This is a Task Group Instruction (TGI) for naval ship maintenance work on the USS HOWARD (DDG-83). The TGI, numbered 02 LVL WEATHER AY A 0, specifies the replacement of a stuffing tube and nonskid system located on the 02 Level Weather deck, Starboard side, between frames 242 and 316, with work including the Pressure Lock (01-330-3-L) and Passage (01-314-01-L). The scope involves removing and installing one dimmer switch (Symbol 951.1), two stuffing tubes for the dimmer switch, and two Electromagnetic Pulse (EMP) Protection Assemblies, along with applying nonskid coating to 520 square feet of deck plating in accordance with MIL-PRF-24667, Type V, Composition G. The contractor work schedule runs from November 30, 2026, to March 1, 2027.
The instruction identifies Government Furnished Material (GFM) including various stuffing tube components, box hub fittings and couplings, flexible conduit, and electrical control items, with all materials specified by stock number and material composition (primarily CRES-316L stainless steel). Related service work provided by SRF-JRMC includes crane and rigging services, electrical and utility services, safety and gas-free inspections, and QA inspections. Critical special requirements note that work affects a fire zone boundary, necessitating fabrication and staging of a non-flammable closure in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The instruction contains change control indicating correction to Reference No. 3 effective June 11, 2026. Physical inspection is not required for completion acceptance, though records review is mandatory. The work involves potential asbestos hazard mitigation and incorporates multiple engineering and installation standards including SSPC painting specifications and MIL-STD references.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: 02 LVL WEATHER AY A 0 1
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-83 USS HOWARD JC3
CU PHASE TITLE:
F/O - REPLACE STUFFING TUBE AND NONSKID SYSTEM IN 02 LEVEL WEATHER
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
SEIICHI NAKANO 231B. 315-243-4519 21-MAY-2026
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 21-MAY-2026
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
The revision for Reference No. 3 was incorrect.
CHANGE INSTRUCTIONS:
CH1: Correct Reference No. 3. (6/11/2026)
SPECIAL REQUIREMENTS:
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: 02 LVL WEATHER AY A 0
FOUO
SHIP: DDG-83 CHG/VER: 1/2
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-4 Sketch (1)
J-1 M1-2 Engrg Inst (1-3)
1. SCOPE/PURPOSE
1.1 Title: Stuffing Tube and Nonskid System in 02 Level Weather; replace
1.2 Location of Work:
1.2.1 02 Level Weather, Frames between 330 and 332, Starboard (Stbd)
1.2.2 02 Level Weather, Frames between 242 and 316, Stbd
1.2.3 Pressure Lock (01-330-3-L)
1.2.4 Passage (01-314-01-L)
1.3 Identification:
1.3.1 Quantity (One EA), Dimmer Switch
Symbol: 951.1 Remarks: See Engrg Inst Enclosure-01 for more detail
1.3.2 Quantity (2 EA), Stuffing Tube for Dimmer Switch
Remarks: See Engrg Inst Enclosure-01 for more detail
1.3.3 Quantity (2 EA), Electromagnetic Pulse (EMP) Protection Assembly for Dimmer Switch
Remarks: See Engrg Inst Enclosure-01 for more detail
1.3.4 Quantity (520 SF), 02 Level Deck Plating, Frames between 242 and 316, including vertical surface up to height of 4 inches from deck in and around nonskid deck area and scuttle 02-274-1 and foundation, Stbd
Remarks: See Sketch Enclosure-02 for details.
The areas except louvers and surface where rubber tile is installed.
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.6 Contractor work start date: 11/30/2026
1.7 Contractor work completion date: 3/1/2027
FOUO
SHIP: DDG-83 CHG/VER: 1/2
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-27 NAVSEA Standard Items - 2 N 2 LI FY-27 Local Standard Items - ORG N
3 PDD 300-
ELM-230313
SRF-JRMC STD ELM
INSTALLATION OF STEEL &
CRES STUFFING TUBE
A Y AL
L
4 TM
SYSTEMS &
SPECIFICAT
IONS
SSPC Painting Manual Volume 2 - N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “T” TGI Special Tooling/Equipment
3.4. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Remove existing and install new equipment listed in 1.3.1, stuffing tube listed in 1.3.2 and EMP protection assembly listed in 1.3.3 in accordance with Enclosure-01 and 2.3.
5.1.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) D, Lines One through 7.
5.1.2 Accomplish the requirements of 009-025 of 2.1 for a local air hose test of each new weld of stuffing tube.
Allowable leakage: None.
5.2 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) 46, for each new equipment listed in 1.3.1.
5.2.1 Hand tool clean each equipment. Accomplish each requirement of Surface Preparation Specification SSPC-SP 2 of 2.4.
5.3 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) 21, for each area listed in 1.3.4.
Application of nonskid system must conform to MIL-PRF-24667, Type V, Composition G.
5.3.1 Power tool clean to bare metal for each vertical surface. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of 2.4.
5.4 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
5.5 Notes:
5.5.1 Planner: Code 231B S. Nakano, 243-4519
Planner: Code 233 K. Kondo, 080-9899-1997 Engineer: Code 270 H. Watanabe, 243-4355 Engineer: Code 250 Y. Gouriki, 243-4179
C1209.3 Shimizu, 11120180, SS, 7/1/2026
Shinya.Shimizu.ja Line
FOUO
SHIP: DDG-83 CHG/VER: 1/2
5.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.5.3 Removal and installation of rubber tile on dimmer switch will be covered by TGI No(s). 38JC363403U01 and
38JC363403R01 (SRF-JRMC TGI).
5.5.4 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.5.5 JCNs CM02-L051 and EB14-1086 are related to this TGI.
5.6 Government Furnished Material (GFM):
5.6.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.7 SRF-JRMC will provide the following service work: (TGI No. 38JC363403S02)
5.7.1 [C740] Crane and crane rigging service.
5.7.2 [X99E] Utility service, electrical.
5.7.3 [X99M] Utility service, including water supply, steam supply and low pressure air supply except on board blasting work.
5.7.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.7.6 [C133] QA inspection for (G) symbol(s).
FOUO
M-1
SHIP: DDG-83 CHG/VER: 1/2
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
02 LVL WEATHER AY A 0 2
CU PHASE TITLE:
F/O - REPLACE STUFFING TUBE AND NONSKID SYSTEM IN 02 LEVEL WEATHER
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38JC363403 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
300 M STUFFING, ORIG C233
K.KONDO 080-9899-1997
ORDERED FOR KTR
9B 5975 016209534 NA 4 N 61365013 2/EA
301 M BOX CONN, ORIG C233
K.KONDO 080-9899-1997
ORDERED FOR KTR
9B 5975 015716960 NA 4 N 61365015 2/EA
302 M STUFFING, ORIG C233
K.KONDO 080-9899-1997
ORDERED FOR KTR
9B 5975 016209475 NA 4 N 61365016 2/EA
303 M CONDUIT,METAL,FLEXI, ORIG
C233 K.KONDO 080-9899-1997
ORDERED FOR KTR
9B 5975 016569646 NA 4 N 61365022 10/FT
304 M CONTROL,ELECTRIC LI, ORIG
C233 K.KONDO 080-9899-1997
ORDERED FOR KTR
3B 6220 015747893 NA 4 N 61365031 1/EA
NOTES:
FOUO
M-2
SHIP: DDG-83 CHG/VER: 1/2
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
305 M STUFFING, STUFFING TUBE,
COMPLETE WITH GLAND NUT
AND GLAND RING, FOR DECK,
SPEC: MIL-S24235/18MOD,
M24235/18-061MOD, MODIFY
MATERIAL TO CRES-316L
SIZE-A,
11" LENGTH,
MATL: CRES-316L
ORIG C233 K.KONDO 080-9899-
ORDERED FOR KTR
9G 5975 LL4462796 NA 4 N 61367406 2/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-83 02 LVL WEATHER AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38JC363403 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-83 02 LVL WEATHER AY A 0
REFERENCES: ASTERISKED (*) REFERENCES ARE NOT REQUIRED FOR PRODUCTION WORK
*( a). DDG51 CL-331-7027512 "G": ONE LINE DIAGRAM LIGHTING SYSTEM *(b). DDG51CL-301-7027077 "E": INSTL ELEC & ELEX EQUIPMENT DESIGN ZONE 4720 02 LVL, FR 314-338 *(c). DDG51CL-150-7026732 "H": UNIT STRL ARR DWG ASSY UNIT 4710 *(d). DDG51CL-600-7026502 "F": HULL OUTFIT INSTALL ZONE 4720 FR 317-FR 338 (e). ELM-STD-300-230313 "A": SRF-JRMC STD ELM INSTALLATION OF STEEL & CRES STUFFING TUBE (f). NAVSEA S9AAO-AB-GOS-
010/GSO REV 12: GENERAL SPECIFICATIONS FOR OVERHAUL OF SURFACE SHIPS
NOTES:
1. DRAWING LEGENDS FOR CABLE AND EQUIPMENT ARE AS FOLLOW: PHANTOM LINES (--) REPRESENT EXISTING, SOLID LINES (----) REPRESENT NEW OR RELOCATED, AND HATCH LINES Wil'.I) REPRESENT TO BE REMOVED UNLESS
OTHERWISE NOTED.
2. ALL ABBREVIATIONS ARE IN ACCORDANCE WITH ASME Y14.38.
3. ELECTRICAL EQUIPMENT AND CABLING SHALL BE INSTALLED IN ACCORDANCE WITH MIL-STD-2003B(SH).
4. EQUIPMENT SHALL BE BONDED/GROUNDED IN ACCORDANCE WITH MIL-STD-1310H(NAVY).
5. TEMPLATE ALL WORK FROM SHIP AND EQUIPMENT.
TEST NOTE:
T-1. AFTER COMPLETION OF WORK, AIR HOSE TEST SHALL BE CONDUCTED APPLYING THE METHOD ON PARAGRAPH 192f
OF REF (f) OR NAVSEA STD ITEM 009-025.
MATERIAL LIST
ITEM DESCRIPTION QTY TYPE/SPEC NSN/MATL REMARKS NO
STUFFING TUBE SWIVEL, STRAIGHT,
2 EA MIL-PRF-24758
5975-01-620-9534 P /N: AX0685-2816-SP
TUBE SIZE A, CONDUIT SIZE 16 /CRES 316 CAGE: 05593 OR EQL
2 BOX HUB FITTING, 2 EA MIL-PRF-24758
5975-01-571-6960 P/N: AX0772-20-SP
ADAPTER SIZE 20 /CRES 316 CAGE: 05593 OR EQL
BOX HUB COUPLING, STRAIGHT,
2 EA MIL-PRF-24758
5975-01-620-9475 P /N: AX0737-2016-SP
ADAPTER SIZE 20, CONDUIT SIZE 16 /CRES 316 CAGE: 05593 OR EQL
4 FLEX CONDUIT, SIZE 16 10 FT MIL-PRF-24758
5975-01-656-9646 P /N: CC261-16
/- CAGE: 05593
5 DIMMER, SYM 951.1 MOD (SYM 6422) 1 EA
6220-01-574-7893
STUFFING TUBE, SIZE A, LG=12.5" MIL-S-24235/18
- P /N: OA1SSC 6 2 EA /CRES CAGE: 63044 OR EQL
ENGRG INST
38JC363403A01
ENCLOSURE-01
Sheet 1 of 3
EMP ASSY
(REPLACE)
CBL CKT (01-294-1)-1L-J(5)
INSTL SEE DET 3-A
. STUFFING TUBES
(REPLACE)
INSTL SEE DET 3-A
EMP ASSY
_,.~ (REPLACE)
•. 'CBL CKT (01-294-1)-1L-J(6)
INSTL SEE DET 3-A
SECTION 2-A
REPLACE
(REPLACE)
INSTL SEE DET 3-A
02 LVL, WD, FR 330, STBD, CL OFF SET 20'-3", LKG AFT
-SCALE: NONE-
ENGRG INST
FWD
REF LINE
38JC363403A01 ENCLOSURE-01 Sheet 2 of 3
02 LVL DK
DIMMER
(ITEM 5)
BOX HUB FITTING
(ITEM 2)
BOX HUB COUPLING
(ITEM 3)
EMP CONDUIT
(ITEM 4)
STFG TUBE SWIVEL
(ITEM 1)
STFG TUBE
(ITEM 6)
INSTL SEE REF (e)
DET 3-A (TYP)
INSTALLATION
EMP ASSY FOR
CBL CKT (01-294-1)-1L-J(5) & (01-294-1)-1L-J(6)
-SCALE: NONE-
ENGRG INST
38JC363403A01
ENCLOSURE-01
Sheet 3 of 3
38JC363403A01 SHEET 1 OF 1
SKETCH
ENCLOSURE-02
LOCATION DETAIL OF NONSKID REPLACEMENT AREA
PLAN VIEW
02 LEVEL WEATHER
FR.316 FR.242
- NONSKID REPLACEMENT AREA
LEGEND