1665827-P-700 Drawings - 1 of 2.pdf
PDF 31 MB Posted
- Attached to
- FY22 MCAF PAF180700 SQUADRON OPERATIONS FACILITY, ROYAL AUSTRALIAN AIR FORCE BASE TINDAL, AUSTRALIA
- Solicitation number
- N6274223R1316
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23R1316 Note 6.pdf | ||
| 23R1316_AMD6.pdf | ||
| 23R1316_AMD5.pdf | ||
| 23R1316 Note 5.pdf | ||
| 23R1316_AMD4.pdf | ||
| 23R1316 Note 4.pdf | ||
| 23R1316 AMD3.pdf | ||
| 23R1316_AMD2.pdf | ||
| 23R1316 Note 3.pdf | ||
| P700 SV Sign-in.pdf | ||
| 23R1316_AMD1.pdf | ||
| 23R1316 Note 2.pdf | ||
| 23R1316 Note 1.pdf | ||
| 1665827-P700 Specification_Signed_REV_MAY2023.pdf | ||
| 1665827-P-700 Drawings - 2 of 2.pdf | ||
| 23R1316-RFP.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C044138No.
G-001
PROJECT SITE
SQUADRON OPERATIONS FACILITY
RAAF BASE
TINDAL
PROJECT
VICINITY
30/03/23
03/03/23
333333333333333333333000000000000000000000/////////////////////000000000000000000000333333333333333333333/////////////////////222222222222222222222333333333333333333333
DATE: 03/17/2023
Evan Mizue
G-002
G-101
G-102
G-103
C-001
CIVIL GENERAL NOTES
SURVEY CONTROL
AI
TA
PE
ROAD
TARAKAN
R O
AD
FU
EL L
IN
E
FU
EL P
IP
E
GIV
E W
AY
Brok en
Li d
Bott om
M H 12
9.3
E(HV)
E(HV)
E(H V)
E(H V)
E(H V)
E(H V)
S
S
S
S
S
Red un da nt?
Red un da nt?
S
S
S
S
IL
.8
S S
S S
Ø
E(LV) E(LV) E(LV) E(LV) E(LV) E(LV)
T
T
T
T
CS01
CS02
CS03
CS04
ROAD
TARAKAN
407 408
REFER TO NOTE 15
EXTENT OF CLEARING AND GRUBBING FOR
EARTHWORKS AND CONSTRUCTION MOVEMENT
EXISTING TREES, VEGETATION AND TOPSOIL IN
THIS AREA TO BE GRUBBED, CLEARED AND
DISPOSED OFF SITE OR MANAGED
APPROPRIATELY FOR REUSE IF SUITABLE
REFER TO NOTE 15
REFER TO NOTE 15
DEMOLISH FUEL TANKS AND
ASSOCIATED SERVICES. CONFIRM
WITH DEFENCE PRIOR TO WORKS. 44
1. THE EXISTING CONDITIONS DETAILED IN THIS DEMOLITION PLAN ARE
BUILT FROM THE DEFENCE GFIS DATA, SITE SURVEY AS OF
CONDITIONS AT SEPTEMBER 2020 AND KC30 DESIGN DRAWING
SET.THE DEMOLITION PLANS REPRESENTS THE MOST LIKELY SET OF
CONDITIONS ON SITE AT THE TIME OF CONSTRUCTION, ASSUMING
KC30 WORKS HAVE BEEN COMPLETED.
2. REQUEST KC30 AS CONSTRUCTED DRAWINGS TO AID IN SITE
CONDITIONS CONFIRMATION.
3. PRIOR TO COMMENCEMENT OF ANY GROUND WORKS VERIFY
EXISTING CONDITIONS IN THE FIELD PRIOR TO DEMOLITION.
4. EXISTING UTILITIES AND STRUCTURES TO REMAIN. UNLESS NOTED
OTHERWISE
5. PRIOR TO DEMOLITION VERIFY IF THESE SERVICES SERVE ANY
FACILITIES OTHER THAN THOSE WHICH HAVE BEEN DEMOLISHED OR
MADE REDUNDANT.
6. EXISTING BUILDINGS AND IMMEDIATE SURROUNDING CONCRETE
FOOTPATHS/ BUILDING APRONS TO BE DEMOLISHED AS INDICATED.
AREA TO BE TIDIED AND THE GROUND REINSTATED WITH GRASS
SEEDING UNLESS SHOWN OTHERWISE ON THE DRAWINGS. GRASS
SPECIES TO BE CONFIRMED WITH BASE ENVIRONMENTAL OFFICER.
7. REFER TO DEMOLITION SPECIFICATION FOR FURTHER DETAILS.
8. ALL SERVICES RECORDS TO BE UPDATED TO REFLECT DEMOLISHED
AND ABANDONED INFRASTRUCTURE AND SERVICES.
9. SUBCONTRACTOR TO LOCATE BY ELECTRONIC MEANS IN BOTH LINE
AND LEVEL ALL EXISTING UNDERGROUND SERVICES BEFORE
COMMENCEMENT OF ANY DEMOLITION AND ALL OTHER WORKS. ANY
CONFLICTS WITH PROPOSED WORKS, DISCREPANCY, OR ADDITIONAL
SERVICE, AND AWAIT THE CONTRACTOR'S DIRECTION.
10. ALL DEMOLITION SWALES AND OPEN DRAINS TO BE STRIPPED OF
TOPSOIL AND INFILLED WITH SELECT FILL COMPACTED IN 300mm
THICK LAYERS IN ACCORDANCE WITH SPECIFICATION. ALL AREA OF
SWALES TO BE INFILLED UNDER LEVEL 1 GEOTECHNICAL
SUPERVISION.
11. ALL DISTURBED AREAS SHALL BE FINISHED WITH TOPSOIL AND
DURABLE DRY-LAND GRASS IN ACCORDANCE WITH LANDSCAPE
ARCHITECTS SPECIFICATION.
12. ALL PERMANENTLY DEMOLISHED PAVEMENTS TO BE REMOVED DOWN
TO SUBGRADE LEVEL. BUILD BACK UP TO FINISHED SURFACE WITH
SELECT FILL COMPACTED IN 200mm THICK LAYERS, AND LEAVE ALLOWANCE FOR 100mm TOPSOIL LAYER.
13. ALL BUILDING DEMOLITION WORKS SHALL INCLUDE SEQUENCING,
DISCONNECTION AND DEMOLITION OF ALL ASSOCIATED BUILDING
SERVICES.
14. PRIOR TO REMOVAL OF TREES AND VEGETATION, CONTRACTORS
SHALL SEEK ALL RELEVANT APPROVALS FROM THE CONTRACTING
OFFICER AS PER THE SPECIFICATION.
15. ALL DEMOLISHED MATERIALS TO BE DISPOSED OF OFF SITE AT AN
APPROVED WASTER COLLECTION AND PROCESSING FACILITY
(UNLESS OTHERWISE DIRECTED IN WRITING BY THE CONTRACTING
OFFICER).
16. THE SUBCONTRACTOR TO REFER TO THE RELEVANT ENGINEERING
DRAWINGS FOR TREATMENT, DIVERSION AND DEMOLITION OF
EXISTING SERVICES IMPACTED BY THE WORKS, INCLUDING BUT NOT
LIMITED TO ELECTRICAL, COMMUNICATIONS, HYDRAULIC, CIVIL AND
STRUCTURAL SERVICES.
17. WHERE PORTIONS OF ROAD PAVEMENT ARE TO BE DEMOLISHED, TIE
IN REMAINING PAVEMENT TO SURROUNDING EXISTING GROUND AT
1:6 AND ENSURE DRAINAGE IS ALLOWED FOR.
18. ONLY TREES WITH A TRUNK DIAMETER GREATER THAN 150mm AT 1m
HEIGHT HAVE BEEN LOCATED.
19. BELOW GROUND SERVICES WITHIN THE 'EXTENT OF CLEARING AND
GRUBBING' FOOTPRINT THAT ARE NOTED FOR DEMOLITION OR
CONSTRUCTION ARE TO BE REMOVED, DEMOLISHED, AND PITS
REFILLED WITH SELECT FILL.
20. BELOW GROUND SERVICES OUTSIDE THE 'EXTENT OF CLEARING AND
GRUBBING' FOOTPRINT THAT ARE NOTED FOR DEMOLITION OR
REDUNDANCY CAN BE MADE REDUNDANT.
21. DEMOLISH AND MAKE GOOD OVERHEAD LINE WITHIN THE 'EXTENT OF
CLEARING AND GRUBBING' FOOTPRINT TO THE NEAREST POLE
OUTSIDE OF THE FOOTPRINT.
22. TERMINATE THE WATER MAIN AT THE CONNECTION POINT BY
LOCATING AND EXPOSING THE WATER MAIN CONNECTION POINT.
REMOVE THE TAPPING BAND FROM THE WATER MAIN, PLUG THE
REDUNDANT CONNECTION PENETRATION IN THE MAIN AND INSTALL A
STAINLESS STEEL REPAIR CLAMP OVER THE OLD CONNECTION POINT.
CAP THE OLD REDUNDANT PIPEWORK AND ABANDON THE OLD
WATER MAIN IN SITU. THE OLD REDUNDANT/INTERNAL PIPE SHOULD
NOT BE REUSED FOR INTERNAL PLUMBING. FOR AC PIPES, REMOVE
FULL LENGTHS (COLLAR TO COLLAR).
23. TERMINATE THE SEWER AT THE CONNECTION POINT. THE SEWER
CONNECTION IS TO BE REMOVED AND A BRIDGING PIPE INSTALLED
WITH FLEXIBLE COUPLINGS. THE REDUNDANT PIPEWORK WITHIN THE
LOT CAN BE CAPPED AND ABANDONED. THE OLD
REDUNDANT/INTERNAL PIPE SHOULD NOT BE REUSED FOR INTERNAL
DRAINAGE.
24. STACKING OF BUILDING MATERIALS OUTSIDE THE WORKS ZONES
SHOULD BE AVOIDED. IN THE EVENT THIS OCCURS, PRIOR APPROVAL
SHOULD BE SOUGHT FROM THE CONTRACTING OFFICER AND THE
SITE MADE GOOD AS PER CONTRACTING OFFICER INSTRUCTION.
25. CONTACTOR TO LIAISE WITH RELEVANT AUTHORITIES FOR
DEMOLITION WORKS INCLUDING CIOG AND TELSTRA FOR ANY
COMMUNICATIONS DEMOLITION.
26. CONTRACTOR TO UPDATE THE GEMS DATA FOR DEMOLISHED ITEMS,
BUILDINGS AND SERVICES C-101
C044138No.
XXX
E(HV) E(HV)
C C
E(LV) E(LV)
W W
S S
EXTENT OF CLEARING AND GRUBBING FOR
EARTHWORKS AND CONSTRUCTION MOVEMENT
BORE HOLE LOCATIONS
YY NEW FACILITY BUILDING CORNERS. REFER TO
DRAWING C122 FOR ALL SETOUT POINTS
R6.5
R12.50
R6.50
R12.50 R12.50
R12.50
C-102
SQUADRON OPERATIONS BUILDING
REALIGNMENT OF WESTERN ACCESS
ROAD TO BE DESIGNED UNDER A
SEPARATE WORKS PACKAGE.
15m CLEAR ZONE
FROM BUILDING.
10m UNOBSTRUCTED
ZONE FROM BUILDING.
STORMWATER
SWALE
STORMWATER
SWALE
C044138No.
DROP OFF ZONE
PRECAST REINFORCED CONCRETE
HEADWALL
ROCK LINED ON GEOTEXTILE FABRIC
OUTLET AND INLET PROTECTION
REFER TO DRAWING C503 FOR FENCING
DETAILS AND CONNECTION POINT. FINAL
ALIGNMENT TO BE CONFIRMED ON SITE AND
APPROVED BY CONTRACT ADMINISTRATOR
FFL 131.0m
WASTE ZONE
REFER TO DRAWING C503 FOR FENCING
DETAILS AND CONNECTION POINT. FINAL
ALIGNMENT TO BE CONFIRMED ON SITE AND
APPROVED BY CONTRACT ADMINISTRATOR
WESTERN ACCESS ROAD
R1-1A
R2-4A
R2-4A
R5-40LR2-2LA
W5-49A
R6.5
R12.
R6.50
R12.
R12.50 R12.50
C-111
STORMWATER
SWALE
STORMWATER
SWALE
C044138No.
BK
BK
BK
BK
BK BK
BK
DRIVE ON LEFT IN AUSTRALIA
SIGN PER VIC ROADS
SUPPLEMENT TO AS1743
DRAWING G9-V170
PSBL
PSBL
PSBL
PSBL
FK
FK
PSBL
CLSL
FK
FK
FKFK
FK
FK
FKFK
CONTINUES TO
P400 PROJECT
SQUADRON OPERATIONS BUILDING
FFL 131.0m
SVCV
SV
CV
C1
C1
C1 C
C C
C C
C C
C C
C
C C
C C
C C
C C
C C
C C
C
C
C
C1
C1
C
C
C1 C
C
T
T
T
W
W
W
W W
W W
W
S
S
HM
HM
HM
C C
C C
C C C C C C
C
C
C
C
C
C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
CC E
C
C C
C C
E
E
C
C
E E
E
E2 EE
E
E
E
EE
E E
E E
E E
E
E2
E2
E2
C-121
C044138No.
AIRCRAFT MAINTENANCE
STORAGE FACILITY
SQUADRON OPERATIONS BUILDING
4.5 x 4.5m COMMUNICATIONS PAD. 3.2m EXCLUSION ZONE
COMMUNICATION CONNECTION POINT
PROVIDED BY THE KC30 PROJECT
REFER TO THE ELECTRICAL
DRAWINGS FOR DETAILS.
DOMESTIC WATER SUPPLY CONNECTION POINT
PROVIDED BY THE KC30 PROJECT AT IL 129.81. WATER
METER IS IN ACCORDANCE WITH PWC STD DRG
W1-1-01A.
CH 0.00
NEW TYPE 2 SEWER
CONNECTION IN ACCORDANCE
WITH PWC STD DRG W2-1-02
CH 0.00
IL 127.10
TEE
CH 34.10
DOMESTIC WATER SUPPLY
BRANCH TO P400
LINE 2
REFER TO DRAWING E101 FOR
ELECTRICAL CONDUIT AND
CABLING DETAILS.
REFER TO DRAWING E101 FOR
COMMUNICATIONS CONDUIT
AND CABLING DETAILS.
DOMESTIC WATER SUPPLY
BRANCH TO P400 & P700
LINE 1
90° BEND
CH 4.50
BUILDING
CONNECTION
CH 0.00
IL 129.84
INSPECTION OPENING (IO)
CH 0.42
IL 129.15
45° BEND WITH INSPECTION
OPENING TO SURFACE (IOS)
IN ACCORDANCE WITH AS3500
CH 16.15
BUILDING CONNECTION
CH 20.06
IL 129.47
DN100 PVC SN8
DOMESTIC WATER SUPPLY
BRANCH TO P700
LINE 2
C C C C C
E E
S S
W W
E
C
SEWER UNDER
PROPOSED PAVEMENT.
REFER TO NOTE 3.
FFL 131.0m
EXISTING SEWER UNDER
PROPOSED PAVEMENT.
REFER TO NOTE 3.
EXISTING SEWER. REFER
NOTE 2.
C1
C1
C1 C
C C
C C
C C
C C
C
C C
C C
C C
C C
C C
C C
C
C
C
C1
C1
C
C
C1 C
C
T
T
T
W
W
W
W
W
W W
W
S
S
HM
HM
HM
C C
C C
C C C C C C
C
C
C
C
C
C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
CC E
C
C C
C C
E
E
C
C
E E
E
E2 EE
E
E
E
EE
E E
E E
E E
E
E2
E2
E2
130.0
130.6 130.6
130.7 130.7
130.8
130.8
130.9 130.9
130.1
130.2
130.6
130.7
130.5
130.5
0.5
130.5
130.5 130.5
1.0
1.0
130.5
41 42
C-122
C044138No.
ROCK LINED GEOTEXTILE
FABRIC OUTLET AND
INLET PROTECTION
PRECAST REINFORCED
CONCRETE HEADWALL
RUNOFF FROM
PAVEMENT TO DISPERSE
VIA OVERLAND FLOW
LIMIT OF GRADING. TIE
INTO EXISTING LEVELS.
130.5
2x450x600 RCBC. GRADE AS PER EXISTING
TABLE DRAIN PROVIDED BY THE KC30 PROJECT.
IL 129.82
TIE INTO EXISTING
ROAD BATTER
TIE INTO EXISTING
ROAD BATTER
TIE INTO EXISTING
ROAD BATTER
IL 129.81
REFER TO DRAWING C505 FOR
HEADWALL AND PROTECTION DETAIL
REFER TO DRAWING C505 FOR
HEADWALL AND PROTECTION DETAIL
LIMIT OF GRADING. TIE
INTO EXISTING LEVELS
LIMIT OF CLEARING.
ALLOW FOR 5m ACCESS
TRACK. STABILISE
ACCESS TRACK WITH
GRASS COVER PRIOR TO
COMPLETION.
REFER TO DRAWING C505 FOR
HEADWALL AND PROTECTION DETAIL
IL 129.86
IL 129.87
TIE INTO EXISTING
ROAD BATTER
2x450x600 RCBC. GRADE AS
PER EXISTING TABLE DRAIN
PROVIDED BY THE KC30
PROJECT.
SQUADRON OPERATIONS BUILDING
FFL 131.0m
WESTERN ACCESS ROAD
TABLE DRAIN
FINISHED SURFACEFINISHED SURFACE
CHAINAGE
EXISTING SURFACE
DEPTH TO INVERT
FINISHED SURFACE
DEPTH TO INVERT
FINISHED SURFACE
PIPE INVERT LEVEL
C-124
C044138No.
C-131
0.0
0.2
-0
.16
0.4
1.6
0.5
0.1
0.4
3.1
0.5
0.1
0.4
.19
0.7
0.2
0.4
.34
0.9
0.4
0.4
.00
1.0
0.4
0.5
.00
1.0
0.6
0.3
.76
1.0
0.6
0.3
.38
0.9
0.5
0.3
.00
0.6
0.3
0.2
.31
0.4
0.1
0.2
.99
0.1
-0
.16
0.3
CHAINAGE
DESIGN SURFACE LEVEL
LEVEL DIFFERENCE
CUT - / FILL +
EXISTING SURFACE LEVEL
DATUM RL. 128.00
0.0
0.3
0.1
0.2
4.1
0.9
0.6
0.2
6.9
0.9
0.5
0.3
.00
1.0
0.4
0.5
.02
1.0
0.4
0.5
.59
0.9
0.3
0.5
.22
0.5
-0
.10
0.6
.00
0.4
-0
.16
0.6
.09
0.4
-0
.20
0.6
.19
9.8
-0
.72
0.5
.19
9.8
-0
.70
0.5
.73
0.6
0.2
0.4
.00
0.9
0.5
0.3
.73
1.3
0.9
0.3
CHAINAGE
DESIGN SURFACE LEVEL
LEVEL DIFFERENCE
CUT - / FILL +
EXISTING SURFACE LEVEL
DATUM RL. 128.00
C-301
C044138No.
MATCH INTO
EXISTING
1:6 1.5%
1:6
REFER TO STRUCTURAL DRAWINGS
FOR BUILDING DETAILS
FFL = 131.0m 2.5%
MATCH INTO
EXISTING
1:6 1.5%
DESIGN SURFACE
EXISTING SURFACE
2.5%
REFER TO STRUCTURAL DRAWINGS
FOR BUILDING DETAILS
FFL = 131.0m
MATCH INTO
EXISTING
MATCH INTO
EXISTING2.5%
0.5%
0.5%
0.5%
0.5% 1.5%
1.5% 1:6
DESIGN SURFACE
EXISTING SURFACE
AIRSIDE FENCE
RAISED KERB ONLY
100mm TOPSOIL
AND GRASS
CLEARED AREAS.
RAISED KERB ONLY
100mm TOPSOIL
AND GRASS
CLEARED AREAS.
100mm TOPSOIL AND
GRASS CLEARED AREAS.
C-311
C044138No.
N.S.L
MATCH TO
EXISTING
SPRAYABLE EROSION
CONTROL BLANKET
R15mm R15mm
SETOUT POINT
100mm TOPSOIL
GENERALL FILL
ED
GE
O F
EX
IS
TI
NG
PA
VE
ME
NT
SA
W
CU
T
CUTBACK INITIAL SEAL
30mm AC10 TYPE 2 (C320)
WEARING COURSE
220mm TYPE 2 BASE
BASE COARSE COMPACTED TO
100% MMDD, MIN 80 CBR
300mm TYPE 3 SUBBASE
COMPACTED TO 95% MMDD, MIN
30 CBR
SUBGRADE CBR 3. REFER TO
SITE PREPARATION NOTES
NEW PAVEMENT
NEW PAVEMENT
NEW PAVEMENT
EXISTING SUBGRADE
NEW PAVEMENT
EXISTING PAVEMENT
GENERAL FILL VARIES
SUBGRADE REFER TO
DRG. 12711134-G001
SITE PREPARATION NOTES
SELECT FILL AS PER SITE
PREPARATION NOTES.
C-501
SETOUT POINT
SE
T
OU
T
LIN
E
FSL
CONCRETE SLAB
WHEELSTOP COMPLIANT
TO AS2890.1
FIX M12x300mm BITUMEN
SPIKES
NOTE:
CONTRACTOR TO VERIFY ALL INVERT LEVELS, SURFACE LEVELS,
CLEARANCES AND COVERS ARE CORRECT AND TO BE OBTAINABLE BEFORE
COMMENCEMENT OF ANY WORKS. ALL UNDERGROUND SERVICES SHOWN ON
THESE PLANS ARE INDICATIVE ONLY AND HAVE BEEN PLOTTED FROM THE
RELEVANT AUTHORITIES RECORDS. SERVICES NOT SHOWN ON THESE PLANS
MAY EXIST. IT IS THE CONTRACTORS RESPONSIBILITY TO LOCATE ON SITE
THE LOCATION OF ALL UNDERGROUND SERVICES PRIOR TO CONSTRUCTION.
THE CONTRACTOR IS LIABLE FOR ANY DAMAGE TO ANY UNDERGROUND
SERVICE.
