FY22 MILCON PROJECT AJJY163000 APSI - AIRFIELD DAMAGE REPAIR WAREHOUSE ANDERSEN AIR FORCE BASE, GUAM
Solicitation number
N6274222R1308
Issued by

About this file

This is a solicitation for a design-bid-build construction project to build an airfield damage repair storage facility at Andersen Air Force Base in Guam. The facility will be approximately 7,000 square meters of concrete construction and include supporting site utilities, pavements, and site improvements. The project is to design and construct a complete and usable storage facility in accordance with Department of Defense and base criteria for general building requirements, high performance sustainable building standards. The solicitation was issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO PARKING

FIRE LANE

NO PARKING

FIRE LANE

C-102

A3 TEMPORARY EROSION CONTROL PLAN

SCALE 1" = 30'-0"

TE

M

PO

R

AR

Y

ER

O

SI

O

N C

O N

TR

O

L

PL

AN

TRUE NORTH

15' 60'

SCALE: 1"=30'-0"

0 30'

17246036

DATE: 11/10/21

/1

0/

I

JC

AMENDMENT NO. 0002

EN

VI

RO

NM

EN

TA

L P

RO

TE

CT

IO

N

AN

D

HA

ZM

AT

N

O

TE

S

CE001

ENVIRONMENTAL PROTECTION NOTES

A. PROTECT THE ENVIRONMENTAL RESOURCES DURING THE ENTIRE DURATION

OF THIS CONTRACT. COMPLY WITH FEDERAL, GUAM, AND LOCAL

REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION, INCLUDING

WATER, AIR, SOLID WASTE, HAZARDOUS WASTE AND SUBSTANCES,

CONTAMINATED SOIL, SILICA, OILY SUBSTANCES, AND NOISE POLLUTION.

COMPLY WITH ALL REQUIREMENTS SPECIFIED IN SECTIONS 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS AND 01 57 19.01 20

SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS.

B. SUBMIT ALL NECESSARY ENVIRONMENTAL PLANS AS SPECIFIED IN THE

SPECIFICATIONS FOR REVIEW AND APPROVAL BY THE GOVERNMENT.

C. ARCHAEOLOGICAL MONITORING IS NOT REQUIRED. COMPLETE CULTURAL

RESOURCE AWARENESS TRAINING. SHOULD THE CONTRACTOR MAKE AN

INADVERTENT DISCOVERY; STOP WORK UNTIL THE GOVERNMENT ASSESSES

THE SITUATION.

D. COMPLETE NATURAL RESOURCE AWARENESS TRAINING. PREPARE AND

IMPLEMENT A HAZARD ANALYSIS AND CRITICAL CONTROL POINT PLAN.

E. THE PROJECT SITE IS LOCATED IN AN AREA WITH A HIGH PROBABILITY AREA

OF ENCOUNTERING MEC/MPPEH. PERFORM FULL CLEARANCE AHEAD OF

EARTHWORK. SUBMIT PLANNING DOCUMENTS FOR GOVERNMENT REVIEW

AND APPROVAL.

F. VEGETATION REMOVED DURING CLEARING AND GRUBBING SHALL BE

PROCEEDED FOR REUSE ONSITE. OBTAIN A SOLID WASTE MANAGEMENT

FACILITY PERMIT TO PROCESS GREEN WASTE AND INCLUDE THE PERMIT IN

THE CONTRACTOR'S WASTE MANAGEMENT PLAN.

G. PROVIDE ALL NECESSARY SAMPLING AND TESTING FOR WASTE

CHARACTERIZATION AND DISPOSAL. PREPARE WASTE MANIFEST. ALL

WASTE SHALL BE PROPERLY PACKAGED AND DISPOSED OF IN ACCORDANCE

WITH APPLICABLE FEDERAL, GUAM, AND INSTALLATION REGULATIONS AND

REQUIREMENTS.

H. USE ENGINEERING CONTROLS SUCH AS WATER MISTING AND WIND

BARRIERS TO CONTROL FUGITIVE DUST AND SILICA DURING THE ENTIRE

DURATION OF THIS CONTRACT.

I. EROSION CONTROL MEASURES MUST BE IMPLEMENTED AND PRECAUTIONS

MUST BE TAKEN TO MITIGATE IMPACTS TO STORM DRAIN SYSTEMS AND/OR

NEARBY BODIES OF WATER.

