This is a Contractor Questions form used by NAVSUP Fleet Logistics Center Yokosuka to process inquiries from contractors regarding solicitation N6264926R0011. The form is divided into two sections: an upper section for contractor submission and a lower section restricted for NAVSUP FLCY internal use only.

The contractor question pertains to socket welding requirements specified across 55 datasheets within the solicitation, specifically addressing pipe wall thickness of 0.1875 inches or less. The contractor inquires whether it is feasible to switch from socket welding to a Lock ring system and requests exclusion of Lock ring penetrations from the scope of work for areas requiring the same pipe wall thickness. The NAVSUP FLCY technical review explicitly does not concur with either proposed change, stating that the SRF (Source Review Form) does not support switching from socket welding to a lock ring system and does not support exclusions of these penetrations from the scope of work. The NAVSUP FLCY Response section remains blank in this document, indicating the response was either not yet provided or is to be completed separately.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926R00110008 SF30.pdf PDF
Solicitation Amendment - N6264926R00110008 Conformed Copy.pdf PDF
Revised_Attachment 5_RUS 7C1 SRA PERL (Rev. 1).xlsx XLSX spreadsheet
Solicitation Amendment - N6264926R00110007 Conformed Copy.pdf PDF
Solicitation Amendment N6264926R00110007 SF30.pdf PDF
Solicitation Amendment N6264926R00110006 SF30.pdf PDF
Solicitation Amendment - N6264926R00110006 Conformed Copy.pdf PDF
Solicitation Amendment N6264926R00110005 SF30.pdf PDF
Solicitation Amendment - N6264926R00110005 Conformed Copy.pdf PDF
Attachment 2_Price Proposal Sheet N6264926R0011 (Rev. 3).xlsx XLSX spreadsheet
Solicitation Amendment N6264926R00110004 Conformed Copy.pdf PDF
Solicitation Amendment N6264926R00110004 SF30.pdf PDF
Attachment 2 Price Proposal Breakdown Sheet N6264926R0011 (Rev. 2).xlsx XLSX spreadsheet
Attachment 7_Contractor Questions 1.pdf PDF
Attachment 2_Price Proposal Breakdown Sheet N6264926R0011 (Rev. 1).xlsx XLSX spreadsheet
Solicitation Amendment N6264926R00110002 Conformed Copy.pdf PDF
Solicitation Amendment N6264926R00110002.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A010 KTR Deficiency Reporting.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A008 Temporary Services.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A004 Daily Report.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A002 Quality Assurance Program Plan.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A001 GFM Not.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A009 Fire Safety Council.pdf PDF
Attachment 4_Milestones and Key Events List (RUS 7C1).pdf PDF
Attachment 3_Contractor Questions.pdf PDF
Attachment 2_Price Proposal Breakdown Sheet N6264926R0011.xlsx XLSX spreadsheet
Solicitation Amendment N6264926R00110001.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A005 Weekly Progress Report.pdf PDF
Attachment 6_PPI Contract Data Sheet(s) N6264926R0011.docx DOCX document
Attachment 5_RUS 7C1 SRA PERL.xlsx XLSX spreadsheet
Solicitation - N6264926R0011.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A007 Key Events Report.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A006 Conference Reports.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A003 IPS.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A005 Weekly Progress Report.pdf PDF
Attachment 2_Price Proposal Breakdown Sheet N6264926R0011.xlsx XLSX spreadsheet
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A006 Conference Reports.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A002 Quality Assurance Program Plan.pdf PDF
Attachment 4_Milestones and Key Events List (RUS 7C1).pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A008 Temporary Services.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A001 GFM Not.pdf PDF
Attachment 6_PPI Contract Data Sheet(s) N6264926R0011.docx DOCX document
Attachment 5_RUS 7C1 SRA PERL.xlsx XLSX spreadsheet
Solicitation - N6264926R0011.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A010 KTR Deficiency Reporting.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A009 Fire Safety Council.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A007 Key Events Report.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A004 Daily Report.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A003 IPS.pdf PDF
Attachment 3_Contractor Questions.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR QUESTIONS

DATE OF REQUEST: _________________________ SOLICITATION NO: __________________________ CONTRACTOR POC: _________________________ NAVSUP FLCY POC: _________________________ PHONE: ____________________________________ PHONE: ____________________________________ E-MAIL: ____________________________________ E-MAIL: ____________________________________ CONTRACTOR QUESTION(s):

DO NOT WRITE BELOW THIS LINE

(For NAVSUP FLCY Use Only)

TECHNICAL REVIEW:

NAVSUP FLCY RESPONSE:

DATE OF REQUEST:
SOLICITATION NO: N6264926R0011
CONTRACTOR POC:
NAVSUP FLCY POC: Miyuki Martone
PHONE:
PHONE_2: 0956-50-2853
EMAIL:
EMAIL_2: miyuki.martone2.ln@us.navy.mil
CONTRACTOR QUESTIONs: With respect to the socket welding requirements outlined in multiple datasheets among the 55 specifications, specifically where the pipe wall thickness is 0.1875 inches or less, we would like to inquire if it is feasible to switch from socket welding to a Lock ring system.

Furthermore, as Lock ring cannot be utilized for penetration areas that require the same pipe wall thickness, could we kindly request that these penetrations be excluded from the scope of work?

TECHNICAL REVIEW: SRF does NOT concur with switching from socket welding to a lock ring system.

SRF does NOT concur with these exclusions from the penetrations scope of work.

NAVSUP FLCY RESPONSE: