This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS SHOUP (DDG-86), detailing a nonskid system replacement project. The work involves replacing the nonskid system on the 02 Level Weather deck area, specifically covering 3,950 square feet between frames 318 and 396 on both port and starboard sides, excluding the vertical launching system and areas with rubber tile. The procedure requires power tool cleaning to bare metal for vertical surfaces, conforming to MIL-PRF-24667, Type V, Composition G standards. The Ship Repair Facility (SRF-JRMC) will provide supporting services including crane rigging, utility services (electrical, water, steam), safety inspections, and quality assurance inspections. The job is scheduled for July 2025, with specific start and completion dates to be determined by the TGI POP (Period of Performance) List.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

16-JUL-2025 1100

20.14.15.2.9020 (September 2024) ICN: 38KC213701 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 02 LVL WEATHER DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC2 13700

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON 02 LVL WEATHER FRAMES BETWEEN 318 AND 396

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

CM012764

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TAKANASHI, TATSUNORI 231A 3152436238 03-JUL-2025

APPROVED BY: CODE: PHONE: DATE:

KOMATSU, SHUUHEI 231A 3152436786 04-JUL-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

CM01-2764

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 02 LVL WEATHER U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

137A0001

1. SCOPE/PURPOSE:

1.1 Title: Nonskid System on 02 Level Weather Frames between 318 and 396; replace

1.2 Location of Work:

1.2.1 02 Level Weather, Frames between 318 and 396, Port and Starboard (Stbd)

1.3 Identification:

1.3.1 Quantity (3,950 SF), 02 Level Deck Plating, Frames between 318 and 396, including vertical surface up to height of 4 inches from deck in and around nonskid deck area, Port and Stbd

Remarks: The area excepts exterior surface of vertical launching system and surface where rubber tile is installed.

1.4 Security Classification: None.

TGI Short Form

16-JUL-2025 1100

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC213701 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 02 LVL WEATHER DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC2 13700

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON 02 LVL WEATHER FRAMES BETWEEN 318 AND 396

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.5 Initial Condition: None.

1.6 Contractor work start date: See TGI POP List

1.7 Contractor work completion date: See TGI POP List

2. PROCEDURE:

2.1 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) 21, for each area listed in 1.3.1.

Application of nonskid system must conform to MIL-PRF-24667, Type V, Composition G.

2.1.1 Power tool clean to bare metal for each vertical surface. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of Ref. No. 3.

2.2 Notes:

2.2.1 Planner: Code 231A T. Takanashi, 243-6238

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 JCN CM01-2764 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38KC213701S02)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including water supply and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

16-JUL-2025 1100

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC213701 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 02 LVL WEATHER DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC2 13700

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON 02 LVL WEATHER FRAMES BETWEEN 318 AND 396

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 TM SYSTEMS &

SPECIFICATIONS

SSPC Painting Manual Volume

- N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KC213701 KEY OP: A01