in the vicinity of the Site other than the Contractor and its subcontractors.
am. PFAS means per- and poly-fluoroalkyl substances.
an. Plant, Equipment and Work means those things used, or work undertaken, by the Contractor to construct the Works but which will not form part of the Works.
ao. Project Documents includes:
(1) Design documentation (shop drawings), Project Plans;
(2) Approvals;
(3) any other data, documents, drawings, records, information, and material produced or provided (or required to be provided) to the Contracting Officer, under or in connection with the Contract, the Contractor's Activities or the Works by, for or on behalf of the Contractor (including by subcontractors); and
(4) all material at any time derived (under or in connection with the Contract, the Contractor's Activities or the Works) from, or based on, the material described in subparagraphs (i) and(iii).
ao. Project Lifecycle and HOTO Plan means the plan prepared by the Contractor in accordance with, and for the purposes of, the HOTO Requirements and finalised under clause 4.2, which must:
(1) be prepared in accordance with the HOTO Plan and Checklist;
(2) meet all applicable HOTO Requirements and Statutory Requirements;
and
(3) include any other matters required by:
SECTION 01 11 00 Page 8
- the Contract; or
- the Contracting Officer or the Commonwealth.
ap. Request for Information is a written request for information submitted by the Contractor to the Contracting Officer. NAVFAC form is available from the Contracting Officer.
aq. Schedule 11 Hazardous Chemical has the meaning given in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth).
ar. Schedule 15 Chemical has the meaning given in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth).
as. Site means the site or sites for the Works as set out in the Contract.
at. Smart Infrastructure Handbook means the Defence Smart Infrastructure Handbook: Planning, Design and Construction available on DEQMS, as amended from time to time.
au. Statutory Requirements means:
(1) any law applicable to the Contractor's Activities or the Works (including Acts, ordinances, regulations, by-laws and other subordinate legislation) including those of the Commonwealth and the Northern Territory;
(2) Approvals (including any condition or requirement under an Approval);
(3) Defence Requirements; and
(4) Environment Requirements.
av. Synthetic Greenhouse Gas means any gas identified as a Synthetic Greenhouse Gas in the Ozone Protection and Synthetic Greenhouse Gas Management Act 1989 (Cth) or in any regulations made under that Act.
aw. U.S. Government means the federal overnment of the United States.
ax. WHS Legislation means:
(1) Work Health and Safety (National Uniform Legislation) Act 2011 (NT) and Work Health and Safety (National Uniform Legislation) Regulations 2011 (NT);
(2) Work Health and Safety Act 2011 (Cth) and Work Health and Safety Regulations 2011 (Cth); and
(3) any other legislation and Codes of Practice in the Northern Territory addressing work health and safety.
ay. Work Health and Safety Plan is:
(1) included as part of the Accident Prevention Plan submitted in accordance with Section 01 35 26 Government Safety Requirements and refers to Australian safety requirements in addition to those
SECTION 01 11 00 Page 9 in the Contract; and
(2) prepared by the Contractor and finalised under paragraph 5.2 of this Australian Requirements Schedule which must set out in adequate detail the procedures the Contractor will implement to manage the Contractor's Activities and the Works from a work health and safety perspective to ensure compliance with all Statutory Requirements (including the WHS Legislation).
az. Works means the physical work, which the Contractor must (to the extent required by the Contract), design, construct, commission, complete and hand over in accordance with the Contract.
1.8 SUBMITTALS
Not used.
1.9 COVERED BY CONTRACT DOCUMENTS
1.9.1 Project Description
The work includes construction of a United States Air Force (USAF) squadron operations facility at the Royal Australian Air Force (RAAF) Base in Tindal, Australia. Space is required for aircrew flight equipment maintenance and care, mission planning, intelligence, crew briefings, and crew readiness to support eight KC-10 aircraft, and incidental related work. Systems to be commissioned in this project include, but is not limited to, Ventilating and Air Conditioning Systems (no heating or refrigeration), Building Automation System (HVAC Control System), Service Water Heating System, Plumbing System, and Utility Energy Metering Systems and Sub-Meters.
