This solicitation is for the design and construction of an airfield damage repair storage facility at Andersen Air Force Base in Guam. The Navy is seeking bids to construct a 7,000 square meter concrete facility with supporting site utilities, pavements, and improvements. The facility will be designed in accordance with Department of Defense and Air Force criteria for high-performance sustainable buildings. Bids are due by the date specified in the solicitation issued by the Naval Facilities Engineering Command. The selected contractor will be responsible for designing and building the storage warehouse to provide a complete and usable facility.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5893336

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RFP N62742-22-R-1308, WON 1641920, FY22 MILCON PROJECT AJJY163000 APSI - AIRFIELD DAMAGE REPAIR WAREHOUSE, ANDERSEN

AIR FORCE BASE, GUAM

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Nov-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274222R1308

X 9B. DATED (SEE ITEM 11)

06-Oct-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Nov-2021

CODE

NAVFAC PACIFIC

CONSTRUCTION CONTRACTS BR (CODE ACQ33)

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

N62742 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6274222R1308

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

SMALL BUSINESS SUBCONTRACTING PLAN

Delete the SMALL BUSINESS SUBCONTRACTING PLAN and replace with the attached SMALL BUSINESS SUBCONTRACTING PLAN (Amendment 0002).

SPECIFICATIONS

PROJECT TABLE OF CONTENTS

Delete the PROJECT TABLE OF CONTENTS and replace it with the attached PROJECT TABLE OF CONTENTS (Amendment 0002)

SUBMITTAL REGISTER

Delete the SUBMITTAL REGISTER and replace it with the attached SUBMITTAL REGISTER Amendment 0002

SECTION 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

Delete and replace with the attached Section 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL Amendment 0002.

SECTION 02 82 00 ASBESTOS REMEDIATION

Delete and replace with the attached Section 02 82 00 ASBESTOS REMEDIATION Amendment 0002

SECTION 02 83 00 LEAD REMEDIATION

Delete and replace with the attached Section 02 83 00 LEAD REMEDIATION Amendment 0002

SECTION 03 30 00 CAST-IN-PLACE CONCRETE

Delete and replace with the attached SECTION 03 30 00 CAST-IN-PLACE CONCRETE Amendment 0002

SECTION 03 45 33 PRECAST AND PRESTRESSED STRUCTURAL CONCRETE

Delete and replace with the attached Section 03 45 33 PRECAST AND PRESTRESSED STRUCURAL CONCRETE Amendment 0002

SECTION 09 90 00 PAINTS AND COATINGS

Delete and replace with the attached Section 09 90 00 PAINTS AND COATINGS Amendment 0002

SECTION 10 14 00.20 INTERIOR SIGNAGE

Delete SECTION 10 14 00.20 INTERIOR SIGNAGE in its entirety and from the Project Table of Contents.

SECTION 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM

Delete and replace with the attached Section 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM Amendment 0002.

SECTION 32 12 13 BITUMINOUS TACK AND PRIME COATS

Delete and replace with the attached Section 32 12 13 BITUMINOUS TACK AND PRIME COATS Amendment 0002.

SECTION 32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

Delete and replace with the attached Section 32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS Amendment 0002.

DOCUMENT 00 01 15 LIST OF DRAWINGS

1.2 CONTRACT DRAWINGS

The following drawings are revised as of 10 November 2021:

NAVFAC DWG NO.

TITLE

17246036

C-102 – TEMPORARY EROSION CONTROL PLAN

17246037 CE001 – ENVIRONMENTAL PROTECTION AND HAZMAT NOTES

17246046 C-504 – MISCELLANEOUS DETAILS

17246048 C-506 – MISCELLANEOUS DETAILS

17246049 C-507- MISCELLANEOUS DETAILS

17246051 C-509 – MISCELLANEOUS DETAILS

17246054 S-001 – GENERAL STRUCTURAL NOTES

17246059 SB102 – PARTIAL FOUNDATION PLAN-AREA A

17246069 S-202 - ELEVATIONS

17246070 S-203 - ELEVATIONS

17246071 S-204 - ELEVATIONS

17246074 S-400 – ENLARGED PLANS AND SECTIONS

17246076 S-502 – TYPICAL CONCRETE DETAILS

17246078 S-504 – PRECAST SECTIONS AND DETAILS

17246079 S-505 – PRECAST SECTIONS AND DETAILS

17246086 A-102 – PARTIAL FLOOR PLAN-AREA A

17246087 A-103 – PARTIAL FLOOR PLAN-AREA B

17246088 A-104 – PARRTIAL FLOOR PLAN-AREA C

17246089 A-105 – PARTIAL FLOOR PLAN-AREA D

17246090 AE121 – OVERALL REFLECTED CEILING PLAN

17246092 A-201 - EXTERIOR ELEVATIONS

17246093 A-202 – EXTERIOR ELEVATIONS

17246094 A-203 – EXTERIOR ELEVATIONS

17246104 A-612 – DOOR, WINDOW & LOUVER DETAILS

17246128 EG101 – GROUNDING PLAN

17246132 E-401 – ENLARGED PLAN

17246133 E-501 - DETAILS

-- End of Amendment –

SMALL BUSINESS SUBCONTRACTING PLAN

SOLICITATION N62742-22-R-1308

Rev Oct 2017 1 Amendment 0002

INDIVIDUAL SMALL BUSINESS SUBCONTRACTING PLAN

(TO BE SUBMITTED BY OTHER THAN SMALL BUSINESSES ONLY)

