FY21 MCAF P-3001/AJJY203001, APSI - STANDOFF WEAPONS COMPLEX, MSA2, ANDERSEN AIR FORCE BASE, GUAM
Solicitation number
N6274220R1334
Issued by

About this file

This solicitation is for the construction of a missile maintenance and assembly complex at Andersen Air Force Base in Guam. The project scope includes alterations and construction of an addition to Building 51109 to support preload capability of rotary launchers; improving roadways to support loaded munitions trailers from the maintenance facility to storage magazines; constructing a powered munitions trailer maintenance facility; and building two new earth covered magazines to support storage of standoff weapons and pre-loaded launchers. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command for FY21. Responses are due based on the solicitation number and details provided.

View the file

Other files

File Type Posted
20R1334-Note8.pdf PDF
20R1334 AMD 0006.pdf PDF
20R1334-AMD 0005.pdf PDF
20R1334-Note7.pdf PDF
20R1334-Note6.pdf PDF
20R1334-Amd 0004 Spec 02 41 00 - Attach A.pdf PDF
20R1334-Amd 0004.pdf PDF
20R1334-Note5.pdf PDF
20-R-1334-Amd 0003.pdf PDF
20R1334-Note4.pdf PDF
20R1334-AMD2.pdf PDF
20R1334-Note3.pdf PDF
20R1334-SV SignIn.PDF PDF
20R1334-AMD1.pdf PDF
20R1334-Note2.pdf PDF
20R1334-Note1.pdf PDF
20R1334-Specs_Part2of2.pdf PDF
20R1334-JAs.zip ZIP file
20R1334-RFP.pdf PDF
20R1334-Dwgs.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC PACIFIC

WORK ORDER NO:

1632562

SPECIFICATIONS

(VOLUME 01 OF 02)

For

FY21 MCAF PROJECT AJJY203001

APSI-STANDOFF WEAPONS COMPLEX, MSA2

At the

ANDERSEN AFB, GUAM

PREPARED BY:

777 Main Street Fort Worth, Texas 76102 USA

A/E Contract No. N62742-17-D-0003

Architectural: Shigeharu Shimada, AIA Jacobs Interiors: Jeri L. Champine Jacobs Mechanical: Ryan Casperaites, PE Jacobs Civil: Kathyriya Kennedy, PE Jacobs Electrical: Andrew Gardner, PE Jacobs Telecom: Rene Rubio, PE Jacobs Structural: Alex Bannerot, PE Jacobs Fire Protection: Joseph D. Shumake, FPE Jacobs

Submitted By: _______________________________ Date: ____________ Mr. Blaine Paxton, AIA, NCARB

APPROVED BY:

Specification: _________________________________________________ Mr. Clint Hashiba, P.E.

For Commander, NAVFAC Pacific: ________________________________________________

Mr. Evan Mizue, P.E.

Date: _______________________

08/28/2020

Mr. Clint Hashiba, Mr. Evan Mizue, P.E

______9/10/2020

SEALS PAGE FOR WFXO6312

FY21 MCAF P-3001/AJJY203001

APSI – STANDOFF WEAPONS COMPLEX, MSA 2

100% (FINAL) DESIGN SUBMITTAL

Andersen Air Force Base, Guam

A/E CONTRACT No. N62742-17-D-003

DELIVERY ORDER NO. N6274219F0327

This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Architect under the laws of the State of Texas.

Name: Shigeharu Shimada

License Number: 19279

Firm:

Jacobs Engineering Group Inc.

Texas Registered Engineering Firm F-2966

Name: Kathyriya H. Kennedy

License Number: 98244

Firm:

Jacobs Engineering Group Inc.

Texas Registered Engineering Firm F-2966

Name: Jeri L. Champine

License Number: 629

Firm:

Jacobs Engineering Group Inc.

Texas Registered Engineering Firm F-2966

This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Engineer under the laws of the State of Texas.

Name: Ryan A. Casperaites

License Number: 128479

Firm:

Jacobs Engineering Group Inc.

Texas Registered Engineering Form F-2966

08-28-2020

08-28-2020

08-28-2020

08-28-2020

This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Interior Designer under the laws of the State of Texas.

This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Engineer under the laws of the State of Texas.

This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Engineer under the laws of the State of Texas.

Name: Alex Bannerot

License Number: 91686

Firm:

Jacobs Engineering Group Inc.

Texas Registered Engineering Form F-2966

This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Fire Protection Engineer under the laws of the State of California.

Name: Joseph D. Shumake

License Number: CA1952

Firm:

Jacobs Engineering Group Inc.

Texas Registered Engineering Form F-2966

This document was prepared by me or under my direct personal supervision and that I am a duly registered Professional Engineer under the laws of the State of Texas.

Name: Andrew T. Gardner

License Number: 130901

Firm:

Jacobs Engineering Group Inc.

Texas Registered Engineering Form F-2966

This document was prepared by me under my direct personal supervision and that I am a Registered Communications Distribution Designer as accredited by BICSI.

Name: Rene Rubio

License Number: 201777R

Firm:

Jacobs Engineering Group Inc.

Texas Registered Engineering Form F-296608-28-2020

08-28-2020

08-28-2020

AJJY203001, APSI - Standoff Weapons Complex, MSA2 1632562 Andersen AFB, Guam

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LIST OF DRAWINGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT

MANAGEMENT SYSTEM

01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.03 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (JRM-ESS)

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

01 91 00.15 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 31 30 MARINE CONCRETE FOR EARTH COVERED MAGAZINES

03 37 13 SHOTCRETE

03 41 33 PRECAST STRUCTURAL PRETENSIONED CONCRETE

03 45 33 PRECAST STRUCTURAL CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 40 00 COLD-FORMED METAL FRAMING

PROJECT TABLE OF CONTENTS Page 1

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 16 MINERAL FIBER BLANKET INSULATION

07 27 36 SPRAY FOAM AIR BARRIERS

07 57 12 LIQUID APPLIED ELASTOMERIC SILICONE ROOFING COATING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

08 33 13 COILING COUNTER DOORS

08 33 23 OVERHEAD COILING DOORS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

09 67 23.13 STANDARD RESINOUS FLOORING

09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM

09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM

09 90 00 PAINTS AND COATINGS

09 96 53.13 SILICONE ELASTOMERIC COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL

22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 48.19 SEISMIC BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS

23 23 00 REFRIGERANT PIPING

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.21 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE

AND LIFE SAFETY

25 05 11.23 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

BUILDING CONTROL SYSTEM

25 05 11.26 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

UTILITY CONTROL SYSTEM

25 08 11.00 20 RISK MANAGEMENT FRAMEWORK FOR FACILITY-RELATED CONTROL

SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS

26 13 00 HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 27 14.00 20 ELECTRICITY METERING

26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DI VI SI ON 31 - EARTHWORK

31 21 13 RADON MITIGATION

31 23 00.00 20 EXCAVATION AND FILL

PROJECT TABLE OF CONTENTS Page 3

31 31 16.13 CHEMICAL TERMITE CONTROL

31 32 23 FOUNDATION DRILLING AND GROUTING

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE BASE COURSES

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 46 13 FOUNDATION DRAINAGE SYSTEM