This project is being delivered by NFP to support USAF and PACAF's mission requirements as the end user.
a. P700
The PAF180700 APR Squadron Operations Facility project (P700) includes the construction of an operations facility to support up to 75 personnel, access pavements, grading and drainage improvements, and supporting utility infrastructure required to accommodate the planned facility.
The USAF requires an adequately sized and configured squadron operations facility for bomber aircraft crews to support enhanced air cooperation (EAC) missions at RAAF Base Tindal. The facility is required to support strategic operations and to run multiple 15-day training exercises during the Northern Territory’s dry season for deployed B-52 squadrons.
The proposed Squadron Operations Facility will serve as the main control point for all unit flight and flying training tasks including planning, briefing, and administration. The facility, planned for USAF bomber aircraft exercises, will support the EAC at RAAF Base Tindal.
In addition to the requirements specified in the Contract Documents, all work must also be conducted in accordance with the applicable Australian legislation, Australian codes of practice, applicable AS/NZS standards, Australian Defence policies, and relevant Australian Defence authorization.
SECTION 01 11 00 Page 10
1.9.2 Location
The work is located at the Royal Australian Air Force (RAAF) Base Tindal, Northern Territory, Australia, approximately as indicated in the drawings.
1.10 OCCUPANCY OF PREMISES
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches and corridors.
1.11 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.12 LOCATION OF UNDERGROUND UTILITIES
Complete digging permits prior to start of excavation, and comply with installation requirements for locating and marking underground utilities. Contact the Contracting Officer to coordinate with the RAAF Base Tindal Estate and Infrastructure Group (E&IG) Base Support Services for utility information prior to excavating, to mark utilities, and with sufficient time. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not located on drawings. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.12.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.13 SALVAGE MATERIAL AND EQUIPMENT
The demountable buildings are to be disconnected and disposed of by the Contractor.
SECTION 01 11 00 Page 11
PART 2 PRODUCTS
2.1 General
Unless otherwise specified in the Job Specifications, the storage, handling and installation of all materials shall be in accordance with the manufacturer's recommendations.
The Works shall be generally of standards of design, construction and finish suitable for heavy industrial and heavy commercial service and resistant to vandalism.
All materials and equipment shall be the best of their respective kinds, complying with the relevant Standards and Local Codes of Practice. Unless otherwise specified, all materials and equipment shall be new and shall be delivered to the site with the maker's label intact.
The Contractor shall be required to transport and deliver to and from the Site all materials, equipment, vehicles, constructional plant and other items to be used in executing the Works.
2.2 Proprietary Items
The Works Description and drawing make reference to proprietary items or approved equivalent. Mention of a proprietary service, product or material brand name indicates that the item is compliant with the relevant specific description and necessary properties (as may be determined by the Contracting Officer) unless the relevant specific description identifies the item as ASIO-preferred or clearly states that no alternative is allowed, it does not indicate an exclusive preference. Do not proceed to order or use an alternative unless direction to proceed is received by the Contracting Officer.
Substitution is allowed only to the extent that it is compliant with the requirements and equivalent to the Works Description.
If the Contracting Officer deems that use of the alternative constitutes a Variation, the Variation will be dealt with in accordance with the Contract.
Submissions: In proposed alternatives submissions, the Contractor must include sufficient information to permit evaluation, including:
a. Information as for Proposed Product including Works Description and drawings, material composition, type test reports, performance and rating tables, compliance with legislation and standards, installation or application methods, serviceability, durability, protection needs, maintenance requirements and recommendations
b. Any significant differences from specified items, effects on other work and costs.
c. Evidence of consistency with the Contract and equivalence to the required or described item;
d. If appropriate, samples;
e. Reasons for the proposed substitution;
f. Statement of the extent of revisions to the Contract documents;
g. Statement of the extent of revisions to the approved program;
SECTION 01 11 00 Page 12
h. Statement of cost implications comparing both the complying offer and the alternative. Documentary evidence of materials costs shall be included. Certified copies of supplier quotations will be accepted.
