J-3 Contractor Pricing Sheet_rev 1.xlsx

XLSX spreadsheet 40 KB Posted

Attached to
USNS EARL WARREN (T-AO 207) ROH/UWILD AMENDMENT 0003
Solicitation number
N6264927RL005
Issued by

About this file

This is a J-3 Contractor Pricing Sheet for repair and overhaul services on the USNS EARL WARREN (T-AO 207), a naval oiler vessel, with a performance period from May 31 to July 11, 2027. The pricing template is structured in two primary categories: CAT A (base work items) and CAT B (optional continuation services and miscellaneous piping replacement). CAT A encompasses general services and requirements, hull and structural work, propulsion machinery maintenance, electrical systems, communications and navigation equipment, auxiliary machinery, habitability and outfitting, HVAC systems, and in-water drydocking and hull inspection services (UWILD). The sheet requests pricing for both prime contractor and subcontractor labor hours, labor prices, and material prices for various maintenance, inspection, and repair activities, with specific line items including ballast tank preservation, main engine overhaul assistance, electrical system services, fire protection system inspections, lifeboat and rescue boat certifications, and underwater vessel inspections. CAT B includes a 15-day continuation of services option with unit pricing for daily support items, and miscellaneous piping replacement work with unit prices per linear foot for 16-inch, 14-inch, and 12-inch pipes and associated fittings. All line items in the provided template show zero pricing entries marked as "NSP" (not submitted/priced) or "$-," indicating this is a blank pricing template awaiting contractor cost proposals. Offerors must submit proposals by December 2, 2026, at 1:00 PM Singapore Standard Time to NAVSUP Fleet Logistics Center Yokosuka, with performance to occur in the U.S. 7th Fleet Area of Responsibility excluding India.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-3 Pricing Sheet

USNS EARL WARREN (T-AO 207)Labor Rate
31 May - 11 Jul 2027 (ROH/UWILD)PRIME CONTRACTORSUBCONTRACTOR
WI No.TitleLabor HrsLabor PriceMateral Price (CFM)Labor hrsLabor PriceMateral Price (CFM)Other (Specify in Remarks)Total PriceCAT
CLIN 0001 - CAT A
0000GENERAL SERVICES AND REQUIREMENTS
0001TAO205-SWI-SCOPE GENERAL REQUIREMENTS AND DEFINITIONSNSPNSPNSPNSPNSPNSPNSPNSPA
0002TAO205-SWI-TECHNICAL AND MANUFACTURES REPRESENTATIVENSPNSPNSPNSPNSPNSPNSPNSPA
0003TAO205_SWI_APPROACH, BERTHING AND MOORING REQUIREMENTNSPNSPNSPNSPNSPNSPNSPNSPA
0004TAO205-SWI-TESTING AND QUALITY ASSURANCENSPNSPNSPNSPNSPNSPNSPNSPA
0005TAO205_SWI_HIGH VOLTAGE ELECTRICAL SAFETY PROCEDURE REQUIREMENTSNSPNSPNSPNSPNSPNSPNSPNSPA
0006TAO205_SWI_HEAVY WEATHER PLANNSPNSPNSPNSPNSPNSPNSPNSPA
0007TAO205_SWI_COLD WEATHER PLANNSPNSPNSPNSPNSPNSPNSPNSPA
0010TAO205_SWI_FURNISH OFFICE FOR OMT0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0011TAO205-SWI-GENERAL SERVICES FOR SHIP0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
7.1.1 Electrical Shore Power0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
Unit price per kWh = US$0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.2 MPDE, SSDG, SSTG, AUXDG, GTRB, Engine, HP/LP Turbine Coverings0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.3 Shore Steam0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.4 Potable Water0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
Unit price per gallon = US$0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.5 De-ionized Water0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
Unit price per gallon = US$0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.6 Heat Exchanger Saltwater Cooling0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.7 Compressed Air0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.8 Fire Protection - included in item 0160$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.9 Tempoary Lighting and Ventilation0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.10 Temporary Space Cooling0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.11 Sewage Disposal0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.12 Heat Lamps0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.13 Debris and Garbage Removal0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.14 Interior Bulkhead and Deck Protection0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.15 Helicopter Deck Protection0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.16 Toilet and Sanitary Facilities0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.17 Oil Containment Boom0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.18 Gangways0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.19 Bilge Water Removal0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
