26-2435 OPS.xlsx
XLSX spreadsheet 179 KB Posted
- Attached to
- Equipment Operations, Maintenance, and Repair Services at Joint Base Pearl harbor Hickam, Hawaii (JBPHH).
- Solicitation number
- N6247827R2535
About this file
This is a Schedule of Work and pricing template for a federal maintenance and repair services contract at Joint Base Pearl Harbor Hickam, Hawaii. The contract covers equipment operations, maintenance, and repair services across multiple military installations including CNRH (Commander Navy Region Hawaii), PHNSY (Pearl Harbor Naval Shipyard), MCBH (Marine Corps Base Hawaii), and NAVFAC HI, with a total contract value of $499,400.00 over the base period plus four one-year option periods and one six-month option to extend.
The pricing structure is divided into recurring and non-recurring work across 15 Equipment Line Items (ELINs). Recurring work includes monthly emergency, urgent, and routine service orders, along with preventive maintenance tasks at varying frequencies (daily, weekly, monthly, quarterly, semi-annual, and annual) for systems such as boilers and unfired pressure vessels, clear water rinse facilities, generators, vehicle wash racks, capstans, compressed air systems, liquid nitrogen storage facilities, wastewater instrumentation, autoclaves, and chilled water systems. Non-recurring work consists of unit-priced labor (UPL) at 2,620 hours and direct material/construction equipment at $1.00 per delivery order (DO), with each period budgeted at $90,800.00 for non-recurring costs. The base period and each option period are priced identically at $90,800.00, with the six-month option to extend priced at $45,400.00. All recurring line items are currently listed at $0.00 and require contractor pricing submissions. The solicitation references Annex 1502000 specifications and multiple attachment documents detailing service requirements and technical specifications for each equipment category.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule
| SCHEDULE OF WORK |
| (TO BE COMPLETED AND SUBMITTED WITH THE OFFER) |
ITEM NO. SUPPLIES/SERVICES AMOUNT
| 0001 | BASE PERIOD - RECURRING WORK | ||
| Price to perform Recurring work, for the 12-month Base Period, in accordance with all the terms of this contract. | $ | - 0 |
| 0002 | BASE PERIOD - NON-RECURRING WORK | |||
| Price to perform Non-Recurring work, for the 12-month Base Period, in accordance with all the terms of this contract. | EST | $ | $ 90,800.00 |
| TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS | ||
| (CLINs) 0001 AND 0002 (BASE PERIOD) | $ | 90,800.00 |
| 0003 | OPTION PERIOD ONE - RECURRING WORK | ||
| Price to perform Recurring work, for the 12-month Option Period One, in accordance with all the terms of this contract. | $ | - 0 |
| 0004 | OPTION PERIOD ONE - NON-RECURRING WORK | |||
| Price to perform Non-Recurring work, for the 12-month Option Period One, in accordance with all the terms of this contract. | EST | $ | 90,800.00 |
| TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS | ||
| (CLINs) 0003 AND 0004 (OPTION PERIOD ONE) | $ | 90,800.00 |
| 0005 | OPTION PERIOD TWO - RECURRING WORK | ||
| Price to perform Recurring work, for the 12-month Option Period Two, in accordance with all the terms of this contract. | $ | - 0 |
| 0006 | OPTION PERIOD TWO - NON-RECURRING WORK | |||
| Price to perform Non-Recurring work, for the 12-month Option Period Two, in accordance with all the terms of this contract. | EST | $ | 90,800.00 |
| TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS | ||
| (CLINs) 0005 AND 0006 (OPTION PERIOD TWO) | $ | 90,800.00 |
| 0007 | OPTION PERIOD THREE - RECURRING WORK | ||
| Price to perform Recurring work, for the 12-month Option Period Three in accordance with all the terms of this contract. | $ | - 0 |
| 0008 | OPTION PERIOD THREE - NON-RECURRING WORK | |||
| Price to perform Non-Recurring work, for the 12-month Option Period Three in accordance with all the terms of this contract. | EST | $ | 90,800.00 |
| TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS | ||
| (CLINs) 0007 AND 0008 (OPTION PERIOD THREE) | $ | 90,800.00 |
| 0009 | OPTION PERIOD FOUR - RECURRING WORK | ||
| Price to perform Recurring work, for the 12-month Option Period Four in accordance with all the terms of this contract. | $ | - 0 |
| 0010 | OPTION PERIOD FOUR - NON-RECURRING WORK | |||
| Price to perform Non-Recurring work, for the 12-month Option Period Four in accordance with all the terms of this contract. | EST | $ | 90,800.00 |
| TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS | ||
| (CLINs) 0009 AND 0010 (OPTION PERIOD FOUR) | $ | 90,800.00 |
| 0011 | OPTION TO EXTEND SERVICES- RECURRING WORK | ||
| Price to perform Recurring work, for the 6-month Option to Extend Services in accordance with all the terms of this contract | $ | - 0 |
| 0012 | OPTION TO EXTEND SERVICES - NON-RECURRING WORK | |||
| Price to perform non-recurring work, for the 6-month Option to Extend Services, in accordance with all the terms of this contract. | EST | $ | 45,400.00 |
| TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS | ||
| (CLINs) 0011 AND 0012 (OPTION TO EXTEND SERVICES) | $ | 45,400.00 |
| TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS | ||
| (CLINs) 0001 THROUGH 0012 | $ | 499,400.00 |
Sheet1 ELIN Customer Requirement LOA
| x001 | CNRH | Boilers and UPVs | 1 | LF | Boilers and UPVs | x | Sent to customer |
| x002 | CNRH Hickam | Clear Water Rinse | 1 | LF | Clear Water Rinse | x | Sent to customer (combined with Vehicle Racks LOA) |
| x003 | CNRH PHNSY | Generator Stack testing | 1 | LF | Gnerator Stack testing | x | Sent to Customer |
| x004 | CNRH Hickam | Vehicle Wash Rack | 1 | LF | Vehcle Wash Rack and Vehicle Service Rack | x | Sent to customer with clear water rinse LOA |
| x005 | CNRH Hickam | Vehicle Service Rack | Sent to customer with clear water rinse LOA | ||||
| x006 | CNRH PHNSY | Boilers and UPVs | 1 | LF | Boilers and UPVs, Liquid Nitrogen | x | Sent to Customer |
| x007 | CNRH PHNSY | Capstans | 1 | LF | Capstans | x | Sent to Customer |
| x008 | PHNSY | Compressed Air (LPACs) | 1 | SF | LPACs | PHNSY | |
| x009 | CNRH PHNSY | Liquid Nitrogen Storage Facility and Liquid Nitrogen Generator | Sent to Customer | ||||
| x010 | MCBH | Boilers and UPVs | 1 | SF | Boilers and UPVs, Wastewater Instrumentation, Generators | Sent to MCBH | |
| x011 | MCBH | Wastewater Instrumentation | Sent to MCBH | ||||
| x012 | CNRH | Wastewater Instrumentation | 1 | LF | Wastewater Instrumentation | CNRH | |
| x013 | NAVFAC HI | Autoclave | 1 | LF | Autoclave | Sent to Customer | |
| x014 | MCBH | Generators | Sent to MCBH | ||||
| x015 | PHNSY | Chilled Water and Elysator | 1 | SF | Chilled Water and Elysator | Sent to Customer |
Sheet2
| A001 CNRH Boilers and UPVs | |||||||||
