This is a Statement of Work (SOW) for Item 0168, a preservation project on the USNS Earl Warren (TAO 207) weather decks under Hull and Structural Contract No. SSU SN 26-010, with a completion date of November 30, 2025.

The work requires comprehensive preservation of weather decks covering approximately 18,300 square feet and 100 tie-down sockets on the vessel. Surface preparation involves mechanical cleaning to bare metal using waterjet cleaning (SSPC-SP WJ-1/NACE WJ-1) and power tool cleaning (SSPC-SP11) standards, with an estimated 12,850 square feet and 330 tie-down sockets requiring treatment. The contractor must provide all labor, materials, staging, tools, equipment, protective coverings, and waste disposal. Coatings to be applied include Amercoat 240 primer (red oxide and dark gray), Amercoat 138G non-skid coating (graphite gray), Amercoat 229T deck markings (white), with specific application requirements for dry film thickness, environmental conditions (temperature range 40°F to 110°F for primer and non-skid), and curing intervals. The government furnishes all coating materials as as-required quantities and provides an OMT Coating Representative for quality oversight. The contractor must document existing deck markings and ship equipment conditions before and after work, conduct operational testing of lights and drains, and submit detailed coating reports including surface profile measurements, environmental conditions at application, and dry film thickness readings. Price quotations must include all disposal costs for grit, wash water, and coating removal, with an estimating basis of one gallon of Amercoat 240 per 100 square feet.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS Earl Warren

( TAO 207 )

HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010

ITEM NO. 0168 CATEGORY "A" 2025-11-30

TAO205-CSI-HIGH PROFILE NON-SKID

WEATHERDECK PRESERVATION (20 PCT) (1

YR)

Robson, Henry

0168 - 1

1.0 ABSTRACT

The purpose of this item is to conduct preservation of all weather decks.

2.0 REFERENCES

2.1 MSC Drawing No. 801-8918769, General Arrangement

2.2 PPG PMC - MSC Paint Handbook

2.3 PPG Product Data Sheets, Amercoat 240 and Amershield

2.4 Surface Preparation Standard, SSPC-SP WJ-1/NACE WJ-1, Waterjet Cleaning of Metals – Clean to Bare Substrate (WJ-1)(Available commercially))

2.5 Surface Preparation Standard, SSPC-SP11, Power Tool

Cleaning to Bare Metal (Available Commercially)

3.0 ITEM LOCATION/DESCRIPTION

3.1 Location/Quantity

3.1.1 Location: Weather decks

a. 01 Weather Deck area frame 45-161, entire exterior area. Width of area shall be 25ft inboard from the Port side shell and 25 feet inboard from the STBD side shell. The entire deck surface will be addressed. Area is to include 6” up all pipe, pipe brackets, deck plate foundations, bulwark, fishplates, bulkheads, etc.

b. 02 Level forward of house, top of FAS Gear lockers, midship truck tunnel and DC locker midship.

3.1.2 Quantity

a. Estimated surface area = 18,300 sq. ft.

b. Estimated 100 tie down sockets

3.2 Item Description/Manufacturer’s Data: None

HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010

ITEM NO. 0168 CATEGORY "A" 2025-11-30

TAO205-CSI-HIGH PROFILE NON-SKID

WEATHERDECK PRESERVATION (20 PCT) (1

0168 - 2

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE

4.1 Government Furnished Equipment (GFE): None

4.2 Government Furnished Material (GFM)

Product Type Color Qty Amercoat 240 Anti-Corrosion Epoxy Red Oxide AS REQ Amercoat 240 Epoxy (1st stripe) Buff AS REQ Amercoat 240 Epoxy (2nd stripe) Dark Gray AS REQ Amercoat 240 Anti-Corrosion Epoxy Dark Gray AS REQ Amercoat 229T Deck Markings White AS REQ

Amercoat 138G Non-Slip Graphite Gray AS REQ

Amercoat T-10 Solvent for Amercoat

240 N/A AS REQ

Amercoat 65 Solvent for Amershield N/A AS REQ

4.3 Government Furnished Service (GFS)

4.3.1 OMT Coating Representative

4.4 Government Furnished Information (GFI): None

5.0 NOTES

5.1 The contractor and all subcontractors, regardless of

tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7, 22, 23, 24, 28, and 29.

