27R2535 Preliminary PPI Responses_19Nov2026.pdf
PDF 153 KB Posted
- Attached to
- Equipment Operations, Maintenance, and Repair Services at Joint Base Pearl harbor Hickam, Hawaii (JBPHH).
- Solicitation number
- N6247827R2535
About this file
This file is a Pre-Proposal Inquiry document containing questions and government responses for Solicitation No. N6247827R2535 regarding Equipment Operations, Maintenance, and Repair services at Oahu, Hawaii.
The solicitation addresses maintenance and repair services for multiple installations including JBPHH Wastewater Treatment Plant and MCBH. Key service requirements include: pipe cleaning for Influent Flow Meters (37, 37A, 37B, B1682) consisting of sediment removal via pressure jetting and vacuum truck prior to semi-annual calibrations; boiler/UPV maintenance; LPAC (Low Pressure Air Compressor) maintenance requiring no specific OEM training or certification; and generator stack testing. Line items 40-45 originally required monthly calibration, but the government indicated an updated document would be issued via amendment addressing contractor concerns about excessive frequency and cost. The solicitation is firm fixed price for all CLINs, with the incumbent contractor (C&S Services, Inc., Contract No. N62478-21-D-2405) having received $1,888,105.00 for last recurring option period and $414,842.00 for non-recurring work. Wage Determination No. 2015-5689, Revision 30 applies. The evaluation includes multiple non-price factors covering qualifications, corporate experience, safety performance (DART/TCR data), and key personnel requirements. Several questions regarding newly formed companies' financial documentation, subcontractor key personnel eligibility, and conflicting regulatory requirements remained unresolved with "Information unavailable at this time" responses, indicating amendments were pending.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. N6247827R2535
PROJECT TITLE/LOCATION: Equipment Operations, Maintenance, and Repair, Oahu, Hawaii
Pre-Proposal Inquiry
Page Section Para.
1 23-Oct
The Solicitation and Commercial Tech Specs have different contract numbers listed. Are these for the same solicitation, and if so, which number is correct, 2435 or 2535?
Solicitation number for this requirement is 2535. All documents with 2435 will be updated to 2535 prior to award.
2 2-Nov 409 of
Attachment J- 1502000-07
Please confirm the periodicity of the sewer cleaning, and what are the criteria for cleanliness that are required to be met? Who will isolate the portions of the sewer and piping to be cleaned?
How is it possible to clean the piping without interrupting daily operations of the facility? Note that monthly cleaning will significantly increase contract cost, and is inconsistent with quarterly calibration requirements.
Pipe Cleaning is specific to the Influent Flow Meters ONLY (37, 37A, 37B, / B- 1682) and should consist of removal of accumulated sedimet/silatiomn by way of pressure jetting and vac truck.
Cleaning shall occur without isolation during normal operations and should occur prior to each Semi-Annual Calibration ONLY for the Influent Flow Meters.
When calibrating this flow meter sedimentation/siltation must be measured and entered into the calculation/calibration.
For removal; The pipe must be sufficiently free from sediment to a level that the calibration accuracy is acceptable and certifiable by the contractor.
The removal volume of a single vac truck should be sufficient.
REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received
July 2016
Pre-Proposal Inquiry
Page Section Para.
3 2-Nov 407 of
For Line items 40-45 at JBPHH Wastewater Treatment Plant, monthly calibration is believed to be excessive and may indicate faulty equipment. It also adds significant cost to the contract. Contractor recommends quarterly calibration. Please confirm whether monthly calibration is required.
An updated document will be issued via amendment.
4 2-Nov
Please provide references for all equipment to be serviced under this contract, to include, but not limited to, Maintenance Requirement Card 65
FMC4Y.
Item being removed off contract; An updated document will be issued via amendment.
2-Nov
For all option year Recurring workbooks, Cell F115 does not include cell F114 in the MCBH Wastewater Instrumentation Sub-Total. Please revise.
An updated document will be issued via amendment.
5 2-Nov
33 and 34 of
Please provide all attachments required for proposal submission, including but not limited to Attachments L-1 and L-2. Added to Sam.gov posting.
6 3-Nov Price Proposal, item j
For an offeror established in 2026 that does not yet have a full-year balance sheet, will a committed business line of credit, together with a current interim balance sheet, satisfy the requirement to demonstrate working capital sufficient to cover two months of the Recurring Work amount for CLIN 0001? Information unavailable at this time.
7 3-Nov Corporate experience
May an offeror meet the magnitude thresholds for the four service categories (Boilers/UPV, LPAC, Generator Stack Testing and Wastewater Instrumentation) using projects performed by different subcontractors, each as a prime contractor, provided the total does not exceed five projects and the period-of-performance overlap requirement is met? Information unavailable at this time.
8 3-Nov Safety Factor
For an offeror that was not in operation during CY2020–CY2024, will an affirmative statement of “no DART/TCR data – firm established in 2026,” together with the required Technical Approach to Safety narrative, be considered compliant with the Factor 3 submittal requirements? Information unavailable at this time.
9 3-Nov
Key personnel (Factor 1(g)
May the Project Manager and Quality Manager be employees of a subcontractor, provided signed letters of commitment are submitted with the proposal? Information unavailable at this time.
10 9-Nov c.(2)(a)1.
b.(2)(a).
The equipment list on page 5 does not include air duct systems or duct cleaning. Is the NADCA certification requirement intended for this solicitation? If so, please identify the PWS task it supports. If not, will the Government issue an amendment removing Factor 2 or replacing it with the intended qualification? Information unavailable at this time.
11 9-Nov
37.
deviation O0038
Please confirm that the second non-price factor is "Qualifications" as stated in the Addendum on page 38, and that the factor list and unfilled bracketed text in FAR 52.212-2 on page 37 will be conformed by amendment. Information unavailable at this time.
12 9-Nov
23.
3-4
All CLINs are firm fixed price, yet the solicitation incorporates FAR 52.212-4 Alternate I, which applies to time-and-materials or labor-hour contracts. Please confirm whether the basic clause or Alternate I governs payment and invoicing under this contract. Information unavailable at this time.
13 9-Nov
33 of b.(j) For a newly formed small business that has not completed a full fiscal year, will an opening balance sheet accompanied by a bank line of credit commitment letter satisfy this requirement? Information unavailable at this time.
14 9-Nov
35 and c.(3)(a) and (b).
b.(3)
For an Offeror that did not exist during CY2020 through CY2024, please confirm that an affirmative statement of no DART or TCR data for those years, with explanation, meets the Factor 3 submittal requirement, and that the absence of OSHA or CIRS records for those years will not be treated as adverse safety information. Information unavailable at this time.
15 9-Nov 38 a.(1)©
The Government states it may compare prices with available historical information. Please provide the incumbent (or most recent predecessor) contract number, contractor name, and the value of the last option period exercised for recurring and non-recurring work.
Please refer to 27R2535 Notice No. 1 General Info document for the last option exercised. See below for Option Period 4 (10/1/2025-9/14/2026) Contract No: N62478-21-D-2405 Contractor: C&S Services, Inc Last Option Recurring: $1,888,105.00 Last Option Period Non-Recurring:
$414,842.00.
16 9-Nov
13 and then 19of 42 in Addend um to
FAR
The solicitation does not identify the applicable wage determination by number. Please confirm that Wage Determination No. 2015-5689, Revision 30 (dated 8/27/2026) is the wage determination applicable to this solicitation and resulting contract.
Wage Determintation 2015-5689 Rev 30 is the most current version.
17 9-Nov 33 c.(1)(a) and 34, c.(1)(b)(i)b
Does the PWS require LPAC maintenance personnel to hold OEM training or certification for the installed compressor make and model? If so, will OEM authorized service performed by a subcontractor satisfy that requirement? No, training is not needed.
Sheet1
File details come from the government source that posted it. Updated .