SIGNAGE AND LINEMARKING NOTES
1. ALL LINEMARKING AND SIGNAGE SHALL BE IN ACCORDANCE WITH AS1742, 1743
AND 2890 AND THE NORTHERN TERRITORY DEPARTMENT OF INFRASTRUCTURE
AND PLANNING STANDARDS
2. ALL LINES ARE WHITE EXCEPT FOR NO STANDING AREAS WHICH ARE MARKED
WITH A SINGLE YELLOW LINE
3. LINE DESCRIPTIONS CONFORM WITH AS1742. DESCRIPTIONS IN BRACKETS
CONFORM WITH TERMINOLOGY USED IN NORTHERN TERRITORY DEPARTMENT
OF INFRASTRUCTURE AND PLANNING STANDARDS
4. THE CONTRACTOR IS TO DEVELOP A SITE SPECIFIC EROSION AND SEDIMENT
CONTROL PLAN IN ACCORDANCE WITH CURRENT COUNCIL AND STATE
GOVERNMENT POLICIES
LANE LINE (SPECIAL
PURPOSE) (ELL)
CONTINUITY LINE (CL)
GIVE WAY LINE
(GWL)
LINEMARKING LEGEND
STOP LINE (SL)
SEPARATION LINE (SL)
EDGE LINE (EL)
CHEVRON MARKING OUT
LINE (LO)
PEDESTRIAN CROSSING
REFER FIGURE 1 AS 1742.10 AND
SECTION 6.5
NOT TO SCALE
KE
RB
LI
NE
/ E
DG
E
OF
P
AV
EM
EN
T
NOTE:
ERECT AND FIX SIGN IN ACCORDANCE WITH SIGN
MANUFACTURERS REQUIREMENTS AND TO AS1742 SETOUT
FOOTING
C-502
C044138No.
NOTE:
1. INCREASE FOOTING DIMENSION TO 450 Ø x 1200 DEEP WITHIN
0-5000 OF FENCE END
NOTE:
1.GATE TO BE IN ACCORDANCE WITH AS1725.
S
E(LV) E(LV) E(LV) E(LV) E(LV) E(LV)
S
E(LV) E(LV) E(LV) E(LV) E(LV) E(LV)
FI
.300 dia
C-503
C044138No.
INDICATIVE LOCATION OF CONNECTION POINT
TO EXISTING AIRSIDE FENCE. CONFIRM
ALIGNMENT ON SITE.
TEMPORARY AIRSIDE
FENCE TO BE REMOVED
FOLLOWING NEW FENCE
CONSTRUCTION.
INDICATIVE LOCATION OF CONNECTION POINT
TO EXISTING AIRSIDE FENCE. CONFIRM
ALIGNMENT ON SITE.
KERBINGKERBING
FOOTPATH
CROSSFALL
CJ
C-504
C044138No.
GROUND LEVEL
WRAP UNDERGROUND
PIPEWORK IN DENSO TAPE
TABLE 'E' STEEL FLANGE
TABLE 'E' DICL FLANGE
(SPECIAL ORDER)
SELECTED COMPACTED GRAVEL FILL
10mm CLOSED CELL LAGGING
DN100, ASTM A53 SEAMLESS, SCHEDULE 40,
GALVANISED STEEL PIPE
FABRICATE PILLAR IN ACCORDANCE WITH AS 4041
TO TEST PRESSURE OF A MINIMUM 2100 KPA
Ø65 MILL COCK WITH BRASS
CAP AND CHAIN. THREAD TO
SUIT ATTENDING AUTHORITY
CONCRETE
THRUST BLOCK 20mPa
APPROVED SQUARE CONCRETE MARGIN
BLOCKS. 450X450X450
CONCRETE FINISH 25mm
ABOVE FINISHED LEVEL
C-505
C044138No.
C-507
C-508
A-001
GENERAL NOTES
BUILDING DESCRIPTION
ADMINISTRATIVE, MISSION BRIEFING/DEBRIEFING
636 SQM.
14 WORKSTATIONS (EXCLUDES MISSION PLANNING AND BRIEFING SPACES)
C
CF3 - SUPPORT ASSET PERFORMING A CAPABILITY SUPPORT FUNCTION
NCC BUILDING CLASSIFICATION
FLOOR AREA
NO OF STOREYS
USE
NCC TYPE OF CONSTRUCTION
POPULATION
NCC IMPORTANCE LEVEL
NCC CLIMATE ZONE
CONTRIBUTION FACTOR
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEEERRE RAAAAAAAAAAAAAAAAAAAAAAAA
IIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAMAA
H I T EC
ELEVATION/DATUM
A1 A-000
A-000 A1 A1
A-000
A-000 A1
TN
PLAN
NORTH
W E
S
N
A-000
AFF
101A
L01
ALPHA/NUMERIC
PLAN IDENTIFICATION
ON GRID SYSTEM
TRUE NORTH
INDICATOR
ALPHA/NUMERIC
IDENTIFICATION
SHEET NUMBER
WHERE DRAWN
ALPHA/NUMERIC
IDENTIFICATION
ALPHA/NUMERIC
IDENTIFICATION
ELEVATION
LETTER
PLAN/ DETAIL/SECTION/
ELEVATION TITLE
SECTION INDICATOR:
PARTIAL BUILDING
SECTION INDICATOR:
FULL BUILDING
ELEVATION INDICATOR:
EXTERIOR
ROOM NAME/
NUMBER TAG
DOOR TAG
NORTH ARROW
SYMBOL
TN
PLAN
NORTH
PLAN NORTH
ARROW
ELEVATION INDICATOR:
INTERIOR (MULTIPLE
VIEWS)
W E
S
N
A-000
1 ELEVATION INDICATOR:
INTERIOR (MULTIPLE
VIEWS)
ELEVATION LETTER
SHEET NUMBER
WHERE DRAWN
ALPHA/NUMERIC
IDENTIFICATION
LOUVER TAG
ROOM
NAME
GRAPHIC SCALE
DETAIL INDICATOR
A1 A-000
SHEET NUMBER
WHERE DRAWN
SHEET NUMBER
WHERE DRAWN
SHEET NUMBER
WHERE DRAWN
DWG NO WHERE
REFERENCE
A1PLAN OR DETAIL
A-0001/4" = 1'-0"
A
A1 A-000
A1 A-000
GRID LINES / BUBBLE
REFERENCE SYMBOLS
CONTRACTOR TO PROVIDE SAMPLE MATERIAL FINISHES FOR APPROVAL.
PROVIDE SEC ENDORSED TAMPER RESISTANT FASTENERS FOR ALL WALLS, ROOF AND ALL EXPOSED
ACCESSORIES OF THE FACILITY.
ALL WORKS SHALL BE PERFORMED IN ACCORDANCE WITH STANDARDS OF BEST PRACTICE BY WORKERS
SKILLED IN THEIR RESPECTIVE TRADES.
THE USE OF REPRODUCTIONS OF THESE CONTRACT DRAWINGS BY ANY CONTRACTOR, SUB-CONTRACTOR, ERECTOR, FABRICATOR, OR MATERIAL SUPPLIER IN LIEU OF PREPARATION OF SHOP DRAWINGS SIGNIFIES HIS ACCEPTANCE OF ALL INFORMATION SHOWN HEREON AS CORRECT AND OBLIGATES HIMSELF TO ANY JOB
EXPENSE, REAL OR IMPLIED ARISING DUE TO ANY ERRORS THAT MAY OCCUR HEREON.
THESE DRAWINGS INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPT, DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS AND THE TYPE OF STRUCTURAL, MECHANICAL, ELECTRICAL SYSTEMS. THE CONTRACTOR SHALL FURNISH ALL ITEMS
REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF WORK.
5.
7.
4.
6.
3.
1.
2.
ALL WORKS MUST CONFORM TO THE REQUIREMENTS OF NCC, AS1428 AND APPLICABLE REGULATORY
AGENCIES HAVING JURISDICTION.
ALL FASTENERS AND CONNECTORS SHALL BE SUITABLE FOR THE CLIMATIC CONDITIONS FOR TINDAL.
CONTRACTOR TO PROVIDE FIRE HAZARD PROPERTIES FOR WALL/FLOOR LININGS IN ACCORDANCE WITH C1.10
8.
ENSURE DISCHARGE FROM EXITS COMPLY WITH D1.10
9.
DISABLE ACCESS TO BE PROVIDED FROM A COMPLIANT DISABLED CAR PARK TO THE PRINCIPAL PEDESTRIAN
ENTRANCE AND THROUGHOUT THE RELEVANT AREAS IN THE BUILDING.
10.
OCCUPANCY LOADING - THE NUMBER OF FACILITIES PROVIDED IN THE BUILDING IS BASED ON 14 OFFICE
STAFF.
11.
ALL DOOR HARDWARE TO BE COMPLIANT HARDWARE FOR BCA ACCESS, MFPE, SECURITY AND AS 1428.
12.
FINAL EMERGENCY LIGHTING AND EXIT SIGNS TO COMPLY WITH NCC PART E4, REFER TO ENGINEERING
DESIGN DRAWINGS FOR DESIGN PERFORMANCE DETAILS.
13.
FIRE EXTINGUISHERS TO BE PROVIDED. REFER TO ENGINEERING DRAWINGS.
14.
DATA SHEET FOR FINAL EXTERNAL WALLS SELECTION TO BE PROVIDED AND CONTRACTORS PERFORMANCE
SOLUTION REPORT TO BE ISSUED FOR THE WEATHERPROOFING OF EXTERNAL WALLS.
15.
ACCU AIR CONDITIONING CONDENSER UNIT
ALUM ALUMINUM
BLDG BUILDING
BOTT BOTTOM
CONC CONCRETE
CONT CONTINUE
C CENTER
CLR CLEAR
DBL DOUBLE
DET DETAIL
FFE FINISH FLORR ELEVATION
Ø DIAMETER
DWGS DRAWINGS
E EAST
ELECT ELECTRICAL
EQUIPT EQUIPMENT
FLR FLOOR
FIN FINISH
FTG FOOTING
GALV GALVANIZE
GEN GENERATOR
GSF GROSS SQUARE FEET
HORIZ HORIZONTAL
INT INTERIOR
L ANGLE
MECH MECHANICAL
MTD MOUNTED
N NORTH
PT PAINT
REFER REFERENCE
S SOUTH
S- SLOPE
SAD SUPPLY AIR DIFFUSSER
SCHED SCHEDULE
SF SQUARE FOOT
SSTL STAINLESS STEEL
STL STEEL
STRUCT STRUCTURAL
THK THICK
TYP TYPICAL
VAR VARIES
VERT VERTICAL
W WIDTH, WEST
W/ WITH
ABBREVIATIONS
ALL SECURITY FITTINGS AND DEVICES TO BE SEC APPROVED AND SELECTED FROM THE SEEPL (SECURITY
EQUIPMENT EVALUATED PRODUCT LIST)
17. THE CONTRACTOR MUST VERIFY FINISH SELECTION OF EXTERIOR AND INTERIOR FINISHES WITH THE
CONTRACTING OFFICER, I.E. WALL/CEILING/ROOF/FLOOR TEXTURES AND COLORS.
16.
THESE DRAWINGS ARE TO BE COORDINATED WITH THE SPECIFICATIONS. REFER TO SPECIFICATIONS FOR PRODUCT GENERAL REQUIREMENTS, METHODS OF INSTALLATION, AND QUALITY OF WORKMANSHIP.
18.
1 8
B
F
A
VESTIBULE
GF-002
HALLWAY 1
GF-024
HALLWAY 2
GF-026
OPS DESK
GF-025
MALE
GF-005
FEMALE
GF-006
CLNR
GF-027
PWD
GF-028
BREAK
ROOM
GF-008
VESTIBULE
GF-010
OPS CO 1
GF-004
OPS CO 2
GF-003
GENERAL ADMIN
SUPPORT 1
GF-011
GENERAL ADMIN
SUPPORT OFFICE 2
GF-029
GENERAL ADMIN SUPP
SHARED OFFICE 3
GF-012
LSE
GF-014
SECURED
VESTIBULE
GF-034
HALLWAY 3
GF-033
MISSION
PLANNING 1
GF-017
MISSION
PLANNING 2
GF-018
CREW
MEETING 2
GF-031
CREW
MEETING 1
GF-016
DUTY OFFICER
GF-032CREW
MEETING 4
GF-020
CREW
MEETING 3
GF-019
MASS BRIEFING 2
GF-022
MASS BRIEFING 1
GF-023
MECHANICAL
ROOM
GF-007
ELECTRICAL
GF-015 MSB
MDB
LIGHTING
DB
UPS
RACK 1
AUS
SEC
FCU
ACCU
WATER
HEATER
HYDRO
PNEUMATIC
TANK
TEF /
COMMS
GF-030
MSB
DB-TEF
FDFD
ROOF LINE
DDCHB
HB
ACCU
RACK 2
USAF
RACK 1
USAF
CHAINLINK FENCE,
SEE CIVIL DWGS
CONCRETE PAD,
SEE CIVIL DWGS
CONCRETE
WALKWAY, SEE
CIVIL DWGS
FE1
FE1
FE1
FE1
FE1
FE1
FDIC
BUS DROP-OFF ZONE,
SEE CIVIL DWGS
COMMS PAD,
SEE CIVIL DWGS
CHEVRON MARKING,
SEE CIVIL DWGS
AC PAVEMENT,
SEE CIVIL DWGS
GRASSED AREA,
SEE CIVIL DWGS
GRASSED AREA,
SEE CIVIL DWGS
ACCU
ACCU DOAS
SECURED
VESTIBULE
GF-021
024A
024B
005 027 028 006 008
034033A
017A
017B 031A
033B
016019
020A
031B
020B
022A
022B
003 004A 004B
005 006
L006 L007
008A
008B
011A011B012014
3A
3A
3C 3C
3B3C
3C 3C 3C
3C
3B
5 3
2 3 4 5 6 7
34990
4628 4533 4533 3470 5730 6610 5485
246019301095
C
D
E
34990
4628 4533 4533 3470 5730 6610 5485
A5
A-401
CONCRETE SPLASH BLOCK,
TYPICAL, SEE A1
A-802
C5 A-701
B5 A-701
COUNTER, SEE
65 9001100
CG
CG
1000 4250
22003661128
A5 A-701
1600 175
00CG
CG
CG
2364172742241600
CG
CG
530 530
3050 920
190 4210 228 1075 1572 1885 2390 2364
E
N
A-401 D1
ACCU
RAMP, SEE CIVIL DWGS
3D
5A
CG CG
CG CG
CG
CG
GF-X001
COVERED ENTRY
GF-X009
COVERED ENTRY 2
GF-X013
ENCLOSURE
MECHANICAL
FD FD
FD FS
FD
3740 10050 3184 568 2200 1740 1306 1000 2542 1720 96 1000 507 294 1000 1000 1000 590
2340 3020 3475
1036 1000 600 1000 600 100010341930
43154315
GF-X009
COVERED ENTRY 2
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEEERRE RAAAAAAAAAAAAAAAAAAAAAAAA
IIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAMAA
H I T EC
A1FLOOR PLAN
SCALE: 1:75
LEGEND:
A-101
GRAPHIC SCALE
150 SERIES CMU WALL
GYPSUM WALL BOARD ON METAL STUD
SECURE AREA (ZONE 4)
TN
PLAN
NORTH
200 SERIES CMU WALL WITH
135mm THK INSULATED METAL WALL
PANEL ON EXTERIOR
SHEET LINED FURRING WALL ON
200 OR 150 SERIES CMU WALL
200 SERIES CMU WALL
FE1 WALL MOUNTED HOOK TYPE,
NO CABINET FIRE EXTINGUISHER,
SEE FIRE PROTECTION DWGS
STEEL COLUMN, SEE STRUCTURAL
NOTES:
1. REFER TO SHEET A-501 FOR WALL TYPE DETAILS
2. REFER TO I-101 FOR FURNITURE AND EQUIPMENT
PLAN/SCHEDULE.
3. DIMENSION ON INTERIOR WALLS ARE TO CENTER
OF WALL UNLESS NOTED OTHERWISE.
4. PROVIDE 50mm RECESSED FLOOR AT WET AREAS, SEE STRUCTURAL DRAWINGS.
FHR FIRE HOSE REELS,
SEE FIRE PROTECTION DWGS
# WALL TYPE TAG, SEE TYPES ON A-502
DOOR TAG, SEE DOOR SCHEDULE &
TYPES ON SHEET A-601
WINDOW TAG, SEE WINDOW SCHEDULE
& TYPES ON SHEET A-601
CHANGE IN FINISH FLOOR ELEVATION,
SEE DETAIL B5/A-801
CORNER GUARD, SEE LIST OF
MATERIALS ON SHEET A-601
CG
VESTIBULE
GF-002
HALLWAY 1
GF-024
HALLWAY 2
GF-026
OPS DESK
GF-025
MALE
GF-005 FEMALE
GF-006
CLNR
GF-027
PWD
GF-028
BREAK
ROOM
GF-008
VESTIBULE
GF-010
OPS CO 1
GF-004OPS CO 2
GF-003
GENERAL ADMIN
SUPPORT 1
GF-011
GENERAL ADMIN
SUPPORT OFFICE 2
GF-029
GENERAL ADMIN SUPP
SHARED OFFICE 3
GF-012
LSE
GF-014
SECURED
VESTIBULE
GF-034
HALLWAY 3
GF-033
MISSION
PLANNING 1
GF-017
MISSION
PLANNING 2
GF-018
CREW
MEETING 2
GF-031
CREW
MEETING 1
GF-016
DUTY OFFICER
GF-032
CREW
MEETING 4
GF-020
CREW
MEETING 3
GF-019
MASS BRIEFING 2
GF-022
MASS BRIEFING 1
GF-023
MECHANICAL
ROOM
GF-007
TEF /
COMMS
GF-030
ROOF LINE
ELECTRICAL
GF-015
SECURED
VESTIBULE
GF-021
82 3 4 5 6 7
34990
4628 4533 4533 3470 5730 6610 5486
34990
4628 4533 4533 3470 5730 6610 5486
190190
896 4590
B
A4 A-802
C4 A-802
B5 A-802
ACCESS PANEL,
SEE
D3 A-802
D5 A-801
D5 A-801
D5 A-801
D5 A-801
PRESSED STEEL GUTTER,
TYPICAL, SEE C1
A-802
A
C
D
E
F
D4 A-802
B4 A-802
1662 400 2471
3992 675
653 1147 1361
EQ
EQ 89
448448 550 1000 1000 1000 475
0 1030
825 1800 1800
286 8630
610 967 634
1307 517
6511840
6051017524
45 670
1409136546
415610 6301140
1024 43
825 825
1853 2462 2462
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEEERRE RAAAAAAAAAAAAAAAAAAAAAAAA
IIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAMAA
H I T EC
A1REFLECTED CEILING PLAN
SCALE: 1:75
A-102
GRAPHIC SCALE
TN
PLAN
NORTH
LEGEND:
600mm x 1200mm ACOUSTICAL CEILING TILE
SEE DETAIL C5 & D3/A-802
13mm THK PLASTERBOARD CEILING, FULLY TAPED AND SET, PAINT FINISH, USE WATER-RESISTANT ON WET AREAS;
SEE D4/A-802
LIGHT FIXTURE,
SEE ELECTRICAL
SUPPLY AIR REGISTER,
SEE MECHANICAL
EXHAUST AIR REGISTER,
SEE MECHANICAL
EXIT SIGN LIGHT,
SEE ELECTRICAL
600mm x 600mm ACCESS PANEL, SEE B5/A-802 FOR DETAILS
0.42 BMT MINI ORB LINING, PRE-FINISHED,
OFF-WHITE
NOTE:
1. SEE SHEET A-601 FOR CEILING HEIGHT AND FINISHES
RETURN AIR REGISTER,
SEE MECHANICAL
SECURE AREA (ZONE 4)
A
ROOF LINE
0°
S
LO
PE
0° S
LO
PE
6° SLOPE
RD RD
RD
RD
6° SLOPE
82 3 4 5 6 7 34990
190 4533 4533 286 5446 6610 54853184 284
ENTRANCE CANOPY WITH
PRESSED STEEL GUTTER
ROOF DRAIN (RD)/GUTTER
SEE C1
A-802
ENTRANCE CANOPY
WITH PRESSED
STEEL GUTTER
34990
4628 4533 4533 3470 5730 6610 5486 190190
D2 A-802
C2 A-802
B
C
D
E
F
D1 A-802
D1 A-802
ROOF MOUNTED LADDER
SUPPORT
AIR TERMINAL, TYPICAL,
SEE ELECTRICAL DWGS
10000 100005124 5124 5124
TYPICAL T
O 4
FALL ARREST ANCHOR,
TYPICAL, SEE
C2 A-701
FRP CATWALK
VTR WITH BACK PAN, SEE
PLUMBING DWGS
B4 P-501
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEEERRE RAAAAAAAAAAAAAAAAAAAAAAAA
IIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAMAA
H I T EC
A1ROOF PLAN
SCALE: 1:75
A-103
GRAPHIC SCALE
TN
PLAN
NORTH
GF-002
HALLWAY 1
GF-024
HALLWAY 2
GF-026
OPS DESK
GF-025
MALE
GF-005
FEMALE
GF-006
CLEANERS
GF-027
PWD
GF-028
BREAK
ROOM
GF-008
VESTIBULE
GF-010
OPS CO 1
GF-004
OPS CO 2
GF-003
GENERAL ADMIN
SUPPORT 1
GF-011
GENERAL ADMIN
SUPPORT OFFICE 2
GF-029
GENERAL ADMIN SUPP
SHARED OFFICE 3
GF-012
LSE
GF-014
SECURED
VESTIBULE
GF-034
HALLWAY 3
GF-033
MISSION
PLANNING 1
GF-017
MISSION
PLANNING 2
GF-018
CREW
MEETING 2
GF-031
CREW
MEETING 1
GF-016
DUTY OFFICER
GF-032CREW
MEETING 4
GF-020
CREW
MEETING 3
GF-019
MASS BRIEFING 2
GF-022
MASS BRIEFING 1
GF-023
MECHANICAL
ROOM
GF-007
ELECTRICAL
GF-015
TEF /
COMMS
GF-030
VESTIBULE
GF-021
ROOM
NUMBER
ROOM
DESCRIPTION
SIGN
TYPE MOUNTING LOCATION
SIGNAGE SCHEDULE
MESSAGE TEXT
01A 01A
03 03 04 03
02 02
01A
01A
01A
01A
01A
01A
01A
01A
01A
01A
01A 01A
06 06
OPS CO 1
MALE TOILET
FEMALE TOILET
OPS CO 2
CLEANERS
PWD
BREAK ROOM
GENERAL ADMIN SUPPORT 1
GENERAL ADMIN SUPPORT OFFICE 2
LSE
ELECTRICAL ROOM
MISSION PLANNING 2
GENERAL ADMIN SUPP SHARED OFFICE 3
SECURED VESTIBULE
MISSION PLANNING 1
CREW MEETING 2
TEF / COMMS
CREW MEETING 3
MASS BRIEFING 1
CREW MEETING 1
CREW MEETING 4
MASS BRIEFING 2
GF-003
GF-005
GF-027
GF-004
GF-028
GF-006
GF-008
GF-011
GF-012
GF-014
GF-034
GF-017
GF-031
GF-030
GF-016
GF-018
GF-020
GF-019
GF-022
GF-023
GF-007
GF-015
GF-029
MECHANICAL ROOM
01A OPERATIONS C01
01A OPERATIONS C02
03 MALE TOILET & AMBULANT
01 CLEANERS
04 UNISEX TOILET
03 FEMALE TOILET & AMBULANT
01A BREAK ROOM
01A ADMIN SUPPORT
01A ADMIN SUPPORT OFFICE
01A ADMIN SUPPORT SHARED OFFICE
01A LIFE SUPPORT EQUIPMENT
01A SECURED VESTIBULE
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
CENTER OF DOOR
CENTER OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
01A MISSION PLANNING 1 LATCH SIDE OF DOOR
01A CREW MEETING 2 LATCH SIDE OF DOOR
01A CREW MEETING 1
01A CREW MEETING 4
01A CREW MEETING 3
01A MISSION PLANNING 2
01 TEF / COMMS
01A MASS BRIEFING 2
01A MASS BRIEFING 1
01A MECHANICAL ROOM
01A ELECTRICAL ROOM
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
LATCH SIDE OF DOOR
09 10
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEEERRE RAAAAAAAAAAAAAAAAAAAAAAAA
IIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAMAA
H I T EC
A1SIGNAGE PLAN
SCALE: 1:75
A-104
GRAPHIC SCALE
TN
PLAN
NORTH
NOTES:
