27R2535 PPI Responses_24NOV2026.pdf

PDF 120 KB Posted

Attached to
Equipment Operations, Maintenance, and Repair Services at Joint Base Pearl harbor Hickam, Hawaii (JBPHH).
Solicitation number
N6247827R2535
Issued by

About this file

This is a Pre-Proposal Inquiry document for Solicitation No. N6247827R2535 issued by the Navy for Equipment Operations, Maintenance, and Repair services at Oahu, Hawaii. The document contains 18 questions and answers received from potential offerors between October 23 and November 9, addressing clarifications needed prior to proposal submission.

Key clarifications include: the correct solicitation number is 2535 (not 2435), with all documents to be updated prior to award; pipe cleaning is specific only to Influent Flow Meters and shall occur prior to semi-annual calibrations without facility isolation; an updated document will address the monthly versus quarterly calibration question for line items 40-45 at JBPHH Wastewater Treatment Plant; Maintenance Requirement Card 65 FMC4Y is being removed from the contract; pricing proposal attachments L-1 and L-2 were added to SAM.gov; both the Project Manager and Quality Manager must be direct employees of the prime contractor; subcontractors may meet magnitude thresholds for the four service categories (Boilers/UPV, LPAC, Generator Stack Testing, and Wastewater Instrumentation) provided the total does not exceed five projects; FAR 52.212-4 Alternate I will be deleted via amendment as all CLINs are firm fixed price; and Wage Determination 2015-5689 Revision 30 (dated 8/27/2026) is applicable. The incumbent contractor was C&S Services, Inc under Contract No. N62478-21-D-2405, with the last option period (10/1/2025–9/14/2026) valued at $1,888,105.00 for recurring work and $414,842.00 for non-recurring work. Several questions regarding newly formed businesses, DART/TCR safety data requirements, and other submission criteria were marked "Information unavailable at this time" or "An updated document will be issued via amendment."

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. N6247827R2535

PROJECT TITLE/LOCATION: Equipment Operations, Maintenance, and Repair, Oahu, Hawaii

Pre-Proposal Inquiry

Page Section Para.

1 23-Oct

The Solicitation and Commercial Tech Specs have different contract numbers listed. Are these for the same solicitation, and if so, which number is correct, 2435 or 2535?

Solicitation number for this requirement is 2535.

All documents with 2435 will be updated to 2535 prior to award.

2 2-Nov 409 of

Attachment J-1502000-

Please confirm the periodicity of the sewer cleaning, and what are the criteria for cleanliness that are required to be met? Who will isolate the portions of the sewer and piping to be cleaned? How is it possible to clean the piping without interrupting daily operations of the facility? Note that monthly cleaning will significantly increase contract cost, and is inconsistent with quarterly calibration requirements.

Pipe Cleaning is specific to the Influent Flow Meters ONLY (37, 37A, 37B, / B-1682) and should consist of removal of accumulated sedimet/silatiomn by way of pressure jetting and vac truck. Cleaning shall occur without isolation during normal operations and should occur prior to each Semi-Annual Calibration ONLY for the Influent Flow Meters.

When calibrating this flow meter sedimentation/siltation must be measured and entered into the calculation/calibration.

For removal; The pipe must be sufficiently free from sediment to a level that the calibration accuracy is acceptable and certifiable by the contractor.

The removal volume of a single vac truck should be sufficient.

3 2-Nov 407 of

For Line items 40-45 at JBPHH Wastewater Treatment Plant, monthly calibration is believed to be excessive and may indicate faulty equipment. It also adds significant cost to the contract. Contractor recommends quarterly calibration. Please confirm whether monthly calibration is required.

An updated document will be issued via amendment.

4 2-Nov

Please provide references for all equipment to be serviced under this contract, to include, but not limited to, Maintenance Requirement Card

65 FMC4Y.

Item being removed off contract; An updated document will be issued via amendment.

Posted on Amend No.

REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSEDate Received

July 2016

Pre-Proposal Inquiry

Page Section Para. Amend No.No. QUESTION GOVERNMENT RESPONSEDate Received

5 2-Nov

For all option year Recurring workbooks, Cell F115 does not include cell F114 in the MCBH Wastewater Instrumentation Sub-Total. Please revise.

An updated document will be issued via amendment.

6 2-Nov

33 and 34 of

Please provide all attachments required for proposal submission, including but not limited to Attachments L-1 and L-2. Added to Sam.gov posting.

7 3-Nov Price Proposal, item j

For an offeror established in 2026 that does not yet have a full-year balance sheet, will a committed business line of credit, together with a current interim balance sheet, satisfy the requirement to demonstrate working capital sufficient to cover two months of the Recurring Work amount for CLIN 0001? Information unavailable at this time.

8 3-Nov Corporate experience

May an offeror meet the magnitude thresholds for the four service categories (Boilers/UPV, LPAC, Generator Stack Testing and Wastewater Instrumentation) using projects performed by different subcontractors, each as a prime contractor, provided the total does not exceed five projects and the period-of-performance overlap requirement is met? Yes.

9 3-Nov Safety Factor

For an offeror that was not in operation during CY2020–CY2024, will an affirmative statement of “no DART/TCR data – firm established in 2026,” together with the required Technical Approach to Safety narrative, be considered compliant with the Factor 3 submittal requirements?

An updated document will be issued via amendment.

Pre-Proposal Inquiry

Page Section Para. Amend No.No. QUESTION GOVERNMENT RESPONSEDate Received

10 3-Nov

Key personnel (Factor 1(g)

May the Project Manager and Quality Manager be employees of a subcontractor, provided signed letters of commitment are submitted with the proposal?

Both the PM and QM must be direct employees of the Prime Contractor.

11 9-Nov c.(2)(a)1.

b.(2)(a).

The equipment list on page 5 does not include air duct systems or duct cleaning. Is the NADCA certification requirement intended for this solicitation? If so, please identify the PWS task it supports. If not, will the Government issue an amendment removing Factor 2 or replacing it with the intended qualification? Question unclear. Unable to answer.

12 9-Nov

37.

deviation O0038

Please confirm that the second non-price factor is "Qualifications" as stated in the Addendum on page 38, and that the factor list and unfilled bracketed text in FAR 52.212-2 on page 37 will be conformed by amendment. Verbiage will be corrected via amendment.

13 9-Nov

23.

3-4

All CLINs are firm fixed price, yet the solicitation incorporates FAR 52.212-4 Alternate I, which applies to time-and-materials or labor-hour contracts. Please confirm whether the basic clause or Alternate I governs payment and invoicing under this contract. Alt I will be deleted via amendment.

14 9-Nov

33 of b.(j) For a newly formed small business that has not completed a full fiscal year, will an opening balance sheet accompanied by a bank line of credit commitment letter satisfy this requirement? Information unavailable at this time.

Pre-Proposal Inquiry

Page Section Para. Amend No.No. QUESTION GOVERNMENT RESPONSEDate Received

15 9-Nov

35 and c.(3)(a) and (b).

b.(3)

For an Offeror that did not exist during CY2020 through CY2024, please confirm that an affirmative statement of no DART or TCR data for those years, with explanation, meets the Factor 3 submittal requirement, and that the absence of OSHA or CIRS records for those years will not be treated as adverse safety information.

An updated document will be issued via amendment.

16 9-Nov 38 a.(1)©

The Government states it may compare prices with available historical information. Please provide the incumbent (or most recent predecessor) contract number, contractor name, and the value of the last option period exercised for recurring and non-recurring work.

Please refer to 27R2535 Notice No. 1 General Info document for the last option exercised. See below for Option Period 4 (10/1/2025- 9/14/2026) Contract No: N62478-21-D-2405 Contractor: C&S Services, Inc Last Option Recurring: $1,888,105.00 Last Option Period Non-Recurring: $414,842.00.

17 9-Nov

13 and then 19of 42 in Addend um to

FAR

The solicitation does not identify the applicable wage determination by number. Please confirm that Wage Determination No. 2015-5689, Revision 30 (dated 8/27/2026) is the wage determination applicable to this solicitation and resulting contract.

Wage Determintation 2015-5689 Rev 30 is the most current version.

18 9-Nov 33 c.(1)(a) and 34, c.(1)(b)(i)b

Does the PWS require LPAC maintenance personnel to hold OEM training or certification for the installed compressor make and model? If so, will OEM authorized service performed by a subcontractor satisfy that requirement? No, training is not needed.