This solicitation is for the construction of a missile maintenance and assembly complex at Andersen Air Force Base in Guam. The project scope includes alterations and construction of an addition to Building 51109 to support preload capability of rotary launchers; improving roadways to support loaded munitions trailers from the maintenance facility to storage magazines; constructing a powered munitions trailer maintenance facility; and building two new earth covered magazines to support storage of standoff weapons and pre-loaded launchers. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command for FY21. Responses are due based on the solicitation number and details provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20R1334-Note8.pdf | ||
| 20R1334 AMD 0006.pdf | ||
| 20R1334-AMD 0005.pdf | ||
| 20R1334-Note7.pdf | ||
| 20R1334-Note6.pdf | ||
| 20R1334-Amd 0004 Spec 02 41 00 - Attach A.pdf | ||
| 20R1334-Amd 0004.pdf | ||
| 20R1334-Note5.pdf | ||
| 20-R-1334-Amd 0003.pdf | ||
| 20R1334-Note4.pdf | ||
| 20R1334-AMD2.pdf | ||
| 20R1334-Note3.pdf | ||
| 20R1334-SV SignIn.PDF | ||
| 20R1334-AMD1.pdf | ||
| 20R1334-Note2.pdf | ||
| 20R1334-Note1.pdf | ||
| 20R1334-Specs_Part2of2.pdf | ||
| 20R1334-JAs.zip | ZIP file | |
| 20R1334-RFP.pdf | ||
| 20R1334-Dwgs.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC PACIFIC
WORK ORDER NO:
1632562
SPECIFICATIONS
(VOLUME 01 OF 02)
For
FY21 MCAF PROJECT AJJY203001
APSI-STANDOFF WEAPONS COMPLEX, MSA2
At the
ANDERSEN AFB, GUAM
PREPARED BY:
777 Main Street Fort Worth, Texas 76102 USA
A/E Contract No. N62742-17-D-0003
Architectural: Shigeharu Shimada, AIA Jacobs Interiors: Jeri L. Champine Jacobs Mechanical: Ryan Casperaites, PE Jacobs Civil: Kathyriya Kennedy, PE Jacobs Electrical: Andrew Gardner, PE Jacobs Telecom: Rene Rubio, PE Jacobs Structural: Alex Bannerot, PE Jacobs Fire Protection: Joseph D. Shumake, FPE Jacobs
Submitted By: _______________________________ Date: ____________ Mr. Blaine Paxton, AIA, NCARB
APPROVED BY:
Specification: _________________________________________________ Mr. Clint Hashiba, P.E.
For Commander, NAVFAC Pacific: ________________________________________________
Mr. Evan Mizue, P.E.
Date: _______________________
08/28/2020
Mr. Clint Hashiba, Mr. Evan Mizue, P.E
______9/10/2020
SEALS PAGE FOR WFXO6312
FY21 MCAF P-3001/AJJY203001
APSI – STANDOFF WEAPONS COMPLEX, MSA 2
100% (FINAL) DESIGN SUBMITTAL
Andersen Air Force Base, Guam
A/E CONTRACT No. N62742-17-D-003
DELIVERY ORDER NO. N6274219F0327
This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Architect under the laws of the State of Texas.
Name: Shigeharu Shimada
License Number: 19279
Firm:
Jacobs Engineering Group Inc.
Texas Registered Engineering Firm F-2966
Name: Kathyriya H. Kennedy
License Number: 98244
Firm:
Jacobs Engineering Group Inc.
Texas Registered Engineering Firm F-2966
Name: Jeri L. Champine
License Number: 629
Firm:
Jacobs Engineering Group Inc.
Texas Registered Engineering Firm F-2966
This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Engineer under the laws of the State of Texas.
Name: Ryan A. Casperaites
License Number: 128479
Firm:
Jacobs Engineering Group Inc.
Texas Registered Engineering Form F-2966
08-28-2020
08-28-2020
08-28-2020
08-28-2020
This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Interior Designer under the laws of the State of Texas.
This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Engineer under the laws of the State of Texas.
This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Engineer under the laws of the State of Texas.
Name: Alex Bannerot
License Number: 91686
Firm:
Jacobs Engineering Group Inc.
Texas Registered Engineering Form F-2966
This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Fire Protection Engineer under the laws of the State of California.
Name: Joseph D. Shumake
License Number: CA1952
Firm:
Jacobs Engineering Group Inc.
Texas Registered Engineering Form F-2966
This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Engineer under the laws of the State of Texas.
Name: Andrew T. Gardner
License Number: 130901
Firm:
Jacobs Engineering Group Inc.
Texas Registered Engineering Form F-2966
This document was prepared by me under my direct personal supervision and that I am a Registered Communications Distribution Designer as accredited by BICSI.
Name: Rene Rubio
License Number: 201777R
Firm:
Jacobs Engineering Group Inc.
Texas Registered Engineering Form F-296608-28-2020
08-28-2020
08-28-2020
AJJY203001, APSI - Standoff Weapons Complex, MSA2 1632562 Andersen AFB, Guam
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.03 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (JRM-ESS)
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 31 30 MARINE CONCRETE FOR EARTH COVERED MAGAZINES
03 37 13 SHOTCRETE
03 41 33 PRECAST STRUCTURAL PRETENSIONED CONCRETE
03 45 33 PRECAST STRUCTURAL CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 40 00 COLD-FORMED METAL FRAMING