1. REFER TO SHEET A-601 FOR INTERIOR SIGNAGE TYPES.
2. SEE TECHNICAL SPECS 10 14 00.20 FOR INTERIOR SINGAGE AND
TECHNICAL SPECS 10 14 10.10 FOR EXTERIOR SIGNAGE SPECIFICATIONS.
3. FINAL NAMING TO BE CONFIRMED BY CONTRACTOR VIA SHOP DRAWINGS.
FFE
INSULATED METAL
ROOF PANEL, C1
INSULATED METAL WALL PANEL
ON FURRING CHANNELS, C2
140mm THK COLOURED
MASONRY BLOCKS WITH
CLEAR SEALER, C3
TOP OF ROOF TRUSS
TOP OF BOND BEAM
FCL50
PRESSED STEEL GUTTER,
TYPICAL
LIGHT FIXTURE, TYPICAL,
SEE ELEC DWGS
F
INSULATED METAL
ROOF PANEL, C1
INSULATED METAL WALL PANEL
ON FURRING CHANNELS, C2
140mm THK COLOURED MASONRY
BLOCKS WITH CLEAR SEALER, C3
A
FFL
ROOF TRUSS
TOP OF
LIGHT FIXTURE, TYPICAL,
SEE ELEC DWGS
F
FFL
INSULATED METAL WALL PANEL
ON FURRING CHANNELS, C2
140mm THK COLOURED MASONRY
BLOCKS WITH CLEAR SEALER, C3
PRESSED STEEL GUTTER,
TYPICAL
ROOF TRUSS
TOP OF
A
FFL
INSULATED METAL
ROOF PANEL, C1
INSULATED METAL WALL PANEL
ON FURRING CHANNELS, C2
140mm THK COLOURED MASONRY
BLOCKS WITH CLEAR SEALER, C3
TOP OF ROOF TRUSS
TOP OF BOND BEAM
FCL50
8 234567
12 3 4 5 6 7
C D EB CDE B
007 006 005 004B 004A 003 002
EXHAUST LOUVER, SEE
MECH DWGS C1
A-802
015 014 012 011B 011A
MECHANICAL PLANT AND
CONCRETE PLINTH, SEE
MECHANICAL DWGS
FLASHING, TYPICAL, SEE B2
A-802
DUCT PENETRATION,
SEE MECH DWGS
DOAS, SEE MECH
DRAWINGS
OUTLINE OF CHAINLINK
FENCE, SEE CIVIL DWGS
DUCT PENETRATION,
SEE MECH DWGS
C1 A-802
010 008A008B
DOWN PIPE, TYPICAL, SEE B1
A-802
EXHAUST LOUVER,
SEE MECHANICAL
DWGS
BOND BEAM
FCL50
TY
PI
CA
L
ROOF MOUNTED LADDER
BRACKET
FRP CATWALK
BUILDING ELEVATION D1
BUILDING ELEVATION C1
BUILDING ELEVATION A1 BUILDING ELEVATION A3
A-201
GRAPHIC SCALE
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEERRE RRRRRAAAAAAAAAAAAAAAAA
IIIIIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAM
H I T EC
C1
C2
COLOR
SYMBOLS MATERIAL DESCRIPTION LOCATION
C3
INSULATED METAL ROOF
PANEL INCLUDING
UNDERSIDE OF ROOF
OVERHANG AND
ACCESSORIES
INSULATED METAL WALL
PANEL AND ACCESSORIES
COLOURED MASONRY
BLOCKS
DOOR & TRIM,
STEEL COLUMN AT
LOWER ROOF
PT-1
RAL 080 70 05 BS 10A05, GOOSEWING
GREY, FACTORY FINISH PAINT
RAL 9002, GREY WHITE, FACTORY
FINISH PAINT
CARBON
DULUX, STEPNEY
EXTERIOR COLOR SCHEDULE
GUTTER,
DOWNPIPE AND
ACCESORIES
PT-2 COLORBOND, SHALE GREY
GF-033
HALLWAY 3
GF-034
VESTIBULE
SECURED
GF-024
HALLWAY 1
GF-026
HALLWAY 2
GF-010
VESTIBULE
GF-021
VESTIBULE
SECURED
INSULATED METAL
ROOF PANEL
ROOF FRAMING,
SEE STRUCTURAL
DRAWINGS
FFL
TOP OF ROOF TRUSS
TOP OF BOND BEAM
FCL50
6°
2 3 4 5 6 7
022A 023 005 027 028 006 008
10°
FFL
TOP OF ROOF TRUSS
GF-016
MEETING 1
CREW
GF-031
MEETING 2
CREW
GF-002
VESTIBULE
GF-024
HALLWAY
GF-025
DESK
OPS
INSULATED METAL
ROOF PANEL
ROOF FRAMING,
SEE STRUCTURAL
DRAWINGS
TOP OF BOND BEAM
6°
OPERABLE PARTITION
TRACK
BA
FCL50
FEDC
A3 A-501
D5 A-801
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEERRE RRRRRAAAAAAAAAAAAAAAAA
IIIIIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAM
H I T EC
BUILDING SECTION C1
BUILDING SECTION A1
A-301
GRAPHIC SCALE
WC
WC
AMB
SHOWER
URINAL
CEILING LN
FFL
CEILING LN
ELEVATION S ELEVATION W ELEVATION N
ELEVATION N
FD
ELEVATION NELEVATION E
A-701 A4
A-701 A3
CEILING LN
J
G AJ
K FL F
W3A - WALL TILE, TYPICAL
F
C B2
SKIRTING PER
SCHEDULE
WINDOW, TYPICAL
L
CLEANERS SINK
8501000
H
850850850850
SPACE FOR
REFRIGERATOR
N
ELEVATION E
M
W3 - WALL TILE
W4A - ACCENT
WALL TILE
W3A - WALL TILE,
TYPICAL
008A 008B
WINDOW ROLLER
SHADE
E
PLASTER BOARD
BULKHEAD
A-701 A2
CLMALE
GF-005 FEMALE
GF-006
CLEANERS
GF-027
PWD
GF-028
FD FD
FD
FD
600 600 2110 140 2150 600 600
100 1015 1015 1015 1001014
140 1220 140 1200 140 2370 140 1210 140
S
N
A-401
B1 EA-401
B1
CEILING LN
FFL
ELEVATION S
J
G
CL
ELEVATION N
F
ELEVATION E GJ
KL
D
F
A
W4 - ACCENT
WALL TILE
D1
I
H
E
W3A - WALL TILE, TYPICAL W3 - WALL
TILE, TYPICAL
S
N
A-401 A1W A-401 A1
WC
AMB
FD
SHOWER
EA-401
S
N
A-401 C1
CEILING LN
FFL
ELEVATION SELEVATION N ELEVATION E
B1
A1
G1
J
G1
K
L
CL
CL
E
O
W3A - WALL TILE
E
N
A-401 C3
CG
CG CG
CG
FD
FD
AP
ACCESS PANEL, COORDINATE EXACT
LOCATION WITH PLUMBING DWGS
A-401 D4
OUTLINE OF CHASE WALL
FOR PLUMBING
FFE
WALL MOUNTED
LAVATORY
150 SERIES WALL
WALL TILE PER SCHEDULE
9mm THK. FIBER CEMENT BOARD, SHEET JOINTED W/ WET AREA
BASECOAT & TAPE ON 64mm X
1.15 BMT STUDS
FLOOR TILE PER SCHEDULE
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEEERRE RAAAAAAAAAAAAAAAAAAAAAAAA
IIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAMAA
H I T EC
A-401
A1FEMALE TOILET (GF-006) INTERIOR ELEVATIONS
SCALE: 1:50M
B1MALE TOILET (GF-005) INTERIOR ELEVATIONS
SCALE: 1:50M
C1PWD TOILET (GF-028) INTERIOR ELEVATIONS
SCALE: 1:50M C3CLEANERS (GF-027) INTERIOR ELEVATIONS
SCALE: 1:75M
D1BREAK ROOM (GF-008) INTERIOR ELEVATIONS
SCALE: 1:50M
D3ENLARGED WALL DETAIL
SCALE: 1:20M D4SECTION
SCALE: 1:20M
TN
PLAN
NORTH
A5ENLARGED PLAN
SCALE: 1:50M
GRAPHIC SCALE
NOTES:
2. REFER TO SHEET A-602 FOR FIXTURE MOUNTING
HEIGHT SCHEDULE.
1. REFER TO SHEET A-601 FOR SCHEDULE OF FINISHES
3. TOILET AREA, 1:100 SLOPE TO DRAIN
4. PROVIDE TILE TRIM ON OUTSIDE AND INSIDE CORNER
WHERE TILE OCCURS, REFER TO DETAIL A3 / A-802.
5. ALL FF&E PWD AMENITIES TO BE INSTALLED TO
AS1428.1
6. REFER TO PLUMBING DRAWINGS
FOR PLUMBING FIXTURES.