(Also referred to as large businesses)

(CONTRACTOR’S NAME)

(ADDRESS)

(CONTRACTOR’S CORPORATE HEADQUARTERS ADDRESS)

[If same as above, so indicate].

N62742-22-R-1308

FY22 MILCON PROJECT AJJY163000, APSI – AIRFIELD DAMAGE REPAIR WAREHOUSE,

ANDERSEN AIR FORCE BASE, GUAM

(Date Prepared)

PLAN SUBMITTED BY:

Signature: __________________________________ Date: ____________________

Printed Name: ___________________________________________________________

Title: __________________________________________________________________

REVIEWED:

Small Business Professional Date

REVIEWED:

Small Business Administration Date Procurement Center Representative

ACCEPTED:

Procuring Contracting Officer Date

Rev Oct 2017 2

SUBCONTRACTING PLAN

This document, together with any attachments, is submitted as a subcontracting plan to satisfy the requirements of Federal Acquisition Regulations (FAR) 19.704. The following goals are established for the contract (including base period and all option items/periods (if applicable)). INCLUDE

SUPPORTING RATIONALE FOR ALL PROPOSED GOALS AND ENSURE THIS PLAN IS

CONSISTENT WITH THE SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT

ASSOCIATED WITH THIS ACQUISITION.

1. a. Total Contract Value $_______________ (Total CLINs 0001 through 0003)

b. Total Subcontracted $_______________ _______% of 1.a (inclusive of all planned subcontracting to all businesses, regardless of size)

c. Total Prime-performed $_______________ _______% of 1.a

2. The following dollars and percentage goals are applicable to the contract cited above. (See FAR 19.704(a)(1) and (2))

a. Large Business $_______________ _______% of 1.b

This number represents total planned subcontract dollars that will be awarded to other than small business concerns (including subcontracts awarded to Historically Black Colleges, Universities and Minority Institutions (HBCU/MIs).

b. Small Business (SB) $_______________ _______% of 1.b

This number represents total planned subcontract dollars that will be awarded to small business concerns** as well as subcontracts awarded under the AbilityOne Program to SourceAmerica (formerly NISH) and National Industries for the Blind (NIB) organizations and subcontracts awarded to Alaskan Native Corporations (ANCs) and Indian Tribes as prescribed in FAR 19.703(c) & FAR 52.219-9.

(** Small business concerns include SBs, Small Disadvantaged Businesses (SDB), Women-Owned Small Businesses (WOSB), Historically Underutilized Business Zone (HUBZone) small businesses, Veteran-Owned Small Businesses (VOSB) and Service-Disabled Veteran-Owned Small Businesses

(SDVOSB))

(Include 2.c, 2.d, 2.e, 2.f, 2.g, 2.h, and 2.i, below).

Notes:

(1) Lines 1.b + 1.c=100% of Line 1.a

(2) Lines 2.a + 2.b = 100% of Line 1.b

Rev Oct 2017 3

(3) Lines 2.c, 2.d, 2.e, 2.f, 2.g, 2.h, and 2.i are calculated against Line 1.b, the total value of overall subcontract dollars.

(4) Subcontracts to companies that qualify in multiple categories of SB must be reported under each category. For example: if you are planning to subcontract $100,000 to company ABC, a woman-owned SDB that is also a certified HUBZone SB, you will report $100,000 on line 2.b (SB), 2.c (HUBZone), 2.d (WOSB) and 2.e (SDB). Accordingly, the sum of 2.c through 2.i will not necessarily equate to the value of 2.b.

(5) Designated HUBZone SBs must be certified by the Small Business Administration (SBA).

c. HUBZone SB $______________ ________% of 1.b

This number represents total planned subcontract dollars that will be awarded to qualified HUBZone small business concerns certified by SBA. (Included in total for 2.b, above)

d. WOSB $_______________ ________% of 1.b

This number represents total planned subcontract dollars under that will be awarded to WOSBs.

(Included in total for 2.b, above)

e. SDB $______________ ________% of 1.b

This number represents total planned subcontracting dollars that will be awarded to small business concerns owned and controlled by socially and economically disadvantaged individuals (include in this category the planned subcontracting dollars to ANCs and Indian Tribes shown in total for 2.i below).