| 12 | $ 1,263.00 | $ 15,156.00 | $ 1,452.45 | 22 | $ 66.02 | 9 | $ 594.18 | 12 | $ 7,130.21 |
| 12 | $ 1,025.00 | $ 12,300.00 | $ 1,178.75 | 22 | $ 53.58 | 9 | $ 482.22 | 12 | $ 5,786.59 |
| 12 | $ 867.00 | $ 10,404.00 | $ 997.05 | 22 | $ 45.32 | 9 | $ 407.88 | 12 | $ 4,894.61 |
| 12 | $ 17,480.00 | $ 209,760.00 | $ 20,102.00 | 22 | $ 913.73 | 9 | $ 8,223.55 | 12 | $ 98,682.55 |
| 12 | $ 8,204.00 | $ 98,448.00 | $ 9,434.60 | 22 | $ 428.85 | 9 | $ 3,859.61 | 12 | $ 46,315.31 |
| 12 | $ 7,866.00 | $ 94,392.00 | $ 9,045.90 | 22 | $ 411.18 | 9 | $ 3,700.60 | 12 | $ 44,407.15 |
| 4 | $ 7,866.00 | $ 31,464.00 | $ 9,045.90 | 22 | $ 411.18 | 9 | $ 3,700.60 | 4 | $ 14,802.38 |
| 1 | $ 7,190.00 | $ 7,190.00 | $ 8,268.50 | 22 | $ 375.84 | 9 | $ 3,382.57 | 1 | $ 3,382.57 |
| 1 | $ 7,190.00 | $ 7,190.00 | $ 8,268.50 | 22 | $ 375.84 | 9 | $ 3,382.57 | 1 | $ 3,382.57 |
| 1 | $ 28,757.00 | $ 28,757.00 | $ 33,070.55 | 22 | $ 1,503.21 | 9 | $ 13,528.86 | 1 | $ 13,528.86 |
| $ 24,802.92 | 1 | $ 24,802.92 | |||||||
| 12 | $ 1,996.00 | $ 23,952.00 | $ 2,295.40 | 8 | $ 286.92 | 9 | $ 2,582.33 | 12 | $ 30,987.90 |
| $ 89,704.00 | $ 539,013.00 | $ 298,103.61 |
| A002 CNRH Clear Water Rinse Facility | |||
| 12 | $ 74.00 | $ 888.00 | $ 85.10 |
| 12 | $ 74.00 | $ 888.00 | $ 85.10 |
| 12 | $ 74.00 | $ 888.00 | $ 85.10 |
| 24 | $ 2,125.00 | $ 51,000.00 | $ 2,443.75 |
| $ 53,664.00 |
| A003 CNRH Generators Stack Testing | |||
| 1 | $ 85,896.00 | $ 85,896.00 | $ 98,780.40 |
| $ 85,896.00 |
| A004 Vehicle Wash Rack | |||
| 12 | $ 74.00 | $ 888.00 | $ 85.10 |
| 12 | $ 74.00 | $ 888.00 | $ 85.10 |
| 12 | $ 74.00 | $ 888.00 | $ 85.10 |
| 1 | $ 77,167.00 | $ 77,167.00 | $ 88,742.05 |
| $ 79,831.00 |
| A005 Vehicle Service Rack | |||
| 12 | $ 74.00 | $ 888.00 | $ 85.10 |
| 12 | $ 74.00 | $ 888.00 | $ 85.10 |
| 12 | $ 74.00 | $ 888.00 | $ 85.10 |
| 1 | $ 25,725.00 | $ 25,725.00 | $ 29,583.75 |
| $ 28,389.00 |
| A006 PHNSY Boilers and UPVs | |||||||||
| 12 | $ 476.00 | $ 5,712.00 | $ 547.40 | 3 | $ 182.47 | 1 | $ 182.47 | 12 | $ 2,189.60 |
| 12 | $ 476.00 | $ 5,712.00 | $ 547.40 | 3 | $ 182.47 | 1 | $ 182.47 | 12 | $ 2,189.60 |
| 12 | $ 476.00 | $ 5,712.00 | $ 547.40 | 3 | $ 182.47 | 1 | $ 182.47 | 12 | $ 2,189.60 |
| 12 | $ 7,022.00 | $ 84,264.00 | $ 8,075.30 | 3 | $ 2,691.77 | 1 | $ 2,691.77 | 12 | $ 32,301.20 |
| 12 | $ 1,194.00 | $ 14,328.00 | $ 1,373.10 | 3 | $ 457.70 | 1 | $ 457.70 | 12 | $ 5,492.40 |
| 12 | $ 1,550.00 | $ 18,600.00 | $ 1,782.50 | 3 | $ 594.17 | 1 | $ 594.17 | 12 | $ 7,130.00 |
| 4 | $ 5,178.00 | $ 20,712.00 | $ 5,954.70 | 3 | $ 1,984.90 | 1 | $ 1,984.90 | 4 | $ 7,939.60 |
| 1 | $ 5,606.00 | $ 5,606.00 | $ 6,446.90 | 3 | $ 2,148.97 | 1 | $ 2,148.97 | 1 | $ 2,148.97 |
| 1 | $ 23,244.00 | $ 23,244.00 | $ 26,730.60 | 3 | $ 8,910.20 | 1 | $ 8,910.20 | 1 | $ 8,910.20 |
| 1 | $ 9,246.00 | $ 9,246.00 | $ 10,632.90 | 3 | $ 3,544.30 | 1 | $ 3,544.30 | 1 | $ 3,544.30 |
| $ 5,316.45 | 1 | $ 5,316.45 | |||||||
| 12 | $ 801.00 | $ 9,612.00 | $ 921.15 | 3 | $ 307.05 | 1 | $ 307.05 | 12 | $ 3,684.60 |
| $ 202,748.00 | $ 83,036.52 |
| A007 PHNSY Capstans | |||
| 12 | $ 626.00 | $ 7,512.00 | $ 719.90 |
| 12 | $ 626.00 | $ 7,512.00 | $ 719.90 |
| 12 | $ 626.00 | $ 7,512.00 | $ 719.90 |
| 2 | $ 23,902.00 | $ 47,804.00 | $ 27,487.30 |
| 2 | $ 13,366.00 | $ 26,732.00 | $ 15,370.90 |
| 2 | $ 9,992.00 | $ 19,984.00 | $ 11,490.80 |
| $ 117,056.00 |
A008 LPACs
| 12 | $ 664.00 | $ 7,968.00 | $ 763.60 | 4 | $ 190.90 | 5 | $ 954.50 | 12 | $ 11,454.00 |
