A0003 J-3 Contractor Pricing Sheet_rev 2.xlsx
XLSX spreadsheet 40 KB Posted
- Solicitation number
- N6264927RL005
About this file
This is a contractor pricing sheet for repair and overhaul work on the USNS EARL WARREN (T-AO 207), a U.S. Navy auxiliary oiler. The pricing template covers the period from May 31 to July 11, 2027, and is structured in two categories: CAT A (primary work scope) and CAT B (optional continuation services and miscellaneous piping replacement). CAT A encompasses extensive maintenance and repair activities across multiple ship systems, including hull and structural work, propulsion machinery, electrical systems, communications and navigation equipment, auxiliary machinery, habitability and furnishings, HVAC systems, and underwater inspection work. Specific line items include ballast tank preservation, main engine overhaul industrial assistance, various system certifications and inspections (such as fire protection systems, lifeboats, and safety equipment), and in-water hull cleaning and inspection services. CAT B provides unit pricing options for a 15-day service continuation and miscellaneous piping replacement work using linear foot rates for 16-inch, 14-inch, and 12-inch pipes and associated fittings.
The pricing sheet template requires both prime contractor and subcontractor cost proposals, with separate columns for labor hours, labor price, material price (cost and freight method), and other expenses. All line items in the provided template are marked as "NSP" (not separately priced) or contain zero values, indicating this is a blank template awaiting actual pricing submission. The solicitation (N6264927RL005) is issued by NAVSUP Fleet Logistics Center Yokosuka with performance in the U.S. 7th Fleet Area of Responsibility, excluding India. The proposal deadline was December 2, 2026, at 1:00 PM Singapore Standard Time, and award of one contract is intended. Contractors must maintain current registration in the System for Awards Management (SAM) to be eligible for award consideration.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-3 Pricing Sheet
| USNS EARL WARREN (T-AO 207) | Labor Rate | |||||||||
| 31 May - 11 Jul 2027 (ROH/UWILD) | PRIME CONTRACTOR | SUBCONTRACTOR | ||||||||
| WI No. | Title | Labor Hrs | Labor Price | Materal Price (CFM) | Labor hrs | Labor Price | Materal Price (CFM) | Other (Specify in Remarks) | Total Price | CAT |
| CLIN 0001 - CAT A | ||||||||||
| 0000 | GENERAL SERVICES AND REQUIREMENTS | |||||||||
| 0001 | TAO205-SWI-SCOPE GENERAL REQUIREMENTS AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A |
| 0002 | TAO205-SWI-TECHNICAL AND MANUFACTURES REPRESENTATIVE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A |
| 0003 | TAO205_SWI_APPROACH, BERTHING AND MOORING REQUIREMENT | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A |
| 0004 | TAO205-SWI-TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A |
| 0005 | TAO205_SWI_HIGH VOLTAGE ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A |
| 0006 | TAO205_SWI_HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A |
| 0007 | TAO205_SWI_COLD WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A |
| 0010 | TAO205_SWI_FURNISH OFFICE FOR OMT | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0011 | TAO205-SWI-GENERAL SERVICES FOR SHIP | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 7.1.1 Electrical Shore Power | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Unit price per kWh = US$ | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.2 MPDE, SSDG, SSTG, AUXDG, GTRB, Engine, HP/LP Turbine Coverings | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.3 Shore Steam | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.4 Potable Water | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Unit price per gallon = US$ | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.5 De-ionized Water | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Unit price per gallon = US$ | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.6 Heat Exchanger Saltwater Cooling | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.7 Compressed Air | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.8 Fire Protection - included in item 016 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.9 Tempoary Lighting and Ventilation | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.10 Temporary Space Cooling | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.11 Sewage Disposal | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.12 Heat Lamps | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.13 Debris and Garbage Removal | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.14 Interior Bulkhead and Deck Protection | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.15 Helicopter Deck Protection | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.16 Toilet and Sanitary Facilities | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.17 Oil Containment Boom | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.18 Gangways | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.19 Bilge Water Removal | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Unit price per gallon = US$ | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.20 Fuel and Oil Transfer - Ships force work | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.21 Compartment Access and Security | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.22 Cold Weather Protection | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.23 Care of the Ship | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.24 Stack Cover | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.25 External Vessel Contamination Protection | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.26 Final Vessel Cleaning | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.27 Crane, Forklift and Transportation Services | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.28 Megger Readings | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7.1.29 Parking Spaces | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 0012 | TAO205-SWI-INFORMATION TECHNOLOGY SERVICES | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0013 | TAO205-SWI-INTEGRATED PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0014 | TAO205-SWI-WEIGHT AND MOMENT REPORT | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0015 | TAO205-SWI-ILS-GFM | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0016 | TAO205-SWI-FIRE PROTECTION AND SHIPS SAFETY PROGRAM | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0017 | TAO205-SWI-HANDLING SHIPS STORES - STORING | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0018 | TAO205-SWI-DELIVERY AND REDELIVERY OF THE VESSEL | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0019 | TAO205-SWI-SHIPBOARD ACCESS AND SECURITY | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0020 | TAO205-SWI-GAS FREE CERTIFICATES | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0021 | TAO205-SWI-CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACES | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0022 | TAO205-SWI-MACHINERY SPACE TURN-OVER DOCK TRIALS AND SEATRIALS | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0023 | TAO205-SWI-HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR FACILITY | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0040 | TAO205-SWI-OCONUS FORCE PROTECTION | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0100 | HULL AND STRUCTURAL | |||||||||
| 115 | MISCELLANEOUS REACH ROD REPAIRS | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 158L | TAO205-CCSI-BALLAST TANK PRESERVATION (10 YR)(6-145-2) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 159 | TAO205-CCSI-DECKHOUSE_PRESERVATION_(10_YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 162 | TAO205-CCSI-WATERTIGHT CLOSURE INSPECTION (5 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 166 | TAO205-CCSI-TOPSIDE PRESERVATION (20 PCT)(1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 168 | TAO205-CSI-HIGH PROFILE NON-SKID WEATHERDECK PRESERVATION (20 PCT)(1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 170 | LTFW EXPANSION TANK PRESERVATION | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 172 | TAO205-CCSI-SEWAGE_TANK_PRESERVATION_(10_YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 173A | TAO205-CCSI-PRESERVE AND PAINT 2K SQFT TOPSIDE (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 173B | TAO205-CCSI-PRESERVE AND PAINT 2K SQFT MACHINERY SPACES (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0200 | PROPULSION MACHINERY | |||||||||
| 203 | TAO205 MAIN ENGINE OVERHAUL INDUSTRIAL ASSISTANCE | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 214 | TAO205-CSI-MAIN ENGINE LOCAL CONTROL PANEL SERVICE (3 YR)(SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 217 | TAO205-CSI-ABS AUTOMATION SURVEY (1 YR) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 218 | MCCS AUTOMATION SUPPORT | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 254 | TAO205-CCSI-THRUST AND LINESHAFT BEARING INSPECTION (5 YR)(SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0300 | ELECTRICAL | |||||||||
| 302 | MCCS DAU GROOM | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 305 | TAO205-CSI-UPS SERVICE (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 307 | TAO205-CSI-PTOPTI SERVICE (1 YR) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 313 | POTABLE WATER SYSTEM ALTERNATE POWER (T-ALT 205-0012) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 316 | MCCS INTERFACE & AUX CABINETS COOLING INSTALL (T-ALT 205-0045) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 320 | MRG SENSOR REDUNDANCY (T-ALT 205-0048) REV-1 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 353 | TAO205-CCSI-THERMOGRAPHIC SURVEY (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0400 | COMMUNICATION AND NAVIGATION | |||||||||
| 401 | STtNG INSTALLATION INDUSTRIAL SUPPORT | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 404 | TAO205-CSI-TV DTS SERVICE (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 405 | HYDRA SYSTEM GROOM | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 416 | RTSO INDUSTRIAL SUPPORT | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 422 | RELOCATE_SIPR_LAN_DROP_IN_SUPPO_OFFICE (VR24-0029) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 450 | TAO205-CSI-ANNUAL INTEGRATED BRIDGE EQUIPMENT SERVICE AND CERTIFICATION (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 453 | TAO205-CSI-ANNUAL GYRO SYSTEM PM | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 454 | TAO205-CCSI-ANNUAL VDR RECERTIFICATION | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 455A | TAO205-CCSI-ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 456 | TAO205-CCSI-MAGNETIC COMPASS SERVICE (2YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 460 | TAO205-CCSI-ANNUAL INSPECTION OF MANUALLY OPERATED ALARMS | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0500 | AUXILIARY MACHINERY | |||||||||
| 501 | TAO205-CSI-SALT WATER SPRINKLING SYSTEM (1 YR) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 502 | INSULATION AND LAGGING REPAIRS | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 504 | REPLACE_DECK_DRAINS | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 506 | AO205-CSI-SSDG ENGINE FUEL INJECTOR MAINTENANCE (4K_HRS)(SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 507 | TAO205-CSI-SSDG ENGINE AIR CHARGE COOLER SERVICE (8K HRS) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 508 | TAO205-CSI-HVAC WATER HEATER SERVICE - (2.5 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 510 | TAO205-CSI-REVERSE OSMOSIS UNIT SERVICE (5 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 512 | TAO205-CSI-PUMP OVERHAUL | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 525 | TAO205-CSI-SCBA CASCADE CYLINDER INSPECTION (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 527 | TAO205-CSI-CARGO CRANE INSPECTION (1 YR) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 528 | FLUSH LT FRESH WATER SYSTEM | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 530 | TAO205-CSI-SSDG TURBOCHARGER SERVICE (8K HRS) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 537 | TAO205-CSI-OILY WATER SEPARATOR SERVICE (1 YR) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 541 | TAO205-CSI-CPP HYDRAULIC POWER PACK INSPECTION (1 YR) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 542 | TAO205-CSI-CPP HYDRAULIC POWER PACK SERVICE (5 YR) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 551 | TAO205-CCSI-OVERHAUL PLATE COOLERS (3 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 554 | TAO205-CCSI-INSPECT TEST AND CERTIFY MACHINERY SPACE CRANES AND HOISTS (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 558 | TAO205-CCSI-PERSONNEL ELEVATOR ANNUAL INSPECTION | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 561A | TAO205-CCSI-GAUGE CALIBRATION (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 562 | TAO205-CCSI-SCBA ANNUAL INSPECTION (SCOTT) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 563A | TAO205-CCSI-SCBA COMPRESSOR AND FILLING STATION INSPECTION AND MAINTENANCE (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 565A | TAO205-CCSI-FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)(SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 567A | TAO205-CCSI-FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)(SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 568A | TAO205-CCSI-WATER MIST-SPRAY SPRINKLER INSPECTION AND TEST (1 YR) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 569 | TAO205-CCSI-FIRE AND SMOKE DETECTION AND ALARM SYSTEM (1 YR) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 570 | TAO205-CCSI-PORTABLE FIRE EXTINGUISHER SERVICE (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 571 | TAO205-CCSI-FIRE AND SMOKE DAMPER SERVICE (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 572 | TAO205-CCSI-DEEP FAT FRYER AND RANGE HOOD FIRE EXTINGUISHING SYSTEM (1 YR) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 573 | TAO205-CCSI-FIRE STATIONS AND HOSES (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 574 | TAO205-CCSI-FIRE DOORS AND SHUTTERS - SLIDING WATERTIGHT DOORS (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 575 | TAO205-CSI-SALT WATER SPRINKLING SYSTEM (1 YR) (SCSI) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 578 | TAO205-CCSI-BOLL AND KIRCH AUTO FLUSH LO FILTER SERVICE (2 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 579 | TAO205-CCSI-BOLL AND KIRCH AUTO FLUSH FO FILTER SERVICE (2 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0600 | HABITABILITY OUTFITTING AND FURNISHINGS | |||||||||
| 601 | TAO205-CSI-GALLEY EQUIPMENT SERVICE (2.5 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 603 | TAO205-CSI-SPIDER MAN BASKETS OVERHAUL (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 605 | TAO205-CSI-LIFEBOAT DIESEL ENGINE MAINTENANCE (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 606 | TAO205-CSI-LIFEBOAT DIESEL ENGINE MAINTENANCE (3 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 623 | SHIPS LAUNDRY WASHER DRYER REPAIRS | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 651A | TAO205-CCSI-ANNUAL LIFEBOAT INSPECTION | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 653A | TAO205-CCSI-ANNUAL RESCUE BOAT INSPECTION | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 653B | TAO205-CCSI-ANNUAL RESCUE BOAT DAVIT INSPECTION | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 656 | TAO205-CCSI-ANNUAL LIFE RAFT CERTIFICATION | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 657 | TAO205-CCSI-ACCOMMODATION LADDER INSPECTION (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 662 | TAO205-CCSI-DEEP FAT FRYER INSPECTION (1 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 668 | TAO205-CSI-INSPECT, TEST AND CERTIFY MATERIAL HANDLING EQUIPMENT - FORKLIFTS (1YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0800 | HVAC | |||||||||
| 810 | AMR DUCT MODIFICATION | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 852 | TAO205-CCSI-LAUNDRY VENT CLEANING (2.5 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 0900 | DRYDOCKING - IN WATER | |||||||||
| 952 | TAO205-CCSI-UNDERWATER INSPECTION IN LIEU OF DRYDOCKING (UWILD) (5 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 958 | TAO205-CCSI-PROPELLER CLEAN AND POLISH AND HULL INSPECTION - IN WATER (0.5 YR) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 1000 | UNDERWAY REPLENISHMENT EQUIPMENT | |||||||||
| 1001 | FABRICATION OF SADDLE WINCH HANDLES AND GRIPS | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 1002 | SADDLE WINCH MOTOR END BELL ROTATION AND CHICO SEALING | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 1003 | TAO_205_CSI DRIVE BREAKER UPGRADE | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| 1004 | CLASS B MOTOR OVERHAUL INHAUL-OUTHAUL ASD | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | A |
| TOTALS CAT "A" | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $0.00 |
| PRIME CONTRACTOR | SUBCONTRACTOR | ||||||||||
| WI No. | Title | Labor hrs | Labor Price | Materal Price (CFM) | Labor hrs | Labor Price | Materal Price (CFM) | Other | |||
| (Specify in Remarks) | Total Price | ||||||||||
| US$ | CAT | ||||||||||
| CLIN 0003 Option - CAT B | |||||||||||
| 0030 | TAO205-SWI-CONTINUATION OF SERVICES (15 DAYS) | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | B | |
| UNIT PRICES (per day) for following: | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | |||
| 7.1 Work Item 010 Furnish Office for Overhaul Management Team (OMT) | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.2 Work Item 011 General Services for the Ship | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.3 Work Item 012 Information Technology Services | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.4 Work Item 013 Project Planning and Monitoring Reports | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.5 Work Item 016 Fire Protection and Ship's Safety Program | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.6 Work Item 017 Handling Ships Stores | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.7 Work Item 019 Shipboard Access and Security | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.8 Work Item 020 Gas Free Certificates | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.9 Work Items 040 OCONUS Force Protection | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| TOTAL UNIT PRICE (per day): | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| TOTAL PRICE FOR 15 DAYS | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $0.00 |
| PRIME CONTRACTOR | SUBCONTRACTOR | ||||||||||
| WI No. | Title | Labor hrs | Labor Price | Materal Price (CFM) | Labor hrs | Labor Price | Materal Price (CFM) | Other | |||
| (Specify in Remarks) | Total Price | ||||||||||
| US$ | CAT | ||||||||||
| CLIN 0004 Option - CAT B | |||||||||||
| 589 | MISCELLANEOUS PIPING REPLACEMENT | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | B | |
| UNIT PRICES for following: | |||||||||||
| 7.1.1 Provide all material and labor as unit price per linear foot for 16” pipe listed in 3.1.2 to remove existing and replace with new. Each Section to be replaced will be a minimum of 2 feet in length. | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.1.2 Provide all material and labor as unit price per linear foot for 14” pipe listed in 3.1.2 to remove existing and replace with new. Each Section to be replaced will be a minimum of 2 feet in length. | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.1.3 Provide material and labor as unit price per linear foot for 12” pipe listed in 3.1.2 to remove existing and replace with new. Each Section to be replaced will be a minimum of 2 feet in length. | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.1.4 Provide material and labor as unit price per 16” fitting listed in 3.1.2 to remove existing and replace with new | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7.1.5 Provide material and labor as unit price per 14” fitting listed in 3.1.2 to remove existing and replace with new. | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| TOTAL PRICE | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| TOTALS CAT "B" | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CAT A | $ - 0 |
| CAT B | $ - 0 |
| Total Price Proposal | $ - 0 |
| GROWTH/NEW WORK RATE PROPOSAL | |
| Labor Burden Rate | $ - 0 |
| Material Handling Fee | 0% |
File details come from the government source that posted it. Updated .