Unit price per gallon = US$0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.20 Fuel and Oil Transfer - Ships force work0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.21 Compartment Access and Security0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.22 Cold Weather Protection0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.23 Care of the Ship0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.24 Stack Cover0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.25 External Vessel Contamination Protection0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.26 Final Vessel Cleaning0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.27 Crane, Forklift and Transportation Services0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.28 Megger Readings0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.29 Parking Spaces0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
0012TAO205-SWI-INFORMATION TECHNOLOGY SERVICES0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0013TAO205-SWI-INTEGRATED PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0014TAO205-SWI-WEIGHT AND MOMENT REPORT0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0015TAO205-SWI-ILS-GFM0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0016TAO205-SWI-FIRE PROTECTION AND SHIPS SAFETY PROGRAM0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0017TAO205-SWI-HANDLING SHIPS STORES - STORING0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0018TAO205-SWI-DELIVERY AND REDELIVERY OF THE VESSEL0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0019TAO205-SWI-SHIPBOARD ACCESS AND SECURITY0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0020TAO205-SWI-GAS FREE CERTIFICATES0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0021TAO205-SWI-CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACES0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0022TAO205-SWI-MACHINERY SPACE TURN-OVER DOCK TRIALS AND SEATRIALS0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0023TAO205-SWI-HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR FACILITY0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0040TAO205-SWI-OCONUS FORCE PROTECTION0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0100HULL AND STRUCTURAL
115MISCELLANEOUS REACH ROD REPAIRS0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
158LTAO205-CCSI-BALLAST TANK PRESERVATION (10 YR)(6-145-2)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
159TAO205-CCSI-DECKHOUSE_PRESERVATION_(10_YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
162TAO205-CCSI-WATERTIGHT CLOSURE INSPECTION (5 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
166TAO205-CCSI-TOPSIDE PRESERVATION (20 PCT)(1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
168TAO205-CSI-HIGH PROFILE NON-SKID WEATHERDECK PRESERVATION (20 PCT)(1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
170LTFW EXPANSION TANK PRESERVATION0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
172TAO205-CCSI-SEWAGE_TANK_PRESERVATION_(10_YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
173ATAO205-CCSI-PRESERVE AND PAINT 2K SQFT TOPSIDE (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
173BTAO205-CCSI-PRESERVE AND PAINT 2K SQFT MACHINERY SPACES (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0200PROPULSION MACHINERY
203TAO205 MAIN ENGINE OVERHAUL INDUSTRIAL ASSISTANCE0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
214TAO205-CSI-MAIN ENGINE LOCAL CONTROL PANEL SERVICE (3 YR)(SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
217TAO205-CSI-ABS AUTOMATION SURVEY (1 YR) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
218MCCS AUTOMATION SUPPORT0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
254TAO205-CCSI-THRUST AND LINESHAFT BEARING INSPECTION (5 YR)(SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0300ELECTRICAL
302MCCS DAU GROOM0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
305TAO205-CSI-UPS SERVICE (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
307TAO205-CSI-PTOPTI SERVICE (1 YR) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
313POTABLE WATER SYSTEM ALTERNATE POWER (T-ALT 205-0012)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
316MCCS INTERFACE & AUX CABINETS COOLING INSTALL (T-ALT 205-0045)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
320MRG SENSOR REDUNDANCY (T-ALT 205-0048) REV-10$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
353TAO205-CCSI-THERMOGRAPHIC SURVEY (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0400COMMUNICATION AND NAVIGATION
401STtNG INSTALLATION INDUSTRIAL SUPPORT0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
404TAO205-CSI-TV DTS SERVICE (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
405HYDRA SYSTEM GROOM0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
416RTSO INDUSTRIAL SUPPORT0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
422RELOCATE_SIPR_LAN_DROP_IN_SUPPO_OFFICE (VR24-0029)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
450TAO205-CSI-ANNUAL INTEGRATED BRIDGE EQUIPMENT SERVICE AND CERTIFICATION (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
453TAO205-CSI-ANNUAL GYRO SYSTEM PM0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
454TAO205-CCSI-ANNUAL VDR RECERTIFICATION0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
455ATAO205-CCSI-ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
456TAO205-CCSI-MAGNETIC COMPASS SERVICE (2YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
460TAO205-CCSI-ANNUAL INSPECTION OF MANUALLY OPERATED ALARMS0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0500AUXILIARY MACHINERY
504REPLACE_DECK_DRAINS0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
506AO205-CSI-SSDG ENGINE FUEL INJECTOR MAINTENANCE (4K_HRS)(SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
507TAO205-CSI-SSDG ENGINE AIR CHARGE COOLER SERVICE (8K HRS) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
508TAO205-CSI-HVAC WATER HEATER SERVICE - (2.5 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
510TAO205-CSI-REVERSE OSMOSIS UNIT SERVICE (5 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
512TAO205-CSI-PUMP OVERHAUL0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
521TAO205-CSI-SALT WATER SPRINKLING SYSTEM (1 YR) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
525TAO205-CSI-SCBA CASCADE CYLINDER INSPECTION (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
527TAO205-CSI-CARGO CRANE INSPECTION (1 YR) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
528FLUSH LT FRESH WATER SYSTEM0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
530TAO205-CSI-SSDG TURBOCHARGER SERVICE (8K HRS) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
537TAO205-CSI-OILY WATER SEPARATOR SERVICE (1 YR) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
541TAO205-CSI-CPP HYDRAULIC POWER PACK INSPECTION (1 YR) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
542TAO205-CSI-CPP HYDRAULIC POWER PACK SERVICE (5 YR) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
551TAO205-CCSI-OVERHAUL PLATE COOLERS (3 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
554TAO205-CCSI-INSPECT TEST AND CERTIFY MACHINERY SPACE CRANES AND HOISTS (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
558TAO205-CCSI-PERSONNEL ELEVATOR ANNUAL INSPECTION0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
561ATAO205-CCSI-GAUGE CALIBRATION (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
562TAO205-CCSI-SCBA ANNUAL INSPECTION (SCOTT)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
563ATAO205-CCSI-SCBA COMPRESSOR AND FILLING STATION INSPECTION AND MAINTENANCE (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
565ATAO205-CCSI-FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)(SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
567ATAO205-CCSI-FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)(SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
568ATAO205-CCSI-WATER MIST-SPRAY SPRINKLER INSPECTION AND TEST (1 YR) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
569TAO205-CCSI-FIRE AND SMOKE DETECTION AND ALARM SYSTEM (1 YR) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
570TAO205-CCSI-PORTABLE FIRE EXTINGUISHER SERVICE (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
571TAO205-CCSI-FIRE AND SMOKE DAMPER SERVICE (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
572TAO205-CCSI-DEEP FAT FRYER AND RANGE HOOD FIRE EXTINGUISHING SYSTEM (1 YR) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
573TAO205-CCSI-FIRE STATIONS AND HOSES (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
574TAO205-CCSI-FIRE DOORS AND SHUTTERS - SLIDING WATERTIGHT DOORS (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
575TAO205-CSI-SALT WATER SPRINKLING SYSTEM (1 YR) (SCSI)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
578TAO205-CCSI-BOLL AND KIRCH AUTO FLUSH LO FILTER SERVICE (2 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
579TAO205-CCSI-BOLL AND KIRCH AUTO FLUSH FO FILTER SERVICE (2 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0600HABITABILITY OUTFITTING AND FURNISHINGS
601TAO205-CSI-GALLEY EQUIPMENT SERVICE (2.5 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
603TAO205-CSI-SPIDER MAN BASKETS OVERHAUL (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
605TAO205-CSI-LIFEBOAT DIESEL ENGINE MAINTENANCE (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
606TAO205-CSI-LIFEBOAT DIESEL ENGINE MAINTENANCE (3 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
623SHIPS LAUNDRY WASHER DRYER REPAIRS0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
651ATAO205-CCSI-ANNUAL LIFEBOAT INSPECTION0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
653ATAO205-CCSI-ANNUAL RESCUE BOAT INSPECTION0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
653BTAO205-CCSI-ANNUAL RESCUE BOAT DAVIT INSPECTION0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
656TAO205-CCSI-ANNUAL LIFE RAFT CERTIFICATION0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
657TAO205-CCSI-ACCOMMODATION LADDER INSPECTION (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
662TAO205-CCSI-DEEP FAT FRYER INSPECTION (1 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
668TAO205-CSI-INSPECT, TEST AND CERTIFY MATERIAL HANDLING EQUIPMENT - FORKLIFTS (1YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0800HVAC
810AMR DUCT MODIFICATION0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
852TAO205-CCSI-LAUNDRY VENT CLEANING (2.5 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
0900DRYDOCKING - IN WATER
952TAO205-CCSI-UNDERWATER INSPECTION IN LIEU OF DRYDOCKING (UWILD) (5 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
958TAO205-CCSI-PROPELLER CLEAN AND POLISH AND HULL INSPECTION - IN WATER (0.5 YR)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
1000UNDERWAY REPLENISHMENT EQUIPMENT
1001FABRICATION OF SADDLE WINCH HANDLES AND GRIPS0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
1002SADDLE WINCH MOTOR END BELL ROTATION AND CHICO SEALING0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
1003TAO_205_CSI DRIVE BREAKER UPGRADE0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
1004CLASS B MOTOR OVERHAUL INHAUL-OUTHAUL ASD0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0A
TOTALS CAT "A"0.00$ - 0$ - 00.00$ - 0$ - 0$ - 0$0.00
PRIME CONTRACTORSUBCONTRACTOR
WI No.TitleLabor hrsLabor PriceMateral Price (CFM)Labor hrsLabor PriceMateral Price (CFM)Other
(Specify in Remarks)Total Price
US$CAT
CLIN 0003 Option - CAT B
0030TAO205-SWI-CONTINUATION OF SERVICES (15 DAYS)N/AN/AN/AN/AN/AN/AN/AN/AB
UNIT PRICES (per day) for following:N/AN/AN/AN/AN/AN/AN/AN/A
7.1 Work Item 010 Furnish Office for Overhaul Management Team (OMT)0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.2 Work Item 011 General Services for the Ship0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.3 Work Item 012 Information Technology Services0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.4 Work Item 013 Project Planning and Monitoring Reports0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.5 Work Item 016 Fire Protection and Ship's Safety Program0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.6 Work Item 017 Handling Ships Stores0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.7 Work Item 019 Shipboard Access and Security0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.8 Work Item 020 Gas Free Certificates0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.9 Work Items 040 OCONUS Force Protection0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
TOTAL UNIT PRICE (per day):0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
TOTAL PRICE FOR 15 DAYS0.00$ - 0$ - 00.00$ - 0$ - 0$ - 0$0.00
PRIME CONTRACTORSUBCONTRACTOR
WI No.TitleLabor hrsLabor PriceMateral Price (CFM)Labor hrsLabor PriceMateral Price (CFM)Other
(Specify in Remarks)Total Price
US$CAT
CLIN 0004 Option - CAT B
589MISCELLANEOUS PIPING REPLACEMENT0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0B
UNIT PRICES for following:
7.1.1 Provide all material and labor as unit price per linear foot for 16” pipe listed in 3.1.2 to remove existing and replace with new. Each Section to be replaced will be a minimum of 2 feet in length.0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.2 Provide all material and labor as unit price per linear foot for 14” pipe listed in 3.1.2 to remove existing and replace with new. Each Section to be replaced will be a minimum of 2 feet in length.0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.3 Provide material and labor as unit price per linear foot for 12” pipe listed in 3.1.2 to remove existing and replace with new. Each Section to be replaced will be a minimum of 2 feet in length.0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.4 Provide material and labor as unit price per 16” fitting listed in 3.1.2 to remove existing and replace with new0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1.5 Provide material and labor as unit price per 14” fitting listed in 3.1.2 to remove existing and replace with new.0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
TOTAL PRICE0.00$ - 0$ - 00.00$ - 0$ - 0$ - 0$ - 0
TOTALS CAT "B"0.00$ - 0$ - 00.00$ - 0$ - 0$ - 0$ - 0
CAT A$ - 0
CAT B$ - 0
Total Price Proposal$ - 0

File details come from the government source that posted it. Updated .