| 12 | $ 664.00 | $ 7,968.00 | $ 763.60 | 4 | $ 190.90 | 5 | $ 954.50 | 12 | $ 11,454.00 |
| 12 | $ 664.00 | $ 7,968.00 | $ 763.60 | 4 | $ 190.90 | 5 | $ 954.50 | 12 | $ 11,454.00 |
| 1 | $ 429,026.00 | $ 429,026.00 | $ 493,379.90 | 4 | $ 123,344.97 | 1 | $ 123,344.97 | 1 | $ 123,344.97 |
| 1 | $ 20,399.00 | $ 20,399.00 | $ 23,458.85 | 4 | $ 5,864.71 | 1 | $ 5,864.71 | 1 | $ 5,864.71 |
| $ 163,571.69 |
| A009 Liquid Nitrogen Storag Facility and Liquid Nitrogen Generator | |||
| 12 | $ 269.00 | $ 3,228.00 | $ 309.35 |
| 12 | $ 269.00 | $ 3,228.00 | $ 309.35 |
| 12 | $ 269.00 | $ 3,228.00 | $ 309.35 |
| 2 | $ 2,113.00 | $ 4,226.00 | $ 2,429.95 |
| 1 | $ 2,113.00 | $ 2,113.00 | $ 2,429.95 |
| 2 | $ 2,113.00 | $ 4,226.00 | $ 2,429.95 |
| 1 | $ 2,113.00 | $ 2,113.00 | $ 2,429.95 |
| 1 | $ 2,191.00 | $ 2,191.00 | $ 2,519.65 |
| $ 24,553.00 |
| A010 MCBH Boilers and UPVs | |||
| 12 | $ 587.00 | $ 7,044.00 | $ 675.05 |
| 12 | $ 587.00 | $ 7,044.00 | $ 675.05 |
| 12 | $ 587.00 | $ 7,044.00 | $ 675.05 |
| 12 | $ 8,034.00 | $ 96,408.00 | $ 9,239.10 |
| 12 | $ 1,650.00 | $ 19,800.00 | $ 1,897.50 |
| 12 | $ 2,588.00 | $ 31,056.00 | $ 2,976.20 |
| 4 | $ 5,174.00 | $ 20,696.00 | $ 5,950.10 |
| 1 | $ 7,112.00 | $ 7,112.00 | $ 8,178.80 |
| 1 | $ 7,112.00 | $ 7,112.00 | $ 8,178.80 |
| 1 | $ 11,853.00 | $ 11,853.00 | $ 13,630.95 |
| 1 | $ 20,446.43 | $ 20,446.43 | $ 20,446.43 |
| 12 | $ 1,996.00 | $ 23,952.00 | $ 2,295.40 |
| $ 259,567.43 |
| A011 MCBH Wastewater Instrumentation | |||||||||
| 12 | $ 402.00 | $ 4,824.00 | $ 462.30 | 50 | $ 9.25 | 53 | $ 490.04 | 12 | $ 5,880.46 |
| 12 | $ 402.00 | $ 4,824.00 | $ 462.30 | 50 | $ 9.25 | 53 | $ 490.04 | 12 | $ 5,880.46 |
| 12 | $ 402.00 | $ 4,824.00 | $ 462.30 | 50 | $ 9.25 | 53 | $ 490.04 | 12 | $ 5,880.46 |
| 4 | $ 8,790.00 | $ 35,160.00 | $ 10,108.50 | 36 | $ 280.79 | 35 | $ 9,827.71 | 4 | $ 39,310.83 |
| 2 | $ 8,790.00 | $ 17,580.00 | $ 10,108.50 | 14 | $ 722.04 | 18 | $ 12,996.64 | 2 | $ 25,993.29 |
| 12 | $ 6,000.00 | 12 | $ 72,000.00 | ||||||
| $ 67,212.00 | $ 154,945.49 |
| A012 CNRH Wastewater Instrumentation | |||||||
| 12 | $ 9.25 | 0 | $ 9.25 | 9 | $ 83.25 | 12 | $ 999.00 |
| 12 | $ 9.25 | 0 | $ 9.25 | 9 | $ 83.25 | 12 | $ 999.00 |
| 12 | $ 9.25 | 0 | $ 9.25 | 9 | $ 83.25 | 12 | $ 999.00 |
| 12 | 0 | 7 | $ 2,100.00 | 12 | $ 25,200.00 | ||
| 4 | 0 | $ - 0 | 9 | $ - 0 | 4 | $ - 0 | |
| 2 | $ 202.17 | 0 | $ 202.17 | 9 | $ 1,819.53 | 2 | $ 3,639.06 |
| $ 4,169.28 | $ 31,836.06 |
| A013 NAVFAC HI Autoclave | |||||
| 12 | $ 74.00 | $ 888.00 | $ 85.10 | $ 85.10 | |
| 12 | $ 74.00 | $ 888.00 | $ 85.10 | $ 85.10 | |
| 12 | $ 74.00 | $ 888.00 | $ 85.10 | $ 85.10 | |
| 2 | $ 1,385.00 | $ 2,770.00 | $ 1,592.75 | 4 | $ 398.19 |
| 1 | $ 3,070.00 | $ 3,070.00 | $ 3,530.50 | $ 3,530.50 | |
| 1 | $ 3,070.00 | $ 3,070.00 | $ 3,530.50 | $ 3,530.50 | |
| 1 | $ 3,070.00 | $ 3,070.00 | $ 3,530.50 | $ 3,530.50 | |
| $ 14,644.00 |
| 12 | $ 309.00 | 8 | $ 309.35 | 12 | $ 3,712.20 |
| 12 | $ - 0 | 8 | $ 309.35 | 12 | $ 3,712.20 |
| 12 | $ - 0 | 8 | $ 309.35 | 12 | $ 3,712.20 |
| 12 | $ 525.00 | 8 | $ 4,200.00 | 12 | $ 50,400.00 |
| 12 | $ 950.00 | 8 | $ 7,600.00 | 4 | $ 30,400.00 |
| 12 | $ 4,700.00 | 8 | $ 37,600.00 | 1 | $ 37,600.00 |
| 12 | $ 420.00 | 8 | $ - 0 |
| A015 Chilled Water And Elysators | ||||
| 12 | 12 | $ 200.00 | 12 | $ 2,400.00 |
| 12 | 12 | $ 85.00 | 12 | $ 1,020.00 |