(Included in total for 2.b, above)

f. VOSB $_______________ ________% of 1.b

This number represents total planned subcontract dollars that will be awarded to small business concerns owned and controlled by veterans (include in this category the planned subcontracting dollars for SDVOSBs shown in 2.g below). (Included in total for 2.b, above)

g. SDVOSB $_______________ ________% of 1.b

This number represents total planned subcontract dollars under this contract that will be awarded to subcontractors who are small business concerns owned and controlled by service-disabled veterans.

(Included in totals for 2.b and 2.f, above)

h. AbilityOne $_______________ ________% of l.b.

This number represents total planned subcontract dollars that will be awarded to AbilityOne associated nonprofit agencies through SourceAmerica and NIB. Per DFARS 219.703, subcontracts awarded to qualified non-profit agencies for the blind or severely disabled may be counted toward the small business subcontracting goal. (Included in total for 2.b, above)

i. Alaskan Native Corporations &

Rev Oct 2017 4

Indian Tribes $_______________ ________% of l.b.

This number represents total planned subcontract dollars that will be awarded to ANCs and Indian Tribes and for which the prime contractor has been designated to receive SDB credit. (See FAR 19.703 & FAR 52.219-9) (Included in totals for 2.b and 2.e, above)

3. The following principal products and/or services will be subcontracted under this contract. (See FAR 19.704(a)(3)

a. Products/services planned to be subcontracted to LB concerns (including HBCU/MIs):

Firm subcontract commitments:

Name of Company/Entity Identifier Products or Services

b. Products/services planned to be subcontracted to SB concerns:

Firm subcontract commitments:

Name of Company/Entity Identifier Products or Services

c. Products/services planned to be subcontracted to certified HUBZone concerns:

Firm subcontract commitments:

Name of Company/Entity Identifier Products or Services

d. Products/services planned to be subcontracted to WOSB concerns:

Rev Oct 2017 5

Name of Company/Entity Identifier Products or Services

e. Products/services planned to be subcontracted to SDB concerns:

Firm subcontract commitments:

Name of Company/Entity Identifier Products or Services

f. Products/services planned to be subcontracted to VOSB concerns:

Firm subcontract commitments:

Name of Company/Entity Identifier Products or Services

g. Products/services planned to be subcontracted to SDVOSB concerns:

Firm subcontract commitments:

Name of Company/Entity Identifier Products or Services

h. Products/services planned to be subcontracted to AbilityOne organizations:

Rev Oct 2017 6

Name of Organization/Entity Identifier Products or Services

i. Planned products/services to be subcontracted to ANCs and Indian Tribe businesses (See 2.i above for explanation):

Firm subcontract commitments:

Name of Company/Entity Identifier Products or Services

4. The following methods were used to develop the above subcontracting goals. Include a statement explaining how the products and services to be subcontracted were established, how the products and services to be subcontracted to SB, SDB, WOSB, HUBZone, VOSB, SDVOSB concerns, AbilityOne program participants, ANCs and Indian Tribes were determined, and how their capabilities were assessed. (See FAR 19.704(a)(4))

5. The following methods were/will be used to identify potential sources for solicitation purposes: (See FAR 19.704(a)(5)) The offeror may rely on the information contained in SAM as an accurate representation of a concern’s size and ownership characteristics for the purposes of maintaining a SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB source list. Use of SAM as a source list does not relieve the offeror of its responsibilities (e.g., outreach, assistance, counseling, or publicizing subcontracting opportuniuties.

Rev Oct 2017 7

6. Indirect and overhead costs have have not been included in the goals specified in 1. and 2. above.

If "have" is checked, explain the method used in determining the proportionate share of indirect costs to be incurred with SBs (including all subcategories delineated above). (See FAR 19.704(a)(6))

7. The following employee will administer the subcontracting program: (See FAR 19.704(a)(7))

NAME: ________________________________________________________________

ADDRESS: ________________________________________________________________

TELEPHONE NO.:_____________________ FAX NO.: ___________________________

EMAIL: ____________________________________________________________________

TITLE: _____________________________________________________________________

This individual has general overall responsibility for the company's small business program. This person should have knowledge of the federal small business programs and be knowledgeable about federal procurement practices. If the prime decides to change the person in this position, they must notify the Contracting Officer and the Deputy for Small Business. The administrator is responsible for the development, preparation and execution of this subcontracting plan, and for monitoring performance relative to contractual subcontracting requirements contained in this plan, including:

a. Developing and maintaining bidders lists of SB, SDB, WOSB, HUBZone SB, VOSB, SDVOSB concerns, AbilityOne program participants, HBCU/MIs, ANCs, and Indian Tribes (hereafter referred to as the small business community) from all possible sources.

b. Counsel and discuss subcontracting opportunities with representatives of the small business community.

c. Ensuring that procurement packages are structured to permit the small business community to participate to the maximum extent possible.

d. Assuring inclusion of the small business community in all solicitations for products or services, which they are capable of providing.

e. Reviewing solicitations to remove statements, clauses, etc., which may tend to restrict or prohibit the small business community participation.

f. Assign each subcontract the NAICS code and corresponding size standard that best describes the principal purpose of the subcontract.

g. Confirm that a subcontractor representing itself as a HUBZone small business concern is certified by SBA as a HUBZone small business concern by SBA in accordance with 52.219-8(d)(2)

h. Provide notice to subcontractors concerning penalties and remedies for misrepresentations of business status as small, veteran-owned small business, HUBZone small, small disadvantaged, or women-owned small business for the purpose of obtaining a subcontract that is to be included as part or all of a goal contained in the subcontracting plan.

i. Ensuring periodic rotation of potential subcontractors on bidders lists.

Rev Oct 2017 8

j. Ensuring that the bid proposal review board documents its reasons for not selecting low bids submitted by the small business community.

k. Ensuring the establishment and maintenance of records of solicitations and subcontract award activity.

l. Attending or arranging for attendance of company counselors at Business Opportunity Workshops, Minority Business Enterprise Seminars, Trade Fairs, etc.

m. Conducting or arranging for the motivational training for purchasing personnel pursuant to the intent of P.L. 95-507.

n. Monitoring attainment of proposed goals.

o. Preparing and submitting required periodic subcontracting reports.

p. Coordinating contractor's activities during the conducting of compliance reviews by Federal agencies.

q. Coordinating the conduct of contractor's activities involving its small business subcontracting program.

r. Additional duties.

8. The following efforts will be taken to ensure that the small business community will have an equitable opportunity to compete for subcontracts. (See FAR 19.704(a)(8))

a. Outreach efforts will be made by identifying:

- Contacts with minority and small business trade associations.

- Contacts with business development organizations.

- Attendance at small and minority business procurement conference and trade fairs.

b. Sources will be requested from the System for Award Management (SAM) website available at https://www.sam.gov/ on the Internet.

Automated data base sources to be used, other than SAM, will be as follows.

c. The following internal efforts will be made to guide and encourage buyers:

(i) Workshops, seminars and training programs will be conducted.

(ii) Activities will be monitored to evaluate compliance with this subcontracting plan.

(iii) Arrange interviews with the small business community.

d. Describe how your small business database, source lists, guides, and other data will be maintained and utilized by buyers in soliciting subcontracts; e.g., rotation of firms in the data base, keeping data base current and useful.

9. Provide assurances the offeror agrees that the FAR clause 52.219-8 entitled "Utilization of Small Business Concerns " will be included in all subcontracts which offer further subcontracting opportunities, and all subcontractors, except SB concerns, that receive subcontracts in excess of $750,000 ($1,500,000 for

Rev Oct 2017 9 construction) will be required to adopt plans that comply with the requirements of the clause at 52.219-9, Small Business Subcontracting Plan. Such plans will be reviewed by comparing them with the provisions of P.L. 95-507 and assuring that all minimum requirements of an acceptable subcontracting plan have been satisfied. The acceptability of percentage goals shall be determined on a case-by-case basis depending on the supplies/services involved, the availability of potential small and small disadvantaged subcontractors, and prior experience. Once approved and implemented, plans will be monitored through the submission of periodic reports, and/or, as time and availability of funds permit, periodic visits to review subcontracting program progress. (See FAR 19.704(a)(9))

10. Provide assurances the offeror will submit such periodic reports and cooperate in any studies or surveys as may be required by the contracting agency or the Small Business Administration in order to determine the extent of compliance by the offeror (contractor) with the subcontracting plan and with FAR clause 52.219-8.

(See FAR 19.704(a)(10))

Provide assurances the offeror will:

a. Submit the Individual Subcontract Report (ISR) and the Summary Subcontract Report (SSR) using the Electronic Subcontracting Reporting System (eSRS) at http://www.esrs.gov, following the instructions in the eSRS and FAR Clause 52.219-9.

1st reporting period – Oct 1 through March 31 Submit NLT 30 April 2nd reporting period – Apr 1 through September 30 Submit NLT 30 October

Reports are required when due, regardless of whether there has been any subcontracting activity since the inception of the contract or the previous reporting period. When a Contracting Officer rejects a report, a revised report shall be submitted within 30 days of the notice of report rejection.

A separate “Final” ISR is required at contract completion.

Upon award of the contract, the identity of the individual(s) responsible for acknowledging receipt or rejecting the ISR and the SSR will be provided to the awardee.

b. After November 30, 2017, include subcontracting data for each order when reporting subcontracting achievements for indefinite-delivery, indefinite quantity contracts intended for use by multiple agencies;

c. Ensure that its large business subcontractors with subcontracting plans agree to submit the ISR and/or the the SSR using the eSRS;

d. Provide its prime contract number and its Entity Identifier number, and the e-mail address of the Government or contractor official responsible for acknowledging or rejecting the reports, to all first tier large business subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs;

e. Require that each large business subcontractor with a subcontracting plan provide the prime contract number and its own Entity Identifier number, and the e-mail address of the Government or contractor official responsible for acknowledging or rejecting the reports, to its large business subcontractors with subcontracting plans; and

Rev Oct 2017 10

f. Ensure that the identified contracting officer and small business professional assigned to the contract are included on the eSRS email notification distribution for each report.