33 46 16 SUBDRAINAGE PIPING

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT

41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

GENERAL

001 17250243 G-001 COVER SHEET

002 17250244 G-002 SHEET INDEX

003 17250245 G-003 SHEET INDEX

004 17250246 G-100 LOCATION MAP & HAUL ROUTE

005 17250247 GB100 SCOPE OF WORK SITE PLAN

006 17250248 GB101 SCOPE OF WORK CONSTRUCTION ZONE 1A

007 17250249 GB102 SCOPE OF WORK CONSTRUCTION ZONE 1B

008 17250250 GB103 SCOPE OF WORK CONSTRUCTION ZONE 1C

009 17250251 GB104 SCOPE OF WORK CONSTRUCTION ZONE 3

010 17250252 GB105 SCOPE OF WORK CONSTRUCTION ZONE 2C

011 17250253 GB106 SCOPE OF WORK CONSTRUCTION ZONE 2B

012 17250254 GB107 SCOPE OF WORK CONSTRUCTION ZONE 2A

013 17250255 GI010 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

014 17250256 GI011 ABBREVIATIONS CONTINUED

015 17250257 GI012 MASM - CODE ANALYSIS

016 17250258 GI013 MASM - OVERALL LIFE SAFETY PLAN

017 17250259 GI014 MASM - AIR BARRIER PLAN AND SECTION

018 17250260 GI030 PTMX - CODE ANALYSIS

019 17250261 GI031 PTMX - OVERALL LIFE SAFETY PLAN

020 17250262 GI032 PTMX - AIR BARRIER PLAN AND SECTION

021 17250263 GI110 MASM - CODE COMPLIANCE SITE PLAN

022 17250264 GI130 PTMX - CODE COMLPIANCE SITE PLAN

023 17250265 GC101 EROSION CONTROL PLAN

024 17250266 GC102 EROSION CONTROL PLAN

025 17250267 GC103 EROSION CONTROL PLAN

026 17250268 GC104 EROSION CONTROL PLAN

027 17250269 GC105 EROSION CONTROL PLAN

028 17250270 GC106 EROSION CONTROL PLAN

029 17250271 GC501 EROSION CONTROL DETAILS

030 17250272 GC502 EROSION CONTROL DETAILS

SURVEY/MAPPING

031 17250275 V-100 OVERALL TOPOGRAPHIC SURVEY

032 17250276 V-101 TOPOGRAPHIC SURVEY PLAN

033 17250277 V-102 TOPOGRAPHIC SURVEY PLAN

GEOTECHNICAL

034 17250278 B-100 BORING LOCATION MAPS

035 17250279 B-101 BORING LOGS

036 17250280 B-102 BORING LOGS

037 17250281 B-103 BORING LOGS

Jacobs WFXO6312 DOCUMENT 00 01 15 Page 1

CIVIL

038 17250282 C-001 GENERAL NOTES AND SYMBOLS

039 17250283 CD100 OVERALL DEMOLITION PLAN

040 17250284 CD101 EXISTING CONDITIONS AND REMOVAL PLAN

041 17250285 CD102 EXISTING CONDITIONS AND REMOVAL PLAN

042 17250286 CD103 EXISTING CONDITIONS AND REMOVAL PLAN

043 17250287 CD104 EXISTING CONDITIONS AND REMOVAL PLAN

044 17250288 CD105 EXISTING CONDITIONS AND REMOVAL PLAN

045 17250289 CD106 EXISTING CONDITIONS AND REMOVAL PLAN

046 17250290 CD107 EXISTING CONDITIONS AND REMOVAL PLAN

047 17250291 CS100 OVERALL SITE PLAN

048 17250292 CS101 SITE IMPROVEMENTS AND GEOMETRIC SITE PLAN

049 17250293 CS102 SITE IMPROVEMENTS AND GEOMETRIC SITE PLAN

050 17250294 CS103 SITE IMPROVEMENTS AND GEOMETRIC SITE PLAN

051 17250295 CS104 SITE IMPROVEMENTS AND GEOMETRIC SITE PLAN

052 17250296 CS105 SITE IMPROVEMENTS AND GEOMETRIC SITE PLAN

053 17250297 CS501 SITE DETAILS

054 17250298 CS502 SITE DETAILS

055 17250299 CS503 SITE DETAILS

056 17250300 CS504 SITE DETAILS

057 17250301 CS505 SITE DETAILS

058 17250302 CG101 GRADING AND DRAINAGE PLAN

059 17250303 CG102 GRADING AND DRAINAGE PLAN

060 17250304 CG103 GRADING AND DRAINAGE PLAN

061 17250305 CG104 GRADING AND DRAINAGE PLAN

062 17250306 CG105 GRADING AND DRAINAGE PLAN

063 17250307 CG106 GRADING AND DRAINAGE PLAN

064 17250308 CG201 STORM DRAIN PROFILES

065 17250309 CG202 STORM DRAIN PROFILES

066 17250310 CG301 SITE SECTIONS

067 17250311 CG302 SITE SECTIONS

068 17250312 CG303 SITE SECTIONS

069 17250313 CG501 DRAINAGE DETAILS

070 17250314 CG502 DRAINAGE DETAILS

071 17250315 CG503 RETAINING WALL DETAILS

072 17250316 CG504 RETAINING WALL DETAILS

073 17250317 CG505 DRAINAGE DETAILS

074 17250318 CG506 DRAINAGE DETAILS

075 17250319 CG507 DRAINAGE DETAILS

076 17250320 CG508 DRAINAGE DETAILS

077 17250321 CG509 DRAINAGE DETAILS

078 17250322 CP201 ROADWAY PLAN AND PROFILE

079 17250323 CP202 ROADWAY PLAN AND PROFILE

080 17250324 CP203 ROADWAY PLAN AND PROFILE

081 17250325 CP204 ROADWAY PLAN AND PROFILE

082 17250326 CP205 ROADWAY PLAN AND PROFILE

083 17250327 CP206 ROADWAY PLAN AND PROFILE

084 17250328 CP207 ROADWAY PLAN AND PROFILE

085 17250329 CP208 ROADWAY PLAN AND PROFILE

086 17250330 CP209 ROADWAY PLAN AND PROFILE

087 17250331 CP210 ROADWAY PLAN AND PROFILE

088 17250332 CP211 ROADWAY PLAN AND PROFILE

089 17250333 CP212 ROADWAY PLAN AND PROFILE

090 17250334 CP213 ROADWAY PLAN AND PROFILE

091 17250335 CP214 ROADWAY PLAN AND PROFILE

092 17250336 CP215 ROADWAY PLAN AND PROFILE

093 17250337 CP216 ROADWAY PLAN AND PROFILE

094 17250338 CP217 ROADWAY PLAN AND PROFILE

Jacobs WFXO6312 DOCUMENT 00 01 15 Page 2

095 17250339 CP218 ROADWAY PLAN AND PROFILE

096 17250340 CP219 ROADWAY PLAN AND PROFILE

097 17250341 CP220 ROADWAY PLAN AND PROFILE

098 17250342 CP221 ROADWAY PLAN AND PROFILE

099 17250343 CP222 ROADWAY PLAN AND PROFILE

100 17250344 CP223 ROADWAY PLAN AND PROFILE

101 17250345 CP224 ROADWAY PLAN AND PROFILE

102 17250346 CP225 ROADWAY PLAN AND PROFILE

103 17250347 CP226 ROADWAY PLAN AND PROFILE

104 17250348 CP227 ROADWAY PLAN AND PROFILE

105 17250349 CU101 UNDERGROUND UTILITIES PLAN

106 17250350 CU102 UNDERGROUND UTILITIES PLAN

107 17250351 CU103 UNDERGROUND UTILITIES PLAN

108 17250352 CU104 UNDERGROUND UTILITIES PLAN

109 17250353 CU105 UNDERGROUND UTILITIES PLAN

110 17250354 CU201 UNDERGROUND UTILITY PROFILES

111 17250355 CU202 UNDERGROUND UTILITY PROFILES

112 17250356 CU501 UTILITY DETAILS

113 17250357 CU502 UTILITY DETAILS

114 17250358 CU503 UTILITY DETAILS

115 17250359 CU504 UTILITY DETAILS

STRUCTURAL

116 17250362 S-001 MASM & PTMX - GENERAL STRUCTURAL NOTES

117 17250363 S-002 MASM & PTMX - GENERAL STRUCTURAL NOTES

118 17250364 S-003 MASM & PTMX - GENERAL STRUCTURAL NOTES

119 17250365 S-005 MASM & PTMX - COMPONENT AND

CLADDING WIND PRESSURE DIAGRAM

120 17250366 S-008 ECM - GENERAL STRUCTURAL NOTES

121 17250367 SB111 MASM - FOUNDATION PLAN

122 17250368 SB131 PTMX - FOUNDATION PLAN

123 17250369 SF111 MASM - ROOF FRAMING PLAN

124 17250370 SF131 PTMX - ROOF FRAMING PLAN

125 17250371 S-211 MASM - ELEVATIONS

126 17250372 S-212 MASM - ELEVATIONS

127 17250373 S-231 PTMX - ELEVATIONS

128 17250374 S-232 PTMX - ELEVATIONS

129 17250375 S-311 MASM - BUILDING SECTION

130 17250376 S-331 PTMX - BUILDING SECTIONS

131 17250377 S-501 MASM & PTMX - TYPICAL CONCRETE DETAILS

132 17250378 S-502 MASM & PTMX - TYPICAL CONCRETE DETAILS

133 17250379 S-503 MASM & PTMX - TYPICAL CONCRETE DETAILS

134 17250380 S-511 MASM & PTMX - CONCRETE SECTIONS AND DETAILS

135 17250381 S-512 MASM & PTMX - CONCRETE SECTIONS AND DETAILS

136 17250382 S-514 MASM & PTMX - CONCRETE SECTIONS AND DETAILS

137 17250383 S-515 MASM - WALL AND ROOF SECTIONS AND DETAILS

138 17250384 S-516 MASM - ROOF SECTIONS AND DETAILS

139 17250385 S-517 MASM - ROOF SECTIONS AND DETAILS

140 17250386 S-518 MASM - ROOF SECTIONS AND DETAILS

141 17250387 S-519 MASM - ROOF SECTIONS AND DETAILS

142 17250388 S-531 PTMX - CONCRETE SECTIONS AND DETAILS

143 17250389 S-532 MASM & PTMX - CONCRETE SECTIONS AND DETAILS

144 17250390 S-535 PTMX - ROOF SECTIONS AND DETAILS

145 17250391 S-555 ECM - ELECTRICAL YARD PLAN AND SECTIONS

ARCHITECTURAL

146 17250394 A-001 MASM - GENERAL NOTES,

SYMBOLS AND EXTERIOR PERSPECTIVES VIEWS

147 17250395 A-003 PTMX - GENERAL NOTES,

Jacobs WFXO6312 DOCUMENT 00 01 15 Page 3

SYMBOLS AND EXTERIOR PERSPECTIVES VIEWS

148 17250396 A-005 ECM - GENERAL NOTES,

SYMBOLS AND EXTERIOR PERSPECTIVES VIEWS

149 17250397 AD110 MASM - DEMOLITION - OVERALL FLOOR PLAN

150 17250398 AD111 MASM - DEMOLITION - ELEVATIONS

151 17250399 AE110 MASM - OVERALL FLOOR PLAN

152 17250400 AE111 MASM - PARTIAL FLOOR PLAN - AREA A

153 17250401 AE112 MASM - PARTIAL FLOOR PLAN - AREA B

154 17250402 AE115 MASM - OVERALL REFLECTED CEILING PLAN

155 17250403 AE116 MASM - PARTIAL REFLECTED CEILING PLAN - AREA A

156 17250404 AE117 MASM - PARTIAL REFLECTED CEILING PLAN - AREA B

157 17250405 AE120 MASM - OVERALL ROOF PLAN

158 17250406 AE121 MASM - PARTIAL ROOF PLAN - AREA A

159 17250407 AE130 PTMX - FLOOR PLAN

160 17250408 AE135 PTMX - REFLECTED CEILING PLAN

161 17250409 AE140 PTMX - ROOF PLAN

162 17250410 AE150 ECM - OVERALL FLOOR PLAN

163 17250411 AE151 ECM - ELECTRICAL YARD

164 17250412 AE155 ECM - OVERALL REFLECTED CEILING PLAN

165 17250413 AE160 ECM - OVERALL ROOF PLAN

166 17250414 A-211 MASM - EXTERIOR ELEVATIONS

167 17250415 A-212 MASM - EXTERIOR ELEVATIONS

168 17250416 A-230 PTMX - EXTERIOR ELEVATIONS

169 17250417 A-231 PTMX - EXTERIOR ELEVATIONS

170 17250418 A-250 ECM - EXTERIOR ELEVATIONS

171 17250419 A-311 MASM - BUILDING SECTIONS

172 17250420 A-315 MASM - WALL SECTIONS

173 17250421 A-316 MASM - WALL SECTIONS

174 17250422 A-318 MASM - WALL SECTION DETAILS

175 17250423 A-319 MASM - WALL SECTION DETAILS

176 17250424 A-330 PTMX - BUILDING SECTIONS

177 17250425 A-335 PTMX - WALL SECTIONS

178 17250426 A-336 PTMX - WALL SECTIONS

179 17250427 A-340 PTMX - WALL SECTION DETAILS

180 17250428 A-350 ECM - BUILDING SECTIONS

181 17250429 A-355 ECM - WALL SECTIONS

182 17250430 A-360 ECM - PLAN AND SECTION DETAILS

183 17250431 A-430 PTMX - ENLARGED RESTROOM PLANS AND

RESTROOM ACCESSORIES

184 17250432 A-431 PTMX - ENLARGED MECHANICAL YARD

185 17250433 A-432 PTMX - ENLARGED ELECTRICAL YARD

186 17250434 A-511 MASM - PLAN DETAILS

187 17250435 A-512 MASM - CEILING DETAILS

188 17250436 A-525 MASM - MISCELLANEOUS DETAILS

189 17250437 A-530 PTMX - MISCELLANEOUS DETAILS

