View the file

Other files

File Type Posted
23R1316 Note 6.pdf PDF
23R1316_AMD6.pdf PDF
23R1316_AMD5.pdf PDF
23R1316 Note 5.pdf PDF
23R1316 Note 4.pdf PDF
23R1316 AMD3.pdf PDF
23R1316_AMD2.pdf PDF
23R1316 Note 3.pdf PDF
P700 SV Sign-in.pdf PDF
23R1316_AMD1.pdf PDF
23R1316 Note 2.pdf PDF
23R1316 Note 1.pdf PDF
1665827-P700 Specification_Signed_REV_MAY2023.pdf PDF
1665827-P-700 Drawings - 2 of 2.pdf PDF
1665827-P-700 Drawings - 1 of 2.pdf PDF
23R1316-RFP.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. N6274223R1316 Amendment No. 0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SPECIFICATIONS

SECTION 27 10 00 – BUILDING TELECOMMUNICATIONS CABLING SYSTEM

Remove Replace with Pages 1-17 Pages 1-17 Amendment No. 0004

DRAWINGS

The following drawings supersede previously issued drawings bearing the same number and title:

DRAWING

NUMBER

NAVFAC

DRAWING

NUMBER

DRAWING TITLE

C-102 17270504 SITE LAYOUT PLAN

C-121 17270506 STORMWATER AND UTILITIES PLAN

A-101 17270520 FLOOR PLAN

A-102 17270521 REFLECTED CEILING PLAN

FY22 MCAF PROJECT PAF180700 SQUADRON OPERATIONS FACILITY 1665827

RAAF, TINDAL

Section 27 10 00 Page 1

AMENDMENT 0004

SECTION 27 10 00

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

08/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials

ELECTRONIC COMPONENTS INDUSTRY ASSOCIATION (ECIA)

ECIA EIA/ECA 310-E (2005) Cabinets, Racks, Panels, and Associated Equipment

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms

INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)

ICEA S-83-596 (2016) Indoor Optical Fiber Cables

ICEA S-90-661 (2012) Category 3, 5, & 5e Individually Unshielded Twisted Pair Indoor Cables for Use in General Purpose and LAN Communications Wiring Systems Technical Requirements

AUSTRALIAN CYBER SECURITY CENTRE (ACSC)

ISM Information Security Manual

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)

ISO 540 (2008) Hard Coal and Coke - Determination of Ash Fusibility

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

ANSI/NEMA WC 66 (2013) Performance Standard for Category 6 and Category 7 100 Ohm Shielded and Unshielded Twisted Pairs

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)

TIA-455-21 (1988a; R 2012) FOTP-21 - Mating Durability of Fiber Optic Interconnecting Devices

Section 27 10 00 Page 2

AMENDMENT 0004

TIA-526-7 (2015a) OFSTP-7 Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant

TIA-568-C.0 (2009; Add 1 2010; Add 2 2012) Generic Telecommunications Cabling for Customer Premises

TIA-568-C.1 (2009; Add 2 2011; Add 1 2012) Commercial Building Telecommunications Cabling Standard

TIA-568-C.2 (2009; Errata 2010; Add 2 2014; Add 1 2016) Balanced Twisted-Pair Telecommunications Cabling and Components Standards

TIA-568-C.3 (2008; Add 1 2011) Optical Fiber Cabling Components Standard

TIA-569 (2015d) Commercial Building Standard for Telecommunications Pathways and Spaces

TIA-606 (2017c) Administration Standard for the Telecommunications Infrastructure

TIA-607 (2015c; Addendum 1 2017) Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises

TIA-1152 (2009) Requirements for Field Test Instruments and Measurements for Balanced Twisted-Pair Cabling

TIA/EIA-604-10 (2002a) FOCIS 10 Fiber Optic Connector Intermateability Standard - Type LC

U.S. FEDERAL COMMUNICATIONS COMMISSION (FCC)

FCC Part 68 Connection of Terminal Equipment to the Telephone Network (47 CFR 68)

UNDERWRITERS LABORATORIES (UL)

UL 50 (2015) UL Standard for Safety Enclosures for Electrical Equipment, Non-Environmental Considerations

UL 969 (2017; Reprint Mar 2018) UL Standard for Safety Marking and Labeling Systems

1.2 RELATED REQUIREMENTS

Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM applies to this section with additions and modifications specified herein.

1.3 DEFINITIONS

Section 27 10 00 Page 3

AMENDMENT 0004

Unless otherwise specified or indicated, electrical and electronics terms used in this specification shall be as defined in TIA-568-C.1, TIA-568-C.2, TIA-568-C.3, TIA-569, TIA-606 and IEEE 100 and herein.

1.3.1 Campus Distributor (CD)

A distributor from which the campus backbone cabling emanates.

1.3.2 Building Distributor (BD)

A distributor in which the building backbone cables terminate and at which connections to the campus backbone cables may be made.

1.3.3 Floor Distributor (FD)

A distributor used to connect horizontal cable and cabling subsystems or equipment.

1.3.4 Telecommunications Room (TR)

An enclosed space for housing telecommunications equipment, cable, terminations, and cross-connects. The room is the recognized cross-connect between the backbone cable and the horizontal cabling.

1.3.5 Entrance Facility (EF) (Telecommunications)

An entrance to the building for both private and public network service cables (including wireless) including the entrance point at the building wall and continuing to the equipment room.

1.3.6 Equipment Room (ER) (Telecommunications)

An environmentally controlled centralized space for telecommunications equipment that serves the occupants of a building. Equipment housed therein is considered distinct from a telecommunications room because of the nature of its complexity.

1.3.7 Open Cable

Cabling that is not run in a raceway. This refers to cabling that is "open" to the space in which the cable has been installed and is therefore exposed to the environmental conditions associated with that space.

1.3.8 Open Office

A floor space division provided by furniture, moveable partitions, or other means instead of by building walls.

1.3.9 Pathway

A physical infrastructure utilized for the placement and routing of telecommunications cable.

1.4 SYSTEM DESCRIPTION

The building telecommunications cabling and pathway system shall include permanently installed backbone and horizontal cabling, horizontal and

Section 27 10 00 Page 4

AMENDMENT 0004

backbone pathways, service entrance facilities, work area pathways, telecommunications outlet assemblies, conduit, raceway, and hardware for splicing, terminating, and interconnecting cabling necessary to transport telephone and data (including LAN) between equipment items in a building.

The horizontal system shall be wired in a star topology from the telecommunications work area to the floor distributor at the center or hub of the star. The backbone cabling and pathway system includes interbuilding interconnecting cabling, pathway, and terminal hardware. The backbone system shall be wired in a star topology with the campus distributor at the center or hub of the star. Provide telecommunications pathway systems referenced herein as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. The telecommunications contractor must coordinate with CIOG concerning access to and configuration of telecommunications spaces.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-02 Shop Drawings

Telecommunications drawings; G

Telecommunications Space Drawings; G

In addition to Section 01 33 00 SUBMITTAL PROCEDURES, provide shop drawings in accordance with paragraph SHOP DRAWINGS.

SD-03 Product Data

Telecommunications cabling (backbone and horizontal); G

Patch panels; G

Telecommunications outlet/connector assemblies; G

Equipment support frame; G

Connector blocks; G

Submittals shall include the manufacturer's name, trade name, place of manufacture, and catalog model or number. Include performance and characteristic curves. Submittals shall also include applicable federal, military, industry, and technical society publication references. Should manufacturer's data require supplemental information for clarification, the supplemental information shall be submitted as specified in paragraph REGULATORY REQUIREMENTS and as required in Section 01 33 00 SUBMITTAL

PROCEDURES.

SD-06 Test Reports

Telecommunications cabling testing; G

SD-07 Certificates

Section 27 10 00 Page 5

AMENDMENT 0004

Telecommunications Contractor Qualifications; G

Key Personnel Qualifications; G

Manufacturer Qualifications; G

Test plan; G

SD-09 Manufacturer's Field Reports

Factory reel tests; G

SD-10 Operation and Maintenance Data

Telecommunications cabling and pathway system Data Package 5; G

SD-11 Closeout Submittals

Record Documentation; G

1.6 QUALITY ASSURANCE

1.6.1 Shop Drawings

In exception to Section 01 33 00 SUBMITTAL PROCEDURES, submitted plan drawings shall be a minimum of 279 by 432 mm in size using a minimum scale of one mm per 100 mm. Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation. Wiring diagrams shall identify circuit terminals and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment. Drawings shall indicate adequate clearance for operation, maintenance, and replacement of operating equipment devices. Submittals shall include the nameplate data, size, and capacity. Submittals shall also include applicable federal, military, industry, and technical society publication references.

1.6.1.1 Telecommunications Drawings

Provide drawings in accordance with TIA-606. The identifier for each termination and cable shall appear on the drawings. Drawings shall depict final telecommunications installed wiring system infrastructure in accordance with TIA-606. The drawings should provide details required to prove that the distribution system shall properly support connectivity from the EF telecommunications and ER telecommunications, CD's and BD's to the telecommunications work area outlets. The following drawings shall be provided as a minimum:

a. T1 - Layout of complete building - Building Area/Serving Zone Boundaries, Backbone Systems, and Horizontal Pathways. Layout of complete building. The drawing indicates location of building areas, serving zones, vertical backbone diagrams, telecommunications rooms, access points, pathways, earthing system, and other systems that need to be viewed from the complete building perspective.

Section 27 10 00 Page 6

AMENDMENT 0004

b. T2 - Serving Zones/Building Area Drawings - Drop Locations and Cable Identification (ID’s). Shows a building area or serving zone. These drawings show drop locations, telecommunications rooms, access points and detail call outs for equipment rooms and other congested areas.

c. T4 - Typical Detail Drawings - Faceplate Labeling, Firestopping, Safety. Detailed drawings of symbols and typicals such as faceplate labeling, faceplate types, faceplate population installation procedures, detail racking, and raceways.

1.6.1.2 Telecommunications Space Drawings

Provide T3 drawings in accordance with TIA-606 that include telecommunications rooms plan views, pathway layout (cable tray, racks, ladder-racks, etc.), mechanical/electrical layout, and rack elevations.

Drawings shall show layout of applicable equipment including incoming cable stub or connector blocks, building protector assembly, outgoing cable connector blocks, patch panels and equipment spaces and cabinet/racks.

Drawings shall include a complete list of equipment and material, equipment rack details, proposed layout and anchorage of equipment and appurtenances, and equipment relationship to other parts of the work including clearance for maintenance and operation. Drawings may also be an enlargement of a congested area of T1 or T2 drawings.

1.6.2 Telecommunications Qualifications

Work under this section shall be performed by and the equipment shall be provided by the approved telecommunications contractor and key personnel.

Qualifications shall be provided for: the telecommunications system contractor, the telecommunications system installer, and the supervisor (if different from the installer). A minimum of 30 days prior to installation, submit documentation of the experience of the telecommunications contractor and of the key personnel.

1.6.2.1 Telecommunications Contractor

The telecommunications contractor shall be a firm which is regularly and professionally engaged in the business of the applications, installation, and testing of the specified telecommunications systems and equipment. The telecommunications contractor shall demonstrate experience in providing successful telecommunications systems within the past 3 years of similar scope and size. Submit documentation for a minimum of three and a maximum of five successful telecommunication system installations for the telecommunications contractor.

1.6.2.2 Key Personnel

Provide key personnel who are regularly and professionally engaged in the business of the application, installation and testing of the specified telecommunications systems and equipment. There may be one key person or more key persons proposed for this solicitation depending upon how many of the key roles each has successfully provided. Each of the key personnel shall demonstrate experience in providing successful telecommunications systems within the past 3 years.

Supervisors and installers assigned to the installation of this system or any of its components shall have a minimum of 3 years experience in the

Section 27 10 00 Page 7

AMENDMENT 0004

installation of the specified copper and fibre optic cable and components.

They shall have factory or factory approved certification from each equipment manufacturer indicating that they are qualified to install and test the provided products. Submit documentation for a minimum of three and a maximum of five successful telecommunication system installations for each of the key personnel. Documentation for each key person shall include at least two successful system installations provided that are equivalent in system size and in construction complexity to the telecommunications system proposed for this solicitation. Include specific experience in installing and testing telecommunications systems and provide the names and locations of at least two project installations successfully completed using optical fibre and copper telecommunications cabling systems. All of the existing telecommunications system installations offered by the key persons as successful experience shall have been in successful full-time service for at least 18 months prior to the issuance date for this solicitation. Provide the name and role of the key person, the title, location, and completed installation date of the referenced project, the referenced project owner point of contact information including name, organization, title, and telephone number, and generally, the referenced project description including system size and construction complexity.

Indicate that all key persons are currently employed by the telecommunications contractor, or have a commitment to the telecommunications contractor to work on this project. All key persons shall be employed by the telecommunications contractor at the date of issuance of this solicitation, or if not, have a commitment to the telecommunications contractor to work on this project by the date that the bid was due to the Contracting Officer.

Note that only the key personnel approved by the Contracting Officer in the successful proposal shall do work on this solicitation's telecommunications system. Key personnel shall function in the same roles in this contract, as they functioned in the offered successful experience. Any substitutions for the telecommunications contractor's key personnel requires approval from The Contracting Officer.

1.6.2.3 Minimum Manufacturer Qualifications

Cabling, equipment and hardware manufacturers shall have a minimum of 3 years experience in the manufacturing, assembly, and factory testing of components which comply with TIA-568-C.1, TIA-568-C.2 and TIA-568-C.3.

1.6.3 Test Plan

Provide a complete and detailed test plan for the telecommunications cabling system including a complete list of test equipment for the components and accessories for each cable type specified, 60 days prior to the proposed test date. Include procedures for certification, validation, and testing.

1.6.4 Regulatory Requirements

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and

Section 27 10 00 Page 8

AMENDMENT 0004

advisory provisions of applicable Australian Standards unless more stringent requirements are specified or indicated.

1.6.5 Standard Products

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer;

however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.

1.6.5.1 Alternative Qualifications

Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.

1.6.5.2 Material and Equipment Manufacturing Date

Products manufactured more than 1 year prior to date of delivery to site shall not be used, unless specified otherwise.

1.7 DELIVERY AND STORAGE

Provide protection from weather, moisture, extreme heat and cold, dirt, dust, and other contaminants for telecommunications cabling and equipment placed in storage.

1.8 ENVIRONMENTAL REQUIREMENTS

Connecting hardware shall be rated for operation under ambient conditions of 0 to 60 degrees C and in the range of 0 to 95 percent relative humidity, noncondensing.

1.9 WARRANTY

The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

1.10 MAINTENANCE

1.10.1 Operation and Maintenance Manuals

Commercial off the shelf manuals shall be furnished for operation, installation, configuration, and maintenance of products provided as a part of the telecommunications cabling and pathway system, Data Package 5.

Submit operations and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and as specified herein not later than 2

Section 27 10 00 Page 9

AMENDMENT 0004

months prior to the date of beneficial occupancy. In addition to requirements of Data Package 5, include the requirements of paragraphs TELECOMMUNICATIONS DRAWINGS, TELECOMMUNICATIONS SPACE DRAWINGS, and RECORD DOCUMENTATION. Ensure that these drawings and documents depict the as-built configuration.

1.10.2 Record Documentation

Provide T5 drawings including documentation on cables and termination hardware in accordance with TIA-606. T5 drawings shall include schedules to show information for cut-overs and cable plant management, patch panel layouts and cover plate assignments, cross-connect information and connecting terminal layout as a minimum. T5 drawings shall be provided in hard copy format. Provide the following T5 drawing documentation as a minimum:

a. Cables - A record of installed cable shall be provided in accordance with TIA-606. The cable records shall include only the required data fields in accordance with TIA-606. Include manufacture date of cable with submittal.

b. Termination Hardware - A record of installed patch panels, cross-connect points, distribution frames, terminating block arrangements and type, and outlets shall be provided in accordance with TIA-606.

Documentation shall include the required data fields only in accordance with TIA-606.

PART 2 PRODUCTS

2.1 COMPONENTS

Components shall be UL or third party certified. Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations, submit proof of such compliance.

The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. The certificate shall state that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard. Provide a complete system of telecommunications cabling and pathway components using star topology.

Provide support structures and pathways, complete with outlets, cables, connecting hardware and telecommunications cabinets/racks. Cabling and interconnecting hardware and components for telecommunications systems shall be testing laboratory certified, and shall conform to the requirements specified herein.

2.2 TELECOMMUNICATIONS PATHWAY

Provide telecommunications pathways in accordance with TIA-569 and as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.

2.3 TELECOMMUNICATIONS CABLING

Cabling shall be UL listed for the application and shall comply with TIA- 568-C.0, TIA-568-C.1, TIA-568-C.2, and TIA-568-C.3. Provide a labeling

Section 27 10 00 Page 10

AMENDMENT 0004

system for cabling as required by TIA-606 and UL 969. Ship cable on reels or in boxes bearing manufacture date for unshielded twisted pair (UTP) in accordance with ICEA S-90-661 and optical fibre cables in accordance with ICEA S-83-596 for all cable used on this project. Cabling manufactured more than 12 months prior to date of installation shall not be used.

2.3.1 Backbone Cabling

2.3.1.1 Backbone Optical Fibre

Provide in accordance with ICEA S-83-596 and TIA-568-C.3. Cable shall be imprinted with fibre count, fibre type and aggregate length at regular intervals not to exceed 1 meter.

Provide the number of strands indicated, (but not less than 12 strands between the main telecommunication room and each of the other telecommunication rooms), of single-mode(OS1), tight buffered fibre optic cable.

2.3.2 Horizontal Cabling

Provide horizontal cable in compliance with applicable Australian Standards and performance characteristics in accordance with TIA-568-C.1.

2.3.2.1 Horizontal Copper

Provide horizontal copper cable, UTP, 100 ohm in accordance with TIA-568- C.2, ANSI/NEMA WC 66, ICEA S-90-661. Provide four each individually twisted pair, minimum size 0.25 mm2 conductors, Category 6e, with a thermoplastic jacket. Cable shall be imprinted with manufacturers name or identifier, flammability rating, size of conductor, transmission performance rating (category designation) and length marking at regular intervals in accordance with ICEA S-90-661. Provide plenum (CMP), riser (CMR), or general purpose (CM or CMG) communications rated cabling suitable for the intended use.

Substitution of a higher rated cable shall be permitted. Cables installed in conduit within and under slabs shall be suitable for use in wet locations.

All copper cables shall have an outer jacket colour of in accordance with Security Control 0825 and 0826 the ISM; all foreignnon-Australian systems (including NIPRNET, SIPRNET, and JWICS) shall be green.

2.3.3 Work Area Cabling

2.3.3.1 Work Area Copper

Provide work area copper cable in accordance with TIA-568-C.2, with a thermoplastic jacket.

All copper cables shall have an outer jacket colour of in accordance with Security Control 0825 and 0826 the ISM; all foreignnon-Australian systems (including NIPRNET, SIPRNET, and JWICS) shall be green.

2.4 TELECOMMUNICATIONS SPACES

Provide connecting hardware and termination equipment in the telecommunications entrance facility to facilitate installation as shown on design drawings for terminating and cross-connecting permanent cabling.

Section 27 10 00 Page 11

AMENDMENT 0004

Provide telecommunications interconnecting hardware color coding in accordance with TIA-606.

2.4.1 Equipment Support Frame

Provide in accordance with ECIA EIA/ECA 310-E and UL 50.

a. Racks, floor mounted modular type, steel construction, treated to resist corrosion. Provide rack with vertical and horizontal cable management channels, top and bottom cable troughs, earthing lug and a surge protected power strip with 6 GPOs.

2.4.2 Connector Blocks

Provide insulation displacement connector (IDC) Type 110 for Category 6 systems. Provide blocks for the number of horizontal and backbone cables terminated on the block plus 25 percent spare.

2.4.3 Cable Guides

Provide cable guides specifically manufactured for the purpose of routing cables, wires and patch cords horizontally and vertically on equipment racks. Cable guides of ring or bracket type devices mounted on rack for horizontal cable management and individually mounted for vertical cable management. Mount cable guides with screws, and/or nuts and lockwashers.

2.4.4 Patch Panels

Provide ports for the number of horizontal and backbone cables terminated on the panel plus 25 percent spare. Provide pre-connectorized copper patch cords for patch panels. Provide patch cords, as complete assemblies, with matching connectors as specified. Patch cords shall meet minimum performance requirements specified in TIA-568-C.1 and TIA-568-C.2 for cables, cable length and hardware specified.

2.4.4.1 Modular to 110 Block Patch Panel

Provide in accordance with TIA-568-C.1 and TIA-568-C.2. Panels shall be third party verified and shall comply with EIA/TIA Category 6e requirements.

Panel shall be constructed of 2.2 mm minimum aluminum and shall be rack mounted and compatible with an ECIA EIA/ECA 310-E equipment rack. Panel shall provide 48 non-keyed, 8-pin modular ports, wired to T568B. Patch panels shall terminate the building cabling on Type 110 IDCs and shall utilize a printed circuit board interface. The rear of each panel shall have incoming cable strain-relief and routing guides. Panels shall have each port factory numbered and be equipped with laminated plastic nameplates above each port.

2.4.4.2 Fibre Optic Patch Panel

Provide panel for maintenance and cross-connecting of optical fibre cables.

Panel shall be constructed of steel and shall be rack mounted and compatible with a ECIA EIA/ECA 310-E equipment rack. Each panel shall provide 12 single-mode adapters as duplex LC in accordance with TIA/EIA-604-10 with zirconia ceramic alignment sleeves. Provide dust cover for unused adapters.

The rear of each panel shall have a cable management tray with removable cover, incoming cable strain-relief and routing guides. Panels shall have

Section 27 10 00 Page 12

AMENDMENT 0004

each adapter factory numbered and be equipped with laminated plastic nameplates above each adapter.

2.5 TELECOMMUNICATIONS OUTLET/CONNECTOR ASSEMBLIES

2.5.1 Outlet/Connector Copper

Outlet/connectors shall comply with FCC Part 68, TIA-568-C.1, and TIA-568- C.2. UTP outlet/connectors shall be non-keyed, 8-pin modular, constructed of high impact rated thermoplastic housing and shall be third party verified and shall comply with TIA-568-C.2 Category 6e requirements.

Outlet/connectors provided for UTP cabling shall meet or exceed the requirements for the cable provided. Outlet/connectors shall be terminated using a Type 110 IDC PC board connector, color-coded for both T568A and T568B wiring. Each outlet/connector shall be wired T568B. UTP outlet/connectors shall comply with TIA-568-C.2 for 200 mating cycles.

2.5.2 Optical Fibre Connectors

Provide in accordance with TIA-455-21. Optical fibre connectors shall be duplex LC in accordance with TIA/EIA-604-10 with zirconia ceramic alignment sleeves, epoxyless crimp style compatible with 8/125 single-mode fibre. The connectors shall provide a maximum attenuation of 0.3 dB at 1550 nm with less than a 0.2 dB change after 500 mating cycles.

2.5.3 Cover Plates

Telecommunications cover plates shall comply with and TIA-568-C.1, TIA-568- C.2, and TIA-568-C.3; constructed of high impact thermoplastic material white in color. Provide labeling in accordance with the paragraph LABELING in this section.

2.6 EARTHING AND BONDING PRODUCTS

Provide in accordance with TIA-607. Components shall be identified as required by TIA-606. Provide rod electrodes, bonding conductors, and earthing busbars as specified in Section 26 20 00 INTERIOR DISTRIBUTION

SYSTEM.

2.7 FIRESTOPPING MATERIAL

Provide firestopping around wall and ceiling penetrations. The material used for the fire-stopping of service penetrations must be concrete, high-temperature mineral fibre, high-temperature ceramic fibre or other material that does not flow at a temperature below 1120 degrees C when tested in accordance with ISO 540, and must have demonstrated that it does not impair the fire resisting performance of the building element in which it is installed.

2.8 MANUFACTURER'S NAMEPLATE

Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.

Section 27 10 00 Page 13

AMENDMENT 0004

2.9 FIELD FABRICATED NAMEPLATES

ASTM D709. Provide laminated plastic nameplates for each equipment enclosure, relay, switch, and device; as specified or as indicated on the drawings. Each nameplate inscription shall identify the function and, when applicable, the position. Nameplates shall be melamine plastic, 3 mm thick, white with black center core. Surface shall be matte finish.

Corners shall be square. Accurately align lettering and engrave into the core. Minimum size of nameplates shall be 25 by 65 mm . Lettering shall be a minimum of 6.35 mm high normal block style.

2.10 TESTS, INSPECTIONS, AND VERIFICATIONS

2.10.1 Factory Reel Tests

Provide documentation of the testing and verification actions taken by manufacturer to confirm compliance with TIA-568-C.1, TIA-568-C.2, TIA-568- C.3, and TIA-526-7 for single mode optical fibre cables.

PART 3 EXECUTION

3.1 INSTALLATION

Install telecommunications cabling and pathway systems, including the horizontal and backbone cable, pathway systems, telecommunications outlet/connector assemblies, and associated hardware in accordance with TIA- 568-C.1, TIA-568-C.2, TIA-568-C.3, and TIA-569 as applicable. Provide cabling in a star topology network. Pathways and outlet boxes shall be installed as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.

Install telecommunications cabling with copper media in accordance with the following criteria to avoid potential electromagnetic interference between power and telecommunications equipment. The interference ceiling shall not exceed 3.0 volts per meter measured over the usable bandwidth of the telecommunications cabling. Cabling shall be run with horizontal and vertical cable guides in telecommunications spaces with terminating hardware and interconnection equipment.

3.1.1 Cabling

Install UTP, and optical fibre telecommunications cabling system as detailed in TIA-568-C.1, TIA-568-C.2, and TIA-568-C.3. Screw terminals shall not be used. Use an approved insulation displacement connection (IDC) tool kit for copper cable terminations. Do not exceed manufacturers' cable pull tensions for copper and optical fibre cables. Provide a device to monitor cable pull tensions. Do not exceed 110 N pull tension for four pair copper cables. Do not chafe or damage outer jacket materials. Use only lubricants approved by cable manufacturer. Do not over cinch cables, or crush cables with staples.

For UTP cable, bend radii shall not be less than four times the cable diameter. Cables shall be terminated; no cable shall contain unterminated elements. Cables shall not be spliced. Label cabling in accordance with paragraph LABELING in this section.

3.1.1.1 Open Cable

Use where indicated on plans in cable trays. Install in accordance with TIA-568-C.1, TIA-568-C.2 and TIA-568-C.3. Do not exceed cable pull tensions recommended by the manufacturer. Copper cable not in a wireway or pathway

Section 27 10 00 Page 14

AMENDMENT 0004

shall be suspended a minimum of 300 mm above ceilings by cable supports no greater than 750 mm apart. Cable shall not be run through structural members or in contact with pipes, ducts, or other potentially damaging items. Placement of cable parallel to power conductors shall be avoided, if possible; a minimum separation of 300 mm shall be maintained when such placement cannot be avoided

Plenum cable shall be used where open cables are routed through plenum areas. Plenum cables shall comply with flammability plenum requirements.

3.1.1.2 Backbone Cable

a. Optical fibre Backbone Cable. Install intrabuilding backbone optical fibre in indicated pathways. Do not exceed manufacturer's recommended bending radii and pull tension. Prepare cable for pulling by cutting outer jacket 250 mm leaving strength members exposed for approximately 250 mm. Twist strength members together and attach to pulling eye.

Vertical cable support intervals shall be in accordance with manufacturer's recommendations.

3.1.1.3 Horizontal Cabling

Install horizontal cabling as indicated on drawings Do not untwist Category 6 UTP cables more than 12 mm from the point of termination to maintain cable geometry. Provide slack cable in the form of a figure eight (not a service loop) on each end of the cable, 3 m in the telecommunications room, and 304 mm in the work area outlet..

3.1.2 Pathway Installations

Provide in accordance with TIA-569. Provide building pathway as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.

3.1.3 Service Entrance Conduit, Underground

Provide service entrance underground as specified in Section 26 20 00

INTERIOR DISTRIBUTION SYSTEM.

3.1.4 Cable Tray Installation

Install cable tray as specified in Section 26 20 00 INTERIOR DISTRIBUTION

SYSTEM.

3.1.5 Work Area Outlets

3.1.5.1 Terminations

Terminate UTP cable in accordance with TIA-568-C.1, TIA-568-C.2 and wiring configuration as specified. Terminate fibre optic cables in accordance with

TIA-568-C.3

3.1.5.2 Cover Plates

As a minimum, each outlet/connector shall be labeled as to its function and a unique number to identify cable link in accordance with the paragraph LABELING in this section.

Section 27 10 00 Page 15

AMENDMENT 0004

3.1.5.3 Cables

Unshielded twisted pair and fibre optic cables shall have a minimum of 304 mm of slack cable loosely coiled into the telecommunications outlet boxes.

Minimum manufacturer's bend radius for each type of cable shall not be exceeded.

3.1.5.4 Pull Cords

Pull cords shall be installed in conduit serving telecommunications outlets that do not have cable installed.

3.1.6 Telecommunications Space Termination

Install termination hardware required for Category 6e and optical fibre system. An insulation displacement tool shall be used for terminating copper cable to insulation displacement connectors.

3.1.6.1 Connector Blocks

Connector blocks shall be rack mounted in orderly rows and columns.

Adequate vertical and horizontal wire routing areas shall be provided between groups of blocks. Install in accordance with industry standard wire routing guides in accordance with TIA-569.

3.1.6.2 Patch Panels

Patch panels shall be mounted in equipment racks with sufficient ports to accommodate the installed cable plant plus 25 percent spares.

a. Copper Patch Panel. Copper cable entering a patch panel shall be secured to the panel with cable ties as recommended by the manufacturer to prevent movement of the cable.

b. Fibre Optic Patch Panel. Fibre optic cable loop shall be 900 mm in length. The outer jacket of each cable entering a patch panel shall be secured to the panel to prevent movement of the fibres within the panel, using clamps or brackets specifically manufactured for that purpose.

3.1.6.3 Equipment Support Frames

Install in accordance with TIA-569:

a. Racks, floor mounted modular type. Permanently anchor rack to the floor in accordance with manufacturer's recommendations.

3.1.7 Electrical Penetrations

Seal openings around electrical penetrations through fire resistance-rated wall, partitions, floors, or ceilings with fire-stopping material packed into the gap between the service and wall, floor or ceiling in a manner, and compressed to the same degree, as adopted by for ISO 540 testing.

3.1.8 Earthing and Bonding

Section 27 10 00 Page 16

AMENDMENT 0004

Provide in accordance with TIA-607 and as specified in Section 26 20 00

INTERIOR DISTRIBUTION SYSTEM.

3.2 LABELING

3.2.1 Labels

Provide labeling in accordance with TIA-606. Handwritten labeling is unacceptable. Stenciled lettering for voice and data circuits shall be provided using thermal ink transfer process or laser printer.

3.2.2 Cable

Cables shall be labeled using color labels on both ends with identifiers in accordance with TIA-606.

3.2.3 Termination Hardware

Workstation outlets and patch panel connections shall be labeled using color coded labels with identifiers in accordance with TIA-606.

3.3 FIELD APPLIED PAINTING

Paint electrical equipment as required to match finish of adjacent surfaces or to meet the indicated or specified safety criteria. Painting shall be as specified in Section 09 90 00 PAINTS AND COATINGS.

3.4 FIELD FABRICATED NAMEPLATE MOUNTING

Provide number, location, and letter designation of nameplates as indicated.

Fasten nameplates to the device with a minimum of two sheet-metal screws or two rivets.

3.5 TESTING

3.5.1 Telecommunications Cabling Testing

Perform telecommunications cabling inspection, verification, and performance tests in accordance with TIA-568-C.1, TIA-568-C.2, and TIA-568-C.3. Test equipment shall conform to TIA-1152. Perform optical fibre field inspection tests via attenuation measurements on factory reels and provide results along with manufacturer certification for factory reel tests. Remove failed cable reels from project site upon attenuation test failure.

3.5.1.1 Inspection

Visually inspect UTP and optical fibre jacket materials for third party certification markings. Inspect cabling terminations in telecommunications rooms and at workstations to confirm color code for T568A or T568B pin assignments, and inspect cabling connections to confirm compliance with TIA- 568-C.1, TIA-568-C.2, and TIA-568-C.3. Visually confirm Category 6e, marking of outlets, cover plates, outlet/connectors, and patch panels.

3.5.1.2 Verification Tests

UTP backbone copper cabling shall be tested for DC loop resistance, shorts, opens, intermittent faults, and polarity between conductors, and between

Section 27 10 00 Page 17

AMENDMENT 0004

conductors and shield, if cable has overall shield. Test operation of shorting bars in connection blocks. Test cables after termination but prior to being cross-connected.

For single-mode optical fibre, perform optical fibre end-to-end attenuation tests in accordance with TIA-568-C.3 and TIA-526-7 using Method B, OTDR for single-mode optical fibre. Perform verification acceptance tests.

3.5.1.3 Performance Tests

Perform testing for each outlet as follows:

a. Perform Category 6 link tests in accordance with TIA-568-C.1 and TIA- 568-C.2. Tests shall include wire map, length, insertion loss, NEXT, PSNEXT, ELFEXT, PSELFEXT, return loss, propagation delay, and delay skew.

b. Optical fibre Links. Perform optical fibre end-to-end link tests in accordance with TIA-568-C.3.

3.5.1.4 Final Verification Tests

Perform verification tests for UTP and optical fibre systems after the complete telecommunications cabling and workstation outlet/connectors are installed.

a. Data Tests. These tests assume the Information Technology Staff has a network installed and are available to assist with testing. Connect to the network interface device at the demarcation point. Log onto the network to ensure proper connection to the network.

-- End of Section --

6.0 6.0

.5

1.

NO

M

.SERVICES TRENCH

R6.5

R12.50

R6.50

R12.50 R12.50

R12.50

5.

C-102

SQUADRON OPERATIONS BUILDING DI

SA

BL

ED

V

EH

IC

LE

P

AR

K (2

.6 m x 5.

6m

4.5 x 4.5m COMMUNICATIONS PAD. 3.2m EXCLUSION ZONE

REALIGNMENT OF WESTERN ACCESS

ROAD TO BE DESIGNED UNDER A

SEPARATE WORKS PACKAGE.

15m CLEAR ZONE

FROM BUILDING.

10m UNOBSTRUCTED

ZONE FROM BUILDING.

STORMWATER

SWALE

STORMWATER

SWALEFLEXIBLE PAVEMENT

PROJECT 16652828

P400 WORKS

PACKAGE.

ONE WAY EXIT ONE WAY ENTRY

TN

PLAN

NORTH

A1SITE LAYOUT PLAN

SCALE: 1:200m

FINAL DESIGN SUBMITTAL

C044138No.RE G I

S T

ER

ED PRO F E S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I AC I V I L

A N T

H O N Y P E T R O C C I T T O

BU

S

BA

Y

(3 .0 m x

.0 m

CONCRETE STRIP AT MINIMUM 0.5 % GRADE

AND AT 75 mm BELOW FFL

MECHANICAL EQUIPMENT PLANT 7.5 m x 5.6 m

AND CLASS 2 FENCE AND GATE ENCLOSURE

DROP OFF ZONE

x L

IG

HT

V

EH

IC

LE

P

AR

K (2

.6 m x 5.

6m

PRECAST REINFORCED CONCRETE

HEADWALL

ROCK LINED ON GEOTEXTILE FABRIC

OUTLET AND INLET PROTECTION

KERB RAMP. REFER TYPICAL

DETAIL ON DRAWING C504

3x M

IN

I B

US

P

AR

KS

(2 .9 m x

9.

0m

PEDESTRIAN

ACCESS PATH

FLUSH KERB

RAISED KERB

EXISTING SURFACE DRAINAGE DIRECTION

STOP LINE

EDGE LINE

REFER TO DRAWING C503 FOR FENCING

DETAILS AND CONNECTION POINT. FINAL

ALIGNMENT TO BE CONFIRMED ON SITE AND

APPROVED BY CONTRACT ADMINISTRATOR

20000mm

1:200

100000

SHEET LEGEND:

2.50m

2.

m

BOLLARDS LOCATION AS PER ARCHITECTURAL

DRAWINGS. AS PER DETAIL ON DRAWING C-502

C1 C-311

C1 C-311

A1 C-311

A1 C-311

FFL 131.0m

WASTE ZONE

REFER TO DRAWING C503 FOR FENCING

DETAILS AND CONNECTION POINT. FINAL

ALIGNMENT TO BE CONFIRMED ON SITE AND

APPROVED BY CONTRACT ADMINISTRATOR

D3 C502

D1 C502

WHEEL STOPS (TYP)

AIRSIDE FENCE REFER DRAWING C-503/

NEW ASPHALT PAVEMENT AREA REFER TO DRAWING

C-505 FOR DETAILS

NEW 100MM THICK CONCRETE FOOTPATH, SL72 MESH,

REFER TO DRAWING C-504 FOR DETAILS

PROVIDE SECURITY

AND TRASH SCREEN

WESTERN ACCESS ROAD

L

EG

EN

D

UP

DA

TE

D

.0

6.

C S

P400 AIRSIDE FENCE REFER DRAWING C-503

Evan Mizue

13 JULY 2023

SVCV

SV

CV

C1

C1

C1 C

C C

C C

C C

C C

C

C C

C C

C C

C C

C C

C C

C

C

C

C1

C1

C

C

C1 C

C

T

T

T

W

W

W

W W

W W

W

S

S

HM

HM

HM

C C

C C

C C C C C C

C

C

C

C

C

C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C C

CC E

C

C C

C C

E

E

C

C

E E

E

E2 EE

E

E

E

EE

E E

E E

E E

E

E2

E2

E2

C-121

C044138No.

AIRCRAFT MAINTENANCE

STORAGE FACILITY

SQUADRON OPERATIONS BUILDING

4.5 x 4.5m COMMUNICATIONS PAD. 3.2m EXCLUSION ZONE

COMMUNICATION CONNECTION POINT

PROVIDED BY THE KC30 PROJECT

REFER TO THE ELECTRICAL

DRAWINGS FOR DETAILS.

DOMESTIC WATER SUPPLY CONNECTION POINT

PROVIDED BY THE KC30 PROJECT AT IL 129.81. WATER

METER IS IN ACCORDANCE WITH PWC STD DRG

W1-1-01A.

CH 0.00

NEW TYPE 2 SEWER

CONNECTION IN ACCORDANCE

WITH PWC STD DRG W2-1-02

CH 0.00

IL 127.10

TEE

CH 34.10

DOMESTIC WATER SUPPLY BRANCH

TO P400 LINE 2 TO BE PROVIDED BY

P400 PROJECT. LINE TO BE CAPPED

IF P400 LINE 2 IS IMPLEMENTED

PRIOR TO P700 LINE 1.

REFER TO DRAWING E101 FOR

ELECTRICAL CONDUIT AND

CABLING DETAILS.

REFER TO DRAWING E101 FOR

COMMUNICATIONS CONDUIT

AND CABLING DETAILS.

DOMESTIC WATER SUPPLY

BRANCH TO P400 & P700

LINE 1

90° BEND

CH 4.50

BUILDING

CONNECTION

CH 0.00

IL 129.84

INSPECTION OPENING (IO)

CH 0.42

IL 129.15

45° BEND WITH INSPECTION

OPENING TO SURFACE (IOS)

IN ACCORDANCE WITH AS3500

CH 16.15

BUILDING CONNECTION

CH 20.06

IL 129.47

DN100 PVC SN8

DOMESTIC WATER SUPPLY

BRANCH TO P700

LINE 2

C C C C C

E E

S S

W W

E

C

SEWER UNDER

PROPOSED PAVEMENT.

REFER TO NOTE 3.

FFL 131.0m

EXISTING SEWER UNDER

PROPOSED PAVEMENT.

REFER TO NOTE 3.

EXISTING SEWER. REFER

NOTE 2.

1 8

B

F

A

VESTIBULE

GF-002

HALLWAY 1

GF-024

HALLWAY 2

GF-026

OPS DESK

GF-025

MALE

GF-005

FEMALE

GF-006

CLNR

GF-027

PWD

GF-028

BREAK

ROOM

GF-008

VESTIBULE

GF-010

OPS CO 1

GF-004

OPS CO 2

GF-003

GENERAL ADMIN

SUPPORT 1

GF-011

GENERAL ADMIN

SUPPORT OFFICE 2

GF-029

GENERAL ADMIN SUPP

SHARED OFFICE 3

GF-012

LSE

GF-014

SECURED

VESTIBULE

GF-034

HALLWAY 3

GF-033

MISSION

PLANNING 1

GF-017

MISSION

PLANNING 2

GF-018

CREW

MEETING 2

GF-031

CREW

MEETING 1

GF-016

DUTY OFFICER

GF-032CREW

MEETING 4

GF-020

CREW

MEETING 3

GF-019

MASS BRIEFING 2

GF-022

MASS BRIEFING 1

GF-023

MECHANICAL

ROOM

GF-007

ELECTRICAL

GF-015 MSB

MDB

LIGHTING

DB

UPS

RACK 1

AUS

SEC

FCU

ACCU

WATER

HEATER

HYDRO

PNEUMATIC

TANK

TEF /

COMMS

GF-030

MSB

DB-TEF

FDFD

ROOF LINE

DDCHB

HB

ACCU

RACK 2

USAF

RACK 1

USAF

CHAINLINK FENCE,

SEE CIVIL DWGS

CONCRETE PAD,

SEE CIVIL DWGS

CONCRETE

WALKWAY, SEE

CIVIL DWGS

FE1

FE1

FE1

FE1

FE1

FE1

FDIC

BUS DROP-OFF ZONE,

SEE CIVIL DWGS

COMMS PAD,

SEE CIVIL DWGS

CHEVRON MARKING,

SEE CIVIL DWGS

AC PAVEMENT,

SEE CIVIL DWGS

GRASSED AREA,

SEE CIVIL DWGS

GRASSED AREA,

SEE CIVIL DWGS

ACCU

ACCU DOAS

SECURED

VESTIBULE

GF-021

024A

024B

005 027 028 006 008

034033A

017A

017B 031A

033B

016019

020A

031B

020B

022A

022B

003 004A 004B

005 006

L006 L007

008A

008B

011A011B012014

3A

3A

3C 3C

3B3C

3C 3C 3C

3C

3B

5 3

2 3 4 5 6 7

34990

4628 4533 4533 3470 5730 6610 5485

246019301095

C

D

E

34990

4628 4533 4533 3470 5730 6610 5485

A5

A-401

CONCRETE SPLASH BLOCK,

TYPICAL, SEE A1

A-802

C5 A-701

B5 A-701

COUNTER, SEE

65 9001100

CG

CG

1000 4250

22003661128

A5 A-701

1600 175

00CG

CG

CG

2364172742241600

CG

CG

530 530

3050 920

190 4210 228 1075 1572 1885 2390 2364

E

N

A-401 D1

ACCU

RAMP, SEE CIVIL DWGS

3D

5A

CG CG

CG CG

CG

CG

GF-X001

COVERED ENTRY

GF-X009

COVERED ENTRY 2

GF-X013

ENCLOSURE

MECHANICAL

FD FD

FD FS

FD

3740 10050 3184 568 2200 1740 1306 1000 2542 1720 96 1000 507 294 1000 1000 1000 590

2340 3020 3475

1036 1000 600 1000 600 100010341930

43154315

GF-X009

COVERED ENTRY 2

FINAL DESIGN SUBMITTAL

RO C A A

N

4-30-24

T

C

Exp.