*Note 1: If contract value is $30,000 or more and the solicitation includes FAR Clause 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards, ensure additional reporting requirements are met in eSRS in accordance with this clause.

11. The offeror will maintain at least the following types of records to document compliance with this subcontracting plan: (See FAR 19.704(a)(11))

a. Source lists, guides, and other data identifying small business, HUBZone small business, women-owned small business, small disadvantaged business, veteran-owned small business and service-disabled veteran-owned small business.

b. Organizations contacted to locate small business, HUBZone small business, women-owned small business, small disadvantaged business, veteran-owned small business and service-disabled veteran-owned small business.

c. On a contract-by-contract basis, records on all subcontract solicitations over $150,000 and indicating for each solicitation:

(i) whether small business, HUBZone SBs, WOSBs, SDBs, VOSBs and SDVOSBs were solicited, and if not, why not; and

(ii) reason why the award was not made to a small business concern.

(iii) written designations from ANCs or Indian Tribes, in accordance with FAR 19.703, if applicable.

d. Records to support other outreach efforts, e.g., contacts with small business trade associations, business development organizations, and attendance at small business procurement conferences and trade fairs, and frequency of accessing SAM.

e. Maintain records of internal guidance and encouragement to buyers through:

(i) Workshops, seminars, training; and

(ii) Monitoring performance to evaluate compliance with the program’s requirement.

f. On a contract-by-contract basis, records to support award data submitted by the contractor to the

Government including the name, address, and business size of each subcontractor.

12. Assurances that the offeror will make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that the offeror used in preparing the bid or proposal, in the same or greater scope, amount, and quality used in preparing and submitting the bid or proposal. Responding to a request for a quote does not constitute use in preparing a bid or proposal. An offeror used a small business concern in preparing the bid or proposal if – (See FAR 19.704(a)(12))

a. The offeror identifies the small business concern as a subcontractor in the bid or proposal or associated small business subcontracting plan, to furnish certain supplies or perform a portion of the contract; or

b. The offeror used the small business concern’s pricing or cost information or technical expertise in preparing the bid or proposal, where there is written evidence of an intent or understanding that the small business concern will be awarded a subcontract for the related work if the offeror is awarded the contract.

Rev Oct 2017 11

13. Assurances that the contractor will provide the contracting officer with a written explanation if the contractor fails to acquire articles, equipment, supplies, services or materials or obtain the performance of construction work as described in paragraph 12 of this plan. This written explanation will be submitted to the contracting officer within 30 days of contract completion. (See FAR 19.704(a)(13))

14. Assurances that the contractor will not prohibit a subcontractor from discussing with the contracting officer any material matter pertaining to payment to or utilization of a subcontractor. (See FAR 19.704(a)(14))

15. Assurances that the offeror will pay its small business subcontractors on time and in accordance with the terms and conditions of the subcontract, and notify the contracting officer if the offeror pays a reduced or an untimely payment to a small business subcontractor (see 52.242-5). (See FAR 19.704(a)(15))

*****END OF PLAN*****

The original copy of this plan will be included in the file and made a material part of the contract.

Copy to:

Small Business Professional SBA Procurement Center Representative

AJJY163000, APSI - Airfield Damage Repair Warehouse 1641920 Andersen AFB, Guam

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 08/15 SUMMARY OF WORK

01 14 00 11/11 WORK RESTRICTIONS

01 20 00.00 20 11/11 PRICE AND PAYMENT PROCEDURES

01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 05/17 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

01 32 17.00 20 05/18 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00 08/18 SUBMITTAL PROCEDURES

01 33 29 02/17 SUSTAINABILITY REPORTING

01 35 26 02/17 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 11/11 QUALITY CONTROL

01 45 35 02/15 SPECIAL INSPECTIONS

01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 11/15 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL

CONTROLS

01 57 19.03 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL

CONTROLS (JRM-ESS)

01 58 00 08/19 PROJECT IDENTIFICATION

01 74 19 02/19 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19 CLOSEOUT SUBMITTALS

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 02/15 FACILITY ELECTRONIC OPERATION AND

MAINTENANCE SUPPORT INFORMATION (eOMSI)

01 91 00.15 02/19 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 05/10 DEMOLITION

02 61 13 02/10 EXCAVATION AND HANDLING OF

CONTAMINATED MATERIAL

02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS

02 82 00 11/18 ASBESTOS REMEDIATION

02 83 00 11/18 LEAD REMEDIATION

02 84 33 04/06 REMOVAL AND DISPOSAL OF

POLYCHLORINATED BIPHENYLS (PCBs)

