23R1316_AMD5.pdf
PDF 2 MB Posted
- Attached to
- FY22 MCAF PAF180700 SQUADRON OPERATIONS FACILITY, ROYAL AUSTRALIAN AIR FORCE BASE TINDAL, AUSTRALIA
- Solicitation number
- N6274223R1316
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23R1316 Note 6.pdf | ||
| 23R1316_AMD6.pdf | ||
| 23R1316 Note 5.pdf | ||
| 23R1316_AMD4.pdf | ||
| 23R1316 Note 4.pdf | ||
| 23R1316 AMD3.pdf | ||
| 23R1316_AMD2.pdf | ||
| 23R1316 Note 3.pdf | ||
| P700 SV Sign-in.pdf | ||
| 23R1316_AMD1.pdf | ||
| 23R1316 Note 2.pdf | ||
| 23R1316 Note 1.pdf | ||
| 1665827-P700 Specification_Signed_REV_MAY2023.pdf | ||
| 1665827-P-700 Drawings - 2 of 2.pdf | ||
| 1665827-P-700 Drawings - 1 of 2.pdf | ||
| 23R1316-RFP.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. N6274223R1316 Amendment No. 0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SPECIFICATIONS
SECTION 01 14 00 – WORK RESTRICTIONS
Remove Replace with Pages 1-10 Pages 1-12 Amendment No. 0005
DRAWINGS
The following drawings supersede previously issued drawings bearing the same number and title:
DRAWING
NUMBER
NAVFAC
DRAWING
NUMBER
DRAWING TITLE
E-101 17270575 ELECTRICAL & COMMUNICATION SITE PLAN 1
E-102 17270576 ELECTRICAL & COMMUNICATION SITE PLAN 2
FY22 MCAF PROJECT PAF180700 SQUADRON OPERATIONS FACILITY 1665827
RAAF, TINDAL
Section 01 14 00 Page 1
AMENDMENT 0005 7/20/2023
SECTION 01 14 00
WORK RESTRICTIONS
11/11, CHG 11: 11/20
PART 1 GENERAL
1.1 REFERENCES
1.1.1 Australian Standards
Without limiting the Conditions of Contract the Contract includes published documents adduced by reference (to the whole or part), and the Contractor (itself or through its agents) is deemed to have adequate knowledge of them.
Responsibilities and duties of the Commonwealth, Contractor and Contracting Officer are not altered by requirements in such published documents referenced in the Works Description. Unless otherwise specified in the Works Description and, where applicable, materials and workmanship shall be in accordance with the latest version of the Technical Specification, Drawings and the applicable Australian Standards and Codes. Site Copies: Keep copies on Site of those referenced documents in the Works Description that are cited or referenced or that specify Site work.
AUSTRALIAN GOVERNMENT CIVIL AVIATION SAFETY AUTHORITY (CASA)
MOS139 Manual of Standards Part 139 - Aerodromes
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
Personnel List
Vehicle List
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. The Contractors operations as approved by the Contracting Officer must not interfere with normal Defence operations.
b. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
c. Permission to interrupt any Activity roads or utility service must be requested in writing a minimum of 20 calendar days prior to the desired date of interruption. Provide a Permission to Interrupt (PTI) to the Contracting Officer to communicate construction activities affecting the Base operations including but not limited to concrete pours, service temporary closures and temporary fencing. The PTI is to provide
Section 01 14 00 Page 2
AMENDMENT 0005 7/20/2023
notice of the upcoming activity, the expected duration of the works and the areas affected. Submit the request to the RAAF Tindal Base Support Manager via the Contracting Officer.
d. During exercises, lock down rehearsals and lockdown, the Contractor will not be able to work.
e. The work is within close proximity to the runway. Any construction lights are to be shrouded in accordance with MOS139. The construction of the structures are within close proximity to the JOCS and cranes are not to encroach the JOCS.
Any construction works using cranes shall only be permitted with prior approval from the Base Support Manager and site stakeholders. The Contractor shall provide 15 days' notice when seeking approval for the use of a crane. Subject to the construction methodology, the Contractor may need to submit a NOTAM to use a crane.
e. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
(1) Tindal Northern Territory has distinct dry and wet seasons. The dry season typically occurs from May to October. The wet season typically occurs from November to April.
