This is a Performance Work Statement (PWS) for Item 0159 under Hull and Structural Contract No. SSU SN 26-010 for the USNS Earl Warren (TAO 207), with a completion date of November 30, 2025.
The contractor must surface prepare and paint the vessel's Deckhouse located at Frames 177 to 214, from Main Deck to 08 Level, covering approximately 24,000 square feet total (10,000 sqft forward, 5,000 sqft port, 6,000 sqft starboard, 3,000 sqft aft). Work includes all vertical surfaces, overhangs, handrails, doors, and vent closures, but excludes decks, davits, cranes, and their support structures. The contractor must provide all labor, materials, staging, tools, and equipment. Surface preparation requires solvent cleaning using biodegradable detergent per SSPC-SP6/NACE 3, followed by high-pressure water wash (2,500-3,000 PSI) and chloride testing to a maximum of 10 µg/cm² contamination. Slurry blast using waterjet cleaning (SSPC-SP WJ-1/NACE WJ-1) to bare metal is required, with power tool cleaning (SSPC-SP-11) applied to inaccessible areas. Coating application consists of three epoxy primer coats (Amercoat 240): one red oxide coat at 5-6 mils DFT, one off-white stripe coat at 2-3 mils DFT, and one off-white full coat at 5-6 mils DFT, followed by one polyurethane topcoat (Amershield, haze gray) at 3-4 mils DFT. All materials are Government-Furnished Material, including solvents for viscosity control only. The contractor must coordinate with ship's force for lockout/tagout procedures, provide adequate lighting and staging, maintain protective coverings inspected daily, and submit a comprehensive Paint Report within three days of completion including environmental conditions, DFT readings, product identification, and surface profile measurements. An OMT Coating Representative and Government Paint Technical Representative will observe work quality on the government's account. The work must comply with General Technical Requirements (GTRs) 1-7, 22-24, 28-29, and follow all manufacturer specifications for paint application with strict environmental and temperature controls.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS Earl Warren
( TAO 207 )
HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010
ITEM NO. 0159 CATEGORY "A" 2025-11-30
TAO205-CCSI-
DECKHOUSE_PRESERVATION_(10_YR) (1)
Robson, Henry
0159 - 1
1.0 ABSTRACT
The purpose of this item is to surface prepare and paint the vessel's Deck House.
2.0 REFERENCES
2.1 MSC Drawing No. 801-8918769, General Arrangement
2.2 Surface Preparation Standard, SSPC-SP WJ-1/NACE 3 WJ-
1, Waterjet Cleaning of Metals – Clean to Bare Substrate (WJ-1)(Available commercially)
2.3 Surface Preparation Standard, SSPC-SP-11, Power Tool
Cleaning to Bare Metal (Available Commercially)
2.4 Surface Preparation Standard, SSPC-SP1, Solvent
Cleaning (Available Commercially)
2.5 Surface Preparation Standard, SSPC-PA2, Measurement of
Dry Coating Thickness with Magnetic Gages (Available Commercially)
2.6 PPG Product Data Sheets, Amercoat 240 and Amershield
(Available Commercially)
2.7 NAVSEA Drawing No. 631-8726946, Paint Schedule
3.0 ITEM LOCATION/DESCRIPTION
3.1 Location: Deckhouse, Frame 177 to Frame 214, Main deck
to 08 Level
NOTE: This does not include decks, davits, cranes or their support structure.
3.2 Quantity
3.2.1 Forward – 10,000 sqft
3.2.2 Port – 5,000 sqft
3.2.3 Starboard – 6,000 sqft
3.2.4 Aft – 3,000 sqft
HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010
ITEM NO. 0159 CATEGORY "A" 2025-11-30
TAO205-CCSI-
0159 - 2
3.3 Description: All vertical surfaces and including
overhangs and handrails.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE
4.1 Government Furnished Equipment (GFE): None
4.2 Government Furnished Material (GFM)
Product Type/Notes Color Qty Amercoat 240 Epoxy (1st primer coat) Red Oxide AS REQ Amercoat 240 Epoxy (stripe coat) Off-White AS REQ Amercoat 240 Epoxy (2nd primer coat) Off-White AS REQ Amershield Polyurethane (topcoat) Haze Gray AS REQ
Amercoat T-10 Solvent N/A AS REQ Amercoat 65 Solvent N/A AS REQ
4.3 Government Furnished Services (GFS)
4.3.1 OMT Coating Representative
4.4 Government Furnished Information (GFI): None
5.0 NOTES
5.1 The contractor and all subcontractors, regardless of
tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7, 22, 23, 24, 28, and 29.
5.2 The contractor and all subcontractors, regardless of
tier are advised to review other work items under this contract, including but not limited to all Work Items to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.
5.3 Solvents supplied as GFM are for viscosity control
only. Solvents required for equipment clean-up are the responsibility of the contractor.
HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010
ITEM NO. 0159 CATEGORY "A" 2025-11-30
TAO205-CCSI-
0159 - 3
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional
7.0 STATEMENT OF WORK REQUIRED
7.1 Provide all labor, materials, staging, tools and
equipment as required to renew the paint coatings on the Deckhouse identified in section 3.0 using References 2.1 through
2.8 as guidance. The areas are to include handrails, doors, and vent closures.
7.2 Prior to the start of any surface preparation:
7.2.1 Record all markings, label plates and placards
documenting their positions, symbols and text. Submit a copy of the record to the OMT REP.
7.2.2 Note the condition of any damaged windows, port
lights, light globes and lenses.
7.2.3 With assistance from the Ship’s Force, conduct
an operational test in the presence of the OMT REP documenting “as found” conditions of all lighting, speakers and deck drains.
7.3 Coordinate with ship’s force to have associated
equipment locked and/or tagged out per ship’s lock out/tag out policy. When the maintenance is complete, coordinate with ship’s force to have associated equipment unlocked and/or tagged in per ship’s lock out/tag out policy.
7.4 Coordinate with Ship’s Force to tagout all lights, davits, cranes and machinery in way of the areas being worked.
Plug all overboard discharges in way of surfaces being prepared and painted.
7.5 Provide and erect staging required to access all
applicable surfaces as identified in the base work item.
7.6 Paint material will be stored within the Paint
Manufacturer's recommended temperature range. When paint material is being applied, ensure that the material's temperature is within the Manufacturer's recommended range, but in any case, not less than 70°F.
7.7 Provide and maintain adequate lighting during all
HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010
ITEM NO. 0159 CATEGORY "A" 2025-11-30
TAO205-CCSI-
0159 - 4 surface preparation, coating and inspection activities.
7.8 Temporarily remove interferences, label plates and
placards in way of surface preparation and paint application.
Reinstall upon completion of all coatings work. Label plates that are riveted to the hull or otherwise permanently installed need not be removed.
7.9 Prior to start of surface preparation and painting, take precautions to protect the vessel from contamination.
Install drop cloths, masking, division shields, seals, blanks and filtering materials to prevent abrasives and foreign substances from entering lights, machinery, piping, hatches, deck drains, ventilation systems, tank vents, valve stems, motor shafts, seals and temporary openings during blasting and painting operations. The following actions, at a minimum will be taken:
7.9.1 Mask all normally unpainted surfaces
7.9.2 Plug deck drains, deck sprinkler nozzles, and
open pipes.
7.9.3 Wrap all valve stems and exposed portions of
motor shafts, and hydraulic cylinders.
7.9.4 Install filter media on all tank vents and air
intake vents.
7.9.5 Install protective coverings on all installed
equipment, port lights, windows, permanently installed label plates, light globes, switches and pushbuttons, vent screens and appurtenances not intended to be painted.
7.9.6 Protect running rigging (cargo falls, davit
falls, lifts, and cranes) and mooring lines which cannot be stowed or removed for the duration of non-skid removal.
7.9.7 Protective covering will be inspected at
regular intervals, but not less than the start of each work shift. Degraded covering will be repaired prior to restart of work.
7.10 Surface Preparation
HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010
ITEM NO. 0159 CATEGORY "A" 2025-11-30
TAO205-CCSI-
0159 - 5
7.10.1 Solvent Cleaning the Deckhouse using SSPC-
SP6/NACE 3, as guidance, using biodegradable detergent to remove all dirt, oil, grease, soluble salts or other organic matter from the specified surfaces. Biodegradable cleaners or other eco-friendly methods/agents will be used to the greatest extent possible.
7.10.2 Final wash-down will be made with clean, fresh
water at 2,500 to 3,000 PSI. Upon completion of all water washing, chloride testing will be performed at a rate of no less than one test per 500 Square Feet of surface.
7.10.3 The maximum allowable contamination
concentrations will be less than 10 ug/cm2 of chloride contaminants as determined by field or laboratory analysis using reliable, reproducible test equipment.
7.10.4 If contamination is found, additional water
wash will be performed. Additional tests will be made as necessary to determine the extent of contamination and to prove the success of remediation.
7.10.5 Method
a. N/A
b. Slurry blast using Reference 2.2; SSPC-SP6/NACE 3, Commercial Blast Cleaning as guidance the deckhouse area identified in 3.0 using SSPC-SP WJ-1/NACE WJ-1, Waterjet Cleaning of Metals; using Reference 2.2 as guidance. The surface profile achieved will be angular in nature, and within the range set by the coating manufacturer’s product data sheet for the coating system being applied. Prior to the start of abrasive blasting the blast media will be tested to ensure that it is not contaminated with chlorides, as determined by field or laboratory analysis using reliable, reproducible test equipment.
7.10.6 Where spot blasting has been specified, edges
of adjacent intact coating will be feathered-in.
7.10.7 No more than a light (L) grade flash rust will
be allowed on the steel at the time of coating application. If heavier flash rust is present, the surface will be pressure washed at 2,500 to 3,000 PSI and allowed to air dry in order to
HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010
ITEM NO. 0159 CATEGORY "A" 2025-11-30
TAO205-CCSI-
0159 - 6 restore the surface to a paint-able condition.
7.10.8 Accomplish the requirements of SSPC-SP-11 Power
Tool Clean to Bare Metal to any areas inaccessible to the abrasive blast including foundations, fan housings, hose racks, pad eyes, life ring clips, scupper extensions and other appendages in way of the aforementioned areas to bare metal using Reference 2.4 as guidance.
7.10.9 After surface preparation, all surfaces will be
blown down using clean dry air to remove all dust, dirt and debris.
7.10.10 Regardless whether the surfaces are abrasive
blasted, immediately prior to coating the surface will be re-tested for non-visual surface contaminates at a rate of no less than one test per 1,000 square foot of prepared area. The maximum allowable contamination concentrations for surfaces prepared by means of dry abrasive blasting will be less than 10 ug/cm2 of chloride contaminants as determined by field or laboratory analysis using reliable, reproducible test equipment.
7.11 Coatings Application
7.11.1 Prior to application of any coating, the area
to be painted will be inspected and approved by the OMT REP and the Paint Representative. This includes not only the initial coat of paint, but all subsequent coats as well. Inspection will include measuring and recording:
a. type of surface preparation used
b. surface cleanliness
c. surface profile as determined by Keane-Tator Comparator (or equal) examination and/or replica tape
d. environmental conditions (surface temperature, ambient air temperature, dew point temperature and relative humidity)
e. over coating interval (curing time) since previous application
HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010
ITEM NO. 0159 CATEGORY "A" 2025-11-30
TAO205-CCSI-
0159 - 7
f. Dry Film Thickness (DFT) of previous coating taken at a rate of five per 1,000 square feet. DFT gages will be calibrated, spot readings will be taken and DFT tolerances will be using SSPC-PA2, Measurement of Dry Coating Thickness with Magnetic Gages.
7.11.2 Ensure the following conditions are met prior
to painting:
a. Surfaces will be clean, dry and free of oil, grease or residue from abrasive blasting.
b. Surface appearance meets the definition of SSPC-SP WJ-1 or SSPC-SP6/NACE 3, Metal Blast Cleaning.
c. Air and substrate temperatures will be within the range published by the paint manufacturer, see References
2.7 and 2.8. Surface temp during application and curing is acceptable down to:
1. 23°F (-5°C) for the Amershield.
d. During application, the substrate temperature will be at least 5°F (3°C) above Dew Point.
e. The Relative Humidity is within the range set by the manufacturer, will not exceed 85%.
f. Condensation and/or rain is not to contact the uncured Amershield as it may change the color and gloss.