5.2 The contractor and all subcontractors regardless of

tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 Solvents supplied as GFM are for viscosity control

only. Solvents required for equipment clean-up are the

HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010

ITEM NO. 0168 CATEGORY "A" 2025-11-30

TAO205-CSI-HIGH PROFILE NON-SKID

WEATHERDECK PRESERVATION (20 PCT) (1

0168 - 3 responsibility of the contractor.

5.4 Any additional work will require a Change Order

submitted to the Port Engineer for approval, before the additional work is performed.

5.5 The price quote is to be inclusive of all disposal

costs associated with grit, wash water and coating removal associated with this work item. For estimating purposes, the contractors are to assume one gal. of Amercoat 240 per 100 sq.

ft.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional

7.0 STATEMENT OF WORK REQUIRED

7.1 Provide all labor, materials, staging, tools and

equipment as required to preserve the main mast identified in

3.0 using References 2.1 through 2.7 as guidance.

7.2 Prior to the start of any surface preparation:

7.2.1 Prepare a sketch of the existing deck markings

recording positions and dimensions of all markings. Submit a copy of the sketch to the OMT REP.

7.2.2 With assistance from the Ship’s Crew, conduct

an operational test in the presence of the OMT REP documenting “as found” conditions of all:

a. Deck lighting, perimeter lights, recessed deck lights, flood and spotlights.

b. Deck drains.

7.3 Provide and maintain adequate lighting during the

course of all surface preparation, coating and inspection activities.

7.4 Temporarily remove, store and re-install all

interferences as required to accomplish the specified work.

7.5 Temporarily install drop cloths, masking, division

shields, seals, blanks and filtering materials to prevent

HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010

ITEM NO. 0168 CATEGORY "A" 2025-11-30

TAO205-CSI-HIGH PROFILE NON-SKID

WEATHERDECK PRESERVATION (20 PCT) (1

0168 - 4 abrasives and foreign substances from entering lights, machinery, piping, hatches, deck drains, ventilation systems, tank vents, valve stems, motor shafts, seals and temporary openings during blasting and coating operations. Measures to be taken but are NOT limited to:

7.5.1 Plug deck drains, deck edge nozzles, and open

pipes.

7.5.2 Wrap all valve stems and exposed portions of

hydraulic cylinders.

7.5.3 Temporarily install filter media on all tank

vents and air intake vents.

7.5.4 Temporarily install protective coverings on all

port-lights, windows, light globes and landing light lenses.

7.5.5 Protect running rigging (cargo falls, lifts, and cranes) and mooring lines which cannot be stowed or removed for the duration of non-skid removal.

7.6 Protective covering will be inspected at regular

intervals, but not less than the start of each work shift.

Degraded covering will be repaired prior to restart of work.

7.7 Perform a HP freshwater wash down of the entire area

defined in paragraph 3.1 to remove all oil, grease, dirt and soluble salts from the surface of the specified work.

7.8 Upon completion of the wash down, ensure that the

ship's equipment is protected from damage caused by blasting, dust or coat. Measurements to be taken include, but are not limited to, the following:

7.8.1 Plug open ends of pipes, vents and ducts.

7.8.2 Grease and wrap all valve stems and exposed

portions of hydraulic cylinders. Install filters on all air intake vents. Install covers on all fuel tank vents.

7.8.3 In areas to be slurry blasted and coated, take

photos and record all ship's markings, including information, size and color.

HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010

ITEM NO. 0168 CATEGORY "A" 2025-11-30

TAO205-CSI-HIGH PROFILE NON-SKID

WEATHERDECK PRESERVATION (20 PCT) (1

0168 - 5

7.8.4 Install protective covering on all lights, electrical cable and electrical boxes.

7.8.5 Mask all normally uncoated surfaces.

7.8.6 Protect running rigging and mooring lines which

cannot be stowed or removed for the duration of blasting and coating operations, to prevent contamination by blasting abrasive, dust or overspray. The lifeboat davits, winches, sheaves and wire ropes are to be sealed off while maintenance is being conducted.

7.9 Perform an inspection of the weather deck area as

defined in Paragraph 3.1 with the Port Engineer and onsite OMT Representative to identify all areas to be Mechanically Cleaned to bare metal. For estimating purposes, assume 12,850 sq. ft.

and 330 tie down sockets at SSPC-SP WJ-1/NACE 3.