(2) Pitch Black Exercise generally occurs from late June to early August in even numbered years. Other training exercises are regularly scheduled throughout the year. Coordinate scheduling of construction activities with training exercises via the Contracting OfficerPitch Black exercise typically spans a duration of three weeks and is scheduled to take place between late June and early August in even numbered years. As a result, the contractor should anticipate and plan for potential disruptions, as the Base will experience increased activity during this period. While construction activities will generally be permitted to proceed, it is important for the contractor to be aware that certain areas may necessitate additional coordination, which will be communicated by the Base Infrastructure Advisor Office through the contracting office. Therefore, the contractor is advised to take this information into account when scheduling their work activities during the specified timeframe.
(3) RAAF Base Tindal December stand-down occurs from late December to early January Australian Government holidays are defined as Northern Territory public holidays including the regional holiday for Katherine Show Day. A list of holidays is available at https://nt.gov.au/nt-public-holidays.
(4) The Reduced Activity Period (RAP) is typically 4 weeks, commencing mid-December and ending mid-January. Construction activities can continue during this period, there are no restrictions for a base perspective, however Base support is limited during this time.
(5) The operations may interrupt Contractor work. Allow for 10 interruption days in addition to the RAP.
Section 01 14 00 Page 3
AMENDMENT 0005 7/20/2023
(6) Coordination with other construction projects on RAAF Tindal.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.4.2 Lockdown
In the event of a lockdown the alert of 'LOCKDOWN LOCKDOWN' will be broadcasted across the radio network. If no radio network is available, the Contractor will be contacted and advised to go into Lockdown. Contractor is required to then take a 'Run-Hide' response. This involves the Contractor leaving the Site and finding a safe location to bunker down. Whilst in Lockdown do not return to the Site. Once the building the Contractor is bunkered in has been secured it is not to be opened until the Lockdown situation is over. The Contactor is to radio/call into Defence liaison officer and advise that it has responded to the lockdown and has exited the Site. Personnel are to remain in Lockdown until the 'STAND DOWN' or 'ALL CLEAR' command is given where all personnel are to report to the Defence liaison officer for a full muster.
1.4.3 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.3.1 RAAF Base Tindal Induction
a. To access RAAF Base Tindal all visitors/contractor personnel must undertake a Base induction.
b. Prior to entering Unit areas, all visitors/contractor personnel must check with the Unit or building point of contact (POC) for site specific induction.
c. Foreign National visitors/contractor's personnel must have prior approval from Base Support Manger (BSM) or Senior Australian Defence Force Officer (SADFO) prior to accessing RAAF Base Tindal.
d. Contractor is responsible for verifying access restrictions for the installations associated with foreign national workers prior to submission.
1.4.3.2 No Smoking Policy
Section 01 14 00 Page 4
AMENDMENT 0005 7/20/2023
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.4.4 Working Hours
Regular working hours at RAAF Base Tindal are between 0600-1900, Monday through Friday, excluding Northern Territory public or regional holidays.
For access outside of these hours, after hours permissions through the Defence Contractor Access Card (DCAC) issuing process are required .
1.4.5 Reduced Activity Period (RAP)
The Reduced Activity Period (RAP) is typically 4 weeks, commencing mid- December and ending mid-January. Construction activities can continue during this period, there are no restrictions for a base perspective, however Base support is limited during this time.
1.4.6 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
1.4.7 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Northern Territory public or regional holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS. Cut overs and interruptions are limited to not more than 8 hours, except as approved by the Contracting Officer.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, date serviceand fire alarm are considered utility cutovers pursuant to the paragraph WORK OUTSIDE
REGULAR HOURS.
d. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain.
1.5 SECURITY REQUIREMENTS
1.5.1 Personnel List
Section 01 14 00 Page 5
AMENDMENT 0005 7/20/2023
Submit for approval, at least 15 days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:
a. Name
b. Date and place of birth
c. Citizenship
d. Home address
e. e. Government-issued photo identification
1.5.1.1 Citizenship Requirements
Clearance for aliens (non-Australian citizens) may require additional time for approval.
1.5.2 Vehicle List
Submit an original list of vehicles to be utilized at the work site with the following information for each vehicle:
a. Make
b. Year
c. Model
d. License number
e. Registered owner
1.5.3 PassesInstallation Access
Submit request for personnel and vehicle passes together. RAAF Base Tindal Induction and Airside Awareness Training are required for all personnel.
When collecting a Defence Contractor Access Card (DCAC) from the pass office there is a short PowerPoint presentation detailing general requirements of RAAF Tindal. Separate inductions are required if personnel are working Airside or within the Explosive Ordinance (EO) precinct.
All people entering the base shall show a current pass before entering the base. Permanent Site-based staff (eg. Site Manager, Site Foreman, etc) may apply for a Defence Common Access Card (DCAC) with escort privileges (valid for maximum 12 months) to facilitate regular entry to the Base. The completed pro-forma DCAC application must be submitted to the Contracting Officer a minimum of 30 days before site access is required.
All non-permanent Contractor Site-based employees, subcontractors, suppliers and any other persons connected with the Contractor's Activities and the Works will be required to present a valid Red Pass to gate security prior to entry to the Base each day. Upon application in an approved form reviewed and not rejected by the Contracting Officer, a Red Pass (valid for maximum 12 months) may be issued by the Commonwealth (in its absolute discretion) to employees, subcontractors, suppliers and any other persons connected with
Section 01 14 00 Page 6
AMENDMENT 0005 7/20/2023
the Contractor's activities and the Works. The requested duration of the Pass must be no greater than is required by the Contractor's Program.
While the passes are processed an interim paper pass valid for up to 30 days can be provided on request and subject to review. The request is to include the required details (name, contact details, address, employer, date of access, drivers licence) and a police check. The paper pass application is to be submitted to the Contracting Officer a minimum of seven days prior to the requested first entry date.
All deliveries to Base, including concrete deliveries, must either have a red pass or be escorted.
A 2 day paper pass can be arranged for infrequent visitors with 5 days' notice and a police check being provided.
The Contractor will maintain on-site an up-to-date register of all visitor passes requested and approved. This register will be available for review by the Contracting Officer at any time. A Base Pass will be valid for entry to the Base between the access hours for Contractor\s Activities on Site as set out in or otherwise in accordance with the Contract.
Drivers of vehicles entering the Base are required to hold a valid drivers licence, complete an induction before entering Base and vehicle registrations must be current. All Queensland road rules, including but not limited to speed regulations, mobile phone usage and vehicle loading must be complied with within the Base and may be enforced by Military Police
Maintain strict accountability over passes. Immediately report to the Contracting Offices, passes missing or lost and the circumstances.
Should any personnel be identified by the Contracting Officer as unsuitable for access, the Contractor shall ensure that these personnel are not granted or continue to be granted entry. The Contractor must report to the Contracting Officer within 24 hours all unauthorised access, safety and security incidents or accidents relating to the Project The Contractor is to submit request for personnel and vehicle passes together. In addition to the RAAF Base Tindal Induction, all personnel working within airside areas or within the Explosive Ordnance (EO) precinct will be required to undergo separate inductions.
All personnel entering the base shall show a current pass before entering the base. Permanent Site-based staff (e.g. Site Manager, Site Foreman, etc.) will be required to apply for a Defence Common Access Card (DCAC) to facilitate regular entry to the Base. The completed pro-forma DCAC (AE294 Form) application must be submitted to the Contracting Officer a minimum of 30 days before site access is required.
Two types of DCACs can be applied for:
a. Cleared DCAC which requires a valid Australian Government Security Clearance. This pass enables the holder to escort visitors and provides after-hours access to site.
b. Uncleared DCAC which requires an Australian Federal Police Check that has been issued for less than 30 days. This pass provides restricted access onsite, enabling the holder to escort visitors and provides after-hours access to site.
Section 01 14 00 Page 7
AMENDMENT 0005 7/20/2023
All non-permanent Contractor Site-based employees, subcontractors, suppliers and any other persons connected with the Contractor's Activities and the Works will be required to present a DCAC to gate security prior to entry to the Base each day. Upon application in an approved form reviewed and not rejected by the Contracting Officer, a DCAC (valid for the duration of the works) may be issued by the Commonwealth (in its absolute discretion) to employees, subcontractors, suppliers and any other persons connected with the Contractor's activities and the Works. The requested duration of the Pass must be no greater than is required by the Contractor's Program.
While the passes are processed an interim paper pass valid for up to 30 days can be provided on request and subject to review by the RAAF Base Tindal BM. The request is to include the required details (name, contact details, address, employer, date of access, drivers license) and a police check. The paper pass application is to be submitted to the Contracting Officer a minimum of seven days prior to the requested first entry date.
All deliveries to Base, including concrete deliveries, must either have a DCAC or be escorted by a DCAC holder. A two-day paper pass can be arranged for infrequent visitors with 5 days' notice and a Australian Federal Police check being provided.
The Contractor will maintain on-site an up-to-date register of all visitor passes requested and approved. This register will be available for review by the Contracting Officer at any time. A Base Pass will be valid for entry to the Base between the access hours for Contractor’s Activities on Site as set out in or otherwise in accordance with the Contract.
Drivers of vehicles entering the Base are required to hold a valid drivers license, complete an induction before entering Base and vehicle registrations must be current. All Northern Territory road rules, including but not limited to speed regulations, mobile phone usage and vehicle loading must be complied with within the Base and may be enforced by Military Police.
The Contractor will be required to maintain strict accountability over passes. This includes tracking which of its personnel hold DCACs and visitor passes and immediately report to the Contracting Offices, passes missing or lost and the circumstances. Should any personnel be identified by the Contracting Officer as unsuitable for access, the Contractor shall ensure that these personnel are not granted or continue to be granted entry. The Contractor must report to the Contracting Officer within 24 hours all unauthorized access, safety and security incidents or accidents relating to the Project.
1.5.4 Security Escorts
A security escort is required for all Contractor personnel who are not authorized for unescorted access to RAAF Base Tindal. Contractor personnel who have escort authorization may be the security escort.
The security escort must be with the person or group of persons being escorted at all times while on Base.
Section 01 14 00 Page 8
AMENDMENT 0005 7/20/2023
Subcontractors authorized to provide security escort services are available, but if utilized, must be engaged by the Contractor. No additional cost to the Government will be allowed for security escorts after contract award.
A security escort is required for all visitors and non-DCAC holders.
Contractor personnel who hold DCACs may function as security escorts.
The security escort must be with the person or group of persons being escorted at all times while within RAAF Base Tindal. Escorted personnel must be within visual sight of the security escort and able to communicate directly.
Subcontractors authorized to provide security escort services are available, but if utilized, must be engaged by the Contractor, noting a maximum of 3 personnel only can be escorted by a security escort at one time. No additional cost to the Government will be allowed for security escorts after contract award.
1.5.5 Security Management Plan
Prepare and submit a Construction Security Management Plan. The plan must describe in detail the measures that will be implemented to ensure security including identification and pass procedures, controlling the Contractor's activities on Base and at the project site, and any physical security measures during regular work hours and outside of regular work hours.
1.5.6 Commonwealth Security Requirements
a. The Contractor must provide, for the duration of the Contractor's Activities, a "Unit Security Officer" holding Defence Industry Security Program (DISP) accreditation to process (on an as required basis) security clearances for any person engaged in connection with the Contractor's Activities or the Works who requires a Defence Common Access Card (DCAC).
(bb) Without limiting its obligations under the Contract, the Contractor must ensure that it and its personnel:
(1) comply with the Commonwealth's security clearance process;
(2) obtain the level of security clearance required by the Commonwealth; and
(3) comply with all security policies and procedures of the Commonwealth.
b. Without limiting its obligations under the Contract, Contractor shall not disclose any Classified Information unless the disclosure:
(1) is strictly in accordance with the provisions of the Defence Security Manual;
(2) has first been approved in writing by the Commonwealth (which approval may be subject to any conditions that the Commonwealth thinks fit including execution of any deed of confidentiality);
(3) disclosure is not otherwise prohibited under the laws of the United States; and
Section 01 14 00 Page 9
AMENDMENT 0005 7/20/2023
(4) written authorization is obtained by the Contracting Officer
c. The Contractor shall handle and store any Classified Information in its possession or control strictly in accordance with the provisions of the Defence Security Manual and the laws of the United States.
d. The Contractor shall ensure that any subcontract made in connection with this Contract contains enforceable obligations requiring the subcontractor to comply with the Contractor's obligations arising under this paragraph 15 as if the subcontractor were the Contractor
1.5.7 Defence's Security Alert System
a. The Contractor acknowledges and agrees that:
(1) the Base and the Site is subject to the Defence's Security Alert System; and
(2) Defence's Security Alert System level, as at the Effective Date, is "Alert" or such other level as advised by the Contracting Officer.
b. The Contractor must be, and must ensure that its subcontractors are, fully familiar with the requirements of Defence's Security Alert System in relation to RAAF Base Tindal.
c. The Contractor must, and must ensure that its subcontractors:
(1) attend any required security briefing from time to time; and
(2) participate in any rehearsal of Defence's Security Alert System from time to time.
d. In carrying out the Contractor's Activities, the Contractor must, and must ensure that its subcontractors, comply with the requirements of Defence's Security Alert System:
(1) at any level applicable to the Site from time to time; and
(4) at any alternative level (or individual measure from a higher level to meet a specific threat or threats) applicable to the Site from time to time.
e. If there is any change to Defence's Security Alert System level (or individual measure from a higher level to meet a specific threat or threats) applicable to the Base or the Site from time to time after the Effective Date, the Contractor must immediately comply with any such changes in Defence's Security Alert System requirements.
1.6 PROHIBITED ITEMS
The Contractor's employees, subcontractors, suppliers and any other persons connected with the Contractor's Activities and the Works are prohibited from bringing any of the following on to the base:
a. Video recorders/cameras;
b. Firearms;
Section 01 14 00 Page 10
AMENDMENT 0005 7/20/2023
c. Cameras (except as noted in the Works Description' clause on Photographs);
d. Tape recorders;
e. Telescopes;
f. Binoculars;
g. Animals (including pets);
h. Drugs that are prohibited by law including marijuana; and
i. Alcohol.
1.7 PHOTOGRAPHS
Taking limited project related photos will be limited to key personnel only within the construction Sites and personnel are required to be approved.
Applications to include the name of the person seeking authorisation, details of what will be photographed, why, relevance to Contract, date and time when photographs will be taken.
Photographs are to be submitted as directed by the Contracting Officer for review. One SIM Card is to be used which is to be handed over to the Contracting Officer at Completion.
Except as set out in this clause, photography is not permitted on the Site or on Base without the prior written permission of the Contracting Officer.
The Contractor's Foreman and/or Site Manager may take photos of the Site for sole purposes of construction records. These photos must be viewed by Contracting Officer.
The Contractor must ensure that none of its employees, subcontractors, suppliers or other persons in connection with the Contractor's Activities and the Works:
a. takes photographs of Base facilities, vehicles and/or personnel without the specific prior written approval of the Contracting Officer;
b. takes any photographs without carrying the relevant authorisation on their person.
Persons doing so may be immediately removed from the Base and the Site and entry rights revoked and may be subject to prosecution. All authorised photographs must be taken with a digital camera only.
1.8 METHOD OF WORK PLAN FOR AIRFIELD ACTIVITIES
The Contractor must ensure that the Contractor's Activities and the Works do not compromise aircraft operations or the safety of aircraft.
As part of the Contractor's Activities, the Contractor must liaise with the Commonwealth and the Contracting Officer as required to co-ordinate the Contractor's Activities and the Works with, and prevent interruption of, Commonwealth activities including aircraft operations and the safety of aircraft.
Section 01 14 00 Page 11
AMENDMENT 0005 7/20/2023
The Contractor must prepare a Method of Work Plan for Airfield Activities as part of its Site Management Plan which must set out in adequate detail all procedures the Contractor will implement to manage the Contractor's Activities on and near an airfield Site, including:
a. measures to ensure that the Contractor's Activities and the Works do not compromise aircraft operations or the safety of aircraft;
b. the establishment of the Site;
c. access to the Site;
d. security passes for the Site;
e. personnel and vehicle identification and control on the Site;
f. control of personnel including a point of contact from the Contractor;
g. coordination of schedule and work activities with the Commonwealth and Other Contractors as required under the Contract or as directed by the Contracting Officer;
h. approvals prior to carrying out Works;
i. rubbish, dust and debris control;
j. Foreign Object Damage (FOD) control;
k. noise management;
l. fencing;
m. security of the Works;
n. hours of work;
o. traffic management;
p. safety procedures;
q. fuel and hazardous material storage;
r. issues associated with military exercises and military expeditions; and
s. issues associated with aircraft movements.
1.9 SMART INFRASTRUCTURE REQUIREMENTS
Without limiting its obligations under the Contract, the Contractor must manage the Contractor's Activities and the Works to ensure compliance with the Smart Infrastructure Handbook.
PART 2 PRODUCTS
Not Used
Section 01 14 00 Page 12
AMENDMENT 0005 7/20/2023
PART 3 EXECUTION
Not Used
-- End of Section --
AI
TA
PE
RO
AD
C
C C C C C C C C C C C C C C
C
C
C C C C C C C C C C C C C C C
C
C
C
C C
C
C2
HM
HM
C C
C
C C C C C
C C
C
C C
C C
C C
C C
C C
C
C
E C
C
C
C C
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E
EE
E E
E E
E C
C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C
C
C
C
E
E2E2
E2
E2
E E
C C
C C
C
CE
E
E
C C
C C
C
CE
E C
C C
C
C
C
W
W
C
C W
AI
TA
PE
ROAD
TARAKAN
R O
AD
FU
EL L
IN
E
FU
EL P
IP
E
GIV
No s erv ice s
E(HV)
E(HV)
E(HV)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(HV) E(HV) E(HV)E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
Brok en
Li d
E(LV)
E(LV
E(LV
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
Bott om
M H 12
9.3
FU
E(
LV
C
C
C
C
C
C
C
CC
E(H V)
C
C
C
E(LV)
E(LV)
E(LV)
E(LV)
E(LV)
C
E(LV)
C
C
C
C
C
C
C
C
C
E(
LV
E(
LV
E(
LV
E(
LV
E(
LV
C
C
FU
FU
FU
FU
FU
FU
E(
LV
E(
LV
E(
LV
E(
LV
C C
C C
C
C
C
C
E(HV)
E(HV)
E(H V)
E(H V)
E(H V)
E(H V)
C
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W
W
W
S
S
S
S
S
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
W
W
W
W
W
W
W
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Red un da nt?
Red un da nt?
S
S
S
S
S
S S
S S
S S
S S
S S
S
IL
.8
S S
S S
Ø
E(LV) E(LV) E(LV) E(LV) E(LV) E(LV)
GP
B
H
T
SB
M
E
H
T
T B
B B
SV
M SV
M
SV
M
M
CM
SV
M
B
B
B T
M E
H W
M
T
M
CM
M
CM
M E
G
M E
T
CS02
CS03
CS04
M
CM
H
3x100mm HDPVC CONDUIT WITH
3-CELL INNERDUCT. 1 CONDUIT
WITH 2x48 STRAND SMOF FOR
BUILDINGS SYSTEMS AND NYLON
ROPE IN THE OTHER SPARES.
PROVIDE TERMITE RESISTANT
SHEATHING.
4x100mm HDPVC CONDUIT WITH
3-CELL INNERDUCT. 1 CONDUIT
WITH 1x48 STRAND SMOF FOR
BUILDINGS SYSTEMS. 1 CONDUIT
FOR SATCOM COMMUNICATIONS
AND NYLON ROPE IN THE OTHER
SPARES. PROVIDE TERMITE
RESISTANT SHEATHING.
4x100mm HDPVC
CONDUITS FOR LV
CABLING. PROVIDE
NYLON ROPE IN SPARE
CONDUIT. PROVIDE
TERMITE RESISTANT
SHEATHING.
2x100mm HDPVC
CONDUITS FOR COMMS
TO SATCOM
2x48 STRAND SMOF.
SHALL CONNECT INTO BUILDING 542 AND BUILDING 390,
APPROXIMATELY 3000M AWAY.
CONTRACTOR SHALL CONFIRM DISTANCES ON SITE
PRIOR TO PROCUREMENT.
2x100mm HDPVC CONDUITS
FOR FUTURE
COMMUNICATIONS CABLING.
PROVIDE NYLON ROPE IN
CONDUIT. PROVIDE TERMITE
RESISTANT SHEATHING.