| 12 | 12 | $ 85.00 | 12 | $ 1,020.00 |
| 4 | $ 5,040.00 | 4 | $ 20,160.00 | |
| $ 5,410.00 | $ 24,600.00 |
Base Recurring
| ATTACHMENT J-0200000-14 | OFFERER PROPOSED UNIT PRICE Enter proposed unit price in this column. Price will automatically copy to the UNIT PRICE cell rounded to two decimal places. |
| EXHIBIT LINE ITEM NUMBERS | |
| SOLICITATION/CONTRACT # N62478-26-2435 | |
| EXHIBIT A |
| Line Item 0001 Recurring Work - Base Period | ||||||
| PROVIDE PRICES FOR - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 through A015 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| A001 | CNRH - Boilers and Unfired Pressure Vessels (UPVs) | |||||
| A001AA | Provide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| A001AB | Provide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| A001AC | Provide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| A001AD | Perform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| A001AE | Perform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| A001AF | Perform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| A001AG | Perform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 4 | Q | $ - 0 | $ - 0 | |
| A001AH | Perform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| A001AJ | Perform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| A001AK | RESERVED | |||||
| A001AL | RESERVED | |||||
| A001AM | Provide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.3.1 | 12 | M | $ - 0 | $ - 0 | |
| SubTotal - CNRH - Boilers and Unfired Pressure Vessels (UPVs) | $ - 0 | |||||
| 0.00 | ||||||
| A002 | CNRH HICKAM - Clear Water Rinse Facility | |||||
| A002AA | Provide response and performance to Emergency Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| A002AB | Provide response and performance to Urgent Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| A002AC | Provide performance for Routine Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| A002AD | Perform Semi-Monthly Preventive Maintenance on Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.2.4 | 24 | SM | $ - 0 | $ - 0 | |
| SubTotal - CNRH HICKAM - Clear Water Rinse Facility | $ - 0 | |||||
| 0.00 | ||||||
| A003 | CNRH PHNSY - Generators Stack Testing | |||||
| A003AA | Perform annual Gas Turbine Generator Stack Emmission Testing IAW Annex 1502000 Spec Item 3.2.7 | 1 | A | $ - 0 | $ - 0 | |
| SubTotal - CNRH PHNSY - Generators Stack Testing | $ - 0 | |||||
| 0.00 | ||||||
| A004 | CNRH HICKAM - Vehicle Wash Rack | 0.00 | ||||
| A004AA | Provide response and performance to Emergency Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| A004AB | Provide response and performance to Urgent Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| A004AC | Provide performance for Routine Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| A004AD | Perform annual Preventive Maintenance for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.2.11 | 1 | A | $ - 0 | $ - 0 | |
| SubTotal - CNRH HICKAM - Vehicle Wash Rack | $ - 0 | |||||
| 0.00 | ||||||
| A005 | CNRH HICKAM - Vehicle Service Rack | 0.00 | ||||
| A005AA | Provide response and performance to Emergency Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| A005AB | Provide response and performance to Urgent Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| A005AC | Provide performance for Routine Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| A005AD | Perform Annual Preventive Maintenance for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.2.11 | 1 | A | $ - 0 | $ - 0 | |