The impact on construction and running costs shall be included
i. Statement of consequent alterations to other parts of the Works;
j. If the required or described item is proven to be unavailable; and
k. Evidence of enhanced value to the Commonwealth.
If products must comply with product certification schemes, submit evidence of compliance.
The Contractor must bear any additional costs, including fees, charges, and administration costs resulting from submission of non-compliant alternatives.
2.3 FIRE HAZRAD PROPERTIES
The Contractor shall ensure that materials and finishes selected comply with fire hazard property limits under Building Code of Australia (BCA) C1.10 and advise the Contracting Officer if a requirement would not comply.
2.4 MANUFACTURERS' OR SUPPLIERS' RECOMMENDATIONS
Obtain all applicable manufacturers' and suppliers' specifications, recommendations and instructions; ensure that each is current; comply with them to the extent that is not in conflict with any requirement under the Contract; advise the Contracting Officer of any conflict with a requirement that might affect any of the objectives listed in the definition of manufacturers' specification, and of any supplementary or contrary action.
Provide, transport, deliver, store, handle, protect, finish, adjust, and prepare for use manufactured items in accordance with the current written recommendations and instructions of the manufacturer or supplier.
Where items are specified or shown on the Works Description drawings in generic or non-prescriptive terms, select and provide items that are recommended by the manufacturer as appropriate to the particular service conditions.
Submit the manufacturer's recommendations and instructions to the Contracting Officer and advise of conflicts with other requirements.
Advise the Contracting Officer of specified works that are contrary to manufacturers' or suppliers' written recommendations and instructions.
2.5 PRODUCT CERTIFICATION
If products must comply with product certification schemes, provide them in accordance with the certification requirements.
2.6 MATERIALS SEPARATION
Prevent direct contact between incompatible metals, and between green hardwood or chemically treated timber and aluminium or coated steel, by either:
SECTION 01 11 00 Page 13
a. applying an anti-corrosion, low moisture transmission coating to contact surfaces; or
b. inserting a separation layer
Any fasteners used to join incompatible materials shall not contribute to the deterioration of any materials being joined.
All dissimilar metals and materials shall be suitably isolated in accordance with industry standards to prevent galvanic corrosion.
2.7 SEALED CONTAINERS
If materials or products are supplied by the manufacturer in closed or sealed containers or packages, bring the materials or products to point of use in the original containers or packages.
2.8 CONSISTENCY
For the whole quantity of each material or product use the same manufacturer or source and provide consistent type, size, quality and appearance.
2.9 COMPATABILITY
Use only materials that are fully compatible with others in proximity, and will cause no discolouration, corrosion, disfigurement or failure; if any possibility of such detriment exists between required materials, advise the Contracting Officer.
2.10 COLOURS
Product colours shall be selected by the Contractor from the material's standard colour range, except for paints (which may be non-standard colours). The Contractor must confirm specified colours with the Contracting Officer.
2.11 PROTECTIVE COATINGS
All equipment and materials (including all metal surfaces) supplied under this Contract shall be suitably protected from corrosion (internally and externally, where applicable) or deterioration due to the presence of aggressive soil and the prevailing environment and climatic conditions.
Protective coatings (or additives) shall be types suitable for the surfaces (or materials) to be protected and the prevailing conditions.
2.12 AQUEOUS FILM FORMING FOAM
The Contractor shall ensure that supply and installation of any materials under this Contract that requires or contains Aqueous Film Forming Foam (AFFF) complies with the Department of Defence Infrastructure Division Environment and Engineering Branch Pollution Prevention Management Manual.