PROJECT TABLE OF CONTENTS Page 1
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 36 SPRAY FOAM AIR BARRIERS
07 57 12 LIQUID APPLIED ELASTOMERIC SILICONE ROOFING COATING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 90 00 PAINTS AND COATINGS
09 96 53.13 SILICONE ELASTOMERIC COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
PROJECT TABLE OF CONTENTS Page 2
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 23 00 REFRIGERANT PIPING
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.21 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE
AND LIFE SAFETY
25 05 11.23 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
BUILDING CONTROL SYSTEM
25 05 11.26 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
UTILITY CONTROL SYSTEM
25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONTROL
SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS
26 13 00 HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DI VI SI ON 31 - EARTHWORK
31 21 13 RADON MITIGATION
31 23 00.00 20 EXCAVATION AND FILL
PROJECT TABLE OF CONTENTS Page 3
31 31 16.13 CHEMICAL TERMITE CONTROL
31 32 23 FOUNDATION DRILLING AND GROUTING
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 46 13 FOUNDATION DRAINAGE SYSTEM
33 46 16 SUBDRAINAGE PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
GENERAL
001 17250243 G-001 COVER SHEET
002 17250244 G-002 SHEET INDEX
003 17250245 G-003 SHEET INDEX
004 17250246 G-100 LOCATION MAP & HAUL ROUTE
005 17250247 GB100 SCOPE OF WORK SITE PLAN
006 17250248 GB101 SCOPE OF WORK CONSTRUCTION ZONE 1A
007 17250249 GB102 SCOPE OF WORK CONSTRUCTION ZONE 1B
008 17250250 GB103 SCOPE OF WORK CONSTRUCTION ZONE 1C
009 17250251 GB104 SCOPE OF WORK CONSTRUCTION ZONE 3
010 17250252 GB105 SCOPE OF WORK CONSTRUCTION ZONE 2C
011 17250253 GB106 SCOPE OF WORK CONSTRUCTION ZONE 2B
012 17250254 GB107 SCOPE OF WORK CONSTRUCTION ZONE 2A
013 17250255 GI010 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
014 17250256 GI011 ABBREVIATIONS CONTINUED
015 17250257 GI012 MASM - CODE ANALYSIS
016 17250258 GI013 MASM - OVERALL LIFE SAFETY PLAN
017 17250259 GI014 MASM - AIR BARRIER PLAN AND SECTION
018 17250260 GI030 PTMX - CODE ANALYSIS
019 17250261 GI031 PTMX - OVERALL LIFE SAFETY PLAN
020 17250262 GI032 PTMX - AIR BARRIER PLAN AND SECTION
021 17250263 GI110 MASM - CODE COMPLIANCE SITE PLAN
022 17250264 GI130 PTMX - CODE COMLPIANCE SITE PLAN
023 17250265 GC101 EROSION CONTROL PLAN
024 17250266 GC102 EROSION CONTROL PLAN
025 17250267 GC103 EROSION CONTROL PLAN
026 17250268 GC104 EROSION CONTROL PLAN
027 17250269 GC105 EROSION CONTROL PLAN
028 17250270 GC106 EROSION CONTROL PLAN
029 17250271 GC501 EROSION CONTROL DETAILS
030 17250272 GC502 EROSION CONTROL DETAILS
SURVEY/MAPPING
031 17250275 V-100 OVERALL TOPOGRAPHIC SURVEY
032 17250276 V-101 TOPOGRAPHIC SURVEY PLAN
033 17250277 V-102 TOPOGRAPHIC SURVEY PLAN
GEOTECHNICAL
034 17250278 B-100 BORING LOCATION MAPS
035 17250279 B-101 BORING LOGS
036 17250280 B-102 BORING LOGS
037 17250281 B-103 BORING LOGS
Jacobs WFXO6312 DOCUMENT 00 01 15 Page 1
CIVIL
038 17250282 C-001 GENERAL NOTES AND SYMBOLS
039 17250283 CD100 OVERALL DEMOLITION PLAN
040 17250284 CD101 EXISTING CONDITIONS AND REMOVAL PLAN
041 17250285 CD102 EXISTING CONDITIONS AND REMOVAL PLAN
042 17250286 CD103 EXISTING CONDITIONS AND REMOVAL PLAN
043 17250287 CD104 EXISTING CONDITIONS AND REMOVAL PLAN
044 17250288 CD105 EXISTING CONDITIONS AND REMOVAL PLAN
045 17250289 CD106 EXISTING CONDITIONS AND REMOVAL PLAN
046 17250290 CD107 EXISTING CONDITIONS AND REMOVAL PLAN
047 17250291 CS100 OVERALL SITE PLAN
048 17250292 CS101 SITE IMPROVEMENTS AND GEOMETRIC SITE PLAN
049 17250293 CS102 SITE IMPROVEMENTS AND GEOMETRIC SITE PLAN
050 17250294 CS103 SITE IMPROVEMENTS AND GEOMETRIC SITE PLAN
051 17250295 CS104 SITE IMPROVEMENTS AND GEOMETRIC SITE PLAN
052 17250296 CS105 SITE IMPROVEMENTS AND GEOMETRIC SITE PLAN
053 17250297 CS501 SITE DETAILS
054 17250298 CS502 SITE DETAILS
055 17250299 CS503 SITE DETAILS
056 17250300 CS504 SITE DETAILS
057 17250301 CS505 SITE DETAILS
058 17250302 CG101 GRADING AND DRAINAGE PLAN
059 17250303 CG102 GRADING AND DRAINAGE PLAN
060 17250304 CG103 GRADING AND DRAINAGE PLAN
061 17250305 CG104 GRADING AND DRAINAGE PLAN
062 17250306 CG105 GRADING AND DRAINAGE PLAN
063 17250307 CG106 GRADING AND DRAINAGE PLAN
064 17250308 CG201 STORM DRAIN PROFILES
065 17250309 CG202 STORM DRAIN PROFILES
066 17250310 CG301 SITE SECTIONS
067 17250311 CG302 SITE SECTIONS
068 17250312 CG303 SITE SECTIONS
069 17250313 CG501 DRAINAGE DETAILS
070 17250314 CG502 DRAINAGE DETAILS
071 17250315 CG503 RETAINING WALL DETAILS
072 17250316 CG504 RETAINING WALL DETAILS
073 17250317 CG505 DRAINAGE DETAILS
074 17250318 CG506 DRAINAGE DETAILS
075 17250319 CG507 DRAINAGE DETAILS
076 17250320 CG508 DRAINAGE DETAILS
077 17250321 CG509 DRAINAGE DETAILS
078 17250322 CP201 ROADWAY PLAN AND PROFILE
079 17250323 CP202 ROADWAY PLAN AND PROFILE
080 17250324 CP203 ROADWAY PLAN AND PROFILE
081 17250325 CP204 ROADWAY PLAN AND PROFILE
082 17250326 CP205 ROADWAY PLAN AND PROFILE
083 17250327 CP206 ROADWAY PLAN AND PROFILE
084 17250328 CP207 ROADWAY PLAN AND PROFILE
085 17250329 CP208 ROADWAY PLAN AND PROFILE
086 17250330 CP209 ROADWAY PLAN AND PROFILE
087 17250331 CP210 ROADWAY PLAN AND PROFILE
088 17250332 CP211 ROADWAY PLAN AND PROFILE
089 17250333 CP212 ROADWAY PLAN AND PROFILE
090 17250334 CP213 ROADWAY PLAN AND PROFILE
091 17250335 CP214 ROADWAY PLAN AND PROFILE
092 17250336 CP215 ROADWAY PLAN AND PROFILE
093 17250337 CP216 ROADWAY PLAN AND PROFILE
094 17250338 CP217 ROADWAY PLAN AND PROFILE
Jacobs WFXO6312 DOCUMENT 00 01 15 Page 2
095 17250339 CP218 ROADWAY PLAN AND PROFILE
096 17250340 CP219 ROADWAY PLAN AND PROFILE
097 17250341 CP220 ROADWAY PLAN AND PROFILE
098 17250342 CP221 ROADWAY PLAN AND PROFILE
099 17250343 CP222 ROADWAY PLAN AND PROFILE
100 17250344 CP223 ROADWAY PLAN AND PROFILE
101 17250345 CP224 ROADWAY PLAN AND PROFILE
102 17250346 CP225 ROADWAY PLAN AND PROFILE
103 17250347 CP226 ROADWAY PLAN AND PROFILE
104 17250348 CP227 ROADWAY PLAN AND PROFILE
105 17250349 CU101 UNDERGROUND UTILITIES PLAN
106 17250350 CU102 UNDERGROUND UTILITIES PLAN
107 17250351 CU103 UNDERGROUND UTILITIES PLAN
108 17250352 CU104 UNDERGROUND UTILITIES PLAN
109 17250353 CU105 UNDERGROUND UTILITIES PLAN
110 17250354 CU201 UNDERGROUND UTILITY PROFILES
111 17250355 CU202 UNDERGROUND UTILITY PROFILES
112 17250356 CU501 UTILITY DETAILS
113 17250357 CU502 UTILITY DETAILS
114 17250358 CU503 UTILITY DETAILS
115 17250359 CU504 UTILITY DETAILS
STRUCTURAL
116 17250362 S-001 MASM & PTMX - GENERAL STRUCTURAL NOTES
117 17250363 S-002 MASM & PTMX - GENERAL STRUCTURAL NOTES
118 17250364 S-003 MASM & PTMX - GENERAL STRUCTURAL NOTES
119 17250365 S-005 MASM & PTMX - COMPONENT AND
CLADDING WIND PRESSURE DIAGRAM
120 17250366 S-008 ECM - GENERAL STRUCTURAL NOTES
121 17250367 SB111 MASM - FOUNDATION PLAN
122 17250368 SB131 PTMX - FOUNDATION PLAN
123 17250369 SF111 MASM - ROOF FRAMING PLAN
124 17250370 SF131 PTMX - ROOF FRAMING PLAN
125 17250371 S-211 MASM - ELEVATIONS
126 17250372 S-212 MASM - ELEVATIONS
127 17250373 S-231 PTMX - ELEVATIONS
128 17250374 S-232 PTMX - ELEVATIONS
129 17250375 S-311 MASM - BUILDING SECTION
130 17250376 S-331 PTMX - BUILDING SECTIONS
131 17250377 S-501 MASM & PTMX - TYPICAL CONCRETE DETAILS
132 17250378 S-502 MASM & PTMX - TYPICAL CONCRETE DETAILS
133 17250379 S-503 MASM & PTMX - TYPICAL CONCRETE DETAILS
134 17250380 S-511 MASM & PTMX - CONCRETE SECTIONS AND DETAILS
135 17250381 S-512 MASM & PTMX - CONCRETE SECTIONS AND DETAILS
136 17250382 S-514 MASM & PTMX - CONCRETE SECTIONS AND DETAILS
137 17250383 S-515 MASM - WALL AND ROOF SECTIONS AND DETAILS
138 17250384 S-516 MASM - ROOF SECTIONS AND DETAILS
139 17250385 S-517 MASM - ROOF SECTIONS AND DETAILS
140 17250386 S-518 MASM - ROOF SECTIONS AND DETAILS
141 17250387 S-519 MASM - ROOF SECTIONS AND DETAILS
142 17250388 S-531 PTMX - CONCRETE SECTIONS AND DETAILS
143 17250389 S-532 MASM & PTMX - CONCRETE SECTIONS AND DETAILS
144 17250390 S-535 PTMX - ROOF SECTIONS AND DETAILS
145 17250391 S-555 ECM - ELECTRICAL YARD PLAN AND SECTIONS
ARCHITECTURAL
146 17250394 A-001 MASM - GENERAL NOTES,
SYMBOLS AND EXTERIOR PERSPECTIVES VIEWS
147 17250395 A-003 PTMX - GENERAL NOTES,
Jacobs WFXO6312 DOCUMENT 00 01 15 Page 3
SYMBOLS AND EXTERIOR PERSPECTIVES VIEWS
148 17250396 A-005 ECM - GENERAL NOTES,
SYMBOLS AND EXTERIOR PERSPECTIVES VIEWS
149 17250397 AD110 MASM - DEMOLITION - OVERALL FLOOR PLAN
150 17250398 AD111 MASM - DEMOLITION - ELEVATIONS
151 17250399 AE110 MASM - OVERALL FLOOR PLAN
152 17250400 AE111 MASM - PARTIAL FLOOR PLAN - AREA A
153 17250401 AE112 MASM - PARTIAL FLOOR PLAN - AREA B
154 17250402 AE115 MASM - OVERALL REFLECTED CEILING PLAN
155 17250403 AE116 MASM - PARTIAL REFLECTED CEILING PLAN - AREA A
156 17250404 AE117 MASM - PARTIAL REFLECTED CEILING PLAN - AREA B
157 17250405 AE120 MASM - OVERALL ROOF PLAN
158 17250406 AE121 MASM - PARTIAL ROOF PLAN - AREA A
159 17250407 AE130 PTMX - FLOOR PLAN
160 17250408 AE135 PTMX - REFLECTED CEILING PLAN
161 17250409 AE140 PTMX - ROOF PLAN
162 17250410 AE150 ECM - OVERALL FLOOR PLAN
163 17250411 AE151 ECM - ELECTRICAL YARD
164 17250412 AE155 ECM - OVERALL REFLECTED CEILING PLAN
165 17250413 AE160 ECM - OVERALL ROOF PLAN
166 17250414 A-211 MASM - EXTERIOR ELEVATIONS
167 17250415 A-212 MASM - EXTERIOR ELEVATIONS
168 17250416 A-230 PTMX - EXTERIOR ELEVATIONS
169 17250417 A-231 PTMX - EXTERIOR ELEVATIONS
170 17250418 A-250 ECM - EXTERIOR ELEVATIONS
171 17250419 A-311 MASM - BUILDING SECTIONS
172 17250420 A-315 MASM - WALL SECTIONS
173 17250421 A-316 MASM - WALL SECTIONS
174 17250422 A-318 MASM - WALL SECTION DETAILS
175 17250423 A-319 MASM - WALL SECTION DETAILS
176 17250424 A-330 PTMX - BUILDING SECTIONS
177 17250425 A-335 PTMX - WALL SECTIONS
