Attachment 5_RUS 7C1 SRA PERL.xlsx

XLSX spreadsheet 56 KB Posted

Attached to
USS RUSHMORE (LSD-47) 7C1 SRA 52pkg
Solicitation number
N6264926R0011
Issued by

About this file

This is a Project Readiness List (PRL) and Event Readiness List (ERL) schedule document for USS RUSHMORE (LSD-47) 7C1 Selected Restricted Availability (SRA) maintenance and repair work. The spreadsheet tracks 57 work packages and associated tasks scheduled between September 21, 2026, and June 15, 2027, with a primary performance completion milestone of January 8, 2027.

The work items encompass major ship systems repairs and preservation including waste water and bilge system tank repairs, ballast tank repairs and preservation, fuel and oil tank repairs, piping replacements, deck plating repairs, and main propulsion diesel engine (MPDE) component overhauls and repairs. Additional scope includes auxiliary systems such as auxiliary machinery room maintenance, hydraulic piping modifications, reverse osmosis unit foundation preservation, ventilation duct replacements, and various brazing and cofferdam installation work. Each task is assigned an ICN (Item Control Number), KOI (Key Operation Item) designation, and JSN (Job Schedule Number), with completion criteria marked as Inspection (I), Production (P), Testing (T), or Certification (C). Key milestones include Main Machinery Space Propulsion Plant Completion (PW00) on March 30, 2027, and Work Complete (WC00) on February 15, 2027 for forward air conditioning plant work. The document serves as the baseline schedule for the USS RUSHMORE repair and maintenance contract being performed at Commander Fleet Activities Sasebo (CFAS) with a period of performance from October 12, 2026, through July 31, 2027.

View the file

Other files

File Type Posted
Solicitation Amendment - N6264926R00110008 Conformed Copy.pdf PDF
Solicitation Amendment N6264926R00110008 SF30.pdf PDF
Revised_Attachment 5_RUS 7C1 SRA PERL (Rev. 1).xlsx XLSX spreadsheet
Solicitation Amendment - N6264926R00110007 Conformed Copy.pdf PDF
Solicitation Amendment N6264926R00110007 SF30.pdf PDF
Solicitation Amendment - N6264926R00110006 Conformed Copy.pdf PDF
Solicitation Amendment N6264926R00110006 SF30.pdf PDF
Solicitation Amendment - N6264926R00110005 Conformed Copy.pdf PDF
Attachment 2_Price Proposal Sheet N6264926R0011 (Rev. 3).xlsx XLSX spreadsheet
Solicitation Amendment N6264926R00110005 SF30.pdf PDF
Attachment 8_Contractor Questions 2.pdf PDF
Solicitation Amendment N6264926R00110004 Conformed Copy.pdf PDF
Solicitation Amendment N6264926R00110004 SF30.pdf PDF
Attachment 2 Price Proposal Breakdown Sheet N6264926R0011 (Rev. 2).xlsx XLSX spreadsheet
Solicitation Amendment N6264926R00110002 Conformed Copy.pdf PDF
Solicitation Amendment N6264926R00110002.pdf PDF
Attachment 7_Contractor Questions 1.pdf PDF
Attachment 2_Price Proposal Breakdown Sheet N6264926R0011 (Rev. 1).xlsx XLSX spreadsheet
Solicitation Amendment N6264926R00110001.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A005 Weekly Progress Report.pdf PDF
Attachment 6_PPI Contract Data Sheet(s) N6264926R0011.docx DOCX document
Attachment 5_RUS 7C1 SRA PERL.xlsx XLSX spreadsheet
Solicitation - N6264926R0011.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A007 Key Events Report.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A006 Conference Reports.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A003 IPS.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A009 Fire Safety Council.pdf PDF
Attachment 4_Milestones and Key Events List (RUS 7C1).pdf PDF
Attachment 3_Contractor Questions.pdf PDF
Attachment 2_Price Proposal Breakdown Sheet N6264926R0011.xlsx XLSX spreadsheet
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A010 KTR Deficiency Reporting.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A008 Temporary Services.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A004 Daily Report.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A002 Quality Assurance Program Plan.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A001 GFM Not.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A008 Temporary Services.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A001 GFM Not.pdf PDF
Attachment 6_PPI Contract Data Sheet(s) N6264926R0011.docx DOCX document
Solicitation - N6264926R0011.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A010 KTR Deficiency Reporting.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A009 Fire Safety Council.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A007 Key Events Report.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A004 Daily Report.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A003 IPS.pdf PDF
Attachment 3_Contractor Questions.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A006 Conference Reports.pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A002 Quality Assurance Program Plan.pdf PDF
Attachment 4_Milestones and Key Events List (RUS 7C1).pdf PDF
dd1423 LSD 47 SRA 7C1 (FY27) CDRL A005 Weekly Progress Report.pdf PDF
Attachment 2_Price Proposal Breakdown Sheet N6264926R0011.xlsx XLSX spreadsheet
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