A. SITE WORKERS MUST BE INFORMED OF THE PRESENCE OF HAZARDOUS

MATRIALS, CONTAMINATED SOIL, AND MEC. THE HAZARDS MUST BE

MITIGATED PROPERLY PRIOR TO ANY DISTURBANCES OR DEMOLITION.

B. ALL WORK INVOLVING HAZARDOUS MATERIALS/WASTE AND CONTAMINATED

SOIL MUST BE CONDUCTED IN A CONTROLLED MANNER PROTECTIVE OF THE

WORKERS, BASE PERSONNEL, AND THE ENVIRONMENT IN ACCORDANCE

WITH APPLICABLE FEDERAL, GUAM, AND INSTALLATIONS REGULATIONS AND

REQUIREMENTS.

C. COMPLY WITH ALL APPLICABLE FEDERAL, GUAM, AND INSTALLATION HEALTH

AND SAFETY REGULATIONS.

D. PROVIDE ALL NECESSARY TRAINING TO EMPLOYEES AND

SUBCONTRACTORS TO COMPLY WITH ALL APPLICABLE FEDERAL, GUAM, AND

INSTALLATION HEALTH AND SAFETY LAWS AND REGULATIONS.

PESTICIDE-IMPACTED SOIL (PIS) MANAGEMENT

NOTES

A. A SOIL SCREENING SURVEY REPORT IS AVAILABLE UPON REQUEST. THE

ANALYTICAL RESULTS FOR CONTAMINANTS WERE COMPARED TO THE STATE

OF HAWAII, DEPARTMENT OF HEALTH, TIER 1, ENVIRONMENTAL SCREENING

LEVELS (ESL). REVIEW AND UNDERSTAND THE SURVEY REPORT.

B. CONDUCT CONTAMINATED/POTENTIALLY CONTAMINATED SOIL WORK IN

ACCORDANCE WITH SECTION 02 61 13 EXCAVATION AND HANDLING OF

CONTAMINATED MATERIAL.

C. PIS EXCEEDING THE ESL WAS IDENTIFIED WITHIN THE PROJECT AREA.

CONDUCT PIS WORK IN ACCORDANCE WITH SECTION 02 61 13. THE PIS

BOUNDARY IS AS FOLLOWS:

1. LATERAL BOUNDARY: SOIL AT DEMOLISHED BUILDING 21003 FOOTPRINT

PLUS 3 FEET FROM THE EDGE OF THE FOOTPRINT

2. VERTICAL BOUNDARY: 0-2 FEET BELOW GROUND SURFACE

D. PREPARE A SOIL MANAGEMENT PLAN FOR GOVERNMENT REVIEW AND

APPROVAL PRIOR TO ANY SITE DISTURBANCE.

E. REUSE THE PIS UNDER 1 FT OF CLEAN SOIL OR IMPERVIOUS SURFACE (I.E.

BUILDING SLAB, PAVEMENT, ETC.) IF THE SOIL MEETS THE GEOTECHNICAL

REQUIREMENTS SPECIFIED IN SECTION 31 23 00.00 20 EXCAVATION AND FILL.

DO NOT REUSE OR RELOCATE PIS IN UTILITY TRENCHES.

F. PLACE A PERMEABLE BUT PROTECTIVE BARRIER (I.E. ORANGE WARNING

BARRIER GEOTEXTILE) BELOW AND ABOVE THE PIS. PROVIDE A CLOSURE

REPORT WITH DRAWINGS SHOWING THE PIS RELOCATION AREAS.

G. STOCKPILE PIS SEPARATELY AND DO NOT MIX PIS WITH CLEAN SOIL.

H. EXCESS SOIL THAT WILL BE TRANSPORTED OFF-SITE FOR REUSE OR

DISPOSAL MUST BE CHARACTERIZED TO ENSURE COMPLIANCE WITH

FEDERAL, GUAM AND RECIPIENT GUIDELINES AND REQUIREMENTS. PROVIDE

NECESSARY SOIL SAMPLING AND CHARACTERIZATION FOR DISPOSAL.

1. PIS: IF REUSING OF PIS IS NOT FEASIBLE, DISPOSE OF THE SOIL AT A

PERMITTED FACILITY IN THE MAINLAND U.S. IF DISPOSAL THE OF PIS IS

REQUIRED, CONTRACTOR MUST CONTACT THE CONTRACTING OFFICER.

2. OTHER EXCESS SOIL: COMPLY SOIL TESTING AND DISPOSAL

REQUIREMENTS SPECIFIED IN SECTION 31 23 00.00 20 EXCAVATION AND

FILL.

WORKER SAFETY NOTES

HAZARDOUS MATERIAL

DEMOLITION/REMOVAL NOTES

LEGEND AND ABBREVIATIONS

ACM ASBESTOS-CONTAINING MATERIAL

LBP LEAD-BASED PAINT (LEAD CONCENTRATION ≥ 5,000 MG/KG)

LCP LEAD-CONTAINING PAINT (LEAD CONCENTRATION < 5,000 MG/KG)

MG/KG MILLIGRAMS PER KILOGRAM

MEC MUNITIONS AND EXPLOSIVES OF CONCERN

MPPEH MATERIAL POTENTIALLY PRESENTING AN EXPLOSIVE HAZARD

PCB POLYCHLORINATED BIPHENYL

PIS PESTICIDE-IMPACTED SOIL

SQ. FT. SQUARE FOOT

TSCA TOXIC SUBSTANCES CONTROL ACT

A. A HAZARDOUS BUILDING MATERIAL SURVEY REPORT IS AVAILABLE UPON

REQUEST. CONDUCT ADDITIONAL HAZARDOUS MATERIAL TESTING, AS

NEEDED.

B. ASBESTOS-CONTAINING MATERIALS (ACM): ACM DISTURBANCE WORK MUST

COMPLY WITH THE REQUIREMENTS IN SECTION 02 82 00 ASBESTOS

REMEDIATION. THE CONFIRMED ACM IS AS FOLLOW:

ACM: 550 LINEAR FEET OF LIGHT GRAY CEMENT DRAINPIPE (18% ASBESTOS)

C. LEAD-BASED PAINTS (LBP) AND LEAD-CONTAINING PAINTS (LCP): COMPLY

WITH THE REQUIREMENTS IN SECTION 02 83.00 LEAD REMEDIATION.

1. ASSUME ALL PAINTED SURFACE CONTAINS LEAD.

2. TOTAL PAINT REMOVAL IS NOT ANTICIPATED, EXCEPT WHERE

DEMOLITION ACTIVITIES, SUCH AS CUTTING, GRINDING, OR

PENETRATION, WOULD GENERATE AIRBORNE LEAD DUST.

3. PAINT IN POOR CONDITIONS, SUCH AS CRACKING, PEELING, CHIPPING

OR FLAKING, MUST BE REMOVED PRIOR TO ANY DEMOLITION ACTIVITIES.

4. PAINT WASTE SHALL BE TESTED FOR TOXICITY CHARACTERISTIC

LEACHING PROCEDURE (TCLP) PRIOR TO DISPOSAL.

D. POLYCHLORINATED BIPHENYLS (PCB): CONDUCT WORK IN ACCORDANCE

WITH SECTION 02 84 33 REMOVAL AND DISPOSAL OF PCBS.

1. TRANSFORMER: NO PCB INFORMATION WAS AVAILABLE FOR THE

TRANSFORMER OIL. ASSUME THE OIL CONTAINS PCB GREATER THAN 50

PPM WHICH IS A TOXIC SUBSTANCES CONTROL ACT (TSCA) REGULATED

WASTE. COLLECT AN OIL SAMPLE FOR PCB ANALYSIS AND DISPOSE OF

THE OIL ACCORDINGLY IN ACCORDANCE WITH TSCA.

2. TRANSFORMER PAD: REPORTABLE LEVELS OF PCB WERE FOUND

BELOW THE CONCENTRATION, 2 MG/KG, THAT LOCAL RECYCLING OR

DISPOSAL FACILITIES ARE PERMITTED TO ACCEPT THE DEMOLISHED

DEBRIS. THE CONCRETE SAMPLING WAS LIMITED TO THE EXPOSED

TRANSFORMER PAD ALONG THE CONCRETE PAD. CONDUCT FURTHER

CONCRETE SAMPLING AND TESTING FOR THE ENTIRE PAD WHEN THE

TRANSFORMER AND ELECTRICAL EQUIPMENT IS REMOVED.

E. NO HAZARDOUS MATERIAL SURVEY WAS CONDUCTED FOR THE

UNDERGROUND UTILITIES (I.E. WATER, SEWER PIPELINES) TO BE

DEMOLISHED. IF SUSPECT MATERIALS PREVIOUSLY UNFORESEEN BECOME

UNCOVERED, CONDUCT ADDITIONAL TESTING WITH THE CONTRACTOR'S

EXPENSE PRIOR TO DISTURBANCE OF SUSPECTED MATERIALS. IF

HAZARDOUS MATERIAL REMOVAL/ABATEMENT IS REQUIRED FOR

UNFORESEEN MATERIALS, CONTRACTOR MUST CONTACT THE

CONTRACTING OFFICER.

APPROXIMATE PROJECT LIMITS

PESTICIDE-IMPACTED SOIL

LEGEND

PESTICIDE-IMPACTED SOIL AT DEMOLISHED BUILDING 21003 FOOTPRINT:

LATERAL: SOIL AT DEMOLISHED BUILDING 21003 FOOTPRINT PLUS 3

FEET FROM THE EDGE OF THE FOOTPRINT

VERTICAL: ASSUME 0-2 FEET BELOW GROUND SURFACE

PIS BOUNDARY:

LATERAL: SOIL AT DEMOLISHED BUILDING 21003 FOOTPRINT PLUS 3 FEET

FROM THE EDGE OF THE FOOTPRINT

VERTICAL: 0-2 FEET BELOW GROUND SURFACE

BONNIS BOULEVARD

PLAN

NORTH

" 50"

150"

0"

50"

20" 30"

AM

D

R

FI

s

/1

0/

JC

AMENDMENT NO. 0002

1 2 3 4 5

D

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE

AN

D

ER

SE

N A

IR

F

O R

C E

BA

SE

G U

AM

, M

.I.

N

AV

FA

C P

AC

IF

IC

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

AN

D

ER

SE

N A

IR

F

O R

C E

BA

SE

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC DATE

APPROVED

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AS SHOWN

1641920

FIRE PROTECTION

FY

M

IL

C O

N P

-3

/ A

JJ

Y2

AP

SI

AI

R

FI

EL

D D

AM

AG

E R

EP

AI

R W

AR

EH

O U

SE

N

AV

FA

C

P

AC

IF

IC

FI

N

AL

D

ES

IG

N S

U

BM

IT

TA

L

JACOBS GOVERNMENT SERVICES COMPANY

777 MAIN STREET

FORT WORTH, TEXAS 76102 UNITED STATES

N62742-17-D-0003

A/E INFO

D

C

B

A

A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274219F0342

JEG NO. WFXO6314

DRAWFORM REVISION: 30 APR 2015

Eunjin Kotkovetz 11/10/2021

CL CL EK

1 2 3 4 5

D

C

B

A

1 2 3 4

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE

AN

D

ER

SE

N A

IR

F

O R

C E

BA

SE

G U

AM

, M

.I.

N

AV

FA

C P

AC

IF

IC

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

AN

D

ER

SE

N A

IR

F

O R

C E

BA

SE

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC DATE

APPROVED

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AS SHOWN

1641920

FIRE PROTECTION

FY

M

IL

C O

N P

-3

/ A

JJ

Y2

AP

SI

AI

R

FI

EL

D D

AM

AG

E R

EP

AI

R W

AR

EH

O U

SE

N

AV

FA

C

P

AC

IF

IC

FI

N

AL

D

ES

IG

N S

U

BM

IT

TA

L

JACOBS GOVERNMENT SERVICES COMPANY

777 MAIN STREET

FORT WORTH, TEXAS 76102 UNITED STATES

N62742-17-D-0003

A/E INFO

D

C

B

A

A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274219F0342

JEG NO. WFXO6314

DRAWFORM REVISION: 30 APR 2015

EMS HSJ EMS

AMENDMENT NO. 0002

C-504

M

IS

C

EL

LA

N

EO

U

S D

ET

AI

LS

EMS HSJ EMS

C1 VALVE AND BOX ASSEMBLY DETAIL

NOT TO SCALE

C3 VALVE BOX DETAIL

NOT TO SCALE

A1 TAPPING SLEEVE AND VALVE INSTALLATION DETAIL

NOT TO SCALE

A3 WATERLINE TRENCH DETAIL

NOT TO SCALE

A5 CONCRETE THRUST BLOCK SCHEDULE

NOT TO SCALE

D1 IDENTIFICATION TAG FOR VALVE BOX COVER

NOT TO SCALE

C4 POST INDICATOR VALVE DETAIL

NOT TO SCALE

17246046

DATE: 11/10/21

/1

0/

I

C

B

A

1 2 3 4

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE

AN

D

ER

SE

N A

IR

F

O R

C E

BA

SE

G U

AM

, M

.I.