178 17250426 A-336 PTMX - WALL SECTIONS
179 17250427 A-340 PTMX - WALL SECTION DETAILS
180 17250428 A-350 ECM - BUILDING SECTIONS
181 17250429 A-355 ECM - WALL SECTIONS
182 17250430 A-360 ECM - PLAN AND SECTION DETAILS
183 17250431 A-430 PTMX - ENLARGED RESTROOM PLANS AND
RESTROOM ACCESSORIES
184 17250432 A-431 PTMX - ENLARGED MECHANICAL YARD
185 17250433 A-432 PTMX - ENLARGED ELECTRICAL YARD
186 17250434 A-511 MASM - PLAN DETAILS
187 17250435 A-512 MASM - CEILING DETAILS
188 17250436 A-525 MASM - MISCELLANEOUS DETAILS
189 17250437 A-530 PTMX - MISCELLANEOUS DETAILS
190 17250438 A-531 PTMX - CEILING & PENETRATION DETAILS
191 17250439 A-611 MASM - PARTITION TYPES
192 17250440 A-612 MASM - PENETRATION DETAILS
193 17250441 A-613 MASM - DOOR & FRAME SCHEDULE
194 17250442 A-614 MASM - DOOR DETAILS
195 17250443 A-615 MASM - LOUVER TYPES AND DETAILS
196 17250444 A-630 PTMX - PARTITION TYPES
197 17250445 A-631 PTMX - DOOR & FRAME SCHEDULE
198 17250446 A-632 PTMX - DOOR DETAILS
199 17250447 A-633 PTMX - LOUVER & WINDOW DETAILS
FIRE PROTECTION
217 17250466 F-001 GENERAL NOTES AND SYMBOLS
218 17250467 FA111 MASM - FIRE ALARM PLAN - LEVEL 1 AREA A
Jacobs WFXO6312 DOCUMENT 00 01 15 Page 4
219 17250468 FA112 MASM - FIRE ALARM PLAN - LEVEL 1 AREA B
220 17250469 FA131 PTMX - FIRE ALARM PLAN - LEVEL 1
221 17250470 FP116 MASM - FIRE PROTECTION PLAN - LEVEL 1 AREA A
222 17250471 FP136 PTMX - FIRE PROTECTION PLAN
223 17250472 FA511 FIRE ALARM/MASS NOTIFICATION DETAILS - PART 1
224 17250473 FA512 MASM - FIRE ALARM/MASS NOTIFICATION
DETAILS - PART 2
225 17250474 FP511 MASM - FIRE SUPPRESSION DETAILS - PART 1
INTERIORS
200 17250449 I-001 GENERAL NOTES & SYMBOLS
201 17250450 IN111 MASM-OVERALL FINISH PLAN - LEVEL 1
202 17250451 IN112 MASM-PARTIAL FINISH & SIGNAGE
PLAN - LEVEL 1 - AREA A
203 17250452 IN113 MASM-PARTIAL FINISH & SIGNAGE
PLAN - LEVEL 1 - AREA B
204 17250453 IN131 PTMX-OVERALL FINISH AND SIGNAGE PLAN - LEVEL 1
205 17250454 IF111 MASM-OVERALL CEQ PLAN - LEVEL 1
206 17250455 IF112 MASM-PARTIAL CEQ PLAN - LEVEL 1 - AREA A
207 17250456 IF113 MASM-PARTIAL CEQ PLAN - LEVEL 1 - AREA B
208 17250457 IF131 PTMX-OVERALL CEQ PLAN - LEVEL 1
209 17250458 I-231 PTMX-INTERIOR ELEVATIONS & ENLARGED PLANS
210 17250459 I-311 MASM-MILLWORK SECTIONS AND DETAILS
211 17250460 I-331 PTMX-MILLWORK SECTIONS AND DETAILS
212 17250461 I-611 MASM-FINISH MATERIAL LEGEND & ROOM FINISH SCHEDULE
213 17250462 I-613 MASM-EQUIPMENT LEGEND - NIC
214 17250463 I-614 MASM-SIGNAGE DETAILS
215 17250464 I-631 PTMX-FINISH MATERIAL LEGEND & ROOM FINISH SCHEDULE
216 17250465 I-632 PTMX-SIGNAGE SCHEDULE & DETAILS
PLUMBING
226 17250476 P-001 PLUMBING LEGEND
227 17250477 P-110 MASM - OVERALL UNDERFLOOR PLAN
228 17250478 P-111 MASM - PARTIAL UNDERFLOOR PLAN - AREA A
229 17250479 P-120 MASM - OVERALL FLOOR PLAN
230 17250480 P-122 MASM - PARTIAL FLOOR PLAN - AREA A
231 17250481 P-123 MASM - PARTIAL FLOOR PLAN - AREA B
232 17250482 P-130 PTMX - OVERALL UNDERFLOOR PLAN
233 17250483 P-131 PTMX - OVERALL FLOOR PLAN
234 17250484 P-411 MASM - ENLARGED PLANS
235 17250485 P-431 PTMX - ENLARGED PLANS
236 17250486 P-432 PTMX - ENLARGED PLANS
237 17250487 P-501 PLUMBING DETAILS
238 17250488 P-502 PLUMBING DETAILS
239 17250489 P-503 PLUMBING DETAILS
240 17250490 P-504 PLUMBING DETAILS
241 17250491 P-611 MASM - PLUMBING SCHEDULES
242 17250492 P-631 PTMX - PLUMBING SCHEDULES
243 17250493 P-711 MASM - PLUMBING SCHEMATICS
244 17250494 P-712 MASM - DOMESTIC COLD WATER SCHEMATIC
245 17250495 P-713 MASM - SANITARY WASTE AND INDUSTRIAL
WASTE RISER DIAGRAM
246 17250496 P-714 MASM - DOMESTIC WATER RISER DIAGRAM
247 17250497 P-715 MASM - COMPRESSED AIR RISER DIAGRAM
248 17250498 P-731 PTMX - PLUMBING SCHEMATICS
249 17250499 P-732 PTMX - PLUMBING SCHEMATICS
250 17250500 P-733 PTMX - SANITARY RISER DIAGRAM
251 17250501 P-734 PTMX - DOMESTIC WATER RISER DIAGRAM
252 17250502 P-735 PTMX - COMPRESSED AIR RISER DIAGRAM
Jacobs WFXO6312 DOCUMENT 00 01 15 Page 5
MECHANICAL
253 17250504 M-001 GENERAL NOTES AND SYMBOLS
254 17250505 MD110 MASM - HVAC PLAN - OVERALL DEMO
255 17250506 MH110 MASM - HVAC PLAN - OVERALL
256 17250507 MH111 MASM - HVAC PLAN - AREA A
257 17250508 MH130 PTMX - OVERALL HVAC FLOOR PLAN
258 17250509 MP120 MASM - HVAC PIPING PLAN - OVERALL
259 17250510 MP121 MASM - HVAC PIPING PLAN - AREA A
260 17250511 MP140 PTMX - OVERALL HVAC PIPING PLAN
261 17250512 M-311 MASM - HVAC SECTIONS
262 17250513 M-331 PTMX - HVAC SECTIONS
263 17250514 M-411 MASM - HVAC ENLARGED PLANS
264 17250515 M-431 PTMX - HVAC ENLARGED PLANS
265 17250516 M-501 HVAC DETAILS
266 17250517 M-502 HVAC DETAILS
267 17250518 M-503 HVAC DETAILS
268 17250519 M-611 MASM - HVAC SCHEDULES
269 17250520 M-631 PTMX - HVAC SCHEDULES
270 17250521 M-711 MASM - HVAC DIAGRAMS
271 17250522 M-731 PTMX - HVAC DIAGRAMS
272 17250523 MI801 HVAC CONTROLS
273 17250524 MI802 HVAC CONTROLS
274 17250525 MI803 HVAC CONTROLS
ELECTRICAL