7.10 Deck areas, including but not limited to all

permanently attached fittings such as bitts, cleats, chocks, pad eyes, staples, fairleads, gunwale bars, bulkheads and equipment foundations from the deck up 6 inches are to be accomplished.

7.11 Blast the areas in way of rust and mechanical damage

and feather to tightly adhered coat in accordance with SSPC-SP- 10 standards (Reference 2.5).

7.12 After cleaning and before coating, thoroughly inspect

weather deck noting any electrical issues, broken hangers and cable runs, deformation cracking or broken welds on main mast and submit report to the OMT REP of findings. Should any repairs be noted and required to be repaired by the OMT REP, a change order will be issued.

7.13 Coatings Application

7.13.1 Prior to application of any coating, the areas

identified in section 3.0 to be coated will be inspected and approved by the OMT REP and the OMT Coating Representative.

This includes not only the initial coat of paint, but all subsequent coats as well. Inspection will include measuring and recording:

HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010

ITEM NO. 0168 CATEGORY "A" 2025-11-30

TAO205-CSI-HIGH PROFILE NON-SKID

WEATHERDECK PRESERVATION (20 PCT) (1

0168 - 6

a. Type of surface preparation used

b. Surface cleanliness

c. Surface profile as determined by Keane-Tator Comparator (or equal) examination and/or replica tape

d. Environmental conditions (surface temperature, ambient air temperature, dew point temperature and relative humidity)

e. Over coating interval (curing time) since previous application

f. Dry Film Thickness (DFT) of previous coating taken at a rate of five per 1,000 square feet

7.13.2 Ensure the following conditions are met prior

to coating:

a. Surfaces will be clean, dry and free of oil, grease or residue from abrasive blasting.

b. Surface appearance meets the definition of SSPC-SP10, Near White Metal Blast Cleaning.

c. Air and substrate temperatures will be within the range published by the coating manufacturer, see Reference 2.4.

d. Ambient Air temp during application and curing should be between:

1. 40°F (4°C) and 110°F (43°C) for the Primer.

2. 50°F (10°C) and 100°F (38°C) for the Non- Skid.

3. 40°F (4°C) and 120°F (49°C) for the Markings.

4. Surface temp during application should be between:

HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010

ITEM NO. 0168 CATEGORY "A" 2025-11-30

TAO205-CSI-HIGH PROFILE NON-SKID

WEATHERDECK PRESERVATION (20 PCT) (1

0168 - 7

5. 40°F (4°C) and 120°F (49°C) for the Primer and Markings.

6. 40°F (4°C) and 110°F (43°C) for the Non- Skid.

e. During application, the substrate temperature will be at least 5°F (3°C) above Dew Point.

f. The Relative Humidity is within the range set by the manufacturer, will not exceed 85%.

7.13.3 No coating will be applied at temperatures

below 40°F without prior written approval of the OMT REP.

7.13.4 No coating will be applied between the hours of

sunset and 0800 without prior written approval of the OMT REP.

7.13.5 All coatings will be prepared and applied using

the manufacturer’s requirements outlined in the Product Data Sheets, Reference 2.4 as guidance. Random Wet Film Thickness (WFT) readings are to be taken during the application of coatings to verify correct millage are being applied.

7.13.6 EPOXY

a. Apply the following 1st and 2nd Coats of Primer to all blasted and power tool cleaned surfaces. A stripe coat is also required between primer coats.

b. The primer coats must be applied by spraying in order to obtain a uniform DFT and coverage. Rolling the primer is not permitted.

c. One full coat of Amercoat 240, (buff) at 5-6 mils DFT.

d. One stripe coat of Amercoat 240, (dark gray) at 2-3 mils DFT.

e. One full coat of Amercoat 240, (dark gray) 5-6 mils DFT.

f. The stripe coat must be applied by brush to all

HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010

ITEM NO. 0168 CATEGORY "A" 2025-11-30

TAO205-CSI-HIGH PROFILE NON-SKID

WEATHERDECK PRESERVATION (20 PCT) (1

0168 - 8 weldments, crevices, corners, edges, tie-downs and other areas not conducive to proper coverage. Stripe coats will extend a minimum of 2" from each edge of the area being stripe coated.

7.13.7 NON-SKID

a. Apply one Coat of Amercoat 138G Non-Skid to the deck.

b. Amercoat 138G must be applied with a napless phenolic roller in order to obtain the necessary raised ridge profile. Thinning is not permitted.

c. Apply at a rate of approximately 30 square feet per gallon.

d. The surface will show a uniform pattern of peaks and ridges. The ridge profile will be continuous and reasonably uniform. Peaks and ridges will be generally in the same direction (fore-aft preferred), approximately 1/2 to 1 inch apart, and approximately 1/16 to 3/32 inch high. Aggregate will present a rough, uniformly coarse appearance over the entire surface with no loosely bound clumps of particles.

e. All longitudinal weld seams will be cross-rolled, perpendicular to the direction of peaks and valleys of the non-skid, 3 to 6 inches minimum on either side of the weld, and welds 8 inches or less apart will be treated as one weld.

f. Non-skid will be applied to within approximately 2” of all deck fittings and protrusions and approximately 5” off deck coaming and edges.

7.13.8 DECK EDGES, GUTTERS AND TIE DOWNS

a. Apply one coat of Amercoat 240, (dark gray) at 5-6 mils DFT.

7.13.9 MARKINGS

a. Layout chalk lines for all deck markings effected by non-skid repair using the prepared sketch.

b. OMT REP is to inspect, verify and approve the

HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010

ITEM NO. 0168 CATEGORY "A" 2025-11-30

TAO205-CSI-HIGH PROFILE NON-SKID

WEATHERDECK PRESERVATION (20 PCT) (1

0168 - 9 chalk lines prior to application of any paint coating to the markings. MSC is to be given 48 hours advance notice as a minimum.

c. Apply one Coat of Amercoat 229T (white) at 2-3 mils DFT to all deck markings.

7.13.10 The environmental conditions, DFT of each

coat, cure and over coating intervals are critical to the application of non-skid. The application of all coatings will adhere to the Product Data Sheets and OMT Coating Rep. For weather conditions outside 50°F (10°C) through 90°F (32°C) range consult the OMT Coating Rep for proper overcoat intervals.

7.14 During the course of all surface preparation and

coating operations, the area involved will be roped off or otherwise barricaded to prevent entry by persons other than those directly involved in the work underway or those inspecting same. Those persons who are allowed in the work area will wear disposable booties over their shoes to prevent contamination of the surface. New booties will be put on each time a person enters the area. Such cordoning or barricading will remain in place until the non-skid and color markings are properly cured.

7.15 Remove all protective coverings, debris and replace

all interferences removed in the performance of this item. Upon completion the vessel will be cleaned of all residues resulting from the surface preparation and coating operations.

7.16 Upon completion of work, ship force will conduct final

operational testing of perimeter lights, recessed deck lights, flood and spotlights and drains in the vicinity of the non-skid work completed. Compare "post work" performance test results to the "as-found" conditions. Correct any discrepancies noted between the “as found” and “post work” conditions. All repaired items will be satisfactorily re-demonstrated to ship force and

OMT REP.

7.17 Reports

7.17.1 When inspection, service and testing reveal any

deficiency a condition report is to be submitted to the OMT Rep with recommended repairs and parts required. Submit one

HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010

ITEM NO. 0168 CATEGORY "A" 2025-11-30

TAO205-CSI-HIGH PROFILE NON-SKID

WEATHERDECK PRESERVATION (20 PCT) (1

0168 - 10 electronic copy in Portable Document Format (PDF).

7.17.2 Submit a report that includes “as released”

condition of the Topside Preservation Weather Deck. Submit one electronic copy in Portable Document Format (PDF).

7.17.3 All reports and checklists are to be completed

and signed by the person who carried out the inspection and maintenance work and countersigned by the Company’s representative.

7.18 Painting/Lagging: None additional

7.19 Manufacturer’s Representative

7.19.1 A Government Coating Technical Representative

will be in attendance, on the government’s account, to observe the surface preparation and coating application and to advise the OMT REP as to the quality, and appropriateness of the contractor’s efforts. They are not for supervision of the contractor’s workforce.

7.20 Preparation of Drawings

7.20.1 Prepare and submit a coating report to the OMT

REP within three days of completing the coating application. The report is to include the following data:

a. The location, date and time of each coating application.

b. Surface profile measurements of the metal substrate.

c. Results of testing for non-visible surface contaminants (soluble salts).

d. The air and substrate temperatures, relative humidity and dewpoint temperature at the time of each coating application.

e. Interval between coatings.

f. Dry film thickness readings at a rate of five

HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010

ITEM NO. 0168 CATEGORY "A" 2025-11-30

TAO205-CSI-HIGH PROFILE NON-SKID

WEATHERDECK PRESERVATION (20 PCT) (1

0168 - 11 spot readings per 100 sq. ft. of surface for each coat of paint.

g. Coating Manufacturer, Product Identification Number, color and Batch Numbers for each coat of paint applied.

8.0 GENERAL REQUIREMENTS: None additional

1.0 ABSTRACT
2.0 REFERENCES
2.1 MSC Drawing No. 801-8918769, General Arrangement
2.2 PPG PMC - MSC Paint Handbook
2.3 PPG Product Data Sheets, Amercoat 240 and Amershield
2.4 Surface Preparation Standard, SSPC-SP WJ-1/NACE WJ-1, Waterjet Cleaning of Metals – Clean to Bare Substrate (WJ-1)(Available commercially))
2.5 Surface Preparation Standard, SSPC-SP11, Power Tool Cleaning to Bare Metal (Available Commercially)
3.0 ITEM LOCATION/DESCRIPTION
3.1 Location/Quantity
3.1.1 Location: Weather decks
a. 01 Weather Deck area frame 45-161, entire exterior area. Width of area shall be 25ft inboard from the Port side shell and 25 feet inboard from the STBD side shell. The entire deck surface will be addressed. Area is to include 6” up all pipe, pipe b...
b. 02 Level forward of house, top of FAS Gear lockers, midship truck tunnel and DC locker midship.
3.1.2 Quantity
a. Estimated surface area = 18,300 sq. ft.
b. Estimated 100 tie down sockets

3.2 Item Description/Manufacturer’s Data: None

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE
4.1 Government Furnished Equipment (GFE): None
4.2 Government Furnished Material (GFM)
4.3 Government Furnished Service (GFS)
4.3.1 OMT Coating Representative

4.4 Government Furnished Information (GFI): None

5.0 NOTES
5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tie...
5.2 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work i...
5.3 Solvents supplied as GFM are for viscosity control only. Solvents required for equipment clean-up are the responsibility of the contractor.
5.4 Any additional work will require a Change Order submitted to the Port Engineer for approval, before the additional work is performed.
5.5 The price quote is to be inclusive of all disposal costs associated with grit, wash water and coating removal associated with this work item. For estimating purposes, the contractors are to assume one gal. of Amercoat 240 per 100 sq. ft.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional
7.0 STATEMENT OF WORK REQUIRED
7.1 Provide all labor, materials, staging, tools and equipment as required to preserve the main mast identified in 3.0 using References 2.1 through 2.7 as guidance.
7.2 Prior to the start of any surface preparation:
7.2.1 Prepare a sketch of the existing deck markings recording positions and dimensions of all markings. Submit a copy of the sketch to the OMT REP.
7.2.2 With assistance from the Ship’s Crew, conduct an operational test in the presence of the OMT REP documenting “as found” conditions of all:
a. Deck lighting, perimeter lights, recessed deck lights, flood and spotlights.
b. Deck drains.
7.3 Provide and maintain adequate lighting during the course of all surface preparation, coating and inspection activities.
7.4 Temporarily remove, store and re-install all interferences as required to accomplish the specified work.
7.5 Temporarily install drop cloths, masking, division shields, seals, blanks and filtering materials to prevent abrasives and foreign substances from entering lights, machinery, piping, hatches, deck drains, ventilation systems, tank vents, valve ste...
7.5.1 Plug deck drains, deck edge nozzles, and open pipes.
7.5.2 Wrap all valve stems and exposed portions of hydraulic cylinders.
7.5.3 Temporarily install filter media on all tank vents and air intake vents.
7.5.4 Temporarily install protective coverings on all port-lights, windows, light globes and landing light lenses.
7.5.5 Protect running rigging (cargo falls, lifts, and cranes) and mooring lines which cannot be stowed or removed for the duration of non-skid removal.
7.6 Protective covering will be inspected at regular intervals, but not less than the start of each work shift. Degraded covering will be repaired prior to restart of work.
7.7 Perform a HP freshwater wash down of the entire area defined in paragraph 3.1 to remove all oil, grease, dirt and soluble salts from the surface of the specified work.
7.8 Upon completion of the wash down, ensure that the ship's equipment is protected from damage caused by blasting, dust or coat. Measurements to be taken include, but are not limited to, the following:
7.8.1 Plug open ends of pipes, vents and ducts.
7.8.2 Grease and wrap all valve stems and exposed portions of hydraulic cylinders. Install filters on all air intake vents. Install covers on all fuel tank vents.
7.8.3 In areas to be slurry blasted and coated, take photos and record all ship's markings, including information, size and color.
7.8.4 Install protective covering on all lights, electrical cable and electrical boxes.
7.8.5 Mask all normally uncoated surfaces.
7.8.6 Protect running rigging and mooring lines which cannot be stowed or removed for the duration of blasting and coating operations, to prevent contamination by blasting abrasive, dust or overspray. The lifeboat davits, winches, sheaves and wire rop...
7.9 Perform an inspection of the weather deck area as defined in Paragraph 3.1 with the Port Engineer and onsite OMT Representative to identify all areas to be Mechanically Cleaned to bare metal. For estimating purposes, assume 12,850 sq. ft. and 330 ...
7.10 Deck areas, including but not limited to all permanently attached fittings such as bitts, cleats, chocks, pad eyes, staples, fairleads, gunwale bars, bulkheads and equipment foundations from the deck up 6 inches are to be accomplished.
7.11 Blast the areas in way of rust and mechanical damage and feather to tightly adhered coat in accordance with SSPC-SP-10 standards (Reference 2.5).
7.12 After cleaning and before coating, thoroughly inspect weather deck noting any electrical issues, broken hangers and cable runs, deformation cracking or broken welds on main mast and submit report to the OMT REP of findings. Should any repairs be ...
7.13 Coatings Application
7.13.1 Prior to application of any coating, the areas identified in section 3.0 to be coated will be inspected and approved by the OMT REP and the OMT Coating Representative. This includes not only the initial coat of paint, but all subsequent coats ...
a. Type of surface preparation used
b. Surface cleanliness
c. Surface profile as determined by Keane-Tator Comparator (or equal) examination and/or replica tape
d. Environmental conditions (surface temperature, ambient air temperature, dew point temperature and relative humidity)
e. Over coating interval (curing time) since previous application
f. Dry Film Thickness (DFT) of previous coating taken at a rate of five per 1,000 square feet
7.13.2 Ensure the following conditions are met prior to coating:
a. Surfaces will be clean, dry and free of oil, grease or residue from abrasive blasting.
b. Surface appearance meets the definition of SSPC-SP10, Near White Metal Blast Cleaning.
c. Air and substrate temperatures will be within the range published by the coating manufacturer, see Reference 2.4.
d. Ambient Air temp during application and curing should be between:
1. 40 F (4 C) and 110 F (43 C) for the Primer.
2. 50 F (10 C) and 100 F (38 C) for the Non- Skid.
3. 40 F (4 C) and 120 F (49 C) for the Markings.
4. Surface temp during application should be between:
5. 40 F (4 C) and 120 F (49 C) for the Primer and Markings.
6. 40 F (4 C) and 110 F (43 C) for the Non-Skid.
e. During application, the substrate temperature will be at least 5 F (3 C) above Dew Point.
f. The Relative Humidity is within the range set by the manufacturer, will not exceed 85%.
7.13.3 No coating will be applied at temperatures below 40 F without prior written approval of the OMT REP.
7.13.4 No coating will be applied between the hours of sunset and 0800 without prior written approval of the OMT REP.
7.13.5 All coatings will be prepared and applied using the manufacturer’s requirements outlined in the Product Data Sheets, Reference 2.4 as guidance. Random Wet Film Thickness (WFT) readings are to be taken during the application of coatings to verif...
7.13.6 EPOXY
a. Apply the following 1st and 2nd Coats of Primer to all blasted and power tool cleaned surfaces. A stripe coat is also required between primer coats.
b. The primer coats must be applied by spraying in order to obtain a uniform DFT and coverage. Rolling the primer is not permitted.
c. One full coat of Amercoat 240, (buff) at 5-6 mils DFT.
d. One stripe coat of Amercoat 240, (dark gray) at 2-3 mils DFT.
e. One full coat of Amercoat 240, (dark gray) 5-6 mils DFT.
f. The stripe coat must be applied by brush to all weldments, crevices, corners, edges, tie-downs and other areas not conducive to proper coverage. Stripe coats will extend a minimum of 2" from each edge of the area being stripe coated.
7.13.7 NON-SKID
a. Apply one Coat of Amercoat 138G Non-Skid to the deck.
b. Amercoat 138G must be applied with a napless phenolic roller in order to obtain the necessary raised ridge profile. Thinning is not permitted.
c. Apply at a rate of approximately 30 square feet per gallon.
d. The surface will show a uniform pattern of peaks and ridges. The ridge profile will be continuous and reasonably uniform. Peaks and ridges will be generally in the same direction (fore-aft preferred), approximately 1/2 to 1 inch apart, and approxim...
e. All longitudinal weld seams will be cross-rolled, perpendicular to the direction of peaks and valleys of the non-skid, 3 to 6 inches minimum on either side of the weld, and welds 8 inches or less apart will be treated as one weld.
f. Non-skid will be applied to within approximately 2” of all deck fittings and protrusions and approximately 5” off deck coaming and edges.
7.13.8 DECK EDGES, GUTTERS AND TIE DOWNS
a. Apply one coat of Amercoat 240, (dark gray) at 5-6 mils DFT.
7.13.9 MARKINGS
a. Layout chalk lines for all deck markings effected by non-skid repair using the prepared sketch.
b. OMT REP is to inspect, verify and approve the chalk lines prior to application of any paint coating to the markings. MSC is to be given 48 hours advance notice as a minimum.
c. Apply one Coat of Amercoat 229T (white) at 2-3 mils DFT to all deck markings.

7.13.10 The environmental conditions, DFT of each coat, cure and over coating intervals are critical to the application of non-skid. The application of all coatings will adhere to the Product Data Sheets and OMT Coating Rep. For weather conditions ou...

7.14 During the course of all surface preparation and coating operations, the area involved will be roped off or otherwise barricaded to prevent entry by persons other than those directly involved in the work underway or those inspecting same. Those p...
7.15 Remove all protective coverings, debris and replace all interferences removed in the performance of this item. Upon completion the vessel will be cleaned of all residues resulting from the surface preparation and coating operations.
7.16 Upon completion of work, ship force will conduct final operational testing of perimeter lights, recessed deck lights, flood and spotlights and drains in the vicinity of the non-skid work completed. Compare "post work" performance test results to ...
7.17 Reports
7.17.1 When inspection, service and testing reveal any deficiency a condition report is to be submitted to the OMT Rep with recommended repairs and parts required. Submit one electronic copy in Portable Document Format (PDF).
7.17.2 Submit a report that includes “as released” condition of the Topside Preservation Weather Deck. Submit one electronic copy in Portable Document Format (PDF).
7.17.3 All reports and checklists are to be completed and signed by the person who carried out the inspection and maintenance work and countersigned by the Company’s representative.
7.18 Painting/Lagging: None additional
7.19 Manufacturer’s Representative
7.19.1 A Government Coating Technical Representative will be in attendance, on the government’s account, to observe the surface preparation and coating application and to advise the OMT REP as to the quality, and appropriateness of the contractor’s ef...
7.20 Preparation of Drawings
7.20.1 Prepare and submit a coating report to the OMT REP within three days of completing the coating application. The report is to include the following data:
a. The location, date and time of each coating application.
b. Surface profile measurements of the metal substrate.
c. Results of testing for non-visible surface contaminants (soluble salts).
d. The air and substrate temperatures, relative humidity and dewpoint temperature at the time of each coating application.
e. Interval between coatings.
f. Dry film thickness readings at a rate of five spot readings per 100 sq. ft. of surface for each coat of paint.
g. Coating Manufacturer, Product Identification Number, color and Batch Numbers for each coat of paint applied.

8.0 GENERAL REQUIREMENTS: None additional

File details come from the government source that posted it. Updated .