Procurement of AFFF product must not contain Perfluorooctane Sulfonate (PFOS) or Perfluorooctanoic Acid (PFOA) as the active ingredient.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 14
SECTION 01 11 00 Page 15
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 11 00 Page 16
SECTION 01 14 00
WORK RESTRICTIONS
11/ 11, CHG 11: 11/ 20
PART 1 GENERAL
1.1 REFERENCES
1.1.1 Australian Standards
Without limiting the Conditions of Contract the Contract includes published documents adduced by reference (to the whole or part), and the Contractor (itself or through its agents) is deemed to have adequate knowledge of them. Responsibilities and duties of the Commonwealth, Contractor and Contracting Officer are not altered by requirements in such published documents referenced in the Works Description. Unless otherwise specified in the Works Description and, where applicable, materials and workmanship shall be in accordance with the latest version of the Technical Specification, Drawings and the applicable Australian Standards and Codes. Site Copies: Keep copies on Site of those referenced documents in the Works Description that are cited or referenced or that specify Site work.
AUSTRALIAN GOVERNMENT CIVIL AVIATION SAFETY AUTHORITY (CASA)
MOS139 Manual of Standards Part 139 - Aerodromes
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
Personnel List
Vehicle List
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. The Contractors operations as approved by the Contracting Officer must not interfere with normal Defence operations.
b. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
c. Permission to interrupt any Activity roads or utility service must be requested in writing a minimum of 20 calendar days prior to the desired date of interruption. Provide a Permission to Interrupt (PTI) to the Contracting Officer to communicate construction activities affecting the Base operations including but not limited to concrete pours, service temporary closures and temporary fencing. The PTI is to provide notice of the upcoming activity, the expected duration of the
SECTION 01 14 00 Page 1 works and the areas affected. Submit the request to the RAAF Tindal Base Support Manager via the Contracting Officer.
d. During exercises, lock down rehearsals and lockdown, the Contractor will not be able to work.
e. The work is within close proximity to the runway. Any construction lights are to be shrouded in accordance with MOS139. The construction of the structures are within close proximity to the JOCS and cranes are not to encroach the JOCS.
Any construction works using cranes shall only be permitted with prior approval from the Base Support Manager and site stakeholders. The Contractor shall provide 15 days' notice when seeking approval for the use of a crane. Subject to the construction methodology, the Contractor may need to submit a NOTAM to use a crane.
e. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
(1) Tindal Northern Territory has distinct dry and wet seasons. The dry season typically occurs from May to October. The wet season typically occurs from November to April.
(2) Pitch Black Exercise generally occurs from late June to early August in even numbered years. Other training exercises are regularly scheduled throughout the year. Coordinate scheduling of construction activities with training exercises via the Contracting Officer.
(3) RAAF Base Tindal December stand-down occurs from late December to early January Australian Government holidays are defined as Northern Territory public holidays including the regional holiday for Katherine Show Day. A list of holidays is available at https://nt.gov.au/nt-public-holidays.
(4) The Reduced Activity Period (RAP) is typically 4 weeks, commencing mid-December and ending mid-January. Construction activities can continue during this period, there are no restrictions for a base perspective, however Base support is limited during this time.
(5) The operations may interrupt Contractor work. Allow for 10 interruption days in addition to the RAP.
(6) Coordination with other construction projects on RAAF Tindal.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
SECTION 01 14 00 Page 2
1.4.2 Lockdown
In the event of a lockdown the alert of 'LOCKDOWN LOCKDOWN' will be broadcasted across the radio network. If no radio network is available, the Contractor will be contacted and advised to go into Lockdown.
Contractor is required to then take a 'Run-Hide' response. This involves the Contractor leaving the Site and finding a safe location to bunker down. Whilst in Lockdown do not return to the Site. Once the building the Contractor is bunkered in has been secured it is not to be opened until the Lockdown situation is over. The Contactor is to radio/call into Defence liaison officer and advise that it has responded to the lockdown and has exited the Site. Personnel are to remain in Lockdown until the 'STAND DOWN' or 'ALL CLEAR' command is given where all personnel are to report to the Defence liaison officer for a full muster.
1.4.3 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.3.1 RAAF Base Tindal Induction
a. To access RAAF Base Tindal all visitors/contractor personnel must undertake a Base induction.
b. Prior to entering Unit areas, all…