Attachment 2 Price Proposal Breakdown Sheet N6264926R0011 (Rev. 2).xlsx
XLSX spreadsheet 423 KB Posted
- Attached to
- USS RUSHMORE (LSD-47) 7C1 SRA 52pkg
- Solicitation number
- N6264926R0011
About this file
This is a Price Proposal Breakdown Sheet (Revision 2) for a Navy ship repair and maintenance contract for the USS RUSHMORE (LSD-47). The solicitation number is N6264926R0011, issued by NAVSUP Fleet Logistics Center Yokosuka, with performance at Commander Fleet Activities Sasebo (CFAS), India Basin, Japan. The contract covers 54 Individual Contracting Numbers (ICNs) bundled under CLIN 0001, with a Growth CLIN (CLIN 0002) representing 16.27% of the total proposed cost for CLIN 0001. The vessel availability window is October 12, 2026 through June 14, 2027 (7C1 Availability period). The work encompasses repair, preservation, and maintenance of various ship systems including ballast tanks, waste management tanks, bilge areas, machinery room components, main propulsion diesel engines (MPDE), and ventilation systems. Prices are quoted in Japanese Yen (JPY).
The breakdown sheet requires offerors to submit detailed labor cost estimates (both in-house and subcontractor man-hours), material costs, and other direct costs (ODC) for each individual ICN. Labor categories include Surface Finishing (SFTR), Installation (INSL), Welding (WELD), Sheet Metal (SMTL), Repairs (RGRS), Painting (PNTR), Electrical (ELEC), Pipe Fitting (PFTR), Quality Assurance (QA), and other specialized work. The proposal deadline was July 29, 2026 at 10:00 AM Japan Standard Time for ABR/MSRA holders. Award will be made as a firm fixed-price job order to qualified contractors possessing an active Master Agreement for Repair and Alteration of Vessels (MARAV), such as a Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) in the Japan Region.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
Offeror / Company Name: Rev. 2
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | Other Cost | Proposed Price |
| Solicitation No: | N6264926R0011 | CLIN 0001 (54 ICNs) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| Ship Name: | USS RUSHMORE (LSD-47) | CLIN 0002 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| Availability: | 10/12/2026 - 06/14/2027 (7C1 Availability) | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Total Work Item (Specify) | 54 | Total Evaluated Price | ¥0 |
| Growth CLIN % | 16.27% | Fully Burdened Labor Rate (In House) | ¥0 |
| Note to Offerors: The values in this "SUMMARY" table is linked to the corresponding data from Tabs for each ICN listed, manual input is not necessary. | |||||||||
| No. | ICN No. | Description | Proposed Labor | Material / Other | Proposed Price (JPY) | ||||
| In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | Other Cost (JPY) | ||||
| 1 | 38E9312306R_00_A01 | ACCESSIBLE VOID 6-56-4-V; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 38E9312315R_00_A01 | DECK PLATING ON MMR NO.ONE UPPER LEVEL; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 38E9312317R_00_A01 | BILGE AREA IN FWD SHAFT ALLEY; PRESERVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | 38E9312318_00_A01 | WASTE WATER DRAIN COLLECTING TANK 6-61-2-W; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 38E9312319R_00_A01 | BILGE AREA IN MAIN MACHINERY ROOM NUMBER 2; PRESERVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | 38E9312324R_00_A01 | DECK SURFACE IN 3-74-1-E; PRESERVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | 38E9312326R_00_A01 | JP-5 SERVICE TANK 6-98-5-J; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 8 | 38E9312327_00_A01 | WASTE WATER DRAIN COLLECTING TANK 6-83-1-W; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 9 | 38E9312328_00_A01 | BALLAST TANK 6-81-3-W; REPAIR AND PRESERVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 10 | 38E9312329_00_A01 | BALLAST TANK 6-89-1-W; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 11 | 38E9312330R_00_A01 | BALLAST TANK 6-74-0-W; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 12 | 38E9312331R_00_A01 | BALLAST TANK 6-83-0-W; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 13 | 38E9312334R_00_A01 | BALLAST TANK 6-85-1-W; REPAIR AND PRESERVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 14 | 38E9312341_00_A01 | WASTE OIL TANK 6-59-1-F; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 15 | 38E9312342_00_A01 | OILY WASTE HOLDING TANK 6-59-2-F; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 16 | 38E9312343_00_A01 | OILY WATER DRAIN COLLECTING TANK 6-65-2-W; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 17 | 38E9312344_00_A01 | OILY WASTE HOLDING TANK 6-81-1-F; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 18 | 38E9312345_00_A01 | WASTE OIL TANK 6-81-2-F; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 19 | 38E9312346_00_A01 | OILY WATER DRAIN COLLECTING TANK 6-86-3-W; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 20 | 38E9312347_00_A01 | OILY WATER COLLECTING TANK 6-93-2-W; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 21 | 38E9312349R_00_A01 | DECK OF ESCAPE TRUNK; PRESERVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 22 | 38E9312356R_00_A01 | BILGE AREA