About this file

This document provides responses to questions from contractors regarding Solicitation Number N6274220R1334 from the Department of the Navy Naval Facilities Engineering Command. The solicitation seeks the construction of a missile maintenance and assembly complex at Andersen Air Force Base in Guam, including alterations to Building 51109 to support preloading of rotary launchers, improvements to roadways to support loaded munitions trailers, construction of a trailer maintenance facility, and two new earth covered magazines for weapons storage. Key clarifications provided in the responses include confirmation that work stoppages due to COVID-19 would constitute a force majeure delay; identification of areas available for contractor offices and locations of existing utilities; and clarification of technical details and requirements shown in the design drawings.

View the file

Other files

File Type Posted
20R1334-Note8.pdf PDF
20R1334 AMD 0006.pdf PDF
20R1334-AMD 0005.pdf PDF
20R1334-Note7.pdf PDF
20R1334-Note6.pdf PDF
20R1334-Amd 0004 Spec 02 41 00 - Attach A.pdf PDF
20R1334-Amd 0004.pdf PDF
20R1334-Note5.pdf PDF
20-R-1334-Amd 0003.pdf PDF
20R1334-Note4.pdf PDF
20R1334-AMD2.pdf PDF
20R1334-SV SignIn.PDF PDF
20R1334-AMD1.pdf PDF
20R1334-Note2.pdf PDF
20R1334-Note1.pdf PDF
20R1334-Specs_Part2of2.pdf PDF
20R1334-JAs.zip ZIP file
20R1334-RFP.pdf PDF
20R1334-Specs_Part1of2.pdf PDF
20R1334-Dwgs.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING COMMAND, PACIFIC

258 MAKALAPA DR., STE. 100

PEARL HARBOR, HI 96860-3134

Notice No. 3

8 October 2020

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-20-R-1334

FY21 MCAF P-3001/AJJY203001 APSI – STANDOFF WEAPONS COMPLEX,

MSA2, ANDERSEN AIR FORCE BASE, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The

RFP remains unchanged unless it is amended in writing on a Standard Form 30.

4. Specifications Part 1 of 2, Section 01 45 00.00 20, Page 4, 1.5.1.1 Duties. Please clarify to whom will the Quality Control Manager directly report to.

ANSWER: Per Specification Section 01 45 00.00 20, Para. 1.4, “The QC Manager must report to an officer of the firm and not be subordinate to the Project Superintendent or the Project

Manager.”

5. Specifications Part 1 of 2, Section 01 32 17.00 20, Page 19, 1 (c) A Government-delay.

Please confirm if work stoppage or quarantine restrictions due to COVID-19 are considered a

Government-delay.

ANSWER: Work stoppage or quarantine restrictions due to COVID-19 are considered a Force majeure delay. Refer also to FAR 52.249-10, Default (Fixed-Price Construction), in Document

00700 of the RFP.

6. Specifications Part 1 of 2, Section 01 50 00, Page 8, 3.4.2 Administrative Field Offices.

Please provide the location and total area that the Contractor may utilize for Administrative Field

Offices including the location of water and electricity tapping points.

ANSWER: Free Zones 1B and 3 identified on Drawing GB-100 show areas that the Contractor may occupy for the duration of the project. The physical requirements of the Contractor’s

Temporary Facilities are specified in Specification Section 01 50 00, Para. 3.4. The existing utility services are shown on Drawing V-101.

7. Specifications Part 1 of 2, Section 01 14 00, Page 2, Paragraph l. Please clarify if Zone 1A, 2A, 2B and the new vehicle gate must be turned over to the Government and ready for use within

270 days after award or after NTP.

ANSWER: Zone 1A, 2A, 2B and the new vehicle gate must be turned over to the Government and ready for use within 270 days after NTP. An amendment is forthcoming to clarify this.

8. Specifications Part 1 of 2, Section 01 50 00, Page 5, 3.2.2 Payment for Utility Services.

Please provide the electricity and water rates including the cost of connecting, converting, and transferring the utilities to the work for estimating purposes.

ANSWER: Assume the following rates and cost for estimating purposes –

Electricity = $333.11 /MWh

Potable Water = $11.00 /KGal

Sewer = $18.04 /KGal

$20,000 for connecting, converting, and transferring the utilities to the work.

9. Specifications Part 1 of 2, Section 01 14 00, Page 2, Paragraph j. Please confirm if the 20 workdays per calendar year, that the contractor must allow for work delays, are already included in the project duration of 730 calendar days.

ANSWER: Confirmed.

10. Drawing, Page 125, 126, 127 and 128, S-211, S-212, S-231, and S-232, Concrete Wall elevation. The Concrete wall elevation at the bottom of the wall footings on drawings S-211, S-

212, S-231 and S-232 shows a layout of thin materials that looks like a lean concrete. Please verify if the lean concrete will be provided at the bottom of wall footing foundation.

ANSWER: The thin lean concrete layer is not required. An amendment is forthcoming to clarify this.