| SubTotal - CNRH HICKAM - Vehicle Service Rack | $ - 0 | |||||
| 0.00 | ||||||
| A006 | CNRH PHNSY - Boilers and Unfired Pressure Vessels (UPVs) | 0.00 | ||||
| A006AA | Provide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| A006AB | Provide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| A006AC | Provide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| A006AD | Perform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| A006AE | Perform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| A006AF | Perform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| A006AG | Perform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 4 | Q | $ - 0 | $ - 0 | |
| A006AH | Perform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| A006AJ | Perform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| A006AK | RESERVED | |||||
| A006AL | RESERVED | |||||
| A006AM | Provide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.4.1 | 12 | M | $ - 0 | $ - 0 | |
| SubTotal - CNRH PHNSY - Boilers and Unfired Pressure Vessels (UPVs) | $ - 0 | |||||
| 0.00 | ||||||
| A007 | CNRH PHNSY - CAPSTANS | 0.00 | ||||
| A007AA | Provide response and performance to Emergency Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| A007AB | Provide response and performance to Urgent Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| A007AC | Provide performance for Routine Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| A007AD | Perform Semi-Annual Preventive Maintenance on Capstans IAW Annex 1502000 Spec Item 3.2.3 | 2 | SA | $ - 0 | $ - 0 | |
| A007AE | Perform Semi-Annual Preventive Maintenance on Trolleys IAW Annex 1502000 Spec Item 3.2.9 | 2 | SA | $ - 0 | $ - 0 | |
| A007AF | Perform Semi-Annual Preventive Maintenance on Truss Brows with Electric Winches IAW Annex 1502000 Spec Item 3.2.10 | 2 | SA | $ - 0 | $ - 0 | |
| SubTotal - CNRH PHNSY - CAPSTANS | $ - 0 | |||||
| 0.00 | ||||||
| A008 | PHNSY - Compressed Air Systems (LPAC) | |||||
| A008AA | Provide response and performance to Emergency Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| A008AB | Provide response and performance to Urgent Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| A008AC | Provide performance for Routine Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| A008AD | Perform Annual Overhaul Maintenance on Compressed Air Systems (LPAC) IAW Annex 1502000 Spec Item 3.2.5.1 | 1 | A | $ - 0 | $ - 0 | |
| A008AE | Perform Annual inspections on Compressed Air Systems (LPAC) IAW Annex 1502000 Spec Item 3.2.5.1 | 1 | A | $ - 0 | $ - 0 | |
| RESERVED | $ - 0 | |||||
| 0.00 | ||||||
| A009 | CNRH PHNSY - Liquid Nitrogen Storage Facility and Liquid Nitrogen Generator | |||||
| A009AA | Provide response and performance to Emergency Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| A009AB | Provide response and performance to Urgent Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| A009AC | Provide performance for Routine Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| A009AD | Perform Semi-Annual Preventive Maintenance on Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Items 3.2.8 & 3.2.8.1 | 2 | SA | $ - 0 | $ - 0 | |
| A009AE | Perform annual Preventive Maintenance on Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Items 3.2.8 & 3.2.8.1 | 1 | A | $ - 0 | $ - 0 | |