275 17250527 E-001 GENERAL NOTES & LEGEND
276 17250528 ES100 OVERALL ELECTRICAL SITE PLAN
277 17250529 ES101 ELECTRICAL SITE PLAN - AREA 1
278 17250530 ES102 ELECTRICAL SITE PLAN - AREA 2
279 17250531 ES103 ELECTRICAL SITE PLAN - AREA 3
280 17250532 ES104 ELECTRICAL SITE PLAN - AREA 4
281 17250533 ES105 ELECTRICAL SITE PLAN - AREA 5
282 17250534 ES106 ELECTRICAL SITE PLAN - AREA 6
283 17250535 ES107 ELECTRICAL SITE PLAN - AREAS 7 & 8
284 17250536 ES108 ELECTRICAL SITE PLAN - AREAS 9 & 10
285 17250537 ES109 ELECTRICAL SITE PLAN - AREAS 11 & 12
286 17250538 ES110 ELECTRICAL SITE PLAN - AREA 13
287 17250539 ED110 MASM - OVERALL DEMOLITION POWER PLAN
288 17250540 ED301 MASM - SUPPORT DEMOLITION POWER PLAN
289 17250541 E-100 MASM - OVERALL ELECTRICAL PLAN
290 17250542 EG110 MASM - OVERALL GROUNDING PLAN
291 17250543 EG111 MASM - OVERALL LIGHTNING PROTECTION PLAN
292 17250544 EG130 PTMX - OVERALL GROUNDING PLAN
293 17250545 EG131 PTMX - OVERALL LIGHTNING PROTECTION PLAN
294 17250546 EP111 MASM - PARTIAL POWER PLAN - AREA A
295 17250547 EP112 MASM - PARTIAL POWER PLAN - AREA B
296 17250548 EP130 PTMX - OVERALL POWER PLAN
297 17250549 EP150 ECM - OVERALL POWER & LIGHTING PLAN
298 17250550 EL111 MASM - PARTIAL LIGHTING PLAN - AREA A
299 17250551 EL130 PTMX - OVERALL LIGHTING PLAN
300 17250552 E-401 MASM - ENLARGED POWER & LIGHTING PLANS
301 17250553 E-501 DETAILS
302 17250554 E-502 DETAILS
303 17250555 E-503 DETAILS
304 17250556 E-504 DETAILS
305 17250557 E-505 DETAILS
306 17250558 E-506 DETAILS
307 17250559 E-507 DETAILS
Jacobs WFXO6312 DOCUMENT 00 01 15 Page 6
308 17250560 E-601 MASM - ONE LINE DIAGRAM
309 17250561 E-602 PTMX - ONE LINE DIAGRAM
310 17250562 E-603 ECM - ONE LINE DIAGRAM
311 17250563 E-605 GROUNDING RISERS
312 17250564 E-611 LIGHTING SCHEDULES & CONTROL MATRIX
313 17250565 E-612 LIGHTING DETAILS
314 17250566 E-621 EQUIPMENT SCHEDULE
315 17250567 E-631 MASM - PANEL SCHEDULES
316 17250568 E-632 MASM - PANEL SCHEDULES
317 17250569 E-633 MASM - PANEL SCHEDULES
318 17250570 E-635 PTMX - PANEL SCHEDULES
319 17250571 E-636 PTMX - PANEL SCHEDULES
320 17250572 E-637 PTMX - PANEL SCHEDULES
321 17250573 E-641 ECM - PANEL SCHEDULES
TELECOMM
322 17250575 T-001 GENERAL NOTES & LEGEND
323 17250576 TT110 MASM - OVERALL COMMUNICATION PLAN
324 17250577 TT111 MASM - PARTIAL COMMUNICATION PLAN - AREA A
325 17250578 TT112 MASM - PARTIAL COMMUNICATION PLAN - AREA B
326 17250579 TT130 PTMX - OVERALL COMMUNICATION PLAN
327 17250580 TT150 ECM - OVERALL COMMUNICATION PLAN
328 17250581 T-402 PTMX - ENLARGED PLANS
329 17250582 T-501 DETAILS
330 17250583 T-502 DETAILS
331 17250584 T-503 DETAILS
332 17250585 T-601 COMMUNICATION DIAGRAMS/SCHEDULES
ECM PROTOTYPE INDEX
333 17250588 S-001E STRUCTURAL GENERAL NOTES
334 17250589 S-002E ABBREVIATIONS
335 17250590 S-101E FOUNDATION AND FLOOR PLAN
336 17250591 S-102E ROOF FRAMING PLAN
337 17250592 S-201E BUILDING ELEVATIONS
338 17250593 S-301E BUILDING SECTIONS
339 17250594 S-302E WALL SECTIONS
340 17250595 S-303E RETAINING WALL SECTIONS AND DETAILS
341 17250596 S-501E FOUNDATION AND SLAB-ON-GRADE DETAILS
342 17250597 S-502E PRECAST WALL PANEL DETAILS
343 17250598 S-503E PRECAST ROOF PANEL DETAILS
344 17250599 S-504E WALL AND ROOF CONNECTION DETAILS
345 17250600 S-701E DOOR FRAME ELEVATIONS AND DETAILS
346 17250601 S-702E DOOR ELEVATIONS
347 17250602 S-703E DOOR SECTIONS
348 17250603 S-704E DOOR DETAILS
349 17250604 S-705E INTERNAL LOCKING DEVICES
350 17250605 M-101E MECHANICAL PLAN, SECTIONS, AND NOTES
351 17250606 M-501E MECHANICAL DETAILS
352 17250607 E-001E GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
353 17250608 E-101E TYPICAL LIGHTNING PROTECTION AND GROUNDING
SYSTEM PLAN
354 17250609 E-501E LIGHTING PROTECTION AND GROUNDING DETAILS 1
355 17250610 E-502E LIGHTING PROTECTION AND GROUNDING DETAILS 2
356 17250611 E-503E ROLLING SPHERE ANALYSIS
-- End of Document --
Jacobs WFXO6312 DOCUMENT 00 01 15 Page 7
THIS PAGE INTENTIONALLY LEFT BLANK
Jacobs WFXO6312 DOCUMENT 00 01 15 Page 8
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The project's scope of work includes the new construction of three new facilities and the selective demolition and renovations of one existing facility in the MSA2 area of Andersen AFB, Guam. The work also includes the removal and replacement of the roads serving the Munitions area, East Perimeter Road between connection to north end of the airfield to the taxiway adjacent to the MSA2 area. The work is located in a secured area of the base and requires the Contractor, and subcontractors, to obtain special clearance and attend airfield driving training classes to access these areas.
Work will include the construction of two cast-in-place concrete earth covered magazines (4,400 SF), a new Powered Trailer Maintenance Facility (PTMF) of cast-in-place concrete walls and roof structure (8,273 SF) and renovations/additions to the Missile Assembly Shop (14,168/ 16,288 SF).