7.11.3 No coating will be applied below 35°F (1.7°C)
without prior written approval of the OMT REP.
7.11.4 No coating will be applied between the hours of
sunset and 0800 without prior written approval of the OMT REP.
7.11.5 All coatings will be prepared and applied using
the manufacturer’s requirements outlined in the Product Data Sheets, using Reference 2.7 as guidance. Random Wet Film Thickness (WFT) readings are to be taken during the application of coatings to verify correct millage are being applied.
7.11.6 EPOXY
HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010
ITEM NO. 0159 CATEGORY "A" 2025-11-30
TAO205-CCSI-
0159 - 8
a. Apply the following 1st and 2nd Coats of Primer to all blasted and power tool cleaned surface.
b. One full coat of Amercoat 240, (red oxide) at 5-6 mils DFT.
c. One stripe coat of Amercoat 240, (off-white) at 2-3 mils DFT.
d. One full coat of Amercoat 240, (off-white) 5-6 mill DFT.
e. The stripe coat will be applied to all weldments, crevices, corners, edges and other areas not conducive to proper coverage. Stripe coats will extend a minimum of 2" from each edge of the area being stripe coated.
7.11.7 POLYURETHANE
a. Apply One full top coat of Amershield, (haze gray) 3-4 mill DFT to the Deckhouse.
b. The environmental conditions, DFT of each coat, cure and over coating intervals are critical to the application.
The application of all coatings will adhere to the Product Data Sheets and OMT Paint Rep. For weather conditions outside 35°F (1.7°C) through 90°F (32°C) range consult the OMT Paint Representative for proper overcoat intervals.
7.12 During the course of all surface preparation and
coating operations, the area involved will be roped off or otherwise barricaded to prevent entry by persons other than those directly involved in the work underway or those inspecting same. Such cordoning or barricading will remain in place until the topcoat is properly cured.
7.13 Upon completion the vessel will be cleaned of all
residues resulting from the surface preparation and painting operations. Remove all protective coverings, debris and replace all interferences removed in the performance of this item.
7.14 Upon completion of work, ship force will conduct final
operational testing of ALL lights, speakers, flood and spot lights, sprinkler heads and drains in the vicinity of the
HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010
ITEM NO. 0159 CATEGORY "A" 2025-11-30
TAO205-CCSI-
0159 - 9 deckhouse work completed. Contractor and ship force will compare "post work" performance test results to the "as-found" conditions previously recorded in paragraphs 7.2.1 through
7.2.3. Correct any discrepancies noted between the “as found” and “post work” conditions. All repaired items will be satisfactorily re-demonstrated to ship force and OMT REP.
7.15 Reports
7.15.1 When inspection, service and testing reveal any
deficiency a condition report is to be submitted to the OMT REP with recommended repairs and parts required. Submit one electronic copy in Portable Document Format (PDF).
7.15.2 All reports and checklists are to be completed
and signed by the person who carried out the inspection and maintenance work and countersigned by the Company’s.
7.15.3 Prepare a Paint Report and submit same to the
OMT REP within three days of completing the coating application.
The report will include the following data:
a. The location, date and time of each coating application.
b. The air and substrate temperatures, relative humidity and dewpoint temperature at the time of each coating application.
c. Interval between coatings.
d. Dry film thickness readings at a rate of five spot readings per 1,000 sq. ft. of surface for each coat of paint. DFT gages will be calibrated, and spot readings will be taken using SSPC-PA2, Measurement of Dry Coating Thickness with Magnetic Gages as guidance.
e. Paint Manufacturer, Product Identification Number, color and Batch Numbers for each coat of paint applied.
f. Surface profile measurements of the metal substrate.
g. Results of testing for non-visible surface
HULL AND STRUCTURAL CONTRACT NO. SSU SN 26-010
ITEM NO. 0159 CATEGORY "A" 2025-11-30
TAO205-CCSI-
0159 - 10 contaminants (soluble salts).
7.16 Painting: None additional
7.17 Manufacturer's Representative
7.17.1 A Government Paint Technical Representative
will be in attendance, on the government’s account, to observe the surface preparation and coating application on the government’s behalf and to advise the OMT REP as to the quality, and appropriateness of the contractor’s efforts. He/She is not for supervision of the contractor’s workforce.
7.18 Preparation of Drawings: None additional
8.0 GENERAL REQUIREMENTS: None additional
| 1.0 ABSTRACT |
| The purpose of this item is to surface prepare and paint the vessel's Deck House. |
| 2.0 REFERENCES |
| 2.1 MSC Drawing No. 801-8918769, General Arrangement |
| 2.2 Surface Preparation Standard, SSPC-SP WJ-1/NACE 3 WJ-1, Waterjet Cleaning of Metals – Clean to Bare Substrate (WJ-1)(Available commercially) |
| 2.3 Surface Preparation Standard, SSPC-SP-11, Power Tool Cleaning to Bare Metal (Available Commercially) |
| 2.4 Surface Preparation Standard, SSPC-SP1, Solvent Cleaning (Available Commercially) |
| 2.5 Surface Preparation Standard, SSPC-PA2, Measurement of Dry Coating Thickness with Magnetic Gages (Available Commercially) |
| 2.6 PPG Product Data Sheets, Amercoat 240 and Amershield (Available Commercially) |
| 2.7 NAVSEA Drawing No. 631-8726946, Paint Schedule |
| 3.0 ITEM LOCATION/DESCRIPTION |
| 3.1 Location: Deckhouse, Frame 177 to Frame 214, Main deck to 08 Level |
| NOTE: This does not include decks, davits, cranes or their support structure. |
| 3.2 Quantity |
| 3.2.1 Forward – 10,000 sqft |
| 3.2.2 Port – 5,000 sqft |
| 3.2.3 Starboard – 6,000 sqft |
| 3.2.4 Aft – 3,000 sqft |
3.3 Description: All vertical surfaces and including overhangs and handrails.
| 4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE |
| 4.1 Government Furnished Equipment (GFE): None |
| 4.2 Government Furnished Material (GFM) |
| 4.3 Government Furnished Services (GFS) |
| 4.3.1 OMT Coating Representative |
4.4 Government Furnished Information (GFI): None
| 5.0 NOTES |
| 5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tie... |
| 5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract, including but not limited to all Work Items to determine their effect on the work required under this work item. Many of the defi... |
| 5.3 Solvents supplied as GFM are for viscosity control only. Solvents required for equipment clean-up are the responsibility of the contractor. |
| 6.0 QUALITY ASSURANCE REQUIREMENTS: None additional |
| 7.0 STATEMENT OF WORK REQUIRED |
| 7.1 Provide all labor, materials, staging, tools and equipment as required to renew the paint coatings on the Deckhouse identified in section 3.0 using References 2.1 through 2.8 as guidance. The areas are to include handrails, doors, and vent closures. |
| 7.2 Prior to the start of any surface preparation: |
| 7.2.1 Record all markings, label plates and placards documenting their positions, symbols and text. Submit a copy of the record to the OMT REP. |
| 7.2.2 Note the condition of any damaged windows, port lights, light globes and lenses. |
| 7.2.3 With assistance from the Ship’s Force, conduct an operational test in the presence of the OMT REP documenting “as found” conditions of all lighting, speakers and deck drains. |
| 7.3 Coordinate with ship’s force to have associated equipment locked and/or tagged out per ship’s lock out/tag out policy. When the maintenance is complete, coordinate with ship’s force to have associated equipment unlocked and/or tagged in per ship’s... |
| 7.4 Coordinate with Ship’s Force to tagout all lights, davits, cranes and machinery in way of the areas being worked. Plug all overboard discharges in way of surfaces being prepared and painted. |
| 7.5 Provide and erect staging required to access all applicable surfaces as identified in the base work item. |
| 7.6 Paint material will be stored within the Paint Manufacturer's recommended temperature range. When paint material is being applied, ensure that the material's temperature is within the Manufacturer's recommended range, but in any case, not less tha... |
| 7.7 Provide and maintain adequate lighting during all surface preparation, coating and inspection activities. |
| 7.8 Temporarily remove interferences, label plates and placards in way of surface preparation and paint application. Reinstall upon completion of all coatings work. Label plates that are riveted to the hull or otherwise permanently installed need not ... |
| 7.9 Prior to start of surface preparation and painting, take precautions to protect the vessel from contamination. Install drop cloths, masking, division shields, seals, blanks and filtering materials to prevent abrasives and foreign substances from e... |
| 7.9.1 Mask all normally unpainted surfaces |
| 7.9.2 Plug deck drains, deck sprinkler nozzles, and open pipes. |
| 7.9.3 Wrap all valve stems and exposed portions of motor shafts, and hydraulic cylinders. |
| 7.9.4 Install filter media on all tank vents and air intake vents. |
| 7.9.5 Install protective coverings on all installed equipment, port lights, windows, permanently installed label plates, light globes, switches and pushbuttons, vent screens and appurtenances not intended to be painted. |
| 7.9.6 Protect running rigging (cargo falls, davit falls, lifts, and cranes) and mooring lines which cannot be stowed or removed for the duration of non-skid removal. |
| 7.9.7 Protective covering will be inspected at regular intervals, but not less than the start of each work shift. Degraded covering will be repaired prior to restart of work. |
| 7.10 Surface Preparation |
| 7.10.1 Solvent Cleaning the Deckhouse using SSPC-SP6/NACE 3, as guidance, using biodegradable detergent to remove all dirt, oil, grease, soluble salts or other organic matter from the specified surfaces. Biodegradable cleaners or other eco-friendly me... |
| 7.10.2 Final wash-down will be made with clean, fresh water at 2,500 to 3,000 PSI. Upon completion of all water washing, chloride testing will be performed at a rate of no less than one test per 500 Square Feet of surface. |
| 7.10.3 The maximum allowable contamination concentrations will be less than 10 ug/cm2 of chloride contaminants as determined by field or laboratory analysis using reliable, reproducible test equipment. |
| 7.10.4 If contamination is found, additional water wash will be performed. Additional tests will be made as necessary to determine the extent of contamination and to prove the success of remediation. |
| 7.10.5 Method |
| a. N/A |
| b. Slurry blast using Reference 2.2; SSPC-SP6/NACE 3, Commercial Blast Cleaning as guidance the deckhouse area identified in 3.0 using SSPC-SP WJ-1/NACE WJ-1, Waterjet Cleaning of Metals; using Reference 2.2 as guidance. The surface profile achieved w... |
| 7.10.6 Where spot blasting has been specified, edges of adjacent intact coating will be feathered-in. |
| 7.10.7 No more than a light (L) grade flash rust will be allowed on the steel at the time of coating application. If heavier flash rust is present, the surface will be pressure washed at 2,500 to 3,000 PSI and allowed to air dry in order to restore th... |
| 7.10.8 Accomplish the requirements of SSPC-SP-11 Power Tool Clean to Bare Metal to any areas inaccessible to the abrasive blast including foundations, fan housings, hose racks, pad eyes, life ring clips, scupper extensions and other appendages in way ... |
| 7.10.9 After surface preparation, all surfaces will be blown down using clean dry air to remove all dust, dirt and debris. |
| 7.10.10 Regardless whether the surfaces are abrasive blasted, immediately prior to coating the surface will be re-tested for non-visual surface contaminates at a rate of no less than one test per 1,000 square foot of prepared area. The maximum allowab... |
| 7.11 Coatings Application |
| 7.11.1 Prior to application of any coating, the area to be painted will be inspected and approved by the OMT REP and the Paint Representative. This includes not only the initial coat of paint, but all subsequent coats as well. Inspection will include ... |
| a. type of surface preparation used |
| b. surface cleanliness |
| c. surface profile as determined by Keane-Tator Comparator (or equal) examination and/or replica tape |
| d. environmental conditions (surface temperature, ambient air temperature, dew point temperature and relative humidity) |
| e. over coating interval (curing time) since previous application |
| f. Dry Film Thickness (DFT) of previous coating taken at a rate of five per 1,000 square feet. DFT gages will be calibrated, spot readings will be taken and DFT tolerances will be using SSPC-PA2, Measurement of Dry Coating Thickness with Magnetic Gages. |
| 7.11.2 Ensure the following conditions are met prior to painting: |
| a. Surfaces will be clean, dry and free of oil, grease or residue from abrasive blasting. |
| b. Surface appearance meets the definition of SSPC-SP WJ-1 or SSPC-SP6/NACE 3, Metal Blast Cleaning. |
| c. Air and substrate temperatures will be within the range published by the paint manufacturer, see References 2.7 and 2.8. Surface temp during application and curing is acceptable down to: |
| 1. 23 F (-5 C) for the Amershield. |
| d. During application, the substrate temperature will be at least 5 F (3 C) above Dew Point. |
| e. The Relative Humidity is within the range set by the manufacturer, will not exceed 85%. |
| f. Condensation and/or rain is not to contact the uncured Amershield as it may change the color and gloss. |
| 7.11.3 No coating will be applied below 35 F (1.7 C) without prior written approval of the OMT REP. |
| 7.11.4 No coating will be applied between the hours of sunset and 0800 without prior written approval of the OMT REP. |
| 7.11.5 All coatings will be prepared and applied using the manufacturer’s requirements outlined in the Product Data Sheets, using Reference 2.7 as guidance. Random Wet Film Thickness (WFT) readings are to be taken during the application of coatings to... |
| 7.11.6 EPOXY |
| a. Apply the following 1st and 2nd Coats of Primer to all blasted and power tool cleaned surface. |
| b. One full coat of Amercoat 240, (red oxide) at 5-6 mils DFT. |
| c. One stripe coat of Amercoat 240, (off-white) at 2-3 mils DFT. |
| d. One full coat of Amercoat 240, (off-white) 5-6 mill DFT. |
| e. The stripe coat will be applied to all weldments, crevices, corners, edges and other areas not conducive to proper coverage. Stripe coats will extend a minimum of 2" from each edge of the area being stripe coated. |
| 7.11.7 POLYURETHANE |
| a. Apply One full top coat of Amershield, (haze gray) 3-4 mill DFT to the Deckhouse. |
| b. The environmental conditions, DFT of each coat, cure and over coating intervals are critical to the application. The application of all coatings will adhere to the Product Data Sheets and OMT Paint Rep. For weather conditions outside 35 F (1.7 C) t... |
| 7.12 During the course of all surface preparation and coating operations, the area involved will be roped off or otherwise barricaded to prevent entry by persons other than those directly involved in the work underway or those inspecting same. Such co... |
| 7.13 Upon completion the vessel will be cleaned of all residues resulting from the surface preparation and painting operations. Remove all protective coverings, debris and replace all interferences removed in the performance of this item. |
| 7.14 Upon completion of work, ship force will conduct final operational testing of ALL lights, speakers, flood and spot lights, sprinkler heads and drains in the vicinity of the deckhouse work completed. Contractor and ship force will compare "post wo... |
| 7.15 Reports |
| 7.15.1 When inspection, service and testing reveal any deficiency a condition report is to be submitted to the OMT REP with recommended repairs and parts required. Submit one electronic copy in Portable Document Format (PDF). |
| 7.15.2 All reports and checklists are to be completed and signed by the person who carried out the inspection and maintenance work and countersigned by the Company’s. |
| 7.15.3 Prepare a Paint Report and submit same to the OMT REP within three days of completing the coating application. The report will include the following data: |
| a. The location, date and time of each coating application. |
| b. The air and substrate temperatures, relative humidity and dewpoint temperature at the time of each coating application. |
| c. Interval between coatings. |
| d. Dry film thickness readings at a rate of five spot readings per 1,000 sq. ft. of surface for each coat of paint. DFT gages will be calibrated, and spot readings will be taken using SSPC-PA2, Measurement of Dry Coating Thickness with Magnetic Gages ... |
| e. Paint Manufacturer, Product Identification Number, color and Batch Numbers for each coat of paint applied. |
| f. Surface profile measurements of the metal substrate. |
| g. Results of testing for non-visible surface contaminants (soluble salts). |
| 7.16 Painting: None additional |
| 7.17 Manufacturer's Representative |
| 7.17.1 A Government Paint Technical Representative will be in attendance, on the government’s account, to observe the surface preparation and coating application on the government’s behalf and to advise the OMT REP as to the quality, and appropriatene... |
7.18 Preparation of Drawings: None additional
8.0 GENERAL REQUIREMENTS: None additional