190 17250438 A-531 PTMX - CEILING & PENETRATION DETAILS

191 17250439 A-611 MASM - PARTITION TYPES

192 17250440 A-612 MASM - PENETRATION DETAILS

193 17250441 A-613 MASM - DOOR & FRAME SCHEDULE

194 17250442 A-614 MASM - DOOR DETAILS

195 17250443 A-615 MASM - LOUVER TYPES AND DETAILS

196 17250444 A-630 PTMX - PARTITION TYPES

197 17250445 A-631 PTMX - DOOR & FRAME SCHEDULE

198 17250446 A-632 PTMX - DOOR DETAILS

199 17250447 A-633 PTMX - LOUVER & WINDOW DETAILS

FIRE PROTECTION

217 17250466 F-001 GENERAL NOTES AND SYMBOLS

218 17250467 FA111 MASM - FIRE ALARM PLAN - LEVEL 1 AREA A

Jacobs WFXO6312 DOCUMENT 00 01 15 Page 4

219 17250468 FA112 MASM - FIRE ALARM PLAN - LEVEL 1 AREA B

220 17250469 FA131 PTMX - FIRE ALARM PLAN - LEVEL 1

221 17250470 FP116 MASM - FIRE PROTECTION PLAN - LEVEL 1 AREA A

222 17250471 FP136 PTMX - FIRE PROTECTION PLAN

223 17250472 FA511 FIRE ALARM/MASS NOTIFICATION DETAILS - PART 1

224 17250473 FA512 MASM - FIRE ALARM/MASS NOTIFICATION

DETAILS - PART 2

225 17250474 FP511 MASM - FIRE SUPPRESSION DETAILS - PART 1

INTERIORS

200 17250449 I-001 GENERAL NOTES & SYMBOLS

201 17250450 IN111 MASM-OVERALL FINISH PLAN - LEVEL 1

202 17250451 IN112 MASM-PARTIAL FINISH & SIGNAGE

PLAN - LEVEL 1 - AREA A

203 17250452 IN113 MASM-PARTIAL FINISH & SIGNAGE

PLAN - LEVEL 1 - AREA B

204 17250453 IN131 PTMX-OVERALL FINISH AND SIGNAGE PLAN - LEVEL 1

205 17250454 IF111 MASM-OVERALL CEQ PLAN - LEVEL 1

206 17250455 IF112 MASM-PARTIAL CEQ PLAN - LEVEL 1 - AREA A

207 17250456 IF113 MASM-PARTIAL CEQ PLAN - LEVEL 1 - AREA B

208 17250457 IF131 PTMX-OVERALL CEQ PLAN - LEVEL 1

209 17250458 I-231 PTMX-INTERIOR ELEVATIONS & ENLARGED PLANS

210 17250459 I-311 MASM-MILLWORK SECTIONS AND DETAILS

211 17250460 I-331 PTMX-MILLWORK SECTIONS AND DETAILS

212 17250461 I-611 MASM-FINISH MATERIAL LEGEND & ROOM FINISH SCHEDULE

213 17250462 I-613 MASM-EQUIPMENT LEGEND - NIC

214 17250463 I-614 MASM-SIGNAGE DETAILS

215 17250464 I-631 PTMX-FINISH MATERIAL LEGEND & ROOM FINISH SCHEDULE

216 17250465 I-632 PTMX-SIGNAGE SCHEDULE & DETAILS

PLUMBING

226 17250476 P-001 PLUMBING LEGEND

227 17250477 P-110 MASM - OVERALL UNDERFLOOR PLAN

228 17250478 P-111 MASM - PARTIAL UNDERFLOOR PLAN - AREA A

229 17250479 P-120 MASM - OVERALL FLOOR PLAN

230 17250480 P-122 MASM - PARTIAL FLOOR PLAN - AREA A

231 17250481 P-123 MASM - PARTIAL FLOOR PLAN - AREA B

232 17250482 P-130 PTMX - OVERALL UNDERFLOOR PLAN

233 17250483 P-131 PTMX - OVERALL FLOOR PLAN

234 17250484 P-411 MASM - ENLARGED PLANS

235 17250485 P-431 PTMX - ENLARGED PLANS

236 17250486 P-432 PTMX - ENLARGED PLANS

237 17250487 P-501 PLUMBING DETAILS

238 17250488 P-502 PLUMBING DETAILS

239 17250489 P-503 PLUMBING DETAILS

240 17250490 P-504 PLUMBING DETAILS

241 17250491 P-611 MASM - PLUMBING SCHEDULES

242 17250492 P-631 PTMX - PLUMBING SCHEDULES

243 17250493 P-711 MASM - PLUMBING SCHEMATICS

244 17250494 P-712 MASM - DOMESTIC COLD WATER SCHEMATIC

245 17250495 P-713 MASM - SANITARY WASTE AND INDUSTRIAL

WASTE RISER DIAGRAM

246 17250496 P-714 MASM - DOMESTIC WATER RISER DIAGRAM

247 17250497 P-715 MASM - COMPRESSED AIR RISER DIAGRAM

248 17250498 P-731 PTMX - PLUMBING SCHEMATICS

249 17250499 P-732 PTMX - PLUMBING SCHEMATICS

250 17250500 P-733 PTMX - SANITARY RISER DIAGRAM

251 17250501 P-734 PTMX - DOMESTIC WATER RISER DIAGRAM

252 17250502 P-735 PTMX - COMPRESSED AIR RISER DIAGRAM

Jacobs WFXO6312 DOCUMENT 00 01 15 Page 5

MECHANICAL

253 17250504 M-001 GENERAL NOTES AND SYMBOLS

254 17250505 MD110 MASM - HVAC PLAN - OVERALL DEMO

255 17250506 MH110 MASM - HVAC PLAN - OVERALL

256 17250507 MH111 MASM - HVAC PLAN - AREA A

257 17250508 MH130 PTMX - OVERALL HVAC FLOOR PLAN

258 17250509 MP120 MASM - HVAC PIPING PLAN - OVERALL

259 17250510 MP121 MASM - HVAC PIPING PLAN - AREA A

260 17250511 MP140 PTMX - OVERALL HVAC PIPING PLAN

261 17250512 M-311 MASM - HVAC SECTIONS

262 17250513 M-331 PTMX - HVAC SECTIONS

263 17250514 M-411 MASM - HVAC ENLARGED PLANS

264 17250515 M-431 PTMX - HVAC ENLARGED PLANS

265 17250516 M-501 HVAC DETAILS

266 17250517 M-502 HVAC DETAILS

267 17250518 M-503 HVAC DETAILS

268 17250519 M-611 MASM - HVAC SCHEDULES

269 17250520 M-631 PTMX - HVAC SCHEDULES

270 17250521 M-711 MASM - HVAC DIAGRAMS

271 17250522 M-731 PTMX - HVAC DIAGRAMS

272 17250523 MI801 HVAC CONTROLS

273 17250524 MI802 HVAC CONTROLS

274 17250525 MI803 HVAC CONTROLS

ELECTRICAL

275 17250527 E-001 GENERAL NOTES & LEGEND

276 17250528 ES100 OVERALL ELECTRICAL SITE PLAN

277 17250529 ES101 ELECTRICAL SITE PLAN - AREA 1

278 17250530 ES102 ELECTRICAL SITE PLAN - AREA 2

279 17250531 ES103 ELECTRICAL SITE PLAN - AREA 3

280 17250532 ES104 ELECTRICAL SITE PLAN - AREA 4

281 17250533 ES105 ELECTRICAL SITE PLAN - AREA 5

282 17250534 ES106 ELECTRICAL SITE PLAN - AREA 6

283 17250535 ES107 ELECTRICAL SITE PLAN - AREAS 7 & 8

284 17250536 ES108 ELECTRICAL SITE PLAN - AREAS 9 & 10

285 17250537 ES109 ELECTRICAL SITE PLAN - AREAS 11 & 12

286 17250538 ES110 ELECTRICAL SITE PLAN - AREA 13

287 17250539 ED110 MASM - OVERALL DEMOLITION POWER PLAN

288 17250540 ED301 MASM - SUPPORT DEMOLITION POWER PLAN

289 17250541 E-100 MASM - OVERALL ELECTRICAL PLAN

290 17250542 EG110 MASM - OVERALL GROUNDING PLAN

291 17250543 EG111 MASM - OVERALL LIGHTNING PROTECTION PLAN

292 17250544 EG130 PTMX - OVERALL GROUNDING PLAN

293 17250545 EG131 PTMX - OVERALL LIGHTNING PROTECTION PLAN

294 17250546 EP111 MASM - PARTIAL POWER PLAN - AREA A

295 17250547 EP112 MASM - PARTIAL POWER PLAN - AREA B

296 17250548 EP130 PTMX - OVERALL POWER PLAN

297 17250549 EP150 ECM - OVERALL POWER & LIGHTING PLAN

298 17250550 EL111 MASM - PARTIAL LIGHTING PLAN - AREA A

299 17250551 EL130 PTMX - OVERALL LIGHTING PLAN

300 17250552 E-401 MASM - ENLARGED POWER & LIGHTING PLANS

301 17250553 E-501 DETAILS

302 17250554 E-502 DETAILS

303 17250555 E-503 DETAILS

304 17250556 E-504 DETAILS

305 17250557 E-505 DETAILS

306 17250558 E-506 DETAILS

307 17250559 E-507 DETAILS

Jacobs WFXO6312 DOCUMENT 00 01 15 Page 6

308 17250560 E-601 MASM - ONE LINE DIAGRAM

309 17250561 E-602 PTMX - ONE LINE DIAGRAM

310 17250562 E-603 ECM - ONE LINE DIAGRAM

311 17250563 E-605 GROUNDING RISERS

312 17250564 E-611 LIGHTING SCHEDULES & CONTROL MATRIX

313 17250565 E-612 LIGHTING DETAILS

314 17250566 E-621 EQUIPMENT SCHEDULE

315 17250567 E-631 MASM - PANEL SCHEDULES

316 17250568 E-632 MASM - PANEL SCHEDULES

317 17250569 E-633 MASM - PANEL SCHEDULES

318 17250570 E-635 PTMX - PANEL SCHEDULES

319 17250571 E-636 PTMX - PANEL SCHEDULES

320 17250572 E-637 PTMX - PANEL SCHEDULES

321 17250573 E-641 ECM - PANEL SCHEDULES

TELECOMM

322 17250575 T-001 GENERAL NOTES & LEGEND

323 17250576 TT110 MASM - OVERALL COMMUNICATION PLAN

324 17250577 TT111 MASM - PARTIAL COMMUNICATION PLAN - AREA A

325 17250578 TT112 MASM - PARTIAL COMMUNICATION PLAN - AREA B

326 17250579 TT130 PTMX - OVERALL COMMUNICATION PLAN

327 17250580 TT150 ECM - OVERALL COMMUNICATION PLAN

328 17250581 T-402 PTMX - ENLARGED PLANS

329 17250582 T-501 DETAILS

330 17250583 T-502 DETAILS

331 17250584 T-503 DETAILS

332 17250585 T-601 COMMUNICATION DIAGRAMS/SCHEDULES

ECM PROTOTYPE INDEX

333 17250588 S-001E STRUCTURAL GENERAL NOTES

334 17250589 S-002E ABBREVIATIONS

335 17250590 S-101E FOUNDATION AND FLOOR PLAN

336 17250591 S-102E ROOF FRAMING PLAN

337 17250592 S-201E BUILDING ELEVATIONS

338 17250593 S-301E BUILDING SECTIONS

339 17250594 S-302E WALL SECTIONS

340 17250595 S-303E RETAINING WALL SECTIONS AND DETAILS

341 17250596 S-501E FOUNDATION AND SLAB-ON-GRADE DETAILS

342 17250597 S-502E PRECAST WALL PANEL DETAILS

343 17250598 S-503E PRECAST ROOF PANEL DETAILS

344 17250599 S-504E WALL AND ROOF CONNECTION DETAILS

345 17250600 S-701E DOOR FRAME ELEVATIONS AND DETAILS

346 17250601 S-702E DOOR ELEVATIONS

347 17250602 S-703E DOOR SECTIONS

348 17250603 S-704E DOOR DETAILS

349 17250604 S-705E INTERNAL LOCKING DEVICES

350 17250605 M-101E MECHANICAL PLAN, SECTIONS, AND NOTES

351 17250606 M-501E MECHANICAL DETAILS

352 17250607 E-001E GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS

353 17250608 E-101E TYPICAL LIGHTNING PROTECTION AND GROUNDING

SYSTEM PLAN

354 17250609 E-501E LIGHTING PROTECTION AND GROUNDING DETAILS 1

355 17250610 E-502E LIGHTING PROTECTION AND GROUNDING DETAILS 2

356 17250611 E-503E ROLLING SPHERE ANALYSIS

-- End of Document --

Jacobs WFXO6312 DOCUMENT 00 01 15 Page 7

THIS PAGE INTENTIONALLY LEFT BLANK

Jacobs WFXO6312 DOCUMENT 00 01 15 Page 8

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The project's scope of work includes the new construction of three new facilities and the selective demolition and renovations of one existing facility in the MSA2 area of Andersen AFB, Guam. The work also includes the removal and replacement of the roads serving the Munitions area, East Perimeter Road between connection to north end of the airfield to the taxiway adjacent to the MSA2 area. The work is located in a secured area of the base and requires the Contractor, and subcontractors, to obtain special clearance and attend airfield driving training classes to access these areas.

Work will include the construction of two cast-in-place concrete earth covered magazines (4,400 SF), a new Powered Trailer Maintenance Facility (PTMF) of cast-in-place concrete walls and roof structure (8,273 SF) and renovations/additions to the Missile Assembly Shop (14,168/ 16,288 SF).

The existing asphalt roadways will be demolished and replace with new reinforced concrete pavement (340,000 SF) capable of supporting maximum vehicle weight of 80,000 lbs. Work also includes sitework clearing and grubbing, grading and extension of existing utilities infrastructure to the new facilities.

1.1.2 Location

The work is located at the Andersen Air Force Base, Guam, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.2 OCCUPANCY OF PREMISES

Building 51109 (MASM) will not be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.3 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that

Jacobs WFXO6312 SECTION 01 11 00 Page 1 which existed before new work started.

1.4 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.4.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 calendar days prior to starting excavation work.

1.5 NCTS/Telecomm/Access Control/IDS Coordination Requirements

1.5.1 NCTS/Telecomm/Access Control/IDS Contractor Access

Allow the NCTS/telecomm/access control/IDS Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with the NCTS/telecomm/access control/IDS Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NCTS/telecomm/access control/IDS Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

Jacobs WFXO6312 SECTION 01 11 00 Page 2

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 State

"State" when used in reference to states of the United States also include the Territory of Guam.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Entry Authorization List; G

Event Waiver Request; G

Free-Zone Request; G

List of Contact Personnel; G

Personnel List; G

Vehicle List; G

Statement Of Acknowledgement Form SF 1413; G

1.3 SPECIAL SCHEDULING REQUIREMENTS

a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

b. The MUNS area will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

c. Permission to interrupt any Activity roads or utility service must be requested in writing a minimum of 30 calendar days prior to the desired date of interruption.

d. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.

e. The project site is within an active munitions storage facility and

Jacobs WFXO6312 SECTION 01 14 00 Page 1

∨∇⊃√⊆∠∇∨∇⊄⇒ ⇐∠∇⊄⊆∠⊂ ∏⊆∫∨⊂⊂ ″∂±∂″♠″ °≠ ≈ƒ← ↓↑∂°↑ ↔° ↔•≡ ↔° ♦°↑× ♦∂↔•∂± ± ∨♣↓≥°←∂♥≡ ⊂≠≡↔ƒ ∈♠±↔∂↔ƒ ⇔∂←↔±…≡ ∨⊂∈⇔ ≡♣…≥♠←∂°±

≡ ←≡↔ ↓↑↔ ƒ …°±↔∂±♠°♠← ↓•ƒ←∂…≥ ↑↑∂≡↑ ←♠…• ← °↑±÷≡ ″≡←•

÷〉 ⇒± ∨±↔↑ƒ ⇒♠↔•°↑∂∞↔∂°± ∂←↔ ∨⇒ ∂← ↑≡→♠∂↑≡≈ ≠°↑ ⇐°±↔↑…↔°↑ ↓≡↑←°±±≡≥ ……≡←← ↔° ↔•≡ ↓↑°∝≡…↔ ←∂↔≡ ″∂±∂″♠″ °≠ ≈ƒ← ↓↑∂°↑ ↔° ↔•≡ ≈↔≡ °≠ ↑≡→♠∂↑≡≈ ……≡←← ↔° ↔•≡ ↓↑°∝≡…↔ ←∂↔≡〉 ⊄•≡ ∨⇒← ″♠←↔ …≥≡↑≥ƒ ≈≡≠∂±≡ ±≈ ∝♠←↔∂≠ƒ ↔•≡ ↓↑°↓°←≡≈ •°♠↑←〉

•〉 ⇒±ƒ …↔∂♥∂↔ƒ ↔•↔ ↑≡→♠∂↑≡← ↔•≡ ♠←≡ °≠ …↑±≡ °↑ ←∂″∂≥↑ ≡→♠∂↓″≡±↔ ≡♣…≡≡≈∂±÷ ↔♦≡±↔ƒ∫≠∂♥≡ ≠≡≡↔ �∫� ∂± •≡∂÷•↔ ±ƒ♦•≡↑≡ °± ←≡ ≠≥∂÷•↔ ↓↔•← ↑≡ ±°↔ ≈♥≡↑←≡≥ƒ ≠≠≡…↔≡≈〉 ⊄•≡ ⇐°±↔↑…↔°↑ ″♠←↔ ←♠″∂↔ ♦∂↔• ⊄∨⊆∉⊂〉 ⊆≡≠≡↑ ↔° ↔•≡ ⇒↑…•∂↔≡…↔♠↑≥ ⇐°″↓↔∂∂≥∂↔ƒ ±≈ ⇑←≡ ⇔≡←∂÷±

♠±≥≡←← °↔•≡↑♦∂←≡ ↓↓↑°♥≡≈ ƒ ↔•≡ ⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑〉 ⊄•≡ ⇐°±↔↑…↔°↑ ″ƒ ≡ ≈∂↑≡…↔≡≈ ↔° ♠←≡ ≥↔≡↑±↔≡ ……≡←← ↑°♠↔≡← ↔° ……°″″°≈↔≡

∝〉 ⊄•≡ ⇐°±↔↑…↔°↑ ″♠←↔ ≥≥°♦ ≠°↑ ♦°↑× ≈≡≥ƒ← ↔°↔≥∂±÷ ♦°↑×≈ƒ← ↓≡↑ …≥≡±≈↑ ƒ≡↑ ″ƒ ±°↔ ≡ …°±←≡…♠↔∂♥≡〉 ⊄•≡←≡ ≈≡≥ƒ← ″ƒ ≡ ≈♠≡ ↔° ¬°♥≡↑±″≡±↔ñ ⊇∇⊂ °↓≡↑↔∂°±←⌠ ≡♣≡↑…∂←≡←⌠ ≡↔…〉

×〉 ⊄•≡ °≈ ∧↑″≡← ↔° ≡ ∂±←↔≥≥≡≈ ∂± ↔•≡ ∂←←∂≥≡ ⇒←←≡″≥ƒ ⊂•°↓ ⇒⊂ ♦∂≥≥ ≡ ∂±←↔≥≥≡≈ ≠↔≡↑ ↔•≡ ⇒⊂ ∂← ……≡↓↔≡≈ ƒ ↔•≡ ¬°♥≡↑±″≡±↔〉 ∉↑∂°↑ ≡ ↔° ♥≡↑∂≠ƒ ↔•≡ °≈ ∧↑″≡← ♦∂≥≥ ≡ ≥≡ ↔° ≡ ∂±←↔≥≥≡≈ ← ↑≡→♠∂↑≡≈〉

¬°♥≡↑±″≡±↔ ±≈ ↑≡≈ƒ ≠°↑ ♠←≡ ♦∂↔•∂±÷ ≈ƒ←〉

m. The three eastern-most ECMs located in MSA 2 (51260, 51261, and 51262) will be reconstructed by another project that is scheduled to start approximately one year after NTP for P-3001.

1.4 CONTRACTOR ACCESS AND USE OF PREMISES

1.4.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials must be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.4.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.4.1.2 Contractor Requirements for Access to Andersen Air Force Base

a. All Contractors shall have a sponsor to the installation on Andersen Air Force Base (AFB). Coordinate access to Andersen Air Force Base with the Contracting Officer.

b. A Contractor Affidavit is required for each person requesting access to Andersen AFB. Complete the "USAF Contractor/Sub-Contractor Access Affidavit" form.

c. Contractors are required to submit a paper pass/Base Pass Request with approval from their sponsor/Contracting Officer to the Visitors control Center.

1.4.1.3 Installation Access

Obtain access to Air Force installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

1.4.1.3.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:

a. Present a letter or official award document from the Contracting

Jacobs WFXO6312 SECTION 01 14 00 Page 3

Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.4.1.3.2 DBIDS Eligibility Requirements

Throughout the year, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.

The Government is the final authority.

1.4.1.3.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.4.1.3.4 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.4.1.4 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to

Jacobs WFXO6312 SECTION 01 14 00 Page 4

⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑ ♦∂≥≥ ∂≈≡±↔∂≠ƒ ≈≡←∂÷±↔≡≈ ←″°×∂±÷ ↑≡←〉

⊆≡÷♠≥↑ ♦°↑×∂±÷ •°♠↑← ″♠←↔ ≡ ≡↔♦≡≡± ∑ 〉″〉 ±≈ ∑ ↓〉″〉⌠ °±≈ƒ ↔•↑°♠÷• ∧↑∂≈ƒ⌠ ≡♣…≥♠≈∂±÷ ¬°♥≡↑±″≡±↔ •°≥∂≈ƒ←〉

∪°↑× ←←°…∂↔≡≈ ♦∂↔• ∨⇐ …≥≡↑±…≡ …↔∂♥∂↔∂≡← ″ƒ ≡ ≈°±≡ ≡↔♦≡≡± ↔•≡ •°♠↑← °≠ ∑ ↓〉″〉 ±≈ ∑ 〉″〉 ±≡♣↔ ≈ƒ °±≈ƒ ↔•↑°♠÷• ∧↑∂≈ƒ ♦∂↔• ↔•≡ ↓↓↑°♥≥ °≠ ↔•≡ ⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑〉 ∨⇐ …≥≡↑±…≡ …↔∂♥∂↔∂≡← ″ƒ ≥←° ≡

×≡ ↓↓≥∂…↔∂°± …≥≡±≈↑ ≈ƒ← ↓↑∂°↑ ↔° ←♠…• ♦°↑× ↔° ≥≥°♦ ↑↑±÷≡″≡±↔← ↔° ≡ ″≈≡ ƒ ↔•≡ ¬°♥≡↑±″≡±↔ ≠°↑ ∂±←↓≡…↔∂±÷ ↔•≡ ♦°↑× ∂± ↓↑°÷↑≡←←⌠ ÷∂♥∂±÷ ↔•≡ ←↓≡…∂≠∂… ≈↔≡←⌠ •°♠↑←⌠ ≥°…↔∂°±⌠ ↔ƒ↓≡ °≠ ♦°↑× ↔° ≡ ↓≡↑≠°↑″≡≈⌠ ↔•≡ ⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑ ″ƒ ↓↓↑°♥≡ ♦°↑× °♠↔←∂≈≡ ↑≡÷♠≥↑ •°♠↑←〉 ⇔♠↑∂±÷ ″±±≡↑ ↓↓↑°♥≡≈ ƒ ↔•≡ ⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑〉

〉〉 ∨♣…≥♠←∂°±↑ƒ ∉≡↑∂°≈

∪°↑× ↓≡↑≠°↑″≡≈ ≈♠↑∂±÷ ↔•≡ ″°±↔•← °≠ ∧≡↑♠↑ƒ ≡♥≡↑ƒ ƒ≡↑ ±≈ ⊂≡↓↔≡″≡↑ ≡♥≡± ±♠″≡↑≡≈ ƒ≡↑← ″ƒ ≡ ↑≡←↔↑∂…↔≡≈ ±≈ñ°↑ ←↔°↓↓≡≈ ♦∂↔•°♠↔ ↓↑∂°↑

〉〉 ⊇↔∂≥∂↔ƒ ⇐♠↔°♥≡↑← ±≈ √±↔≡↑↑♠↓↔∂°±←

〉 ×≡ ♠↔∂≥∂↔ƒ …♠↔°♥≡↑← ±≈ ∂±↔≡↑↑♠↓↔∂°±← ≠↔≡↑ ±°↑″≥ ♦°↑×∂±÷ •°♠↑← °↑ °± ⊂↔♠↑≈ƒ←⌠ ⊂♠±≈ƒ←⌠ ±≈ ¬°♥≡↑±″≡±↔ •°≥∂≈ƒ←〉 ⇐°±≠°↑″ ↔° ↓↑°…≡≈♠↑≡←

〉 ∨±←♠↑≡ ↔•↔ ±≡♦ ♠↔∂≥∂↔ƒ ≥∂±≡← ↑≡ …°″↓≥≡↔≡⌠ ≡♣…≡↓↔ ≠°↑ ↔•≡ …°±±≡…↔∂°±⌠

…〉 √±↔≡↑↑♠↓↔∂°± ↔° ♦↔≡↑⌠ ←±∂↔↑ƒ ←≡♦≡↑⌠ ←↔°↑″ ←≡♦≡↑⌠ ↔≡≥≡↓•°±≡ ←≡↑♥∂…≡⌠ …°″↓↑≡←←≡≈ ∂↑ ↑≡ …°±←∂≈≡↑≡≈ ♠↔∂≥∂↔ƒ …♠↔°♥≡↑← ↓♠↑←♠±↔ ↔° ↔•≡

←ƒ←↔≡″⌠ ∂±…≥♠≈∂±÷ ♦↔≡↑⌠ ←≡♦≡↑⌠ ≡≥≡…↔↑∂…≥⌠ ±≈ ←↔≡″ ←≡↑♥∂…≡←〉 ⊄•≡

…°±≈♠…↔ °≠ ↔•≡ ♦°↑×〉 ⊄•≡ ⇐°±↔↑…↔°↑ ″♠←↔ ±°↔∂≠ƒ ↔•≡ ⇐°±↔↑…↔∂±÷

⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑ …≥≡±≈↑ ≈ƒ← ∂± ≈♥±…≡ ≠°↑ ↔•≡ ≈∂÷÷∂±÷ ↓≡↑″∂↔ ≈∂←…°♥≡↑≡≈〉 ⊃≡↑∂≠ƒ ↔•≡ ≡≥≡♥↔∂°±← °≠ ≡♣∂←↔∂±÷ ↓∂↓∂±÷⌠ ♠↔∂≥∂↔∂≡←⌠ ±≈ ±ƒ ↔ƒ↓≡ °≠ ♠±≈≡↑÷↑°♠±≈ °↑ ≡±…←≡≈ °←↔↑♠…↔∂°± ±°↔ ∂±≈∂…↔≡≈ ↔° ≡ ↑≡″°♥≡≈ ♠↔ ≈∂←…°♥≡↑≡≈ ≈♠↑∂±÷ ←…±±∂±÷ ≥°…↔∂°±← ↔° ≡ ↔↑♥≡↑←≡≈ ƒ ↓∂↓∂±÷⌠ ≈♠…↔←⌠ ±≈

∇°↔∂≠∂…↔∂°± ∉↑∂°↑ ↔° ∨♣…♥↔∂°±∑ ∇°↔∂≠ƒ ↔•≡ ⇐°±↔↑…↔∂±÷ ∠≠≠∂…≡↑ ↔ ≥≡←↔ …≥≡±≈↑ ≈ƒ← ↓↑∂°↑ ↔° ←↔↑↔∂±÷ ≡♣…♥↔∂°± ♦°↑×〉

⇒……≡←← ↑°♠↔≡← ↔° ↔•≡ ↓↑°∝≡…↔ ←∂↔≡ ″ƒ ≡ …•±÷≡≈ ƒ ↔•≡ ¬°♥≡↑±″≡±↔ ↔°

⊂♠″∂↔ ≠°↑ ↓↓↑°♥≥⌠ ↔ ≥≡←↔ …≥≡±≈↑ ≈ƒ← ↓↑∂°↑ ↔° ↔•≡ ≈≡←∂↑≡≈ ≈↔≡ °≠ ≡±↔↑ƒ⌠ ± °↑∂÷∂±≥ ≥↓•≡↔∂…≥ ≥∂←↔ °≠ ↓≡↑←°±±≡≥ ♦•° ↑≡→♠∂↑≡ ≡±↔↑ƒ ∂±↔° ¬°♥≡↑±″≡±↔ ↓↑°↓≡↑↔ƒ ↔° ↓≡↑≠°↑″ ♦°↑× °± ↔•≡ ↓↑°∝≡…↔〉 ∧♠↑±∂←• ≠°↑ ≡…•

≡〉 ⊂°…∂≥ ←≡…♠↑∂↔ƒ ±♠″≡↑

÷〉 ∇↔♠↑≥∂∞↔∂°± °↑ ⇒≥∂≡± ⊆≡÷∂←↔↑↔∂°± °↑ ⊄≡″↓°↑↑ƒ ∇°±∫√″″∂÷↑±↔ √⇔

"I hereby certify that all personnel on this list are either born U.S.

citizens, naturalized U.S. citizens with the naturalization number shown, or legal aliens with the alien registration number indicated or Temporary Non-Immigrant with the Temporary Non-Immigrant ID card number shown."

Signature/Firm Name

1.5.1.1 Citizenship Requirements

Aliens will not be admitted to the work site without approval. Clearance for aliens may require approximately 21 work days for approval.

1.5.2 Vehicle List

Submit an original list of vehicles to be utilized at the work site with the following information for each vehicle:

a. Make

b. Year

c. Model

d. License number

e. Registered owner

1.5.3 Passes

Submit request for personnel and vehicle passes together. Include the Certificate of Insurance for Contractor and Subcontractor(s) and the Statement of Acknowledgement Form SF 1413 with the submittal. Passes will normally be issued within 21 calendar days.

Airfield access requires the driver to attend training courses sponsored by 36 OSS to qualify for an airfield driver certification. Contact TSgt Tory Howard at 36 OSS, tory.howard@us.af.mil.

1.5.3.1 Control

Maintain strict accountability over passes. Immediately report to the source of issue, passes missing or lost and the circumstances. If the Contractor has another active contract or one commencing immediately, employees' names may be transferred from one contract to the other. Final payment will not be effected until employees are transferred to another contract or the records are cleared. Furnish a signed letter, countersigned by the source of issue, stating that passes have been turned in.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

Jacobs WFXO6312 SECTION 01 14 00 Page 7

Jacobs WFXO6312 SECTION 01 14 00 Page 8

SECTION 01 20 00.00 20

PRICE AND PAYMENT PROCEDURES

11/11

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Earned Value Report; G

1.2 EARNED VALUE REPORT

1.2.1 Data Required

This contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices and extended prices.Costs shall be summarized and totals provided for each construction category Within 15 calendar days of notice of award, prepare and deliver to the Contracting Officer an Earned Value Report (construction contract) as directed by the Contracting Officer.

1.2.2 Schedule Instructions

Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer. Identify the cost for site work, and include incidental work to the 5 ft line. Identify costs for the building(s), and include work out to the 5 ft line. Work out to the 5 ft line shall include construction encompassed within a theoretical line 5 ft from the face of exterior walls and shall include attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 ft line.

1.2.3 Real Property Assets

Draft DD Form 1354, Transfer and Acceptance of Military Real Property filled in with the appropriate Real Property Unique Identifiers (RPUID) and related construction Category Codes to summarize the designed real property assets that apply to this contract. The Contractor shall meet with the Contracting Officer and the Real Property Accounting Officer during the Pre Construction Meeting and the Project Closeout Meetings to modify and include any necessary changes to the DD Form 1354.

The Contractor shall provide the Interim DD Form 1354 that uses the appropriate division of the RPUIDs/ Category Codes to represent the final constructed facility and include all associated cost. Coordinate the

Jacobs WFXO6312 SECTION 01 20 00.00 20 Page 1

Contractor's Price and Payment structure with the structure of the RPUIDs/ Category Codes. A blank editable DD Form 1354 in pdf format is available for download from the following web site:

http://www.dtic.mil/whs/directives/forms/eforms/dd1354.pdf

Divide detailed asset breakdown into the RPUIDs and related construction Category Codes and populate associated costs which represent all aspects of the work. Where assets diverge into multiple RPUID/ Category Codes, divide the asset and provide the proportion of the assets in each RPUID/ Category Code. Assets and related RPUID/ Category Codes may be modified by the Contracting Officer as necessary during course of the work.

Coordinate identification and proportion of these assets with the Government Real Property Accounting Officer.

Cost data accumulated under this section are required in the preparation of DD Form 1354.

1.2.4 Schedule Requirements for HVAC TAB

The field work Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC shall be broken down in the Earned Value Report from the cost-loaded NAS by separate line items which reflect measurable deliverables. Specific payment percentages for each line item shall be determined on a case by case basis for each contract. The line items shall be as follows:

a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. The resulting findings shall be submitted to the Government to allow correction of the design. The progress payment shall be issued after review and approval of the report.

b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report shall contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.

c. Season I field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data shall be collected for one seasonal condition (either summer or winter depending on project timing).

d. Approval of Season I report: On completion of the Season I field work, the data is compiled into a report and submitted to the Government. The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.

e. Completion of Season I field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Season I report.

Jacobs WFXO6312 SECTION 01 20 00.00 20 Page 2

f. Approval of Season II report: The TABS Agency completes all Season II field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Season I performance data was compiled. This data shall be compiled into a report and submitted to the Government. On completion of submittal review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Season I report since most of the water and air balancing work effort is completed under Season I.

1.3 CONTRACT MODIFICATIONS

In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, equipment use rates shall be based upon the applicable provisions of the Guam Cost Guidebooks, Equipment Watch Blue Book or acceptable guidance specific to Guam to establish a set cost for equipment and equipment operations cost.