11. Drawing, Page 122 SB131, Slab depression symbol. On the drawing SB131, there is a symbol of “Surface-Stepped” shown along the GL-3 but the dimension is not indicated. The Top elevation of slab (T/SLAB L=100’-0”) is also shown on the drawing. Please verify if the

“surface-stepped” is for the slab or for the footing foundation and what is the dimension of the surface-stepped.

ANSWER: The symbol indicates the transition in slab thickness. Top line of symbol is level, and bottom line is stepped. This is where the slab thickness transitions from 8 in. (Keynote 109) to 6 in. (Keynote 108) occurs.

12. Drawing, Page 140 S-518, Section B2 and B4 for Support Frame. For the Section B2 detail and Section B4 detail on the drawing S-518, the details of the support frames are not shown for clarity. Each refers to A1/S-17 but there is no drawing sheet number S-17. Please verify.

ANSWER: The reference should be to A1/S-517. An amendment is forthcoming to correct this.

13. Drawing, Page 197 A-631, Door Schedule. In the drawing A-631, there is a DOOR

SCHEDULE table that has an “Assembly” column with a Hardware (HDWR) column that indicates different numbers ranging from 1 to 8. Please clarify the meaning of these HDWR numbers.

ANSWER: The HDWR numbers in the Assembly column correspond to the hardware set numbers in Specification Section 08 71 00, Para. 3.6. An amendment is forthcoming to clarify this.

The PTMX, MASM, and ECMs have their own hardware set numbers starting from #1.

14. Drawing, Page 54 CS502, Detail C3 Sawed Contraction Joint; Specifications Part 2 of 2

Section 32 13 13.06, Page 12, 3.4.7.1 Contraction Joints. On the drawing CS502, the Detail C3

Sawed Contraction Joint does not show any dowel bar. However, on specification section

3.4.7.1 Contraction Joints, it mentions “dowels in longitudinal and transverse contraction joints within the paving lane must be held securely.” Please confirm if the dowel bar will be provided on the contraction joints.

ANSWER: Dowel bars are required only for contraction joints for “odd shaped” slabs per Detail

B4 on Drawing CS502. All other contraction joints for “regular shaped” slabs will be saw cut per Detail C3 on Drawing CS502. Dowel diameter, spacing and length are indicated in Table 1 on Drawing CS502. Odd shaped slabs are noted on the plans with an “R.” Specification Section

32 13 13.06, Para. 3.4.7.1 will be clarified in a forthcoming amendment.

15. Specifications Part 2 of 2 Section 33 30 00, Page 6, 2.2.8 Precast Concrete Septic Tanks;

Drawing, Page 115 CU504. In the specifications, section 33 30 00 paragraph 2.2.8, it states

“Provide precast concrete septic tanks risers, base sections, and tops conforming to ASTM

C1227 with Type II cement.

On the drawing CU504, the detail C4 and B4 clearly indicates that the septic tank wall is 8”

CMU wall with Reinforcement bars ½” @ 8” O.C.

Please clarify if the septic tank is precast concrete as per the specifications or a combination of precast concrete and CMU wall.

Please also confirm if the thickness of the concrete top slab of the septic tank is 8” or 6”.

ANSWER: Either precast concrete per the Specifications or CMU walls with cast-in-place concrete top and bottom slab are acceptable pending shop drawing submittal approval. The details on Drawing CU504 indicate CMU walls and cast-in-place top and bottom concrete slabs due to uncertainty on whether precast concrete septic tanks are available in Guam.

The top and bottom slabs indicated on Drawing CU504 must be cast-in-place due to tie-in of the rebar from the slabs to the CMU walls. The concrete top slab thickness must be 8-inches per the dimension indicated in Section C4/CU504. An amendment is forthcoming to include the following –

1) Remove the label indicating 6-inch top slab thickness in Section C4/CU504.

2) Provide notes on Drawing CU504 that indicate a precast concrete septic tank is an acceptable option.

3) Revise Specification Section 33 30 00 to add CMU wall option.

16. CU101, Key Note 121. There are two Key Note 121 shown in the plan view. One of them does not appear to be pointing at anything. Please clarify.

ANSWER: The Key Note 121 tag that is pointing to the concrete pavement should be deleted.

Drawing CU101 will be clarified in a forthcoming Amendment.

17. CU101, Key Note 144. Calls out a precast concrete septic tank. However CU504, Detail

C4 shows CMU block walls for the septic tank. In addition Section 33 30 00, part 2.2.8 is precast concrete septic tanks and 2.2.9 is glass-fiber-reinforced polyester septic tanks. Please confirm precast concrete, CMU block wall, and glass-fiber-reinforced polyester will be acceptable for the septic tank.

ANSWER: Refer to response to Question 15.

18. CU502. Please confirm what the contents of the 5,000 gallon industrial waste storage tanks will be.

ANSWER: The contents of the PTMX and MASM wastewater will include, incidental vehicular fluids, washdown of the floors, and rainwater that may get into the building.

In addition, the MASM tank will include condensate from the air compressor assemblies.

19. CU502. Please provide specifications including the interior and exterior coating requirements of the 5,000 gallon industrial waste steel storage tanks.

ANSWER: No new specification section is required. Drawing CU502 will be revised to clarify the requirements for the 5,000-gallon underground storage tanks in a forthcoming Amendment.

20. CG103, Key Note 403. Calls for a new catch basin. However directly below on the plan view is a note calling for a new MH D-1. Please confirm if this is a proposed catch basin or manhole.

ANSWER: This is a proposed manhole. Key Note 403 will be revised to indicate “PRECAST

STORM DRAIN MANHOLE, RE A3/CG502” in a forthcoming Amendment.

21. CG508, The plan view call out for Catch Basin J-2 appears to be a headwall wall. Please confirm if this is a catch basin or headwall.

ANSWER: J2 is a headwall. Drawing CG508 will be revised to call out J-2 as a headwall in a forthcoming Amendment.

22. ES101 & ES 102. The matchlines do not appear to line up between these sheets. Please confirm if these matchlines are accurate.

ANSWER: Drawings ES101 and ES102 will be clarified in a forthcoming Amendment.

23. ES102. Please confirm if the enclosure shown around the proposed switch gear is an existing or proposed enclosure.

ANSWER: The enclosure around the proposed switch gear is new. Drawing ES102 will be clarified in a forthcoming Amendment.

24. ES104, Key Note 108. Plan view calls out Key Note 108, however there is no Key Note

108 listed. Please clarify.

ANSWER: Keynote 108 tag should be noted as "107." Drawing ES104 will be corrected in a forthcoming Amendment.

25. ES105, Key Note 112. Plan view calls out Key Note 112 appears to be incorrect as this is buried conduit and not a surface mounted panel board. Please clarify.

ANSWER: Key Note 112 tag will be redirected to the surface mounted panel board and Key

Note 105 will be revised to clarify the work required. Drawing ES105 will be revised in a forthcoming Amendment

26. ES105. Plan view shows an unknown structure near Key Note 108 with the proposed duct bank running under. Please clarify what this structure is and if it should remain or be removed.

ANSWER: There is no structure in this area. Drawing ES105 will be clarified in a forthcoming

Amendment.

27. ES105. Please confirm if the enclosure shown around the proposed switch gear is an existing or proposed enclosure.

ANSWER: The enclosure around the proposed switch gear is new. A new Key Note will be added to Drawing ES105 with reference to Drawing CP211 for enclosure siting and Drawing

AE151 for enclosure construction. Drawing ES105 revisions will be issued in a forthcoming

Amendment.

28. E-501. Only provides concrete encased duct bank details. However, ES101 thru ES110

Key Notes identify direct bury power and comm conduits. Please provide a section detail for the direct bury conduits.

ANSWER: Direct burial of power and communications conduit is specified in the Specifications

(Division 33). A detail will be added to Drawing E-501 to show direct burial requirements. The revision to Drawing E-501 will be issued in a forthcoming Amendment.

29. Page 43, CD104, Keynote 115 Existing asphalt pavement to be removed. Drawing CD104 describes Keynote 115 existing asphalt pavement to be removed in front of building # 51109.

Please verify the thickness of existing asphalt pavement.

ANSWER: Assume 3" thick asphalt pavement.

30. Page 34, 36, 37 and 39; B-100, B-102, B-103 and CD100; Existing Asphalt pavement. On drawing B-100, the boring numbers BH-11, BH-12, BH-13, BH-14, BH-15 and BH-16 are located on the existing road asphalt pavement. On the drawings B-102 and B-103 boring logs, it indicates the existing asphalt pavement thickness such as BH-11 is 1” thick and BH-12, BH-13, BH-14, BH-15 and BH-16 are 3” thick. Please verify the thickness of all existing road asphalt pavement to be removed as described on drawing CD100.

ANSWER: Assume the following thicknesses for the existing roads to be removed –

Zone 1A = 3 inches

Zone 1B = 2 inches

Zone 2A = 3 inches

Zone 2B = 3 inches

Zone 2C = 3 inches

Zone 3 = 3 inches

31. Specifications Part 2 of 2, Section 31 31 16.13, Page 4, 2.1 System Description. In the specifications, section 31 31 16.13 under paragraph 2.1 System Description, the chemical termite control indicates “The application can be surface applied or rodded and trenched. This barrier prevents foraging termites from reaching the foundation and piers. Only the soil adjacent to these foundation elements is treated.” In the case of Earth Cover Magazine, please verify if the soil adjacent to the precast wall and roof will be treated as well.

ANSWER: The soil adjacent to the ECM precast walls and roof area are to receive termite protection. The Specifications will be clarified in a forthcoming Amendment.

32. Document 00100, Page 1 of 18 – Proposal Due Date. Request a 6-Week Extension on Bid

Date.

ANSWER: Proposal due date will be extended by 2 weeks in a forthcoming Amendment.