F
10°
FFL
T.O. BOND BEAM
FCL
200 SERIES CMU WALL;
5mm MAX IRONED JOINT
WITH PAINT FINISH
CEILING PER SCHEDULE
ROOF FRAMING, SEE
STRUCTURAL
FLOOR FINISH PER
SCHEDULE
SKIRTINGS PER
SCHEDULE
WIRE HANGER SUSPENDED
FROM Z-PURLIN ABOVE
150mm THK. x 1.15mm BMT STUDS @ 450mm O.C. MAX
200um MIN. FULL UNDERSLAB
TERMITE & MOISTURE
VAPOUR BARRIER
CONCRETE WALKWAY,
SEE CIVIL
150 SERIES COLOURED
MASONRY BLOCKS WITH
CLEAR SEALER
INSULATED METAL WALL
PANELS (R-5.73)
SLOPE
TOP HATS CHANNEL,
TYPICAL, SEE
STRUCTURAL DRAWINGS
1015185
GF-016
MEETING 1
CREW
FFL
CONCRETE WALKWAY,
SEE CIVIL DWGS
INSULATED METAL WALL
PANELS (R-5.73)
DOOR PER SCHEDULE
CEILING PER SCHEDULE
ROOF FRAMING, SEE
STRUCTURAL
GF-021
VESTIBULE
SECURED
T.O. BOND BEAM
@ HIGHEST POINT
T.O. ROOF TRUSS
SLOPE
ROOF FRAMING, SEE
STRUCTURAL
FCL
AP
PR
OX
6m m
H
IG
HE
R
FO
R
GR
OU
T
AN
D
BA
SE
P
LA
TE
WIRE HANGER
SUSPENDED FROM
Z-PURLIN ABOVE30mm CLOSED CELL EXTRUDED POLY-
STYRENE (XPS); R-VALUE 1.1
CONCRETE FOUNDATION, TYPICAL,
SEE STRUCTURAL DRAWINGS
TOP HAT CHANNELS,TYPICAL
SEE STRUCTURAL DRAWINGS
200um MIN. FULL UNDERSLAB
TERMITE & MOISTURE
VAPOUR BARRIER
6°
GF-002
VESTIBULE
6mm THK. PRE-FINISHED
MINI ORB LINING, WHITE
ROOF FRAMING, SEE
STRUCTURAL
INSULATED METAL ROOFING
PANEL
SPLASH BLOCK,
SEE
COLORBOND DOWN PIPE
WHERE OCCURS
STEEL COLUMN, SEE
STRUCTURAL DWGS
CONCRETE WALKWAY,
SEE CIVIL DWGS
SOFFIT PANEL
INSULATED METAL ROOFING
PANEL (R-5.73)
ROOF FRAMING, SEE STRUCTURAL
DRAWINGS
NOTE:
REFER TO CLADDING MANUFACTURER FOR
SPECIFIC INSTALLATION DETAIL.
BA
DOOR PER SCHEDULE
10°
GF-X001
ENTRY
COVERED
14kg/m3 ACOUSTIC
INSULATION
16mm Thk. PLYWOOD AND
ANTICON 2.0 INSULATION FIXED
TO 92mm x 1.15 BMT STUDS @450mm O.C. MAX
16mm Thk. PLYWOOD ON
CONT. ANGLE FIXED TO
PURLINS AND MASTIC BED W/
ANTICON 2.0
16mm Thk. PLYWOOD ON
CONT. ANGLE FIXED TO
PURLINS AND MASTIC BED W/
ANTICON 2.0
16mm Thk. PLYWOOD AND
ANTICON 2.0 INSULATION
FIXED TO 92mm x 1.15 BMT STUDS @450mm O.C. MAX
A4WALL SECTION
SCALE: 1:20M
GRAPHIC SCALE
A-501
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEERRE RRRRRAAAAAAAAAAAAAAAAA
IIIIIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAM
H I T EC
A3WALL SECTION
SCALE: 1:20MA1WALL SECTION
SCALE: 1:20M
NOTE:
1. CONTRACTOR MUST ENSURE THE CORRECT TYPE,
LAYERING, INSTALLATION AND INSULATION TYPE
TO AVOID CONDENSATION ISSUES IN THE NT.
WALL TYPE-5 A1 WALL TYPE-3 A4
WALL TYPE-2 (SECURE WORK AREA) C5
NON-SECURE AREA
BOND BEAM, SEE
STRUCTURAL
FLOOR FINISH, PER
SCHEDULE
SKIRTING, PER
SCHEDULE
INTERIOR
EXTERIOR
INSULATED METAL
ROOF PANEL (R-5.73)
ON FURRING CHANNELS
30mm CLOSED CELL
EXTRUDED POLY-
STYRENE (XPS);
R-VALUE 1.1
BOND BEAM, SEE
STRUCTURAL
FLOOR FINISH, PER
SCHEDULE
SKIRTING, PER
SCHEDULE
200 SERIES CMU WALL;
IRONED JOINT WITH
PAINT FINISH
STEEL FRAMING, SEE
STRUCTURAL
150 SERIES CMU WALL;
IRONED JOINT WITH
PAINT FINISH
BOND BEAM, SEE
STRUCTURAL
FLOOR FINISH, PER
SCHEDULE
SKIRTING, PER
SCHEDULE
1-LAYER 13mm THK
PLASTERBOARD BOTH SIDE
ON 92mm x 1.15mm BMT STUDS @ 450mm O.C. MAX, NOGGINS @1200mm O.C.
CEILING PER
SCHEDULE
FLOOR FINISH, PER
SCHEDULE
SKIRTING, PER
SCHEDULE
CEILING PER
SCHEDULE
CEILING PER,
SCHEDULE
150 SERIES COLOURED
MASONRY BLOCKS W/
CLEAR PENETRATING
SEALER
TYPE-5A SIMILAR BUT USE 150mm THK.
METAL STUD
LEVEL
CEILING
140190 50
DEFLECTION HEAD
TRACK
WALL TYPE-6 C2
EXPANSION SHIELD OR
POWER DRIVEN ANCHOR
@ 800 O.C. W/ 19mm MIN.
EMBEDMENT
0.55 BMT FLASHING PER
MANUFACTURER
NOTE:
REFER TO CLADDING
MANUFACTURER FOR
SPECIFIC INSTALLATION
DETAIL
CEILING PER
SCHEDULE
FLOOR FINISH, PER
SCHEDULE
WALL TILE, PER
SCHEDULE
LEVEL
CEILING
9mm THK. FIBER CEMENT
BOARD, SHEET JOINTED W/
WET AREA BASECOAT &
TAPE ON 50mm x 1.15mm
BMT STUDS AT 450MM O.C.
MAX, NOGGINS
@1200mm O.C.
STEEL FRAMING,
SEE STRUCTURAL
FLOOR FINISH, PER
SCHEDULE
WALL TILE, PER
SCHEDULE
LEVEL
CEILING
CEILING PER
SCHEDULE
9mm THK. FIBER CEMENT
BOARD, SHEET JOINTED W/
WET AREA BASECOAT &
TAPE ON 64mm x 1.15mm
BMT STUDS AT 450MM O.C.
MAX, NOGGINS
@1200mm O.C.
150 SERIES CMU WALL;
IRONED JOINT
DEFLECTION HEAD
TRACK
WALL TYPE-3A C4
WALL TYPE-1 A5
COMPRESSIBLE FILLER,
SEE STRUCTURAL
CONTINUOUS DPC AND
WEEP HOLE @ 800 O.C.
ALUMINUM COVED
TRIM, SEE
STEEL FRAMING,
SEE STRUCTURAL
FLOOR FINISH, PER
SCHEDULE
WALL TILE WHERE
OCCURS
LEVEL
CEILING
CEILING PER
SCHEDULE
150 SERIES CMU WALL;
IRONED JOINT WITH
PAINT FINISH ON WALL
WITHOUT TILE
WALL TYPE-3C C3
COMPRESSIBLE FILLER,
SEE STRUCTURAL
ALUMINUM COVED
TRIM, SEE
150 SERIES CMU WALL;
IRONED JOINT WITH
PAINT FINISH
SECURE AREA
STEEL FRAMING,
SEE STRUCTURAL
DRAWINGS
2-LAYER 13mm THK
PLASTERBOARD (SECURE
SIDE); 1-LAYER 13mm THK PLASTERBOARD W/ 9mm
PLYWOOD (NON-SECURE
SIDE) ON 92mm x 1.15mm BMT STUDS @ 450mm O.C.
MAX, NOGGINS @1200mm O.C.
STEEL FRAMING,
SEE STRUCTURAL
WALL TYPE-3B A3
STEEL FRAMING,
SEE STRUCTURAL
FLOOR FINISH, PER
SCHEDULE
WALL TILE, WHERE
OCCURS
LEVEL
CEILING
CEILING PER
SCHEDULE
9mm THK. FIBER CEMENT
BOARD, SHEET JOINTED W/
WET AREA BASECOAT &
TAPE ON 64mm x 1.15mm
BMT STUDS AT 450MM O.C.
MAX, NOGGINS
@1200mm O.C.
CMU WALL; IRONED
JOINT WITH PAINT
FINISH ON SIDE
WITHOUT FURRING
DEFLECTION HEAD
TRACK
SEE PLAN
COMPRESSIBLE FILLER,
SEE STRUCTURAL
ALUMINUM COVE TRIM
WALL TYPE-3D C1
STEEL FRAMING,
SEE STRUCTURAL
FLOOR FINISH, PER
SCHEDULE
LEVEL
CEILING
CEILING PER
SCHEDULE
9mm THK. FIBER CEMENT
BOARD, SHEET JOINTED W/
WET AREA BASECOAT &
TAPE ON 64mm x 1.15mm
BMT STUDS AT 450MM O.C.
MAX, NOGGINS
@1200mm O.C.
CMU WALL; IRONED JOINT
WITH PAINT FINISH ON SIDE
WITHOUT FURRING
DEFLECTION HEAD
TRACK
COMPRESSIBLE FILLER,
SEE STRUCTURAL
SKIRTING, PER
SCHEDULE
70 140
STEEL FRAMING,
SEE STRUCTURAL
DEFLECTION HEAD
TRACK
NOTES:
1. PROVIDE 19mm PLYWOOD BLOCKING FOR ALL TOILET FIXTURES AND
ACCESSORIES ON METAL STUD WALLS.
2. PROVIDE 19mm PLYWOOD BLOCKING FOR ALL WALL-HUNG FURNITURE
AND EQUIPMENT ON METAL STUD WALLS.
3. PROVIDE 3-COATS OF SILANE/SILOXANE HIGHLY PENETRATING NON-FILM
FORMING SEALER FOR BOTH INTERNAL AND EXTERNAL FACES OF
BLOCKWORK SKIN.
4. PROVIDE WATERPROOFING MEMBRANE ON ALL WET AREAS WITH TILES
TO FULL EXTENT OF THE TILED AREA.
5. BUILDING ELEMENTS IN THE JANITOR ROOM AND SANITARY
COMPARTMENTS MUST BE WATER RESISTANT OR WATERPROOF IN
ACCORDANCE WITH NCC TABLE F1.7 AND COMPLY WITH AS 3790.
2100mm MINIMUM HEIGHT OF MEMBRANE TO WALLS.
6. ALL FIBER CEMENT BOARD TO HAVE A FACTORY APPLIED MOISTURE
RESISTANT MICRO WATER BLOCK FACING.
7. CONTRACTOR MUST ENSURE THE CORRECT TYPE, LAYERING,
INSTALLATION AND INSULATION TYPE TO AVOID CONDENSATION ISSUES
IN THE NT.