DIVISION 03 - CONCRETE

03 30 00 02/19 CAST-IN-PLACE CONCRETE

03 45 33 05/16 PRECAST AND PRESTRESSED STRUCTURAL

CONCRETE

DIVISION 04 - MASONRY

04 20 00 11/15 UNIT MASONRY

DIVISION 05 - METALS

05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS

PROJECT TABLE OF CONTENTS Page 1 Amendment 0002 11/10/2021

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 27 36 05/17 SPRAY FOAM AIR BARRIERS

07 57 12 10/19 LIQUID APPLIED ELASTOMERIC SILICONE

WALL COATING

07 57 16 10/19 LIQUID APPLIED ELASTOMERIC ACRYLIC

ROOFING

07 60 00 05/17 FLASHING AND SHEET METAL

07 84 00 05/10 FIRESTOPPING

07 92 00 08/16 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 16 05/17 ALUMINUM DOORS AND FRAMES

08 33 23 08/15 OVERHEAD COILING DOORS

08 51 13 05/19 ALUMINUM WINDOWS (OPTION ITEM NO. 1)

08 71 00 02/16 DOOR HARDWARE

08 81 00 05/19 GLAZING (OPTION ITEM NO. 1)

08 91 00 05/11 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 90 00 05/11 PAINTS AND COATINGS (OPTION ITEM NO. 2

- Interior Painting)

09 96 00 11/14 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.10 08/17 EXTERIOR SIGNAGE

10 14 53 02/15 TRAFFIC SIGNAGE

10 71 13.13 04/06 STORM SHUTTERS (OPTION ITEM NO. 1)

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 05/18 SEISMIC BRACING FOR MISCELLANEOUS

EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 20 04/08 WET PIPE SPRINKLER SYSTEM, FIRE

PROTECTION

21 30 00 04/08 FIRE PUMPS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 08/18 AIR SUPPLY, DISTRIBUTION, VENTILATION,

AND EXHAUST SYSTEMS

23 05 48.19 05/18 SEISMIC BRACING FOR HVAC

23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 81 00.00 20 11/09 UNITARY AIR CONDITIONING EQUIPMENT

PROJECT TABLE OF CONTENTS Page 2

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.21 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS FIRE AND LIFE SAFETY

25 05 11.23 02 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS BUILDING CONTROL

SYSTEMS INCLUDING ELECTRICAL,

LIGHTING, AND HVAC

25 05 11.26 01 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS ADVANCED METERING

INFRASTRUCTURE (AMI)

DIVISION 26 - ELECTRICAL

26 00 00.00 20 07/06 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 08 00 08/08 APPARATUS INSPECTION AND TESTING

26 12 19.10 05/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 13 00 11/14 HIGH-FIREPOINT FLUIDS INSULATED

PAD-MOUNTED SWITCHGEAR

26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM

26 27 14.00 20 02/11 ELECTRICITY METERING

26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 51 00 05/16 INTERIOR LIGHTING

26 56 00 05/13 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 63.00 20 10/07 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM

SYSTEM

DIVISION 31 - EARTHWORK

31 23 00.00 20 02/11 EXCAVATION AND FILL

31 32 23 08/08 FOUNDATION DRILLING AND GROUTING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 08/08 FIELD MOLDED SEALANTS FOR SEALING

JOINTS IN RIGID PAVEMENTS

32 11 23 08/17 AGGREGATE BASE COURSES

32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS

32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 11/11 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16 PAVEMENT MARKINGS

32 92 19 08/17 SEEDING

DIVISION 33 - UTILITIES

PROJECT TABLE OF CONTENTS Page 3

33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 02/10 STORM DRAINAGE UTILITIES

33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 51 PAGES

AJJY163000, APSI - Airfield Damage Repair Warehouse

02 41 00 SD-01 Preconstruction Submittals

1.8Existing Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

1.6 GNotification

02 61 13 SD-03 Product Data

1.2.5 GWork Plan

1.2.10 GWork Plan

3.11 GClosure Report

SD-06 Test Reports

3.5Confirmation Sampling and

Analysis

3.7.1 GSampling of Stored Material

3.7.2 GSampling Liquid

3.9.2Compaction

3.10 GTurn-in Documents or Weight

Tickets

1.2.2 GSoil Testing Report

02 81 00 SD-03 Product Data

2.1.1Packaging Notifications

3.1 GHazardous Waste Management

Plan

3.2 GOnsite Hazardous Waste

Management

3.3Notices of Non-Compliance and

Notices of Violation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 51 PAGES

