This document is a WebAIM Short Form Task Group Instruction (TGI) for maintenance and preservation work on the USS HOWARD (DDG-83), a naval destroyer.

The work involves preservation of an array antenna enclosure and replacement of the nonskid system on the 05 Level Weather deck. Two distinct work areas totaling 475 square feet are identified: the 05 Level Deck Plating between Frames 130-148 (285 SF) on Port and Starboard sides, and the Top Surface of the Array Antenna Enclosure between Frames 153-170 at 83 feet 2 inches above base line (190 SF) on Port and Starboard sides. The contractor work period runs from November 30, 2026, through March 1, 2027. The procedures require accomplishment of NSI FY-27 standard items specifications, including power tool cleaning to bare metal for vertical surfaces per SSPC-SP 11 surface preparation specifications, and application of nonskid system conforming to MIL-PRF-24667, Type V, Composition G. The work location, scope, and technical requirements are detailed in Sketch Enclosure-01, which provides plan view diagrams and photographs of the affected areas. Supporting infrastructure services will be provided by SRF-JRMC, including crane and rigging services, electrical and utility services, safety and gas-free inspections, and QA inspections. The document was prepared by N. Kurokawa (Code 231B) and approved by S. Nakano (Code 231B) on May 7, 2026, with Work Integration Manager T. Yaginuma overseeing execution.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

06-JUN-2026 1104

20.16.6.0.9631 (May 2026) ICN: 38JC363401 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 05 LVL WEATHER AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC3

CU PHASE TITLE: *F/O - ACCOMPLISH PSVTN OF ARRAY ANT ENCL & REPLT OF NONSKID SYS ON 05 LVL WEA

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

CE03L040

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

KUROKAWA, NAOKI 231B 3152430108 07-MAY-2026

APPROVED BY: CODE: PHONE: DATE:

NAKANO, SEIICHI 231B 3152434519 07-MAY-2026

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

CE03-L040

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

634A1101

1. SCOPE/PURPOSE:

1.1 Title: Preservation of Array Antenna Enclosure and Replacement of Nonskid System on 05 Level Weather; accomplish

1.2 Location of Work:

1.2.1 05 Level Weather, Frames between 130 and 148, Port and Starboard (Stbd)

1.2.2 05 Level Weather, Frames between 153 and 170, 83 Feet 2 Inches Above Base Line (ABL), Port and Stbd

1.3 Identification:

1.3.1 Quantity (285 SF in Total), 05 Level Deck Plating, Frames between 130 and 148, including vertical surface up to height of 4 inches from deck in and around nonskid deck area, Port and Stbd

Remarks:

See Sketch Enclosure-01 for location detail The area except antenna foundation flange and where rubber tile is installed

TGI Short Form

06-JUN-2026 1104

20.16.6.0.9631 (May 2026) (Continued) ICN: 38JC363401 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 05 LVL WEATHER AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC3

CU PHASE TITLE: *F/O - ACCOMPLISH PSVTN OF ARRAY ANT ENCL & REPLT OF NONSKID SYS ON 05 LVL WEA

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (190 SF in Total), Top Surface of Array Antenna Enclosure, 05 Level Weather, Frames between 153 and 170, 83 Feet 2 Inches ABL, including vertical surface up to height of 4 inches from top plating, Port and Stbd

Remarks:

See Sketch Enclosure-01 for location detail The area except antenna foundation flange

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor Work start date: 11/30/2026

1.7 Contractor Work completion date: 3/1/2027

2. PROCEDURE:

2.1 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) 21, for each area listed in 1.3.1.

Application of nonskid system must conform to MIL-PRF-24667, Type V, Composition G.

2.1.1 Power tool clean to bare metal for each vertical surface. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of Ref. No. 3.

2.2 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) One, for each area listed in 1.3.2.

2.3 Notes:

2.3.1 Planner: Code 231B N. Kurokawa, 243-0108

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

2.3.3 JCN CE03-L040 is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC will provide the following service work: (TGI No. 38JC363401S02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including water supply and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbol(s).

06-JUN-2026 1104

20.16.6.0.9631 (May 2026) (Continued) ICN: 38JC363401 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 05 LVL WEATHER AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC3

CU PHASE TITLE: *F/O - ACCOMPLISH PSVTN OF ARRAY ANT ENCL & REPLT OF NONSKID SYS ON 05 LVL WEA

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

06-JUN-2026 1104

20.16.6.0.9631 (May 2026) (Continued) ICN: 38JC363401 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 05 LVL WEATHER AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC3

CU PHASE TITLE: *F/O - ACCOMPLISH PSVTN OF ARRAY ANT ENCL & REPLT OF NONSKID SYS ON 05 LVL WEA

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-27 NAVSEA Standard Items - 2 N 2 LI FY-27 Local Standard Items - ORG N

3 TM SYSTEMS &

SPECIFICATIONS

SSPC Painting Manual Volume

- N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38JC363401A01-Sketch.pdf 07-MAY-2026 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38JC363401 KEY OP: A01

PLAN VIEW

05 LVL WEA

Sheet 1 of 138JC363401A01

SKETCH

ENCLOSURE-01

Naoki.Kurokawa.ja Polygon

Naoki.Kurokawa.ja_1 Polygon

Naoki.Kurokawa.ja_2 Polygon

Naoki.Kurokawa.ja_3 Polygon

Naoki.Kurokawa.ja_4 Typewritten Text

FWD

File details come from the government source that posted it. Updated .