B-1_CLN-1_38KC215301A01_TGI_c2v2.pdf
PDF 144 KB Posted
- Attached to
- USS SHOUP DDG-86 6J2 SIA
- Solicitation number
- N6264926RAA01
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS SHOUP (DDG-86), dated 18-JUL-2025, detailing a nonskid system replacement project. The scope involves replacing the nonskid system on Fueling at Sea (FAS) Station No. 3 and No. 4, covering approximately 790 square feet across multiple deck areas, including 400 SF on Station No. 3's starboard side, 390 SF on Station No. 4's port side, and an additional 28 SF on the CIWS Ammo Handling Platform. The work requires power tool cleaning to bare metal, conforming to MIL-PRF-24667, Type V, Composition G standards, and follows Surface Preparation Specification SSPC-SP 11. The SRF-JRMC will provide supporting services including crane rigging, utility services, safety inspections, and quality assurance inspections.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
18-JUL-2025 1559
20.14.15.2.9020 (September 2024) ICN: 38KC215301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FAS STA NO. 3 AND 4 AY A 0 2/2
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC2
CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON FAS STATION NO. 3 AND NO. 4
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
OD015058 * OD015059
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KANO, DAISUKE 231A 3152430098 10-JUL-2025
APPROVED BY: CODE: PHONE: DATE:
NAKAMURA, YUUJI 231A 3152436041 18-JUL-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
OD01-5058 * OD01-5059
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
153A1101
1 SCOPE/PURPOSE:
1.1 Title: Nonskid System on Fueling at Sea (FAS) Station No. 3 and No. 4; replace
1.2 Location of Work:
1.2.1 02 Level Weather, Frames between 111 and 139, Port and Starboard (Stbd)
1.2.2 01 Level Weather, Frames between 108 and 118, Port
1.3 Identification:
1.3.1 Quantity (400 SF), FAS Station No. 3, 02 Level Deck Plating, Frames between 111 and 139, including vertical surface up to height of 4 inches from deck in and around nonskid deck area, Stbd
1.3.2 Quantity (390 SF), FAS Station No. 4, 02 Level Deck Plating, Frames between 111 and 139, including vertical surface up to height of 4 inches from deck in and around nonskid deck area, Port
TGI Short Form
18-JUL-2025 1559
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC215301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FAS STA NO. 3 AND 4 AY A 0 2/2
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC2
CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON FAS STATION NO. 3 AND NO. 4
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.3.2 Quantity (28 SF), CIWS AMMO Handling Platform, Frames between 108 and 118, including vertical surface up to height of 4 inches from deck in and around nonskid deck area, Port
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date: See TGI POP List
1.7 Contractor work completion date: See TGI POP List
2 PROCEDURE:
2.1 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) 21, for each area listed in 1.3.1 through
1.3.3. Application of nonskid system must conform to MIL-PRF-24667, Type V, Composition G.
2.1.1 Power tool clean to bare metal for each vertical surface. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of Ref. No. 3.
2.2 Notes:
2.2.1 Planner: Code 231A D. Kano, 243-0098
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 JCNs OD01-5058 and OD01-5059 are related to this TGI.
2.3 Government Furnished Material (GFM): None.
2.4 SRF-JRMC will provide the following service work: (TGI No. 38KC215301S02)
2.4.1 [C740] Crane and crane rigging service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including water supply and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.4.6 [C133] QA inspection for (G) symbol(s).
18-JUL-2025 1559
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC215301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FAS STA NO. 3 AND 4 AY A 0 2/2
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC2
CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON FAS STATION NO. 3 AND NO. 4
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 TM SYSTEMS &
SPECIFICATIONS
SSPC Painting Manual Volume
- N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KC215301 KEY OP: A01