IN AUXILIARY MACHINERY ROOM NUMBER ONE; PRESERVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 23 | 38E9312359_00_A01 | VENT PIPING FOR LCAC FO SERVICE TANK (6-99-1-F); REPLACE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 24 | 38E9312367_00_A01 | BILGE AREA IN MMR NO.2; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 25 | 38E9312368_00_A01 | ELM-245219; ACCOMPLISH | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 26 | 38E9323302R_00_A01 | 2A MPDE FUEL CONTROL CROSS SHAFT ASSY AND SHUTDOWN CONTROL VALVE; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 27 | 38E9323303R_00_A01 | 2B MPDE FUEL CONTROL CROSS SHAFT ASSY AND SHUTDOWN CONTROL VLV ASSY; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 28 | 38E9323303R_01_A02 | REV-1(FO1)~REQUIREMENT; REVISE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 29 | 38E9323304R_00_A01 | 2A MPDE 3-WAY SW TEMP REGULATING VLV; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 30 | 38E9323305R_00_A01 | 2A MPDE ATTACHED LO PUMP; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 31 | 38E9323306R_00_A01 | 2B MPDE LO, JW AND INJECTOR COOLING THERMOSTATIC CONTROL VALVE; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 32 | 38E9323307R_00_A01 | 2B MPDE CRANKCASE VACUUM SYSTEM: CLEAN AND INSPECT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 33 | 38E9323308R_00_A01 | 2B MPDE R/L BANK INTERCOOLER; CLEAN, INSPECT AND REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 34 | 38E9323314R_00_A01 | 2B MPDE LO, JW AND INJECTION COOLING WATER COOLER; CLEAN, INSPECT AND REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 35 | 38E9323315R_00_A01 | 2A MPDE L/O, J/W AND INJECTION CLG WATER COOLER; CLEAN, INSPECT AND REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 36 | 38E9323322R_01_A02 | 2A MPDE CRANKCASE VACUUM SYSTEM: CLEAN AND INSPECT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 37 | 38E9323323R_01_A02 | 2A MPDE L/O, J/W AND INJ CLG THERMOSTATIC VLV; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 38 | 38E9323324R_01_A02 | 2A MPDE R/L BANK INTERCOOLER; CLEAN, INSPECT AND REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 39 | 38E9323325R_00_A01 | 2B MPDE 3-WAY SEAWATER TEMPERATURE REGULATING VALVE; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 40 | 38E9323330R_00_A01 | 2A MPDE RIGHT AND LEFT BANK EXHAUST MANIFOLD GASKET; REPLACE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 41 | 38E9323331R_00_A01 | 2A MPDE AIR START DISTRIBUTOR AND CONTROL VALVE; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 42 | 38E9323332R_00_A01 | 2B MPDE FO INJECTION PUMP AND PUMP DRIVE; OVERHAUL | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 43 | 38E9323333R_00_A01 | 2A MPDE INJECTION PUMP AND PUMP DRIVE; OVERHAUL | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 44 | 38E9323335R_01_A02 | 2A MPDE OVERSPEED GOVERNOR ASSEMBLY; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 45 | 38E9323337R_00_A01 | 2A MPDE ROCKER ARM; REPAIR | |||||||
| 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||
| 46 | 38E9323339R_00_A01 | 2B MPDE ENGINE ROCKER ARM; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 47 | 38E9331107R_00_A01 | NO.4 SSDG ATT SW, JW, AND LO PUMP; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 48 | 38E9331112R_00_A01 | NO.4 SSDG COOLING SYSTEM COMPONENTS; REPAIR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 49 | 38E9353101R_00_A01 | NO.2 REVERSE OSMOSIS UNIT FOUNDATION IN 5-74-0-E; PRESERVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 50 | 38E9355102R_00_A01 | DECK PLATE UNDER NO.2 AND NO.3 LPAC IN AMR 2; REPLACE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 51 | 38E9355103_00_A01 | NR. 2 LPAC FOUNDATION IN AMR 2; PRESERVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 52 | 38E9366204R_00_A01 | VENTILATION DUCT (S02-47-2) IN 2-43-4-L; REPLACE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 53 | 38E9366212_00_A01 | SUPPLY VENTILATION DUCT (S1-89-1) IN AMR NO.2; REPLACE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 54 | 38E9366401_00_A01 | DECK IN 2-119-2-Q; PRESERVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 55 | |||||||||
| 56 | |||||||||
| 57 | |||||||||
| 58 | |||||||||
| 59 | |||||||||
| 60 | |||||||||
| 61 | |||||||||
| 62 | |||||||||
| 63 | |||||||||
| 64 | |||||||||
| 65 | |||||||||
| 66 | |||||||||
| 67 | |||||||||
| 68 | |||||||||
| 69 | |||||||||
| 70 | |||||||||
| 71 | |||||||||
| 72 | |||||||||
| 73 | |||||||||
| 74 | |||||||||
| 75 | |||||||||
| 76 | |||||||||
| 77 | |||||||||
| 78 | |||||||||
| 79 | |||||||||
| 80 | |||||||||
| 81 | |||||||||
| 82 | |||||||||
| 83 | |||||||||
| 84 | |||||||||
| 85 | |||||||||
| 86 | |||||||||
| 87 | |||||||||
| 88 | |||||||||
| 89 | |||||||||
| 90 | |||||||||
| 91 | |||||||||
| 92 | |||||||||
| 93 | |||||||||
| 94 | |||||||||
| 95 | |||||||||
| 96 | |||||||||
| 97 | |||||||||
| 98 | |||||||||
| 99 | |||||||||
| 100 | |||||||||
| 101 | |||||||||
| 102 | |||||||||
| 103 | |||||||||
| 104 | |||||||||
| 105 | |||||||||
| 106 | |||||||||
| 107 | |||||||||
| 108 | |||||||||
| 109 | |||||||||
| 110 | |||||||||
| 111 | |||||||||
| 112 | |||||||||
| 113 | |||||||||
| 114 | |||||||||
| 115 | |||||||||
