This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Shoup (DDG-86), specifically focused on preserving the bilge area in Trunk 4-122-2-T. The task involves pumping out, cleaning, and drying a 35 square foot bilge area located in the Escape Trunk, ensuring it is free from oil, debris, and foreign matter. Key procedural requirements include conducting a visual inspection of shell plating and margin plates for structural integrity, deterioration, pitting, cracks, and damage, and submitting an inspection report to the supervisor.

The TGI includes several supporting services to be provided by SRF-JRMC, such as crane and crane rigging service, utility services (electrical, low pressure air, water, and steam supply), safety and gas-free inspections, and quality assurance inspection for coating application. The work is in response to a specific CCIMS report and is associated with Job Control Number ES01-NP0V. The document indicates that contractor work start and completion dates should be referenced from the TGI POP (Period of Performance) List, and no government-furnished material is required for this task.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

05-AUG-2025 0940

20.15.6.0.9333 (July 2025) ICN: 38KC212333 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TRUNK 4-122-2-T MS A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC2 12321

CU PHASE TITLE: F/O – PRESERVE BILGE IN 4-122-2-T

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

ES01NP0V

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

KANO, DAISUKE 231A 3152430098 05-JUL-2025

APPROVED BY: CODE: PHONE: DATE:

NAKAMURA, YUUJI 231A 3152436041 05-AUG-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-NP0V

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 4-122-2-T 4 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A2133

1. SCOPE/PURPOSE:

1.1 Title: Bilge in 4-122-2-T; preserve

1.2 Location of Work:

1.2.1 Escape Trunk (4-122-2-T)

1.3 Identification:

1.3.1 Quantity (35 SF), Bilge Area in 4-122-2-T

Remarks: The area below grating level.

1.4 Security Classification: None.

1.5 Initial Condition:

TGI Short Form

05-AUG-2025 0940

20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC212333 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TRUNK 4-122-2-T MS A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC2 12321

CU PHASE TITLE: F/O – PRESERVE BILGE IN 4-122-2-T

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.5.1 Critical Coated Area: CCNY-DDG086-002-026 for the area listed in 1.3.1.

1.6 Contractor work start date: See TGI POP List

1.7 Contractor work completion date: See TGI POP List

2. PROCEDURE:

2.1 Pump out, clean and dry the bilge area located in 1.2.1 free from oil, debris, and other foreign matter.

2.2 Accomplish the requirements of 009-032 of Ref. No. One, including Table 3, Line(s) 13, for each area listed in 1.3.1.

2.2.1 Upon completion of surface preparation, accomplish visual inspection of each shell plating and margin plate, for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, using Ref. No. 3 and Ref. No. 4 for guidance.

2.2.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of

2.2.1 to the SUPERVISOR.

2.3 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.

2.4 Notes:

2.4.1 Planner: Code 231A D. Kano, 243-0098

Engineer: Code 250 Y. Gouriki, 243-4179

2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.4.3 Provision of oily/chemical water barge will be coordinated by Project Team.

2.4.4 This TGI is in response to CCIMS report No. CCIMS-G1N6-DDG86-016-25 from TGI No. 38KCA11006I02.

2.4.5 JCN ES01-NP0V is related to this TGI.

2.5 Government Furnished Material (GFM): None.

2.6 SRF-JRMC will provide the following service work: (TGI No. 38KC212333S02).

2.6.1 [C740] Crane and crane rigging service.

2.6.2 [X99E] Utility service, electrical.

2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.6.6 [C133] QA inspection for (G) symbol(s) and review of coating application data.

05-AUG-2025 0940

20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC212333 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TRUNK 4-122-2-T MS A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC2 12321

CU PHASE TITLE: F/O – PRESERVE BILGE IN 4-122-2-T

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

05-AUG-2025 0940

20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC212333 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TRUNK 4-122-2-T MS A 0 1/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC2 12321

CU PHASE TITLE: F/O – PRESERVE BILGE IN 4-122-2-T

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 DWG 100-7060380 UNIT STRL ARR DWG ASSY

UNIT 1420

B Y 7,8, 4 DWG 100-7060385 UNIT STRL ARR DWG ASSY

UNIT 2120

D Y 5-6

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KC212333 KEY OP: A01