NOICNKOIJSNTITLESuggest KE/MSSuggest PCDPS00PF00AM15
(Ammo Off Load to support(SA00))SA00

(Start Availability)

AT42

(Complete All Work to Support AT00)

AT00
(Assessment Completion)CX41

(Combat HM&E Support Systems Complete)

CX42

(All Systems Ready to Support (CX00))

HB42

(Work Complete to Support HB00 [INCLUDES CANES])

HB00

(Crew Move Aboard)

CX00

(Commence Combat Systems Light Off (CSLO))

PW42

(Work &Testing Complete to Support (PW00))

PW00
(Main Machinery Space Propulsion Plant Complete (PCD))FM16
(Fuel Onload w/ISIC Oversight/Repair Period)LT42

(Hot Plant Testing w/ISIC Oversight / Repair Period)

AV42

(Work Complete to Support AVCERT)

WC42

(Work & Testing Complete to Support (WC00))

WC00

(All Work COmplete)

DT00 (Commence Dock Trials)
FC00

(Start Fast Cruise)

ST00 (Commence Sea Trials)
CA00 (End of Availability)
EG00 (End Guarantee Period)
COMMENTSEvent Readiness List (Work Item Title)

Legend: "I" = Open & Inspect (CFR), "P" = Production Complete, "T" = Testing Complete, "C" = Certification Complete.

9/21/26 10/12/26 11/19/26 11/26/2026 2/9/27 2/16/27 3/1/27 3/8/27 3/11/27 3/23/27 3/30/27 4/5/27 4/6/27 4/21/27 4/29/27 5/6/27 5/11/27 5/12/27 5/18/27 6/15/27

138E9312318A01EM01-ZEC1WASTE WATER DRAIN COLLECTING TANK 6-61-2-W; REPAIRPW003/30/271/8/273/30/27IPC
238E9312327A01ER01-ZJL2, ER01-ZJQ5WASTE WATER DRAIN COLLECTING TANK 6-83-1-W; REPAIRPW001/8/2710/12/261/8/27IPC
338E9312328A01ER01-ZJQ1, ER01-ZJU0, ER01-ZJM5BALLAST TANK 6-81-3-W; REPAIR AND PRESERVEPW001/8/2710/12/261/8/27IPC
438E9312329A01ER01-ZJN0, ER01-ZJP3BALLAST TANK 6-89-1-W; REPAIRPW001/8/2710/12/261/8/27IPC
538E9312341A01EB14-ZH27, EB14-ZH28WASTE OIL TANK 6-59-1-F; REPAIRPW003/30/271/8/273/30/27IPC
638E9312342A01EB14-ZH30, EB14-ZH29OILY WASTE HOLDING TANK 6-59-2-F; REPAIRPW003/30/271/8/273/30/27IPC
738E9312343A01EB14-ZH33, EB14-ZH34OILY WATER DRAIN COLLECTING TANK 6-65-2-W; REPAIRPW003/30/271/8/273/30/27IPC
838E9312344A01EB14-ZH35, EB14-ZH36OILY WASTE HOLDING TANK 6-81-1-F; REPAIRPW001/8/2710/12/261/8/27IPC
938E9312345A01EB14-ZH37, EB14-ZH38WASTE OIL TANK 6-81-2-F; REPAIRPW001/8/2710/12/261/8/27IPC
1038E9312346A01EB14-ZH39, EB14-ZH40OILY WATER DRAIN COLLECTING TANK 6-86-3-W; REPAIRPW001/8/2710/12/261/8/27IPC
1138E9312347A01EB14-ZH41,EB14-ZH42OILY WATER COLLECTING TANK 6-93-2-W; REPAIRPW001/8/2710/12/261/8/27IPC
1238E9312359A01EA02-1080VENT PIPING FOR LCAC FO SERVICE TANK (6-99-1-F); REPLACEPW001/8/2710/12/261/8/27IPC
1338E9312367A01ES01-NP7I, ES01-NP7J, ES01-NP7KBILGE AREA IN MMR NO.2; REPAIRPW003/30/271/8/273/30/27IPC
1438E9312368A01ES01-NP7L,ES01-NP7M, ES01-NP7N, ES01-NP7OELM-245219; ACCOMPLISH
PW001/8/2710/12/261/8/27PC
1738E9312306A01ER01-ZJP6
ER01-ZJP7ACCESSIBLE VOID 6-56-4-V; REPAIRPW003/30/271/8/273/30/27PC
1838E9312315A01EM01-6720, ES01-NP9A