| 116 | |||||||||
| 117 | |||||||||
| 118 | |||||||||
| 119 | |||||||||
| 120 | |||||||||
| 121 | |||||||||
| 122 | |||||||||
| 123 | |||||||||
| 124 | |||||||||
| 125 | |||||||||
| 126 | |||||||||
| 127 | |||||||||
| 128 | |||||||||
| 129 | |||||||||
| 130 | |||||||||
| 131 | |||||||||
| 132 | |||||||||
| 133 | |||||||||
| 134 | |||||||||
| 135 | |||||||||
| 136 | |||||||||
| 137 | |||||||||
| 138 | |||||||||
| 139 | |||||||||
| 140 | |||||||||
| 141 | |||||||||
| 142 | |||||||||
| 143 | |||||||||
| 144 | |||||||||
| 145 | |||||||||
| 146 | |||||||||
| 147 | |||||||||
| 148 | |||||||||
| 149 | |||||||||
| 150 | |||||||||
| 151 | |||||||||
| 152 | |||||||||
| 153 | |||||||||
| 154 | |||||||||
| 155 | |||||||||
| 156 | |||||||||
| 157 | |||||||||
| 158 | |||||||||
| 159 | |||||||||
| 160 | |||||||||
| 161 | |||||||||
| 162 | |||||||||
| 163 | |||||||||
| 164 | |||||||||
| 165 | |||||||||
| 166 | |||||||||
| 167 | |||||||||
| 168 | |||||||||
| 169 | |||||||||
| 170 | |||||||||
| 171 | |||||||||
| 172 | |||||||||
| 173 | |||||||||
| 174 | |||||||||
| 175 | |||||||||
| 176 | |||||||||
| 177 | |||||||||
| 178 | |||||||||
| 179 | |||||||||
| 180 | |||||||||
| 181 | |||||||||
| 182 | |||||||||
| 183 | |||||||||
| 184 | |||||||||
| 185 | |||||||||
| 186 | |||||||||
| 187 | |||||||||
| 188 | |||||||||
| 189 | |||||||||
| 190 | |||||||||
| 191 | |||||||||
| 192 | |||||||||
| 193 | |||||||||
| 194 | |||||||||
| 195 | |||||||||
| 196 | |||||||||
| 197 | |||||||||
| 198 | |||||||||
| 199 | |||||||||
| 200 |
Rev. 2
1_38E9312306R_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 1_38E9312306R_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 1_38E9312306R_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | ACCESSIBLE VOID 6-56-4-V; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
2_38E9312315R_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 2_38E9312315R_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 2_38E9312315R_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | DECK PLATING ON MMR NO.ONE UPPER LEVEL; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
3_38E9312317R_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 3_38E9312317R_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 3_38E9312317R_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | BILGE AREA IN FWD SHAFT ALLEY; PRESERVE | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
4_38E9312318_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 4_38E9312318_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 4_38E9312318_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | WASTE WATER DRAIN COLLECTING TANK 6-61-2-W; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
5_38E9312319R_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 5_38E9312319R_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 5_38E9312319R_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | BILGE AREA IN MAIN MACHINERY ROOM NUMBER 2; PRESERVE | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
6_38E9312324R_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 6_38E9312324R_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 6_38E9312324R_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | DECK SURFACE IN 3-74-1-E; PRESERVE | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
7_38E9312326R_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 7_38E9312326R_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 7_38E9312326R_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | JP-5 SERVICE TANK 6-98-5-J; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
8_38E9312327_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 8_38E9312327_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 8_38E9312327_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | WASTE WATER DRAIN COLLECTING TANK 6-83-1-W; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
9_38E9312328_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 9_38E9312328_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 9_38E9312328_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | BALLAST TANK 6-81-3-W; REPAIR AND PRESERVE | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
10_38E9312329_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 10_38E9312329_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 10_38E9312329_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | BALLAST TANK 6-89-1-W; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
11_38E9312330R_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 11_38E9312330R_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 11_38E9312330R_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | BALLAST TANK 6-74-0-W; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
12_38E9312331R_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 12_38E9312331R_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 12_38E9312331R_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | BALLAST TANK 6-83-0-W; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
13_38E9312334R_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 13_38E9312334R_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 13_38E9312334R_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | BALLAST TANK 6-85-1-W; REPAIR AND PRESERVE | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
14_38E9312341_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 14_38E9312341_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 14_38E9312341_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | WASTE OIL TANK 6-59-1-F; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
15_38E9312342_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 15_38E9312342_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 15_38E9312342_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | OILY WASTE HOLDING TANK 6-59-2-F; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
16_38E9312343_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 16_38E9312343_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 16_38E9312343_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | OILY WATER DRAIN COLLECTING TANK 6-65-2-W; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
17_38E9312344_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 17_38E9312344_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 17_38E9312344_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | OILY WASTE HOLDING TANK 6-81-1-F; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
18_38E9312345_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 18_38E9312345_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 18_38E9312345_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | WASTE OIL TANK 6-81-2-F; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
19_38E9312346_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 19_38E9312346_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 19_38E9312346_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | OILY WATER DRAIN COLLECTING TANK 6-86-3-W; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
20_38E9312347_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 20_38E9312347_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 20_38E9312347_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | OILY WATER COLLECTING TANK 6-93-2-W; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
21_38E9312349R_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 21_38E9312349R_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 21_38E9312349R_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | DECK OF ESCAPE TRUNK; PRESERVE | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
22_38E9312356R_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 22_38E9312356R_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 22_38E9312356R_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | BILGE AREA IN AUXILIARY MACHINERY ROOM NUMBER ONE; PRESERVE | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
23_38E9312359_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 23_38E9312359_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 23_38E9312359_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | VENT PIPING FOR LCAC FO SERVICE TANK (6-99-1-F); REPLACE | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
24_38E9312367_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 24_38E9312367_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 24_38E9312367_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | BILGE AREA IN MMR NO.2; REPAIR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||
| Other Direct Cost (ODC) (IF ANY) | |||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
TOTAL (¥) ¥0
Rev. 2
25_38E9312368_00_A01
| Ship Name / Availability: | USS RUSHMORE (LSD-47) - 10/12/2026 - 06/14/2027 (7C1 Availability) | ICN 25_38E9312368_00_A01 SUMMARY | Rev. 2 | ||||||||||
| Solicitation No: | N6264926R0011 | ||||||||||||
| SRF-JRMC ICN No: | 25_38E9312368_00_A01 | In-House MH | Sub-KTR MH | In-House Cost | Sub-KTR Cost | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| Description: | ELM-245219; ACCOMPLISH | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if Paragraph(s) / Description column is empty. Please insert rows as needed. | |||||||||||||
| Labor Hour Breakdown | |||||||||||||
| ICN Paragraph(s) / Description | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | Remarks |
TOTAL M/Hs 0 0 0 0 0 0 0 0 0 0 0
| ICN Paragraph(s) / Description | In-House Labor Hour Breakdown | Sub-Contractor Labor Breakdown | |||||
| # Personnel | Hours Per Day | # Days | Additional | ||||
| Hours | TOTAL Man Hours (MH) | Labor Rate (¥) | # Personnel | Hours Per Day | # Days | Additional | |
| Hours | TOTAL Man Hours (MH) | Labor Cost (¥) | Remarks / Sub-KTR Name |
| In-House Labor TOTAL M/Hs | 0 | Sub-Contractor TOTAL M/Hs | 0 | ||||
| Cost Per M/H (¥) | ¥0 | Ave. Per M/H (¥) | |||||
| TOTAL In-House Labor Cost (¥) | ¥0 | TOTAL Sub-KTR Labor Cost (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. | |||||||
| Material Cost Breakdown | |||||||
| Description | Quantity | Unit of Issue | Unit Price (¥) | Extended Price (¥) | Remarks |
| TOTAL (¥) | ¥0 | ||||
| Note: The "Extended Price" will not show if the "Description" column is empty. Please insert rows as needed. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .