This document is a Questions and Answers (Q&A) attachment for federal contract N6264927RL005 concerning repairs to USNS EARL WARREN (T-AO 207) during Fiscal Year 2027 Restricted Overhaul (FY27 ROH) Service Support Unit (SSU) SN 27-010 A0003.
The Q&A clarifications address multiple specification items related to the vessel's repair work. Key technical clarifications include: vessel draft specifications confirming the lightest operating draft for T-AO 205 class vessels at forward draft of 23.53 feet (7.17 meters), mid-ship draft of 25.33 feet (7.72 meters), and aft draft of 25.69 feet (7.83 meters); rejection of SSPC-SP WJ-2 surface preparation method for deckhouse and weatherdeck preservation due to steel lacking required profile from the maker, with new surface profile mandated for coatings; provision of referenced MRG sensor redundancy technical drawings and specifications as requested; cancellation of specification item 0521 for Salt Water Sprinkling System with item 0575 designated for quotation purposes; requirement that contractors bid per specification for Information Technology Services rather than proposing alternative mobile phone arrangements; and confirmation that all cargo tanks and ballast tanks will be opened, cleaned, and gas-freed during the availability period. The government also referenced the need for additional attached reference documents for Miscellaneous Reach Rod Repairs specification item 0115.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6264927RL005 USNS EARL WARREN (T-AO 207)
FY27 ROH SSU SN 27-010 A0003
SPECIFICATION ITEM NO.: _____0159____________ PARA. NO.______7.10.5_______
TITLE: Vessel’s Draft
QUESTION:
For planning and execution of the afloat repair works, could you please confirm the vessel's lightest achievable operating draft (Forward Draft / Aft Draft / Mean Draft) after de-ballasting and projected cargo/fuel consumption, while maintaining safe stability, structural integrity, and operational requirements?
• Forward Draft -
• Aft Draft -
• Mean Draft -
This information is required to assess berth suitability, access requirements, and the feasibility of the planned repair activities.
ANSWER:
CLASS
DRAFT FWD DRAFT M/S DRAFT AFT
(ft.) (m.) (ft.) (m.) (ft.) (m.)
T-AO 205 23.53’ 7.17 25.33’ 7.72 25.69’ 7.83
SPECIFICATION ITEM NO.: 0159 & 0168___________ PARA. NO.: ___________________
TITLE: Deckhouse & High Profile Non-Skid Weatherdeck Preservation
With reference to Amendment 0002, we acknowledge that Slurry Blast WJ-1 is listed as an acceptable alternative method for surface preparation.
In light of this update, we would like to revisit and propose SSPC-SP WJ-2 for the surface preparation scope. While this method does not generate a new surface profile, it effectively preserves the existing substrate profile.
In view of this, we kindly request that the Government / Military Sealift Command (MSC) consult with the paint manufacturer regarding the application of a surface-tolerant primer to ensure full compatibility with the prepared substrate. Our team is also prepared to coordinate directly with the manufacturer to verify these compatibility requirements.
ANSWER:
SSPC-SP WJ-2 is not acceptable due to steel has no profile, delivered from maker; new surface profile is required for coatings
SPECIFICATION ITEM NO.: 0320__________________ PARA. NO.: 2.1.1~2.1.15_________
TITLE: MRG Sensor Redundancy
QUESTION:
We would appreciate it if you could provide the following reference documents?
2.1 REFERENCES
2.1.1 MSC Drawing No. 185-8615967 MRG INSTRUMENTATION FOUNDATION
2.1.2 MSC Drawing No. 241-8615968 MRG TANK LEVEL INDICATION MECHANICAL
MODS
2.1.3 MSC Drawing No. 241-8615969 MRG REDUNDANT LUBE OIL PRESS MECH MODS
2.1.4 MSC Drawing No. 303-8615970 MRG TANK LEVEL INDICATION ELECTRICAL
MODS
2.1.5 MSC Drawing No. 438-8615971 MRG REDUNDANT LUBE OIL PRESS SWITCH
SACOS MODS
2.1.6 252-8724072, Machinery Centralized Control System Mimic Screens
2.1.7 803-7081122, Military Sealift Command General Technical Requirements (GTR’s)
2.1.8 MSC Drawing No. 803-7080803, Computer Aided Designed (CAD) Drawing Standard
2.1.9 201-8953792, Machinery Arrangement
2.1.10 202-8724054, MACHINERY CENTRALIZED CONTROL SYSTEM INPUT/OUTPUT
SIGNAL LIST
2.1.11 NASSCO Dwg 571-3448418 REDUCTION GEAR SYSTEM TESTS DI-074-03.9
2.1.12 NASSCO DWG 571-344-8607; MCCS DVTP, DI-100-23.1
2.1.13 DRIVE CONTROL SYSTEM (PTO/PTI) SHIPBOARD SOVT
2.1.14 NASSCO Dwg 571-344-8417; MAIN DIESEL ENGINE TESTS DI-074-03.5
2.1.15 GMH-J17-00043-8804, R2 FMEA FOR T-AO 205 CLASS FLEET REPLENISHMENT
OILER
ANSWER:
AS REQUESTED
SPECIFICATION ITEM NO.: 0521, 0575_____________ PARA. NO.: ___________________
TITLE: Salt Water Sprinkling System (1 Yr)
The scope of work for the following 2 work items appears to be similar. Could you please review and advise which work item should be used for quotation purposes?
Additionally, kindly revise the J-3 if any amendments are required.
• 0521_A_TAO205-CSI-SALT WATER SPRINKLING SYSTEM (1 YR) (SCSI)
• 0575_A_TAO205-CSI-SALT WATER SPRINKLING SYSTEM (1 YR) (SCSI)
ANSWER:
ITEM 0521 Cancelled
ATTACHMENT J-5
REQUEST FOR SPECIFICATION CLARIFICATION
NAME OF CONTRACTOR: .___________
SPECIFICATION ITEM NO.: 0115_________________ PARA. NO.: 2.0________________
TITLE: MISCELLANEOUS REACH ROD REPAIRS
Please provide references as described in Paragraph 2.0. References not included in DoD safe link.
ANSWER: See attached
NAME OF CONTRACTOR: ___________
SPECIFICATION ITEM NO.: 0012_________________ PARA. NO.: 3.1.1 – 3.1.3__________
TITLE: INFORMATION TECHNOLOGY SERVICES ________________________________
Since our proposed port does not have the existing telephone cable lines, we would like to propose providing mobile phones as an alternative. This is the same arrangement as what we have provided for previous USNS MTA.
Please confirm if this is acceptable.
ANSWER: Bid as per item
NAME OF CONTRACTOR: ___________
SPECIFICATION ITEM NO.: 0021_________________ PARA. NO.: 7.11________________
TITLE: CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACES_________
Please reconfirm all Cargo Tanks and Ballast Tanks listed in 7.11 will be opened, cleaned and gas freed during the availability.
ANSWER: All Cargo Tanks and Ballast Tanks will be opened cleaned and gas free during the availability as per item 0021 CLEAN AND GAS FREE TANKS VOIDS
| 0115 - J-5 Request for Clarification_Redacted.pdf |
| TITLE: MISCELLANEOUS REACH ROD REPAIRS |
| ATTACHMENT J-5 |
| 0012 - J-5 Request for Clarification_Redacted.pdf |
| ATTACHMENT J-5 |
| 0021 - J-5 Request for Clarification_Redacted.pdf |
| TITLE: CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACES_________ |
| ATTACHMENT J-5 |
File details come from the government source that posted it. Updated .