The existing asphalt roadways will be demolished and replace with new reinforced concrete pavement (340,000 SF) capable of supporting maximum vehicle weight of 80,000 lbs. Work also includes sitework clearing and grubbing, grading and extension of existing utilities infrastructure to the new facilities.
1.1.2 Location
The work is located at the Andersen Air Force Base, Guam, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.2 OCCUPANCY OF PREMISES
Building 51109 (MASM) will not be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.3 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that
Jacobs WFXO6312 SECTION 01 11 00 Page 1 which existed before new work started.
1.4 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.4.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 calendar days prior to starting excavation work.
1.5 NCTS/Telecomm/Access Control/IDS Coordination Requirements
1.5.1 NCTS/Telecomm/Access Control/IDS Contractor Access
Allow the NCTS/telecomm/access control/IDS Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with the NCTS/telecomm/access control/IDS Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NCTS/telecomm/access control/IDS Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
Jacobs WFXO6312 SECTION 01 11 00 Page 2
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 State
"State" when used in reference to states of the United States also include the Territory of Guam.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Entry Authorization List; G
Event Waiver Request; G
Free-Zone Request; G
List of Contact Personnel; G
Personnel List; G
Vehicle List; G
Statement Of Acknowledgement Form SF 1413; G
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
b. The MUNS area will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
c. Permission to interrupt any Activity roads or utility service must be requested in writing a minimum of 30 calendar days prior to the desired date of interruption.
d. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
e. The project site is within an active munitions storage facility and
Jacobs WFXO6312 SECTION 01 14 00 Page 1
∨∇⊃√⊆∠∇∨∇⊄⇒ ⇐∠∇⊄⊆∠⊂ ∏⊆∫∨⊂⊂ ″∂±∂″♠″ °≠ ≈ƒ← ↓↑∂°↑ ↔° ↔•≡ ↔° ♦°↑× ♦∂↔•∂± ± ∨♣↓≥°←∂♥≡ ⊂≠≡↔ƒ ∈♠±↔∂↔ƒ ⇔∂←↔±…≡ ∨⊂∈⇔ ≡♣…≥♠←∂°±
≡ ←≡↔ ↓↑↔ ƒ …°±↔∂±♠°♠← ↓•ƒ←∂…≥ ↑↑∂≡↑ ←♠…• ← °↑±÷≡ ″≡←•
÷〉 ⇒± ∨±↔↑ƒ ⇒♠↔•°↑∂∞↔∂°± ∂←↔ ∨⇒ ∂← ↑≡→♠∂↑≡≈ ≠°↑ ⇐°±↔↑…↔°↑ ↓≡↑←°±±≡≥ ……≡←← ↔° ↔•≡ ↓↑°∝≡…↔ ←∂↔≡ ″∂±∂″♠″ °≠ ≈ƒ← ↓↑∂°↑ ↔° ↔•≡ ≈↔≡ °≠ ↑≡→♠∂↑≡≈ ……≡←← ↔° ↔•≡ ↓↑°∝≡…↔ ←∂↔≡〉 ⊄•≡ ∨⇒← ″♠←↔ …≥≡↑≥ƒ ≈≡≠∂±≡ ±≈ ∝♠←↔∂≠ƒ ↔•≡ ↓↑°↓°←≡≈ •°♠↑←〉
•〉 ⇒±ƒ …↔∂♥∂↔ƒ ↔•↔ ↑≡→♠∂↑≡← ↔•≡ ♠←≡ °≠ …↑±≡ °↑ ←∂″∂≥↑ ≡→♠∂↓″≡±↔ ≡♣…≡≡≈∂±÷ ↔♦≡±↔ƒ∫≠∂♥≡ ≠≡≡↔ �∫� ∂± •≡∂÷•↔ ±ƒ♦•≡↑≡ °± ←≡ ≠≥∂÷•↔ ↓↔•← ↑≡ ±°↔ ≈♥≡↑←≡≥ƒ ≠≠≡…↔≡≈〉 ⊄•≡ ⇐°±↔↑…↔°↑ ″♠←↔ ←♠″∂↔ ♦∂↔• ⊄∨⊆∉⊂〉 ⊆≡≠≡↑ ↔° ↔•≡ ⇒↑…•∂↔≡…↔♠↑≥ ⇐°″↓↔∂∂≥∂↔ƒ ±≈ ⇑←≡ ⇔≡←∂÷±
♠±≥≡←← °↔•≡↑♦∂←≡ ↓↓↑°♥≡≈ ƒ ↔•≡ ⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑〉 ⊄•≡ ⇐°±↔↑…↔°↑ ″ƒ ≡ ≈∂↑≡…↔≡≈ ↔° ♠←≡ ≥↔≡↑±↔≡ ……≡←← ↑°♠↔≡← ↔° ……°″″°≈↔≡
∝〉 ⊄•≡ ⇐°±↔↑…↔°↑ ″♠←↔ ≥≥°♦ ≠°↑ ♦°↑× ≈≡≥ƒ← ↔°↔≥∂±÷ ♦°↑×≈ƒ← ↓≡↑ …≥≡±≈↑ ƒ≡↑ ″ƒ ±°↔ ≡ …°±←≡…♠↔∂♥≡〉 ⊄•≡←≡ ≈≡≥ƒ← ″ƒ ≡ ≈♠≡ ↔° ¬°♥≡↑±″≡±↔ñ ⊇∇⊂ °↓≡↑↔∂°±←⌠ ≡♣≡↑…∂←≡←⌠ ≡↔…〉
×〉 ⊄•≡ °≈ ∧↑″≡← ↔° ≡ ∂±←↔≥≥≡≈ ∂± ↔•≡ ∂←←∂≥≡ ⇒←←≡″≥ƒ ⊂•°↓ ⇒⊂ ♦∂≥≥ ≡ ∂±←↔≥≥≡≈ ≠↔≡↑ ↔•≡ ⇒⊂ ∂← ……≡↓↔≡≈ ƒ ↔•≡ ¬°♥≡↑±″≡±↔〉 ∉↑∂°↑ ≡ ↔° ♥≡↑∂≠ƒ ↔•≡ °≈ ∧↑″≡← ♦∂≥≥ ≡ ≥≡ ↔° ≡ ∂±←↔≥≥≡≈ ← ↑≡→♠∂↑≡≈〉
¬°♥≡↑±″≡±↔ ±≈ ↑≡≈ƒ ≠°↑ ♠←≡ ♦∂↔•∂±÷ ≈ƒ←〉
m. The three eastern-most ECMs located in MSA 2 (51260, 51261, and 51262) will be reconstructed by another project that is scheduled to start approximately one year after NTP for P-3001.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials must be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.4.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.1.2 Contractor Requirements for Access to Andersen Air Force Base
a. All Contractors shall have a sponsor to the installation on Andersen Air Force Base (AFB). Coordinate access to Andersen Air Force Base with the Contracting Officer.
b. A Contractor Affidavit is required for each person requesting access to Andersen AFB. Complete the "USAF Contractor/Sub-Contractor Access Affidavit" form.
c. Contractors are required to submit a paper pass/Base Pass Request with approval from their sponsor/Contracting Officer to the Visitors control Center.
1.4.1.3 Installation Access
Obtain access to Air Force installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.4.1.3.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:
a. Present a letter or official award document from the Contracting
Jacobs WFXO6312 SECTION 01 14 00 Page 3
Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.4.1.3.2 DBIDS Eligibility Requirements
Throughout the year, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
1.4.1.3.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.4.1.3.4 One-Day Passes
Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.4.1.4 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to
Jacobs WFXO6312 SECTION 01 14 00 Page 4
⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑ ♦∂≥≥ ∂≈≡±↔∂≠ƒ ≈≡←∂÷±↔≡≈ ←″°×∂±÷ ↑≡←〉
⊆≡÷♠≥↑ ♦°↑×∂±÷ •°♠↑← ″♠←↔ ≡ ≡↔♦≡≡± ∑ 〉″〉 ±≈ ∑ ↓〉″〉⌠ °±≈ƒ ↔•↑°♠÷• ∧↑∂≈ƒ⌠ ≡♣…≥♠≈∂±÷ ¬°♥≡↑±″≡±↔ •°≥∂≈ƒ←〉
∪°↑× ←←°…∂↔≡≈ ♦∂↔• ∨⇐ …≥≡↑±…≡ …↔∂♥∂↔∂≡← ″ƒ ≡ ≈°±≡ ≡↔♦≡≡± ↔•≡ •°♠↑← °≠ ∑ ↓〉″〉 ±≈ ∑ 〉″〉 ±≡♣↔ ≈ƒ °±≈ƒ ↔•↑°♠÷• ∧↑∂≈ƒ ♦∂↔• ↔•≡ ↓↓↑°♥≥ °≠ ↔•≡ ⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑〉 ∨⇐ …≥≡↑±…≡ …↔∂♥∂↔∂≡← ″ƒ ≥←° ≡
×≡ ↓↓≥∂…↔∂°± …≥≡±≈↑ ≈ƒ← ↓↑∂°↑ ↔° ←♠…• ♦°↑× ↔° ≥≥°♦ ↑↑±÷≡″≡±↔← ↔° ≡ ″≈≡ ƒ ↔•≡ ¬°♥≡↑±″≡±↔ ≠°↑ ∂±←↓≡…↔∂±÷ ↔•≡ ♦°↑× ∂± ↓↑°÷↑≡←←⌠ ÷∂♥∂±÷ ↔•≡ ←↓≡…∂≠∂… ≈↔≡←⌠ •°♠↑←⌠ ≥°…↔∂°±⌠ ↔ƒ↓≡ °≠ ♦°↑× ↔° ≡ ↓≡↑≠°↑″≡≈⌠ ↔•≡ ⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑ ″ƒ ↓↓↑°♥≡ ♦°↑× °♠↔←∂≈≡ ↑≡÷♠≥↑ •°♠↑←〉 ⇔♠↑∂±÷ ″±±≡↑ ↓↓↑°♥≡≈ ƒ ↔•≡ ⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑〉
〉〉 ∨♣…≥♠←∂°±↑ƒ ∉≡↑∂°≈
∪°↑× ↓≡↑≠°↑″≡≈ ≈♠↑∂±÷ ↔•≡ ″°±↔•← °≠ ∧≡↑♠↑ƒ ≡♥≡↑ƒ ƒ≡↑ ±≈ ⊂≡↓↔≡″≡↑ ≡♥≡± ±♠″≡↑≡≈ ƒ≡↑← ″ƒ ≡ ↑≡←↔↑∂…↔≡≈ ±≈ñ°↑ ←↔°↓↓≡≈ ♦∂↔•°♠↔ ↓↑∂°↑
〉〉 ⊇↔∂≥∂↔ƒ ⇐♠↔°♥≡↑← ±≈ √±↔≡↑↑♠↓↔∂°±←
〉 ×≡ ♠↔∂≥∂↔ƒ …♠↔°♥≡↑← ±≈ ∂±↔≡↑↑♠↓↔∂°±← ≠↔≡↑ ±°↑″≥ ♦°↑×∂±÷ •°♠↑← °↑ °± ⊂↔♠↑≈ƒ←⌠ ⊂♠±≈ƒ←⌠ ±≈ ¬°♥≡↑±″≡±↔ •°≥∂≈ƒ←〉 ⇐°±≠°↑″ ↔° ↓↑°…≡≈♠↑≡←
〉 ∨±←♠↑≡ ↔•↔ ±≡♦ ♠↔∂≥∂↔ƒ ≥∂±≡← ↑≡ …°″↓≥≡↔≡⌠ ≡♣…≡↓↔ ≠°↑ ↔•≡ …°±±≡…↔∂°±⌠
…〉 √±↔≡↑↑♠↓↔∂°± ↔° ♦↔≡↑⌠ ←±∂↔↑ƒ ←≡♦≡↑⌠ ←↔°↑″ ←≡♦≡↑⌠ ↔≡≥≡↓•°±≡ ←≡↑♥∂…≡⌠ …°″↓↑≡←←≡≈ ∂↑ ↑≡ …°±←∂≈≡↑≡≈ ♠↔∂≥∂↔ƒ …♠↔°♥≡↑← ↓♠↑←♠±↔ ↔° ↔•≡
←ƒ←↔≡″⌠ ∂±…≥♠≈∂±÷ ♦↔≡↑⌠ ←≡♦≡↑⌠ ≡≥≡…↔↑∂…≥⌠ ±≈ ←↔≡″ ←≡↑♥∂…≡←〉 ⊄•≡
…°±≈♠…↔ °≠ ↔•≡ ♦°↑×〉 ⊄•≡ ⇐°±↔↑…↔°↑ ″♠←↔ ±°↔∂≠ƒ ↔•≡ ⇐°±↔↑…↔∂±÷
⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑ …≥≡±≈↑ ≈ƒ← ∂± ≈♥±…≡ ≠°↑ ↔•≡ ≈∂÷÷∂±÷ ↓≡↑″∂↔ ≈∂←…°♥≡↑≡≈〉 ⊃≡↑∂≠ƒ ↔•≡ ≡≥≡♥↔∂°±← °≠ ≡♣∂←↔∂±÷ ↓∂↓∂±÷⌠ ♠↔∂≥∂↔∂≡←⌠ ±≈ ±ƒ ↔ƒ↓≡ °≠ ♠±≈≡↑÷↑°♠±≈ °↑ ≡±…←≡≈ °←↔↑♠…↔∂°± ±°↔ ∂±≈∂…↔≡≈ ↔° ≡ ↑≡″°♥≡≈ ♠↔ ≈∂←…°♥≡↑≡≈ ≈♠↑∂±÷ ←…±±∂±÷ ≥°…↔∂°±← ↔° ≡ ↔↑♥≡↑←≡≈ ƒ ↓∂↓∂±÷⌠ ≈♠…↔←⌠ ±≈
∇°↔∂≠∂…↔∂°± ∉↑∂°↑ ↔° ∨♣…♥↔∂°±∑ ∇°↔∂≠ƒ ↔•≡ ⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑ ↔ ≥≡←↔ …≥≡±≈↑ ≈ƒ← ↓↑∂°↑ ↔° ←↔↑↔∂±÷ ≡♣…♥↔∂°± ♦°↑×〉
⇒……≡←← ↑°♠↔≡← ↔° ↔•≡ ↓↑°∝≡…↔ ←∂↔≡ ″ƒ ≡ …•±÷≡≈ ƒ ↔•≡ ¬°♥≡↑±″≡±↔ ↔°
⊂♠″∂↔ ≠°↑ ↓↓↑°♥≥⌠ ↔ ≥≡←↔ …≥≡±≈↑ ≈ƒ← ↓↑∂°↑ ↔° ↔•≡ ≈≡←∂↑≡≈ ≈↔≡ °≠ ≡±↔↑ƒ⌠ ± °↑∂÷∂±≥ ≥↓•≡↔∂…≥ ≥∂←↔ °≠ ↓≡↑←°±±≡≥ ♦•° ↑≡→♠∂↑≡ ≡±↔↑ƒ ∂±↔° ¬°♥≡↑±″≡±↔ ↓↑°↓≡↑↔ƒ ↔° ↓≡↑≠°↑″ ♦°↑× °± ↔•≡ ↓↑°∝≡…↔〉 ∧♠↑±∂←• ≠°↑ ≡…•
≡〉 ⊂°…∂≥ ←≡…♠↑∂↔ƒ ±♠″≡↑
÷〉 ∇↔♠↑≥∂∞↔∂°± °↑ ⇒≥∂≡± ⊆≡÷∂←↔↑↔∂°± °↑ ⊄≡″↓°↑↑ƒ ∇°±∫√″″∂÷↑±↔ √⇔
"I hereby certify that all personnel on this list are either born U.S.
citizens, naturalized U.S. citizens with the naturalization number shown, or legal aliens with the alien registration number indicated or Temporary Non-Immigrant with the Temporary Non-Immigrant ID card number shown."
Signature/Firm Name
1.5.1.1 Citizenship Requirements
Aliens will not be admitted to the work site without approval. Clearance for aliens may require approximately 21 work days for approval.
1.5.2 Vehicle List
Submit an original list of vehicles to be utilized at the work site with the following information for each vehicle:
a. Make
b. Year
c. Model
d. License number
e. Registered owner
1.5.3 Passes
Submit request for personnel and vehicle passes together. Include the Certificate of Insurance for Contractor and Subcontractor(s) and the Statement of Acknowledgement Form SF 1413 with the submittal. Passes will normally be issued within 21 calendar days.
Airfield access requires the driver to attend training courses sponsored by 36 OSS to qualify for an airfield driver certification. Contact TSgt Tory Howard at 36 OSS, tory.howard@us.af.mil.
1.5.3.1 Control
Maintain strict accountability over passes. Immediately report to the source of issue, passes missing or lost and the circumstances. If the Contractor has another active contract or one commencing immediately, employees' names may be transferred from one contract to the other. Final payment will not be effected until employees are transferred to another contract or the records are cleared. Furnish a signed letter, countersigned by the source of issue, stating that passes have been turned in.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