| A009AF | Perform semiannual Testing, Inspection, and Certification - Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.2.8 | 2 | SA | $ - 0 | $ - 0 | |
| A009AG | Perform Annual Testing, Inspection, and Certification - Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.2.8 | 1 | A | $ - 0 | $ - 0 | |
| A009AH | RESERVED | |||||
| SubTotal - CNRH PHNSY - Liquid Nitrogen Storage Facility and Liquid Nitrogen Generator | $ - 0 | |||||
| 0.00 | ||||||
| A010 | MCBH - Boilers and Unfired Pressure Vessels (UPVs) | 0.00 | ||||
| A010AA | Provide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| A010AB | Provide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| A010AC | Provide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| A010AD | Perform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| A010AE | Perform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| A010AF | Perform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| A010AG | Perform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 4 | Q | $ - 0 | $ - 0 | |
| A010AH | Perform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| A010AJ | Perform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| A010AK | RESERVED | |||||
| A010AL | RESERVED | |||||
| A010AM | Provide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.4.1 | 12 | M | $ - 0 | $ - 0 | |
| SubTotal - MCBH - Boilers and Unfired Pressure Vessels (UPVs) | $ - 0 | |||||
| 0.00 | ||||||
| A011 | MCBH - Wastewater Instrumentation | 0.00 | ||||
| A011AA | Provide response and performance to Emergency Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| A011AB | Provide response and performance to Urgent Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| A011AC | Provide performance for Routine Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| A011AD | Perform Quarterly Calibration - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.6 | 4 | Q | $ - 0 | $ - 0 | |
| A011AE | Perform Semi-Annual Calibration - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.6 | 2 | SA | $ - 0 | $ - 0 | |
| A011AF | Perform Sewer Line Clearing IAW Annex 1502000 Spec Item 3.2.6.1 and Attachment J-1502000-07 | 12 | M | $ - 0 | $ - 0 | |
| SubTotal - MCBH - Wastewater Instrumentation | $ - 0 |
| A012 | CNRH - Wastewater Instrumentation | 0.00 | |||
| A012AA | Provide response and performance to Emergency Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 |
| A012AB | Provide response and performance to Urgent Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 |
| A012AC | Provide performance for Routine Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 |
| A012AD | Perform Monthly Calibration and Maintenance - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.6 | 12 | M | $ - 0 | $ - 0 |
| A012AE | Perform Semi-Annual Calibration and Maintenance - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.6 | 2 | SA | $ - 0 | $ - 0 |
| SubTotal - CNRH - Wastewater Instrumentation | $ - 0 | ||||
| 0.00 | |||||
| A013 | NAVFAC HI - Autoclave | 0.00 | |||
| A013AA | Provide response and performance to Emergency Service Orders for Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 |
| A013AB | Provide response and performance to Urgent Service Orders for Autoclave IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 |
| A013AC | Provide performance for Routine Service Orders for Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 |
| A013AD | Perform Quarterly Preventive Maintenance - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.1 | 4 | Q | $ - 0 | $ - 0 |
| A013AE | Perform Annual certifications - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.1 | 1 | A | $ - 0 | $ - 0 |
| A013AF | Perform Annual pressure check - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.1 | 1 | A | $ - 0 | $ - 0 |
| A013AG | Perform Annual temperature device calibration - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.1 | 1 | A | $ - 0 | $ - 0 |
| SubTotal - NAVFAC HI - Autoclave | $ - 0 |
| A014 | MCAS- Generators | 0.00 | |||
| A014AA | Provide response and performance to Emergency Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 |
| A014AB | Provide response and performance to Urgent Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 |
| A014AC | Provide response and performance to Routine Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 |
| A014AD | Perform Monthly Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-14 | 12 | M | $ - 0 | $ - 0 |
| A014AE | Perform Quarterly Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-14 | 4 | Q | $ - 0 | $ - 0 |
| A014AF | Perform Annual Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-14 | 1 | A | $ - 0 | $ - 0 |
| SubTotal - MCBH - Generator | $ - 0 |
| A015 | PHNSY - Chilled Water and Elysator | 0.00 | |||
| A015AA | Provide response and performance to Emergency Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 |
| A015AB | Provide response and performance to Urgent Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 |
| A015AC | Provide response and performance to Routine Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 |
| A015AD | Perform quarterly Preventive Maintenance on Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.2.13 and Attachment J-1502000-15 | 4 | Q | $ - 0 | $ - 0 |
| SubTotal - PHNSY - Chilled Water and Elysator | $ - 0 |
TOTAL PRICE FOR CONTRACT LINE ITEM 0001 $ - 0
&"Times New Roman,Regular"&10 14-26-2435 J-0200000-14, Page &P of &N
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Base Non-Recurring
ATTACHMENT J-0200000-14 OFFERER
PROPOSED UNIT
PRICE Enter proposed unit price in this column. Price will automatically copy to the UNIT PRICE cell rounded to two decimal places.
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #RFP No. N62478-26-2435 |
| EXHIBIT A |
| Line Item 0002 Nonrecurring Work Price - Base Period | |||||||
| PROVIDE PRICES TO PERFORM NONRECURRING WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs A700 through A701 | |||||||
| ELIN | Description | Description Extended | Est. Qty | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Task order completion times will be specified on each task order.
| 2,620 | HR | $ - 0 | $ - 0 |
| A701 | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
| Task order completion times will be specified on each task order. | 90,800 | DO | $ 1.00 | $ 90,800.00 | ||
| TOTAL LINE ITEMS ELINs A700 through A701 | $ 90,800.00 | |||||
| (Enter this amount into Section B, Item No. 0002, Net Amount) |
(1) The Government will compensate the Contractor based on negotiated amount for the required parts, components, material, and equipment, and not the extended price amount shown in this schedule
(2) Not to Exceed Labor Price amount shown in Unit Price column
&"Times New Roman,Regular"&10 14-26-2435 J-0200000-14, