Attachment I POP Memorandum.pdf
PDF 127 KB Posted
- Attached to
- USS SHOUP DDG-86 6J2 SIA
- Solicitation number
- N6264926RAA01
About this file
This document is a Farm Out B-1 TGI POP (Period of Performance) List for DDG86 6J2 SIA, revision 0, dated 7/28/2025. The list contains six specific naval repair and maintenance tasks scheduled from 9-Mar-26 to 24-Apr-26, all associated with the (6J2)(F/O) designation. The tasks include trunk CCIMS repair painting, VLS deck non-skid replacement, non-skid replacement on specific fast station areas, deck painting, CCS repair, and CIWS magazine structure repair. Each task has an identical start date of 9-Mar-26 and end date of 24-Apr-26, indicating a coordinated maintenance period. The document is prepared and digitally signed by T. KONUTA from C1209.3, with a digital signature timestamp of 2025-07-28.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDG86 6J2 SIA FARM OUT B-1 TGI POP LIST Revision-0 7/28/2025
ICNKO Description START DATE END DATE
38KC212333A01 (6J2)(F/O) 4-122-2-T TRUNK CCIMS-G1N6-DDG86-016-25 FND 1 RPR PAINT 9-Mar-26 24-Apr-26
38KC213701A01 (6J2)(F/O) AFT VLS DECK NON SKID REPL 9-Mar-26 24-Apr-26
38KC215301A01 (6J2)(F/O) NON-SKID ON NR 3 AND 4 FAS STA REPL 9-Mar-26 24-Apr-26
38KC255501A01 (6J2)(F/O) 1-300-1-Q CCIMS-G1N6-DDG86-024-25 FND 1 DECK PAINT 9-Mar-26 24-Apr-26
38KC265402A01 (6J2)(F/O) PRC DK IN CCS RPR 9-Mar-26 24-Apr-26
38KC271301A01 (6J2)(F/O) 01-300-1-M AFT CIWS MAG STR RPR 9-Mar-26 24-Apr-26
Prepared/Accepted by: C1209.3 T.KONUTA Signiture:
| 2025-07-28T13:24:16+0900 | |
| KONUTA.TAKASHI.1278795418 |
File details come from the government source that posted it. Updated .