Jacobs WFXO6312 SECTION 01 14 00 Page 7
Jacobs WFXO6312 SECTION 01 14 00 Page 8
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Earned Value Report; G
1.2 EARNED VALUE REPORT
1.2.1 Data Required
This contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices and extended prices.Costs shall be summarized and totals provided for each construction category Within 15 calendar days of notice of award, prepare and deliver to the Contracting Officer an Earned Value Report (construction contract) as directed by the Contracting Officer.
1.2.2 Schedule Instructions
Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer. Identify the cost for site work, and include incidental work to the 5 ft line. Identify costs for the building(s), and include work out to the 5 ft line. Work out to the 5 ft line shall include construction encompassed within a theoretical line 5 ft from the face of exterior walls and shall include attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 ft line.
1.2.3 Real Property Assets
Draft DD Form 1354, Transfer and Acceptance of Military Real Property filled in with the appropriate Real Property Unique Identifiers (RPUID) and related construction Category Codes to summarize the designed real property assets that apply to this contract. The Contractor shall meet with the Contracting Officer and the Real Property Accounting Officer during the Pre Construction Meeting and the Project Closeout Meetings to modify and include any necessary changes to the DD Form 1354.
The Contractor shall provide the Interim DD Form 1354 that uses the appropriate division of the RPUIDs/ Category Codes to represent the final constructed facility and include all associated cost. Coordinate the
Jacobs WFXO6312 SECTION 01 20 00.00 20 Page 1
Contractor's Price and Payment structure with the structure of the RPUIDs/ Category Codes. A blank editable DD Form 1354 in pdf format is available for download from the following web site:
http://www.dtic.mil/whs/directives/forms/eforms/dd1354.pdf
Divide detailed asset breakdown into the RPUIDs and related construction Category Codes and populate associated costs which represent all aspects of the work. Where assets diverge into multiple RPUID/ Category Codes, divide the asset and provide the proportion of the assets in each RPUID/ Category Code. Assets and related RPUID/ Category Codes may be modified by the Contracting Officer as necessary during course of the work.
Coordinate identification and proportion of these assets with the Government Real Property Accounting Officer.
Cost data accumulated under this section are required in the preparation of DD Form 1354.
1.2.4 Schedule Requirements for HVAC TAB
The field work Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC shall be broken down in the Earned Value Report from the cost-loaded NAS by separate line items which reflect measurable deliverables. Specific payment percentages for each line item shall be determined on a case by case basis for each contract. The line items shall be as follows:
a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. The resulting findings shall be submitted to the Government to allow correction of the design. The progress payment shall be issued after review and approval of the report.
b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report shall contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.
c. Season I field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data shall be collected for one seasonal condition (either summer or winter depending on project timing).
d. Approval of Season I report: On completion of the Season I field work, the data is compiled into a report and submitted to the Government. The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.
e. Completion of Season I field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Season I report.
Jacobs WFXO6312 SECTION 01 20 00.00 20 Page 2
f. Approval of Season II report: The TABS Agency completes all Season II field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Season I performance data was compiled. This data shall be compiled into a report and submitted to the Government. On completion of submittal review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Season I report since most of the water and air balancing work effort is completed under Season I.
1.3 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, equipment use rates shall be based upon the applicable provisions of the Guam Cost Guidebooks, Equipment Watch Blue Book or acceptable guidance specific to Guam to establish a set cost for equipment and equipment operations cost.
1.4 CONTRACTOR'S INVOICE AND CONTRACT…