This document is a Task Group Instruction (TGI) for repairing deck covering on the USS SHOUP (DDG-86), specifically in the Central Control Station and Damage Control Central area (1-268-0-C). The repair involves replacing 77 square feet of existing chemical-resistant flooring with a new chemical-resistant flooring system specified as MIL-PRF-32584, Type IV, in Navy blue color with white flake. An additional 83 square feet of deck plating, including vertical structural surfaces, will also be treated.

The work includes removal of existing equipment, installation of new flooring, and surface preparation. The SRF-JRMC (Ship Repair Facility-Japan Regional Maintenance Center) will provide supporting services such as crane and rigging, utility services, safety inspections, and quality assurance inspections. The task is scheduled for July 2025, with specific start and completion dates to be determined by the TGI POP (Period of Performance) List. A potential asbestos hazard is noted, and the work will follow specific procedural requirements from referenced standard items.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

16-JUL-2025 1119

20.14.15.2.9020 (September 2024) ICN: 38KC265402 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-268-0-C DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC2 66311

CU PHASE TITLE: *F/O – REPAIR DECK COVERING IN 1-268-0-C

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

EM044217

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

KANO, DAISUKE 231A 3152430098 05-JUL-2025

APPROVED BY: CODE: PHONE: DATE:

KOMATSU, SHUUHEI 231A 3152436786 07-JUL-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM04-4217

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 1-268-0-C 1 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

654A1102

1. SCOPE/PURPOSE:

1.1 Title: Deck Covering in 1-268-0-C; repair

1.2 Location of Work:

1.2.1 Central Control Station and Damage Control Central (1-268-0-C)

1.3 Identification:

1.3.1 Quantity (77 SF), Chemical-Resistant Floorings System [Existing] Remarks: See Sketch Enclosure-01 for location detail.

1.3.2 Quantity (77 SF), Chemical-Resistant Floorings System

Specification: MIL-PRF-32584, Type IV Color: 706 Navy blue color coat with white flake

TGI Short Form

16-JUL-2025 1119

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC265402 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-268-0-C DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC2 66311

CU PHASE TITLE: *F/O – REPAIR DECK COVERING IN 1-268-0-C

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.3.3 Quantity (83 SF), Deck Plating including vertical structural surface up to height of One inch from complete chemical-resistant floorings system level

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.6 Contractor work start date: See TGI POP List

1.7 Contractor work completion date: See TGI POP List

2. PROCEDURE:

2.1 Accomplish the requirements of 009-026 of Ref. No. One, including Attachment C, for removal of each existing equipment listed in 1.3.1 and installation of each new equipment listed in 1.3.2.

2.1.1 Accomplish the requirements of 009-032 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.3. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.

2.2 Notes:

2.2.1 Planner: Code 231A D. Kano, 243-0098

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 JCN EM04-4217 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38KC265402S02)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

16-JUL-2025 1119

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC265402 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-268-0-C DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC2 66311

CU PHASE TITLE: *F/O – REPAIR DECK COVERING IN 1-268-0-C

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38KC265402A01-Sketch.pdf 05-JUL-2025 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KC265402 KEY OP: A01

LOCATION MAP OF REPLACEMENT

DECK COVERING AREA IN CCS (1-268-0-C)

38KC265402A01

SKETCH

ENCLOSURE-01 SHEET 1 of 1

Central Control Station and Damage Control Central (1-268-0-C)

Daisuke.Kano.ja Line

Daisuke.Kano.ja_1 Rectangle