02 81 00 SD-06 Test Reports

3.7 GRecordkeeping

3.7 GException Report

3.8Spill Response

SD-07 Certificates

1.4.1 GTransportation and Disposal

Coordinator

1.4.2 GTraining

1.4.3Certification

3.3.3 GShipping Documents and

Packagings Certification

3.3.4Security Plan

3.3.5Certificates of Disposal

3.6Waste Minimization

02 82 00 SD-03 Product Data

1.2.2 GAmended Water

1.3.9 GSafety Data Sheets (SDS) for All

Materials

2.1 GEncapsulants

3.1.2.1 GRespirators

3.1.7 GLocal Exhaust Equipment

3.1.8 GVacuums

3.1.10 GGlovebags

SD-06 Test Reports

1.5.5 GAir Sampling Results

3.2.7.2 GEncapsulation Test Patches

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 51 PAGES

02 82 00 3.2.8.4 GClearance Sampling

3.3.3.2 GAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4 GEmployee Training

1.3.5 GNotifications

1.3.7 GRespiratory Protection Program

1.3.10 GAsbestos Hazard Abatement Plan

1.3.11 GTesting Laboratory

1.3.12 GLandfill Approval

1.3.12 GDelivery Tickets

1.3.12 GWaste Shipment Records

1.3.13 GTransporter Certification

1.3.14 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2 GDesignated Competent Person

1.5.3 GWorker's License or Certificate

1.5.4 GContractor's License or Certificate

1.5.8 GFederal, State or Local Citations

on Previous Projects

2.1 GEncapsulants

3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.2 GWater Filtration Equipment

3.1.8 GVacuums

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 51 PAGES

02 82 00 3.1.8 GVentilation Systems

SD-11 Closeout Submittals

1.3.5 GPermits and Licenses

1.3.5 GNotifications

1.3.7.1 GRespirator Program Records

1.5.6 GProtective Clothing

Decontamination Quality Control

Records

1.5.7 GProtective Clothing

Decontamination Facility

Notification

1.7.1 GRental Equipment

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.4 GMedical Examinations

1.5.2.8 GLead Waste Management Plan

1.5.2.2 GLead Compliance Plan

3.5.2.1 GWritten Evidence of TSD

Approval

SD-03 Product Data

1.6.1Respirators

1.6.4Vacuum Filters

2.1Materials and Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 51 PAGES

02 83 00 2.1.1Expendable Supplies

SD-06 Test Reports

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.3 GSampling Results

SD-07 Certificates

1.5.1.3 GTesting Laboratory

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

3.5.2.1 GTurn-In Documents or Weight

Tickets

02 84 33 SD-01 Preconstruction Submittals

1.2.1 GPCB Testing Result

SD-07 Certificates

1.7.1Training certification

1.7.2Qualifications of CIH

1.7.3 GPCB Sampling and Analysis Plan

and Report

1.7.4PCB work plan

1.7.5 GPCB disposal plan

1.7.6 GNotification

3.8 GTransporter certification

3.5.4 GCertification of Decontamination

3.5.5 GPost cleanup sampling

3.8.1Certificate of disposal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 51 PAGES

02 84 33 3.8.1 GClosure Report

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Plan

1.6.7 GQuality Control Personnel

Certifications

1.6.7Quality Control Organizational

Chart

1.6.9 GLaboratory Accreditation

1.6.2.1 GForm Removal Schedule

3.3.10Maturity Method Data

SD-02 Shop Drawings

1.6.2.1Formwork

1.6.2.2 GReinforcing Steel

SD-03 Product Data

2.4.4Joint Sealants

2.4.3Joint Filler

2.1Formwork Materials

2.3.1Cementitious Materials

2.4.5Vapor Retarder

2.4.1Concrete Curing Materials

2.6Reinforcement

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 51 PAGES

03 30 00 2.2.2Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

1.6.3.4Finishing Plan

2.4.2Nonshrink Grout

SD-04 Samples

1.6.5.1Slab Finish Sample

1.6.5.2Surface Finish Samples

SD-05 Design Data

1.6.1.2 GConcrete Mix Design

1.6.1.1Formwork Calculations

SD-06 Test Reports

1.6.1.2 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.13.2.3 GCompressive Strength Tests

3.13.2.5Unit Weight of Structural

Concrete

3.13.2.6Chloride Ion Concentration

3.13.2.4Air Content

3.13.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 51 PAGES

03 30 00 1.9Welder Qualifications

1.6.3.3Silica Fume Manufacturer's

Representative

1.6.3.5VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.6Safety Data Sheets

1.8.1Forest Stewardship Council

(FSC) Certification

1.6.7.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.4Joint Sealants

2.4.1Curing Compound

03 45 33 SD-02 Shop Drawings

2.1.1.2 GDrawings of Precast Members

2.1.1.2 GDrawings of Precast and

Prestressed Concrete Members

SD-03 Product Data

2.2.9.1Inserts

2.2.10Bearing Pads

SD-04 Samples

2.3.11Surface Finish

SD-05 Design Data

2.1.1.2 GDesign Calculations

1.4.3 GConcrete Mix Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 51 PAGES

03 45 33 SD-06 Test Reports

1.4.3 GConcrete Mix Design

2.2.2.1Fly Ash

2.2.2.2Pozzolan

2.2.2.4Ground Granulated Blast-Furnace

Slag

2.2.4Aggregates

1.4.1.1Concrete and Aggregate Quality

Control Testing

2.2.3Water

SD-07 Certificates

2.3Quality Control Procedures

3.12 GConstruction Records

1.4.1.3Erector's Post Audit Declaration

SD-11 Closeout Submittals

1.4.4Batch Ticket

2.2.1 SRecycled Content for Fly Ash and

Pozzolan

2.2.1 SRecycled Content for Ground Iron

Blast-Furnace Slag

2.2.1Recycled Content for Silica Fume

04 20 00 SD-02 Shop Drawings

3.3.2.1 GCut CMU

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 51 PAGES

04 20 00 2.2.2.2.1 GCement

2.4.1.1 GCementitious Materials

SD-04 Samples

2.2.2.2 GConcrete Masonry Units (CMU)

2.4.1.3 GAdmixtures for Masonry Mortar

2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

3.2.4 GBracing Calculations

SD-06 Test Reports

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

SD-07 Certificates

1.3.1 GSpecial Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.2.3Precast Concrete Units

2.4.1.1Cementitious Materials

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 51 PAGES

04 20 00 2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.2.2 SRecycled Content

05 50 13 SD-02 Shop Drawings

2.3 GBollards/Pipe Guards

2.4 GAngles and Plates

SD-07 Certificates

2.1 GCertified Mill

06 10 00 SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.9.1Certificates of Grade

1.7Preservative Treatment

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-07 Certificates

1.6.1.1Pressure Test Agency

1.6.1.2Thermographer Qualifications

1.6.2Test Instruments

1.6.2Date Of Last Calibration

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 51 PAGES

07 05 23 SD-06 Test Reports

3.5 GPressure Test Procedures

1.6.3 GAir Leakage Test Report

3.5.8 GAir Leakage Test Report

1.6.3 GDiagnostic Test Report

3.6.4 GDiagnostic Test Report

07 27 36 SD-01 Preconstruction Submittals

1.10.1 GQualification of Manufacturer

1.10.2 GQualification of Installer

1.11 GQuality Control Plan

1.11 GSafety Plan

1.9.1 GFire Prevention Plan

1.9.2 GRespirator Plan

SD-02 Shop Drawings

1.5Spray Foam Air Barrier

1.11 GFoam Air Barrier System

1.5.1 GFire-Rated Assemblies

SD-03 Product Data

2.1.2 GClosed Cell

2.2 GPrimers, Adhesives, and Mastics

2.4 GSealants

1.5.2 GSafety Data Sheets

2.1.1 GThermal Barrier Materials

2.1.2 SRecycled Content for Closed Cell

Spray Foam Air Barrier

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 51 PAGES

07 27 36 1.5 GSpray Foam Air Barrier

SD-06 Test Reports

1.5.4 GField Peel Adhesion Test

3.4.5.1 GThermographic Test

1.8 GAir Barrier Test

1.5.3 GPrimers

1.5.4 GFire-Ratings Of Thermal Barrier

Materials

1.5.4 GFlame Spread And Smoke

Developed Index Ratings Of SPF

Products

1.5.4 GFlame Propagation Of Wall

Assemblies

3.4.1 GSite Inspections

SD-07 Certificates

2.1.2 GClosed cell

1.10.1 GQualification of Manufacturer

1.10.2 GQualification of Installer

2.1.5 SIndoor Air Quality for Spray Foam

Air Barrier

SD-08 Manufacturer’s Instructions

1.6.1 GSPF Handling, Storage, and

Spray Procedures

3.2.1 GSubstrate Preparation

1.5.1 GThermal Barrier

2.2 GPrimers, Adhesives, and Mastics

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 51 PAGES

07 27 36 SD-09 Manufacturer’s Field

Reports

1.11Core Samples

3.3.3Daily Work Record

3.4.5Visual Inspection and Thermal

Scanning

07 57 12 SD-03 Product Data

2.2Protective Elastomeric Silicone

Coating

2.3Primer

2.5Sealants

2.4Mineral Granules

SD-04 Samples

1.4.4Elastomeric Silicone Wall System

Mock-up

1.4.5Sample Warranty

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

SD-08 Manufacturer’s Instructions

2.2Protective Coating

2.1.3Manufacturer's Application

Instructions

SD-11 Closeout Submittals

1.11Warranty

3.12Information Card

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 51 PAGES

07 57 16 SD-04 Samples

1.4.4Elastomeric Acrylic Roofing

Systems Mock-up

1.4.5Sample Warranty

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

SD-11 Closeout Submittals

1.11Warranty

3.12Information Card

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.9 GDownspouts

2.2.1 GGravel Stops and fascia

3.1.5 GBase Flashing

3.1.6 GCounterflashing

3.1.12 GCopings

3.1.10 GEave Flashing

2.1 SRecycled Content

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.4…