DERE RA

I G

R E

O J

G S T

UAM

No.

C

E O

H I T EC

T

OE

I H

E

IT

S N

F

T

I

DAI

T

C DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEERRRRRRRRRRRRRE RRRRRRRRRAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA

IIIIIIIIIIIIIIIIIII

G

E

G

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T

UAM

H I T EC

A1FLOOR PLAN

SCALE: 1:75

LEGEND:

A-101

GRAPHIC SCALE

150 SERIES CMU WALL

GYPSUM WALL BOARD ON METAL STUD

SECURE AREA (ZONE 2 FIT FOR BUT

NOT WITH ZONE 4 PROVISIONS)

TN

PLAN

NORTH

200 SERIES CMU WALL WITH

135mm THK INSULATED METAL WALL

PANEL ON EXTERIOR

SHEET LINED FURRING WALL ON

200 OR 150 SERIES CMU WALL

200 SERIES CMU WALL

FE1 WALL MOUNTED HOOK TYPE,

NO CABINET FIRE EXTINGUISHER,

SEE FIRE PROTECTION DWGS

STEEL COLUMN, SEE STRUCTURAL

NOTES:

1. REFER TO SHEET A-501 FOR WALL TYPE DETAILS

2. REFER TO I-101 FOR FURNITURE AND EQUIPMENT

PLAN/SCHEDULE.

3. DIMENSION ON INTERIOR WALLS ARE TO CENTER

OF WALL UNLESS NOTED OTHERWISE.

4. PROVIDE 50mm RECESSED FLOOR AT WET AREAS, SEE STRUCTURAL DRAWINGS.

FHR FIRE HOSE REELS,

SEE FIRE PROTECTION DWGS

# WALL TYPE TAG, SEE TYPES ON A-502

DOOR TAG, SEE DOOR SCHEDULE &

TYPES ON SHEET A-601

WINDOW TAG, SEE WINDOW SCHEDULE

& TYPES ON SHEET A-601

CHANGE IN FINISH FLOOR ELEVATION,

SEE DETAIL B5/A-801

CORNER GUARD, SEE LIST OF

MATERIALS ON SHEET A-601

CG

VESTIBULE

GF-002

HALLWAY 1

GF-024

HALLWAY 2

GF-026

OPS DESK

GF-025

MALE

GF-005 FEMALE

GF-006

CLNR

GF-027

PWD

GF-028

BREAK

ROOM

GF-008

VESTIBULE

GF-010

OPS CO 1

GF-004OPS CO 2

GF-003

GENERAL ADMIN

SUPPORT 1

GF-011

GENERAL ADMIN

SUPPORT OFFICE 2

GF-029

GENERAL ADMIN SUPP

SHARED OFFICE 3

GF-012

LSE

GF-014

SECURED

VESTIBULE

GF-034

HALLWAY 3

GF-033

MISSION

PLANNING 1

GF-017

MISSION

PLANNING 2

GF-018

CREW

MEETING 2

GF-031

CREW

MEETING 1

GF-016

DUTY OFFICER

GF-032

CREW

MEETING 4

GF-020

CREW

MEETING 3

GF-019

MASS BRIEFING 2

GF-022

MASS BRIEFING 1

GF-023

MECHANICAL

ROOM

GF-007

TEF /

COMMS

GF-030

ROOF LINE

ELECTRICAL

GF-015

SECURED

VESTIBULE

GF-021

82 3 4 5 6 7

34990

4628 4533 4533 3470 5730 6610 5486

34990

4628 4533 4533 3470 5730 6610 5486

190190

896 4590

B

A4 A-802

C4 A-802

B5 A-802

ACCESS PANEL,

SEE

D3 A-802

D5 A-801

D5 A-801

D5 A-801

D5 A-801

PRESSED STEEL GUTTER,

TYPICAL, SEE C1

A-802

A

C

D

E

F

D4 A-802

B4 A-802

1662 400 2471

3992 675

653 1147 1361

EQ

EQ 89

448448 550 1000 1000 1000 475

0 1030

825 1800 1800

286 8630

610 967 634

1307 517

6511840

6051017524

45 670

1409136546

415610 6301140

1024 43

825 825

1853 2462 2462

FINAL DESIGN SUBMITTAL

RO C A A

N

4-30-24

T

C

Exp.

DERE RA

I G

R E

O J

G S T

UAM

No.

C

E O

H I T EC

T

OE

I H

E

IT

S N

F

T

I

DAI

T

C DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEERRRRRRRRRRRRRE RRRRRRRRRAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA

IIIIIIIIIIIIIIIIIII

G

E

G

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS T

UAM

H I T EC

A1REFLECTED CEILING PLAN

SCALE: 1:75

A-102

GRAPHIC SCALE

TN

PLAN

NORTH

LEGEND:

600mm x 1200mm ACOUSTICAL CEILING TILE

SEE DETAIL C5 & D3/A-802

13mm THK PLASTERBOARD CEILING, FULLY TAPED AND SET, PAINT FINISH, USE WATER-RESISTANT ON WET AREAS;

SEE D4/A-802

LIGHT FIXTURE,

SEE ELECTRICAL

SUPPLY AIR REGISTER,

SEE MECHANICAL

EXHAUST AIR REGISTER,

SEE MECHANICAL

EXIT SIGN LIGHT,

SEE ELECTRICAL

600mm x 600mm ACCESS PANEL, SEE B5/A-802 FOR DETAILS

0.42 BMT MINI ORB LINING, PRE-FINISHED,

OFF-WHITE

NOTE:

1. SEE SHEET A-601 FOR CEILING HEIGHT AND FINISHES

RETURN AIR REGISTER,

SEE MECHANICAL

SECURE AREA (ZONE 2 FIT FOR BUT

NOT WITH ZONE 4 PROVISIONS)

pdp8577
Tindal P700 Amendment 4
27 10 00 P700
P700_AMEND4_PLANS_sign_flat