ES01-NPA9, ES01-NPAA

ES01-NPABDECK PLATING ON MMR NO.ONE UPPER LEVEL; REPAIR
PW003/30/271/8/273/30/27PC
1938E9312316A01EM01-6780
(EM01-6704)BILGE AREA IN MAIN MACHINERY ROOM NUMBER ONE; PRESERVEPW001/8/2710/12/261/8/27IPC
2038E9312317A01EM01-ZEC0BILGE AREA IN FWD SHAFT ALLEY; PRESERVEPW003/30/271/8/273/30/27IPC
2138E9312319A01ES01-NP4T, EM02-ZE07BILGE AREA IN MAIN MACHINERY ROOM NUMBER 2; PRESERVEPW003/30/271/8/273/30/27IPC
2238E9312324A01ES01-NP4V
DECK SURFACE IN 3-74-1-E; PRESERVEWC002/15/2710/12/262/15/27CFWD A/C Plant
2338E9312326A01EA02-ZA72, EA02-ZA74JP-5 SERVICE TANK 6-98-5-J; REPAIRPW003/30/271/8/273/30/27IPC
2438E9312330A01ER01-ZJN1, ER01-ZJO6BALLAST TANK 6-74-0-W; REPAIRPW003/30/271/8/273/30/27IPC
2538E9312331A01ER01-ZJM8, ER01-ZJP1BALLAST TANK 6-83-0-W; REPAIRPW003/30/271/8/273/30/27IPC
2638E9312334A01ER01-ZJM2, ER01-ZJQ0
ER01-ZJT7BALLAST TANK 6-85-1-W; REPAIR AND PRESERVEPW003/30/271/8/273/30/27IPC
2738E9312349A01ES01-NP9IDECK OF ESCAPE TRUNK; PRESERVEPW001/8/2710/12/261/8/27PC
2838E9312351A01ES01-NPAL, ES01-NPAM
ES01-NPAKBILGE IN AUXILIARY MACHINERY ROOM NUMBER 2; REPAIR AND PRESERVEPW003/30/271/8/273/30/27IPC
2938E9312356A01ES01-NP9V, ES01-NP9B

ES01-NP9C, ES01-NP9W

ES01-NP9X, ES01-NP9Y

ES01-NP9ZBILGE AREA IN AUXILIARY MACHINERY ROOM NUMBER ONE; PRESERVEPW001/8/2710/12/261/8/27IP7/9/00C
3038E9323302A01EM02-ZDX7, EM02-ZDY92A MPDE FUEL CONTROL CROSS SHAFT ASSY AND SHUTDOWN CONTROL VALVE; REPAIRPW001/8/2710/12/261/8/27PC
3138E9323303A01EM02-ZDX8, EM02-ZDZ02B MPDE FUEL CONTROL CROSS SHAFT ASSY AND SHUTDOWN CONTROL VLV ASSY; REPAIRPW001/8/2710/12/261/8/27PC
3238E9323303A02EM02-ZDX8, EM02-ZDZ0REV-1(FO1)~REQUIREMENT; REVISEPW001/8/2710/12/261/8/27PC
3338E9323304A01EM02-ZDX0, EM02-75332A MPDE 3-WAY SW TEMP REGULATING VLV; REPAIR
PW001/8/2710/12/261/8/27PC
3438E9323305A01EM02-ZDX92A MPDE ATTACHED LO PUMP; REPAIRPW001/8/2710/12/261/8/27PC
3538E9323306A01EM02-ZDY0, EM02-ZDZ3
EM02-ZE092B MPDE LO, JW AND INJECTOR COOLING THERMOSTATIC CONTROL VALVE; REPAIRPW001/8/2710/12/261/8/27PC
3638E9323307A01EM02-ZDZ12B MPDE CRANKCASE VACUUM SYSTEM: CLEAN AND INSPECTPW001/8/2710/12/261/8/27PC
3738E9323308A01EM02-ZDZ6, EM02-ZDZ82B MPDE R/L BANK INTERCOOLER; CLEAN, INSPECT AND REPAIRPW001/8/2710/12/261/8/27PC
3838E9323314A01EM02-ZDX6, EM02-ZE18
EM02-ZE192B MPDE LO, JW AND INJECTION COOLING WATER COOLER; CLEAN, INSPECT AND REPAIRPW001/8/2710/12/261/8/27PC
3938E9323315A01EM02-ZDZ5, EM02-ZE17
EM02-ZE202A MPDE L/O, J/W AND INJECTION CLG WATER COOLER; CLEAN, INSPECT AND REPAIRPW001/8/2710/12/261/8/27PC
4038E9323322A02EM02-ZDZ22A MPDE CRANKCASE VACUUM SYSTEM: CLEAN AND INSPECTPW001/8/2710/12/261/8/27PC
4138E9323323A02EM02-ZDZ4, EM02-ZE08
EM02-ZE102A MPDE L/O, J/W AND INJ CLG THERMOSTATIC VLV; REPAIRPW001/8/2710/12/261/8/27PC
4238E9323324A02EM02-ZDZ7, EM02-ZDZ92A MPDE R/L BANK INTERCOOLER; CLEAN, INSPECT AND REPAIRPW001/8/2710/12/261/8/27PC
4338E9323325A01EM02-ZE002B MPDE 3-WAY SEAWATER TEMPERATURE REGULATING VALVE; REPAIRPW001/8/2710/12/261/8/27PC
4438E9323330A01EM02-U3012A MPDE RIGHT AND LEFT BANK EXHAUST MANIFOLD GASKET; REPLACEPW001/8/2710/12/261/8/27PC
4538E9323331A01EM02-ZE122A MPDE AIR START DISTRIBUTOR AND CONTROL VALVE; REPAIRPW001/8/2710/12/261/8/27PC
4638E9323332A01EM02-ZE132B MPDE FO INJECTION PUMP AND PUMP DRIVE; OVERHAULPW001/8/2710/12/261/8/27PC
4738E9323333A01EM02-ZE142A MPDE INJECTION PUMP AND PUMP DRIVE; OVERHAULPW001/8/2710/12/261/8/27PC
4838E9323335A02EM02-U201
2A MPDE OVERSPEED GOVERNOR ASSEMBLY; REPAIRPW001/8/2710/12/261/8/27PC
4938E9323337A01EM02-U3002A MPDE ROCKER ARM; REPAIR
PW001/8/2710/12/261/8/27PC
5038E9323339A01EM02-U3022B MPDE ENGINE ROCKER ARM; REPAIRPW001/8/2710/12/261/8/27PC
5138E9326101A01EXSA-ZBS9S/A 93459D HYDRAULIC PIPING MODIFICATION FOR CPP LOW POINT RETURN; ACCOMPLISHPW001/8/2710/12/261/8/27PC
5238E9331107A01EM04-ZCB8, EM04-ZCC0
EM04-ZCC2NO.4 SSDG ATT SW, JW, AND LO PUMP; REPAIRPW001/8/2710/12/261/8/27PC
5338E9331112A01EM04-ZCC7NO.4 SSDG COOLING SYSTEM COMPONENTS; REPAIRPW001/8/2710/12/261/8/27PC
5438E9353101A01EM02-7583NO.2 REVERSE OSMOSIS UNIT FOUNDATION IN 5-74-0-E; PRESERVEPW001/8/2710/12/261/8/27PC
5538E9355102A01EM04-7517, EM04-7556DECK PLATE UNDER NO.2 AND NO.3 LPAC IN AMR 2; REPLACEPW001/8/2710/12/261/8/27PC
1538E9355103A01EM04-WF08NR. 2 LPAC FOUNDATION IN AMR 2; PRESERVEPW001/8/2710/12/261/8/27PC
1638E9366212A01EM04-7494SUPPLY VENTILATION DUCT (S1-89-1) IN AMR NO.2; REPLACEPW001/8/2710/12/261/8/27PC
5638E9366204A01EM03-3934VENTILATION DUCT (S02-47-2) IN 2-43-4-L; REPLACEPW001/8/2710/12/261/8/27PC
5738E9366401A01EM04-7557DECK IN 2-119-2-Q; PRESERVEPW001/8/2710/12/261/8/27PC

38E9323325 H01 EM02-ZE00 REV-01(DV)~COFFERDAM; INSTALL AND REMOVE WC00 3/2/26 12/15/26 3/2/26

38E9351409 H01 EA05-4906 REV-1(IH)~ BRAZING WORK; ACCOMPLISH WC00 2/12/27 11/14/26 2/12/27

38E9351410 H01 EA05-4909 REV-1(IH)~ BRAZING WORK; ACCOMPLISH WC00

38E9351411 H01 EA05-4910 REV-1(IH)~ BRAZING WORK; ACCOMPLISH WC00

38E9351412 H01 EA05-4908 REV-1(IH)~ BRAZING WORK; ACCOMPLISH WC00

38E9351601 H01 EA05-4907 REV-1(IH)~ BRAZING WORK; ACCOMPLISH WC00

38E9351602 H01 EA05-4905 REV-1(IH)~ BRAZING WORK; ACCOMPLISH WC00

38E9358402 H01 EA04-ZBJ3 REV-01(DV)~COFFERDAM; INSTALL AND REMOVE WC00

12/31/69 I 6/17/00 6/23/00 7/9/00 7/17/00 9/2/00

File details come from the government source that posted it. Updated .