N

AV

FA

C P

AC

IF

IC

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

AN

D

ER

SE

N A

IR

F

O R

C E

BA

SE

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC DATE

APPROVED

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AS SHOWN

1641920

FIRE PROTECTION

FY

M

IL

C O

N P

-3

/ A

JJ

Y2

AP

SI

AI

R

FI

EL

D D

AM

AG

E R

EP

AI

R W

AR

EH

O U

SE

N

AV

FA

C

P

AC

IF

IC

FI

N

AL

D

ES

IG

N S

U

BM

IT

TA

L

JACOBS GOVERNMENT SERVICES COMPANY

777 MAIN STREET

FORT WORTH, TEXAS 76102 UNITED STATES

N62742-17-D-0003

A/E INFO

D

C

B

A

A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274219F0342

JEG NO. WFXO6314

DRAWFORM REVISION: 30 APR 2015

EMS HSJ EMS

AMENDMENT NO. 0002

C-506

A1 CATCH BASIN DETAIL

NOT TO SCALE

M

IS

C

EL

LA

N

EO

U

S D

ET

AI

LS

EMS HSJ EMS

A4 STORM DRAINAGE MANHOLE DETAIL

NOT TO SCALE

C3 DRAINAGE PIPE TRENCH DETAIL

NOT TO SCALE

A4 PLAN

NOT TO SCALE

B4 PLAN

NOT TO SCALE

C3 @LANDSCAPE

NOT TO SCALE

C4 @AC PAVEMENT

NOT TO SCALE

A

B

A3 METAL GRATING DETAILS

NOT TO SCALE

D1 CONNECTION TO EXISTING CATCH BASIN

NOT TO SCALE

17246048

DATE: 11/10/21

C

B

A

1 2 3 4

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE

AN

D

ER

SE

N A

IR

F

O R

C E

BA

SE

G U

AM

, M

.I.

N

AV

FA

C P

AC

IF

IC

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

AN

D

ER

SE

N A

IR

F

O R

C E

BA

SE

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC DATE

APPROVED

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AS SHOWN

1641920

FIRE PROTECTION

FY

M

IL

C O

N P

-3

/ A

JJ

Y2

AP

SI

AI

R

FI

EL

D D

AM

AG

E R

EP

AI

R W

AR

EH

O U

SE

N

AV

FA

C

P

AC

IF

IC

FI

N

AL

D

ES

IG

N S

U

BM

IT

TA

L

JACOBS GOVERNMENT SERVICES COMPANY

777 MAIN STREET

FORT WORTH, TEXAS 76102 UNITED STATES

N62742-17-D-0003

A/E INFO

D

C

B

A

A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274219F0342

JEG NO. WFXO6314

DRAWFORM REVISION: 30 APR 2015

EMS HSJ EMS

AMENDMENT NO. 0002

C-507

M

IS

C

EL

LA

N

EO

U

S D

ET

AI

LS

EMS HSJ EMS

A1 SEWERLINE TRENCH DETAIL

NOT TO SCALE

B1 SEWERLINE TRENCH BELOW A.C. PAVEMENT DETAIL

NOT TO SCALE

A3 SEWERLINE MANHOLE DETAIL

NOT TO SCALE

A3 PLAN

NOT TO SCALE

B3 SECTION

NOT TO SCALE

A5 FLEXIBLE SMH CONNECTION DETAIL

NOT TO SCALE

A4 SECTION

NOT TO SCALE

A5 TOP VIEW

NOT TO SCALE

C4 CONNECTION TO EXIST SEWERLINE - TYPE A

NOT TO SCALE

D4 CONNECTION TO EXIST SEWERLINE - TYPE B

NOT TO SCALE

D1 SEWER MANHOLE ADJUSTMENT DETAIL

NOT TO SCALE

D3 DETAIL

NOT TO SCALE

17246049

DATE: 11/10/21

/1

0/

I

C

B

A

1 2 3 4

SHEET OF

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE

AN

D

ER

SE

N A

IR

F

O R

C E

BA

SE

G U

AM

, M

.I.

N

AV

FA

C P

AC

IF

IC

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

AN

D

ER

SE

N A

IR

F

O R

C E

BA

SE

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC DATE

APPROVED

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AS SHOWN

1641920

FIRE PROTECTION

FY

M

IL

C O

N P

-3

/ A

JJ

Y2

AP

SI

AI

R

FI

EL

D D

AM

AG

E R

EP

AI

R W

AR

EH

O U

SE

N

AV

FA

C

P

AC

IF

IC

FI

N

AL

D

ES

IG

N S

U

BM

IT

TA

L

JACOBS GOVERNMENT SERVICES COMPANY

777 MAIN STREET

FORT WORTH, TEXAS 76102 UNITED STATES

N62742-17-D-0003

A/E INFO

D

C

B

A

A/E Contract No. N62742-17-D-0003 A/E Task Order No. N6274219F0342

JEG NO. WFXO6314

DRAWFORM REVISION: 30 APR 2015

EMS HSJ EMS

AMENDMENT NO. 0002

C-509

M

IS

C

EL

LA

N

EO

U

S D

ET

AI

LS

EMS HSJ EMS

A1 STANDARD SILT FENCE DETAIL

NOT TO SCALE

B2 SECTION A-A

NOT TO SCALE

A4 SANDBAGS TYPICAL INSTALLATION DETAIL

NOT TO SCALE

A3 ELEVATION

NOT TO SCALE

A4 SECTION

NOT TO SCALE

B4 STABILIZED CONSTRUCTION ENTRANCE

NOT TO SCALE

17246051

DATE: 11/10/21

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

10 Nov 2021

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

AM

D

R

FI

/1

0/

I

JC

11-10-2021

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

AM

D

R

FI

/1

0/

I

JC

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

AM

D

R

FI

/1

0/

I

JC

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

AM

D

R

FI

/1

0/

I

JC

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

AM

D

R

FI

/1

0/

I

JC

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

AM

D

R

FI

/1

0/

I

JC

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

AM

D

R

FI

/1

0/

I

JC

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

AM

D

R

FI

s

/1 0/

I

JC

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

AM

D

R

FI

/1

0/

I

JC

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

11/10/2021

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

C

B

A

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 22 X 34

REDUCED PRINT. USE GRAPHIC SCALES

1 2 3 4

D

C

B

A

P3000 AMD# 002 - CV & EV
C-102 - TEMPORARY EROSION CONTROL PLAN
CE001 - ENVIRONMENTAL PROTECTION AND HAZMAT NOTES
C-504 - MISCELLANEOUS DETAILS
C-506 - MISCELLANEOUS DETAILS
C-507 - MISCELLANEOUS DETAILS
C-509 - MISCELLANEOUS DETAILS
P3000 AMD# 002 - ST
S-001 - GENERAL STRUCTURAL NOTES
SB102 - PARTIAL FOUNDATION PLAN -AREA A
S-202 - ELEVATIONS
S-203 - ELEVATIONS
S-204 - ELEVATIONS
S-400 - ENLARGED PLANS AND SECTIONS
S-502 - TYPICAL CONCRETE DETAILS
S-504 - PRECAST SECTIONS AND DETAILS
S-505 - PRECAST SECTIONS AND DETAILS
P3000 AMD# 002 - AR
AE102 - PARTIAL FLOOR PLAN - AREA A
AE103 - PARTIAL FLOOR PLAN - AREA B
AE104 - PARTIAL FLOOR PLAN - AREA C
AE105 - PARTIAL FLOOR PLAN - AREA D
AE121 - OVERALL REFLECTED CEILING PLAN
A-201 - EXTERIOR ELEVATIONS
A-202 - EXTERIOR ELEVATIONS
A-203 - EXTERIOR ELEVATIONS
A-612 - DOOR, WINDOW & LOUVER DETAILS
P3000 AMD@ 002 - EE
EG101 - GROUNDING PLAN
E-401 - ENLARGED PLAN
E-501 - DETAILS
DATE: 16 NOV 2021
2021-11-16T12:02:01-1000

2021-11-16T12:02:26-1000

2021-11-16T12:02:27-1000

2021-11-16T12:03:41-1000

2021-11-16T12:03:41-1000

2021-11-16T12:03:42-1000

2021-11-16T12:03:42-1000

2021-11-16T12:03:43-1000

2021-11-16T12:04:37-1000

2021-11-16T12:04:37-1000

2021-11-16T12:04:38-1000

2021-11-16T12:04:38-1000

2021-11-16T12:05:42-1000

2021-11-16T12:06:29-1000

2021-11-16T12:06:30-1000

2021-11-16T12:07:20-1000

2021-11-16T12:07:21-1000

2021-11-16T12:07:21-1000

2021-11-16T12:07:22-1000

2021-11-16T12:07:23-1000

2021-11-16T12:07:23-1000

2021-11-16T12:09:15-1000

2021-11-16T12:10:09-1000

2021-11-16T12:10:10-1000

2021-11-16T12:10:11-1000

2021-11-16T12:11:21-1000

2021-11-16T12:11:22-1000

File details come from the government source that posted it. Updated .