This is a WebAIM Short Form Task Group Instruction (TGI) for maintenance and preservation work on USS HOWARD (DDG-83). The document specifies preservation work on a flush cover plate and foundation of an Indicator Stabilization Data (ISD) system located in 02 Level Weather, Frames 394-398, at the ship's centerline.

The scope includes removal and reinstallation of one flush cover plate (13-1/2 inches x 16-1/2 inches steel) with new gasket and screw, along with surface preservation of 21 square feet of ISD foundation (outside and inside surfaces) and 3 square feet of deck plating interior surface, all constructed of steel. Contractor work is scheduled to commence November 30, 2026, and conclude March 1, 2027. The work requires compliance with preservation standard 009-032 per Reference No. 1 (NSI FY-27 NAVSEA Standard Items). Government Furnished Material will be provided by SRF-JRMC, including 20 self-locking flat head hex socket screws (ASTM F468, Alloy 500 Mod, 1/4"-20UNC-2A x 1") and 1 square yard of solid rubber sheet. SRF-JRMC will also provide ancillary services including crane and rigging, electrical utility, water/steam/compressed air supply, safety inspections, gas-free inspections, and QA inspection for work requiring certification. Related work for ISD bonding surfaces is covered under separate TGI No. 38JC349201R01.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

12-JUN-2026 0852

20.16.6.0.9631 (May 2026) ICN: 38JC349201 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CV PL & FDN OF ISD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC3

CU PHASE TITLE: F/O - PRESERVE FLUSH COVER PL & FOUNDATION OF ISD IN 02 LVL WEA, FR 394 - 398

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EE023558

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

ASHINA, TAKAAKI 231B 3152434370 04-JUN-2026

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 04-JUN-2026

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EE02-3558

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

492A6101

1. SCOPE/PURPOSE:

1.1 Title: Flush Cover Plate and Foundation of Indicator Stabilization Data (ISD) in 02 Level Weather, Frames between 394 and 398; preserve

1.2 Location of Work:

1.2.1 02 Level Weather, Frames between 394 and 398, Ship’s Center Line

1.3 Identification:

1.3.1 Quantity (One EA), Flush Cover Plate on Foundation of ISD in 02 Level Weather, Frames between 394 and 395, Ship's Center Line

Size: 13-1/2 Inches x 16-1/2 Inches Material: Steel

TGI Short Form

12-JUN-2026 0852

20.16.6.0.9631 (May 2026) (Continued) ICN: 38JC349201 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CV PL & FDN OF ISD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC3

CU PHASE TITLE: F/O - PRESERVE FLUSH COVER PL & FOUNDATION OF ISD IN 02 LVL WEA, FR 394 - 398

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (21 SF), Outside and Inside Surface of Foundation of ISD in 02 Level Weather, Frames between 394 and 398, Ship’s Center Line

Material: Steel Remarks: The area except bonding surfaces of ISD

1.3.3 Quantity (3 SF), Deck Plating Inside Surface of Foundation of ISD in 02 Level Weather, Frames between 394 and 396, Ship’s Center Line

Material: Steel

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 11/30/2026

1.7 Contractor work completion date: 3/1/2027

2. PROCEDURE:

2.1 Remove each existing flush cover plate listed in 1.3.1, using Ref. No. 3 for guidance.

2.1.1 Remove existing gasket.

2.2 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) One, for each equipment and area listed in 1.3.1 through 1.3.3. See 2.5.3 and 2.5.4.

2.3 Reinstall each flush cover plate listed in 1.3.1 in accordance with Ref. No. 3.

2.3.1 Fabricate and install new gasket conforming to material list of Ref. No. 3.

2.3.2 Install new screw conforming to material list of Ref. No. 3.

2.4 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.

2.5 Notes:

2.5.1 Planner: Code 231B T. Ashina, 243-4370

2.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

2.5.3 Preservation work for ISD bonding surfaces of each foundation listed 1.3.2 will be covered by TGI No(s). 38JC349201R01

(SRF-JRMC TGI).

2.5.4 Detail ISD bonding surface area will be provided by SRF-JRMC Shop X51C.

2.5.5 JCN EE02-3558 is related to this TGI.

12-JUN-2026 0852

20.16.6.0.9631 (May 2026) (Continued) ICN: 38JC349201 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CV PL & FDN OF ISD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC3

CU PHASE TITLE: F/O - PRESERVE FLUSH COVER PL & FOUNDATION OF ISD IN 02 LVL WEA, FR 394 - 398

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

2.6 Government Furnished Material (GFM):

2.6.1 SRF-JRMC will provide GFM listed in the Material List.

2.7 SRF-JRMC will provide the following service work: (TGI No. 38JC349201S02).

2.7.1 [C740] Crane and crane rigging service.

2.7.2 [X99E] Utility service, electrical.

2.7.3 [X99M] Utility service, including water supply, steam supply, and low pressure air supply except onboard blasting work.

2.7.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.7.6 [C133] QA inspection for (G) symbol(s).

12-JUN-2026 0852

20.16.6.0.9631 (May 2026) (Continued) ICN: 38JC349201 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CV PL & FDN OF ISD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC3

CU PHASE TITLE: F/O - PRESERVE FLUSH COVER PL & FOUNDATION OF ISD IN 02 LVL WEA, FR 394 - 398

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-27 NAVSEA Standard Items - 2 N 2 LI FY-27 Local Standard Items - ORG N

3 DWG 180-7026399 FDN ARR DWG DSGN ZONE

3250 BKLT NO. 2

G Y 5D

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M SCREW, FLAT HD, SCREW,

FLAT HD, HEX SOCKET, 82

DEGREES COUNTERSUNK,

SPEC: ASTM F468, ALLOY 500

MOD(SELF-LOCKING),

SIZE: 1/4"-20UNC-2A X

1"LGMATL: NICKEL COPPER

ALUMINUM ALLOY 500(UNS

N05500), LOCKING ELEMENT: MIL-DTL-

18240 TYPE P(PATCH)

ORIG: C231B T. ASHINA 243-

4370, ORDERED FOR KTR

9B 5305 LL9008546 NA 4 N 61507421 20/EA

002 M RUBBER SHEET,SOLID, ORIG:

C231B T. ASHINA 243-4370,

ORDERED FOR KTR

9B 9320 002449278 NA 4 N 61425142 1/SY

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38JC349201 KEY OP: A01