R2.0 90mm BATT
INSULATION
R2.0 90mm BATT
INSULATION
R2.0 90mm BATT
INSULATION
R2.0 90mm BATT
INSULATION
R2.0 90mm BATT
INSULATION
R2.0 90mm BATT
INSULATION
STUDS TO UNDERSIDE
OF ROOF FRAMING FOR
LATERAL SUPPORT
STEEL FRAMING,
SEE STRUCTURAL
DEFLECTION HEAD
TRACK
STUDS TO UNDERSIDE
OF ROOF FRAMING FOR
LATERAL SUPPORT
14kg/m3 ACOUSTIC
INSULATION
14kg/m3 ACOUSTIC
INSULATION
14kg/m3 ACOUSTIC
INSULATION
14kg/m3 ACOUSTIC
INSULATION
HIGH MPA GROUT/
CONCRETE
REINFORCED HOB
HIGH MPA GROUT/
CONCRETE
REINFORCED HOB
HIGH MPA GROUT/
CONCRETE
REINFORCED HOB
A-502
GRAPHIC SCALE
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEERRE RRRRRAAAAAAAAAAAAAAAAA
IIIIIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAM
H I T EC
F1
F3
LIST OF MATERIALS
CERAMIC FLOOR TILE, CT1 - METZ - TIMELESS DARK GREY - MICROGRIP P5, 300mm x 300mm, USE WITH GRT3 F4
F2 VINYL COMPOSITION TILE, VCT1 - ARMSTRONG - EXCELON IMPERIAL TEXTURE, STERLING - 7A51904, 305mm x 305mm x 3.2mm VINYL COMPOSITION TILE (ANTI-STATIC), VCT2 - ARMSTRONG - EXCELON SDT, FOSSIL GRAY - 300mm x 300mm
CARPET TILE, CPT1 - SHAW CONTRACT - NOBLE MATERIALS FORM TILE 5T136 - TALC PLATINUM 33535, 610mm x 610mm x 7.59mm F5 CONCRETE WITH ANTI-SLIP EPOXY PAINT - CON1 - SAFEMATE ANTISLIP COAT 'N' SPRINKLE - GREY
W1 W2
CONCRETE MASONRY WALL WITH IRONED JOINT, PAINT FINISH
13mm THK PLASTER WALLBOARD ON METAL FRAMING, PAINT FINISH, USE 9mm THK FIBER CEMENT WALLBOARD ON WET AREAS
ACOUSTICAL CEILING TILE ON ALUMINUM GRID SYSTEM, ACT1 - ARMSTRONG ULTIMA+1005 MICROLOOK 90 SUPRAFINE 15MM GRID, C1
C2
W3
B1 VINYL FEATHERED EDGE SKIRTING, RB1 - ARMSTRONG - STANDARD FLINT, 150mm x 1.5mm x 15m COIL
13mm THK PLASTER BOARD CEILING ON METAL FRAMING, PAINTED FINISH, USE 6mm THK FIBER CEMENT BOARD ON WET AREAS
SYMBOL MATERIAL DESCRIPTION
FLOORS
BASE/SKIRTING
WALL
CEILING
REMARKS
P1 P2
WALL FIELD PAINT, DULUX - NATURAL WHITE
BLUE ACCENT PAINT, DULUX - BLUE SATIN
CORNER GUARD - CS ACROVYN - SM-20N, PEARL - 934CG1
P3 150mm HIGH BASE PAINT, DOOR FRAME AND TRIM PAINT, DULUX - STEPNEY
PAINT
CORNER GUARD
SOLID SURFACE COUNTER TOP, CORIAN - DOVE,12mm THK, EASED EDGESS1
SOLID SURFACE
SEE ROOM FINISH SCHEDULE FOR PAINT FIN
SEE ROOM FINISH SCHEDULE FOR PAINT FIN
SEE ROOM FINISH SCHEDULE FOR PAINT FIN
PAINT SHEEN PER APPLICATION
PAINT SHEEN PER APPLICATION
PAINT SHEEN PER APPLICATION
CASEWORK, TOILET PARTITION FINISH - FORMICA LAMINEX - URBAN WOOD, VELOUR FINISHPL1
PLASTIC LAMINATE
PANEL TYPE TOILET PARTITION - KYSSIA - K1 WASHROOM SYSTEM - FLOOR MOUNTED OVERHEAD BRACED SYSTEM IN PL1 FINISH,TP1
TOILET PARTITION
INTEGRAL WINDOW BLINDS - CONTROLLAVIEW DOUBLE GLAZED VENETIAN IN TILT AND LIFT UNIT WITH INTERNAL CONTROL, WB1
WINDOW SHADE
P4 CEILING PAINT, DULUX - LEXICON HALF PAINT SHEEN PER APPLICATION
B2 VINYL FLAT SKIRTING, RB2 - ARMSTRONG - STANDARD FLINT, 150mm x 1.5mm x 30m COIL (FOR USE WITH CARPET TILES)
ASHLAR INSTALLATION
USE MFR APPROVED TOPCOAT/SEALER
OPERABLE PARTITION FABRIC FINISH - HYTEX - STRATUS - CASARINA 39-26
FABRIC
FB1
INTERIOR DOOR FINISH - NATURAL MAPLEWV1
WOOD VENEER
SLAT COLOR - SILVER
W3A W4 W4A
PANEL- WHITE, GRID - GLOBAL WHITE, 600mm x 1200mm x 19mm
ALUMINUM FRAMES AND FITTINGS
ARDEX EG 15 EASY CLEAN HIGH PERFORMACE EPOXY GROUT - TRAVERTINEGRT1
GROUT
ARDEX EG 15 EASY CLEAN HIGH PERFORMACE EPOXY GROUT - MAGELLAN GREYGRT2
ARDEX EG 15 EASY CLEAN HIGH PERFORMACE EPOXY GROUT - CHARRED ASHGRT3
USE MFR APPROVED TOPCOAT/SEALER
NOTES:
1. CONTRACTOR TO USE SPECIFIED LIST OF MATERIALS ABOVE OR APPROVED LOCALLY SOURCED EQUIVALENT PRODUCT.
2. LIST OF MATERIALS INFERS THE MINIMUM PERFORMANCE LEVEL.
3. REFER TO CID PACKAGE FOR ADDITIONAL INFORMATION ON THE LIST OF MATERIALS.
CERAMIC WALL TILE, CT2 - METZ TIMELESS LIGHT GREY - PLAIN P2, 300mm x 300mm, USE WITH GRT2 CERAMIC WALL TILE, CT3 - METZ TIMELESS BEIGE - PLAIN P2, 300mm x 300mm, USE WITH GRT1
GLAZED CERAMIC WALL TILE, CT5 -METZ SIMPLICITY PALE PINK - 111, 244mm x 119mm, VERTICAL ORIENTATION, USE WITH GRT1 GLAZED CERAMIC WALL TILE, CT4 -METZ SIMPLICITY LIGHT GREY - 921, 244mm x 119mm, VERTICAL ORIENTATION, USE WITH GRT2
N
E
S
W
INTERIOR
ELEVATION
KEY
ROOM FINISH SCHEDULE
VESTIBULE F1 B1 W1/P1 W2/P1 W2/P1 W1/P1 C2/P4GF-002 2700
ROOM
NUMBER
ROOM
DESCRIPTION FLOOR BASE
WALLS CEILING
REMARKS
OPS DESK
OPS CO 1
MALE TOILET
FEMALE TOILET
HALLWAY 1 F1 W1/P1W2/P1 W1/P1
OPS CO 2
CLEANERS
PWD
BREAK ROOM
VESTIBULE
GENERAL ADMIN SUPPORT 1
GENERAL ADMIN SUPPORT OFFICE 2
LSE
ELECTRICAL ROOM
HALLWAY 3
MISSION PLANNING 2
GENERAL ADMIN SUPP SHARED OFFICE 3
SECURED VESTIBULE
DUTY OFFICER
MISSION PLANNING 1
CREW MEETING 2
TEF / COMMS
CREW MEETING 3
MASS BRIEFING 1
CREW MEETING 1
CREW MEETING 4
MASS BRIEFING 2
B1 2700C1W1/W2/P1GF-024
GF-025
GF-003
GF-005
GF-027
GF-004
GF-028
GF-006
GF-008
GF-010
GF-011
GF-012
GF-014
GF-034
GF-033
GF-017
GF-031
GF-030
GF-016
GF-032
GF-018
GF-020
GF-019
GF-022
GF-023
GF-007
GF-015
GF-029
MECHANICAL ROOM
W2/P2 - - -F1 B1 2700C1/C2/P4
W2/P1 W2/P1 W2/P1W1/P1F4 B2 2700C1 W1/P1 W2/P1 W2/P1 W2/P1F4 B2 2700C1 W1/W3 W2/W3/W4 W1/W3 W1/W3 C2/P4F3 - 2700
W3 W3W3 W3F3 - 2700C2/P4
W3A W3AW2/W3A W1/W3AF3 - 2700C2/P4
W1/W3 W1/W2/W3 W1/W2/W3A/W4AW1/W3F3 - 2700C2/P4
W2/P1 W1/P1 W1/W2/P1 W1/P1 C1F1 B1 2700 W1/P1 W1/P1 W1/P1 W1/P1 C2/P4F1 B1 2700
W1/W2/P1 W1/P1 W1/P1 W2/P1F1 B1 2700C1
W2/P1 W2/P1 W2/P1 W2/P1F4 B2 2700C1
W2/P1 W1/P1W2/P1 W2/P1F4 B2 2700C1 W2/P1 W2/P1 W1/P1 W1/P1 C1F1 B1 2700
W2/P1 W1/P1 W2/P1 W2/P1F1 B1 2700C2 W1/W2/P1 W2/P1 W1/W2/P1 W1/P1 C1F1 B1 2700
W2/P1 W1/P1W2/P1 -F4 B2 2700C1
W1/P1 W1/P1 - W2/P1F4 B2 2700C1 W1/P1 W1/P1 W1/P1 W1/P1F2 B1 -C2/P4
- W1/P1 W1/P1 W2/P1F4 B2 2700C1
- W2/P1 W2/P1W2/P1F1 B1 2700C1
W2/P1 W1/P1W2/P1 W1/P1F4 B2 2700C1
W1/P1 - W1/P1W1/P1F4 B2 2700C1
- W1/P1 W1/P1 W1/P1 C1F4 B2 2700
W2/P1 -W1/P1 W1/W2/P1F4 B2 2700C1 W1/P1 W2/P1W1/P1 -F4 B2 2700C1
W1/P1F5 P3 -C2/P4
C2/P4F5 P3 -
PROVIDE 19mm FIRERATED BACKBOARD @ E&S
SECURED VESTIBULEGF-021 F1 B1 W1/P1 W2/P1 W1/P1 W1/P1 C2/P4
W1/P1
W1/P1
W1/P1
W1/P1
W1/P1
W1/P1
W1/P1
HALLWAY 2 F1 W2/P1 W1/P1 W2/P1 W2/P1B1 2700C1GF-026
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEEERRE RAAAAAAAAAAAAAAAAAAAAAAAA
IIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAMAA
H I T EC
A-601
TOILET PARTITIONFC1A
PW
D
PAPER TOWEL DISPENSER/
WASTE RECEPTACLE
SURFACE MOUNTED TYPE
G H SHOWER HEAD
CL
FACE
OF
WALL
FLEX
HOSE
WALL
BAR
CONTROLS
I RECESSED SOAP
DISH
INSTALL @
CENTER OF TILE
FACE OF WALL
STAINLESS
STEEL SOAP
DISPENSER
B1WATER CLOSET
FFL
CL
FACE OF WALL FACE OF WALLFACE OF WALL FACE OF WALL
B1PWD WATER CLOSETA1
FACE OF WALL
PWD GRAB BAR
WITH BACKREST
PWD GRAB BAR
WITH BACKREST
TOILET PAPER
DISPENSER @ PWD
AMBULATORY GRAB BARB2
FACE OF WALL
D URINAL
J WALL MOUNTED
BASIN
L WALL MOUNTED
SOAP DISPENSER
K
CL
MIRROR
TOP OF
BASIN
FACE OF WALL
E CLOTHES HOOK
PW
D
AM
BU
LA
N
T
TOILET PAPER DISPENSERC
FACE OF WALL
FFL
CLOCK, WALLF-35
L
TACK BOARDF-36
C
CL
WHITE BOARDF-37
COMBINATION WHITE/TACK BOARDF-38
BULLETIN BOARD, LOCKABLEF-39
CL
AV-1
CL
WALL MONITOR 1530mm, WITH
RETRACTABLE BRACKET
AV-2
PROJECTOR SCREEN
WHITE BOARD
PROJECTOR SCREEN
FFL
MOP HOLDERM MOP SINK FAUCETN
D1 PRIVACY
PANEL
PAPER TOWEL DISPENSER/
WASTE RECEPTACLE
SURFACE MOUNTED TYPE
G1
PW
D
PRE-FABRICATED
SS SHELF
O
FACE
OF
WALL
TOP OF
PARTITION
E
AMB
A-602
A1MOUNTING HEIGHT SCHEDULE
SCALE: 1:50M
FINAL DESIGN SUBMITTAL
RO C A A
N
4-30-23
T
C
Exp.