CONNECT COMMUNICATION
CONDUITS INTO EXISTING PIT (PIT
A PART OF KC-30)
2x100mm HDPVC CONDUITS
FOR LV CABLING. PROVIDE
NYLON ROPE IN SPARE
CONDUIT. PROVIDE
TERMITE RESISTANT
SHEATHING.
PROVIDE PIT FOR FUTURE
COMMUNICATIONS CONDUITS TO
CONNECT INTO.
PROVIDE 1350x540x950mm DEEP
PIT WITH SCEC APPROVED
COVER.
LEAVE 110m OF FIBRE CABLE
COILED WITHIN PIT FOR
TERMINATION INTO P-400 ONCE
CONSTRUCTED.
E-101
SQUADRON OPERATIONS BUILDING
TN
PLAN
NORTH
A1ELECTRICAL & COMMUNICATION SITE PLAN
SCALE: 1:500m
50m
1:500
FINAL DESIGN SUBMITTAL
E16929No.RE
GI
S T
ER
ED PRO F E S S I ON A L E NG I NEER
ST A T E O F C A L I F O R N I A
E R I C M . P E NN
E L E C T R I C A L
SHEET GENERAL NOTES:
1. CONDUITS PASSING ROADWAYS ARE REQUIRED TO BE UNDER-BORED.
THE CONTRACTOR SHALL ENSURE THE ROAD IS TRAVERSABLE
DURING CONSTRUCTION.
2. ALL ELECTRICAL PITS AND PIT COVERS SHALL BE CLASS D .
3. CONTRACTOR SHALL PROVIDE AND INSTALL CONDUIT SEALS ON BOTH
ENDS OF CONDUITS ENTERING THE BUILDING.
4. PROVIDE 300mm SEPARATION BETWEEN COMMUNICATIONS AND
POWER SERVICES, AND BETWEEN HV AND LV SERVICES.
5. ALL COMMUNICATION TRENCHING CONDUIT WILL BE INSTALLED WITH
DRAWSTRING. PER DCCS.PARA.62-C.
6. ALL COMMUNICATION PIT AND PIPES ARE TO BE INSTALLED PER DCCS
STANDARDS. BELL MOUTHS MUST BE INSTALLED ON ALL CONDUIT
ENDS WITHIN COMMUNICATION PITS.ALL COMMUNICATION PITS
REQUIRE SCEC APPROVED LIDS.
7. ALL BUILDING PENETRATIONS FROM INCOMING PITS ARE AS PER
DCCS.PARA.53-I, A MINIMUM OF 100MM INSIDE-DIAMETER GALVANISED
IRON PLATED CONDUIT FOR ALL BUILDING PENETRATIONS.
PENETRATIONS ARE REQUIRED TO BE WATERPROOF, VERMIN PROOF,
TERMITE PROOFE TO AS 3660.
8. AIRCRAFT MAINTENANCE STORAGE FACILITY US COMMUNICATIONS
WILL CONNECT VIA THE SQUADRON OPERATIONS FACILITY TEF US
COMMS RACK.
9. REFER TO DRAWING E-132 FOR EXTERNAL LIGHTING LAYOUTS,
INCLDUING EXTERNAL LIGHTING CONDUIT RETICULATION.
10. ELECTRICAL AND COMMUNICATION PITS SHALL BE OFFSET 3 METRES
CLEAR FROM STRUCTURE FOOTINGS.
11. WHERE LV AND COMMUNICATION CONDUITS CROSS, THE LV CONDUITS
SHALL CROSS UNDERNEATH BY 300mm.
SC
OP
E M
OD
IF
IC
AT
IO
NS
1.
.2
C S
DATE 08/03/2023
Evan Mizue
HEF9
LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV
AGLAGLAGLAGLAGLAGLAGLAGL
AGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLL
AGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGLGL
AGLAGLAGLAGLAGLAGLAGLAGL
AG
L
AG
L
AG
L
AG
L
AGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGL
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AGLAGLAGLAGLAGLAGLAGLAGLAGLAGLAGL
AG
L
AG
L
AG
L
AG
L
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
D D D D D D D
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
CCCCCCCCC
DDDDD
D D D D D D D
E
E(HV) E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(H V)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(H V)
E(H V)
E(H V)
E(H V)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(HV)
E(HV)
E(H V)
E(H V)
E(HV)
E(HV)
E(HV)
E(H V)
E(H V)
E(HV)
E(HV)
E( H
V) E(
H V)
E( H
V) E(
H V)
E( H
V) E(
H V)
E( H
V) E(
H V)
E( H
V) E(
H V)
E( H
V) E(
H V)
E( H
V) E(
H V)
E( H
V)
E(H V)
E(H V)
E(HV)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(H V)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(
HV
E(
HV
E(
HV
E(H V)
E(H V)
FI
FI
FI
FI
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
LV
E(
LV
E(
LV
E(
LV
E(
LV
E(
LV
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E
E E
E E
E
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
(H V) V
C
H V
E(H
FU
E
E
E
E
E E
E E
E E
E E
E E
E
E
E
C
C C
C C
C C
C C
C
C
C
C
E
C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C
CE
E
E
E
C C
C C
C C
C
CE
E C
C C
4x100mm HDPVCCONDUITS FOR LV
CABLING. PROVIDE
NYLON ROPE IN SPARE
CONDUIT. PROVIDE
TERMITE RESISTANTSHEATHING.
CONNECTION INTOSS35
2x100mm HDPVCCONDUITS FORFUTURE COMMSCABLING. PROVIDE
NYLON ROPE INCONDUITS. PROVIDE
TERMITE RESISTANT
SHEATHING.
COORDINATEINSTALLATION OFCONDUITS WITHTHE KC30 PROJECT.
PROVIDE PIT FORFUTURECOMMUNICATIONS
CONDUITS TOCONNECT INTO.
E-102
TN
PLAN
NORTH
A1ELECTRICAL & COMMUNICATION SITE PLAN
SCALE: 1:500m
50m
1:500
FINAL DESIGN SUBMITTAL
E16929No.RE G I
S T
ER
ED PR O F E S S I ON A L E NGI N EER
S TA T E O F C A L I F O R N I A
E R I C M . P E N N
E L E C T R I C A L
SHEET GENERAL NOTES:
1. CONDUITS PASSING ROADWAYS ARE REQUIRED TO BE UNDER-BORED.
THE CONTRACTOR SHALL ENSURE THE ROAD IS TRAVERSABLE
DURING CONSTRUCTION.
2. ALL ELECTRICAL PITS AND PIT COVERS SHALL BE CLASS D .
3. CONTRACTOR SHALL PROVIDE AND INSTALL CONDUIT SEALS ON BOTH
ENDS OF CONDUITS ENTERING THE BUILDING.
4. PROVIDE 300mm SEPARATION BETWEEN COMMUNICATIONS AND
POWER SERVICES, AND BETWEEN HV AND LV SERVICES.
5. ALL COMMUNICATION TRENCHING CONDUIT WILL BE INSTALLED WITH
DRAW WIRE. PER DCCS.PARA.62-C.
6. ALL COMMUNICATION PIT AND PIPS ARE TO BE INSTALLED PER DCCS
STANDARDS. ALL COMMUNICATION PITS REQUIRE SCEC APPROVED
LIDS.
7. ALL BUILDING PENETRATIONS FROM INCOMING PITS ARE AS PER
DCCS.PARA.53-I, A MINIMUM OF 100MM INSIDE-DIAMETER GALVANISED
IRON PLATED CONDUIT FOR ALL BUILDING.
PENETRATIONS.PENETRATIONS ARE REQUIRED TO BE WATERPROOF,
VERMIN PROOF, TERMITE PROOF TO AS 3660.
8. AIRCRAFT MAINTENANCE STORAGE FACILITY US COMMUNICATIONS
WILL CONNECT VIA THE SQUADRON OPERATIONS FACILITY TEF US
COMMS RACK.
SC
OP
E M
OD
IF
IC
AT
IO
NS
1.
.2
C S
DATE 08/03/2023
Evan Mizue
| 23R1316_AMD5 |
| SPECIFICATIONS |
| SECTION 01 14 00 – WORK RESTRICTIONS |
DRAWINGS
| P700_Amendment_5 |
| P700 01 14 00_PAC_REV |
| P700 E-101&102_Signed_Flattened |