DERE RA
I G
R E
O J
G S T
UAM
No.
C
E O
H I T EC
T
OE
I H
E
IT
S N
F
T
I
DAI
T
C DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEEERRE RAAAAAAAAAAAAAAAAAAAAAAAA
IIIIIIIIIIIII
G
E
G
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T
UAMAA
H I T EC
1. (-) INDICATES FEATURE NOT REQUIRED
2. DOOR TYPES:
SEE DOOR TYPE ELEVATIONS
3. DOOR CONSTRUCTION:
SC = SOLID CORE TIMBER
MC = 1.6 BMT METAL CLADDED
4. DOOR FACING AND FINISH:
MP = METAL PAINTED
WV = WOOD, VENEER,
DOOR SCHEDULE NOTES:
5. FRAME CONSTRUCTION:
MF = METAL FRAME
6. FRAME FINISH:
MP = METAL, PAINTED
7. SEE TECHNICAL SPECS 08 71 00
FOR DOOR HARDWARE SCHEDULE
8. SEE SHEET A-601 FOR DOOR FINISHES
3. WINDOW FRAME:
AL - ALUMINUM / THERMALLY BROKEN
1. (-) INDICATES FEATURE NOT REQUIRED.
4. FRAME FINISH:
AF - ALUMINUM ANODIZED; DARK BRONZE
8. PROVIDE CYCLONE SCREEN ON ALL
EXTERIOR WINDOWS WITH STAINLESS
STEEL MESH (1.5MM X 1.5MM APERTURE)
THAT MEETS THE REQUIREMENTS OF
AS 3959-2009 BUSHFIRE PROTECTION
GUIDELINES AND PREVENTS EMBER
PENETRATION DURING BUSHFIRES.
WIDTH
FFE
ON METAL FRAME
WIDTH
H
EI
G H
T
SOLID CORE WOOD DOOR
ON STEEL FRAME
H
EI
G H
T
SI
LL
H
EI
G H
T
FIXED WINDOW
ON ALUMINUM FRAME
D5 A801
C5 A801
C4 A801
OPERABLE PARTITION
ON STEEL FRAME WITH FABRIC FINISH
H
EI
G H
T
WIDTH
WIDTH
WINDOW SCHEDULE NOTES:
C
200200
WIDTH
H
EI
G H
T
SOLID CORE WOOD DOOR
ON STEEL FRAME
WIDTH
H
EI
G H
T
A ON STEEL FRAME
VISION PANEL
WHERE OCCURS
725200 D2
A801
PAIR OF METAL CLAD SOLID CORE DOOR
D2 A801
C3 A801
C3 A801
D3 A801
C2 A801
C2 A801A3
A801
D E F
B1 A801
B2 A801
VISION PANEL
WHERE
OCCURS
WIDTH
H
EI
G H
T
B ON STEEL FRAME
VISION PANEL
725200
PAIR OF SOLID CORE WOOD DOOR
C1 A801
D1 A801
B3 A801
METAL CLAD
SOLID CORE DOOR
9. PROVIDE WINDOW SHADE ON ALL
EXTERIOR WINDOWS. SEE SHEET A-601
FOR TYPE.
B5 A801
A1 A801
INTERIOR: STOREFRONT CENTER GLAZED
ON ALUMINUM FRAMEG
DOOR
OPENING
D O
O R
H
EI
G H
T
B1 A-701
A1 A-701
C4 A-701
D1 A-701
C1 A-701
D1 A-801
D1 A-701
SIM
SIM
SIM
2. WINDOW TYPES:
DOUBLE GLAZED SUITE WITH
100mm AIR GAP AND JOCKEY SASH.
5. GLAZING:
IG - INSULATING GLASS UNITS (LAMINATED)
200200
VISION PANEL
WHERE
OCCURS
D3 A801
9. SEAL ALL GAPS TO FRAME.
SEE TECHNICAL SPECS 07 92 00
AL = ALUMINUM
LG = LAMINATED GLASS
AF = ALUMINUM FRAME
AN = ANODIZED, DARK BRONZE
FOR JOINT SEALANTS
6. SEE TECHNICAL SPECS 08 81 00 FOR
ALUMINUM WINDOWS
7. SEE TECHNICAL SPECS 08 81 00 FOR
GLAZING, SETTING AND SEALING
REQUIREMENTS.
DOOR SCHEDULE
(NOTE 4) (NOTE 5) (NOTE 6)(NOTE 3)
VESTIBULE002 PR 920mm x 2340mm 45mm MF MPMC MPA
WINDOW
TYPEWIDTH HEIGHT
WINDOW WINDOW SIZE WINDOW FRAME
TYPEMATERIAL FINISH
SILL
HEIGHT
GLAZING
NO. REMARKS
DOOR
ROOM DESCRIPTION
SIZE
( W X H )
TYPE THK.
DOOR FRAME
REMARKSHW
10B WITH VISION PANELS
WINDOW SCHEDULE
LOUVER
TYPEWIDTH HEIGHT
LOUVER LOUVER SIZE WINDOW FRAME
MATERIAL FINISH
SILL
HEIGHTNO.
1000 400 3250L006 AL AF
L007 AL AF
REMARKS
FEMALE TOILET
MECHANICAL ROOM
1 3250300 300
LOUVER SCHEDULE
PROVIDE SL81 MESH FIXED TO INTERIOR SIDE
PROVIDE SL81 MESH FIXED TO INTERIOR SIDE
024A
OPS CO 1
OPS CO 2
CLEANERS
BREAK ROOM
HALLWAY 1
MALE TOILET
PWD
FEMALE TOILET
GENERAL ADMIN SUPPORT 1
SECURED VESTIBULE
017B
LSE
018 MISSION PLANNING 2
033A 033B
017A
020A
GEN ADMIN SUPP SHARED 3
MISSION PLANNING 1
031B CREW MEETING 2
030 TEF/COMMS
CREW MEETING 4
MASS BRIEFING 2
023 MASS BRIEFING 1
022A
022B MASS BRIEFING 2
007 MECHANICAL ROOM
VESTIBULE
024B HALLWAY 1
016 CREW MEETING 1
019 CREW MEETING 3
015 ELECTRICAL ROOM
PR 920mm x 2340mm
031A CREW MEETING 2
1000 1200 IG 1000004A
008A 008B
014 AL AF
AL AF
AL AF
AL AF
AL AF
AL AF
AL AF
005 AL AF
004B AL AF
011A AL AF
OPS CO 1
OPS CO 1
OPS CO 2
MALE TOILET
FEMALE TOILET
BREAK ROOM
BREAK ROOM
GENERAL ADMIN SUPPORT 1
GEN ADMIN SUPP SHARED 3
LSE
600 600 600 600
1000 600
029 GEN ADMIN SUPP SHARED 2
HALLWAY 3
HALLWAY 3
- - - -MISSION PLANNING 1
- - - -020B CREW MEETING 4
920mm x 2340mm
PER MANUFACTURER
PER MANUFACTURER
PER MANUFACTURER
F
F
F
F
PR 920mm x 2340mm
PER MANUFACTURER
45mm MPSC WVB WITH VISION PANELS 45mmG
45mm MPSC WVE 45mm MPSC WVE
45mm MPSC WVD
45mm MPSC WVD 45mm MPSC WVD
45mm MPSC WVD
45mm MPSC WVE 45mmC MF MPMC MP 45mm MPSC WVE
45mm MPSC WVE
45mm MPSC WVE 45mm MPSC WVB
45mmC
45mmG 45mmD MF MPMC MP
45mm MPSC WVE
45mm MPSC WVE
45mm MPSC WVE
45mm MPSC WVE
45mm MPSC WVE 45mm MPSC WVE
45mm MPSC WVE
45mm HM MPSC WVE
45mm MF MPMC MPA
45mm MF MPMC MPA
75mm
75mm
75mm
75mm
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH VISION PANEL
WITH FROSTED PRIVACY FILM
FIRE EXIT DOOR ONLY
WITH FROSTED PRIVACY FILM
920mm x 2340mm
920mm x 2340mm
920mm x 2340mm
920mm x 2340mm 920mm x 2340mm
920mm x 2340mm
920mm x 2340mm
920mm x 2340mm 920mm x 2340mm
PER MANUFACTURER
920mm x 2340mm
920mm x 2340mm 920mm x 2340mm
920mm x 2340mm
920mm x 2340mm
920mm x 2340mm
920mm x 2340mm 920mm x 2340mm 920mm x 2340mm
920mm x 2340mm
920mm x 2340mm 920mm x 2340mm
920mm x 2340mm
920mm x 2340mm 920mm x 2340mm
920mm x 2340mm
IG
IG
IG
IG
IG
IG
IG
IG
IG
1000 1200
1000 1200
MF
MF
MF
MF
MF
MF
MF
MF
MF
MF
MF
MF
MF
MF
MF
MF
MF
MF
MF
10A
02A 07A
02B
021 SECURED VESTIBULE 45mmC920mm x 2340mm 07
WITH VISION PANELS
PER MANUFACTURER
PER MANUFACTURER
PER MANUFACTURER
WITH INTEGRAL WINDOW BLINDS
WITH INTEGRAL WINDOW BLINDS
WITH INTEGRAL WINDOW BLINDS
WITH INTEGRAL WINDOW BLINDS
WITH INTEGRAL WINDOW BLINDS
WITH INTEGRAL WINDOW BLINDS
WITH INTEGRAL WINDOW BLINDS
WITH INTEGRAL WINDOW BLINDS
AF ANAL LG
AF ANAL LG
WITH VISION PANEL
FIRE EXIT DOOR ONLYMF MPMC MP
011B AL AFGENERAL ADMIN SUPPORT 1 1 IG 100012001000 WITH INTEGRAL WINDOW BLINDS
45mm MPSC WVD MF
MF MPMC MP
JUNCTION BOX
FOR CARD READER
JUNCTION BOX FOR FUTURE
DOOR POSITION SWITCH,
(LOCATED AT LATCH SIDE
OF DOOR LEAF)
M
AX
JUNCTION BOX
FOR FUTURE
ELECTRIC STRIKE
JUNCTION BOX FOR
FUTURE CARD READER,
LOCATE CARD READER
ON ADJACENT WALL IF
NO SPACE ON SIDE
OF DOOR
M
AX
JUNCTION BOX FOR FUTURE
ELECTRIC STRIKE,
(INACTIVE LEAF)
JUNCTION BOX
FOR ELECTRIC
LOCK
NOTES:
1. FOR DOOR SECURITY LAYOUT LOCATIONS, SEE SHEET E-102.
2. ALL JUNCTION BOXES SHOULD BE 100x100x35 DEEP WITH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .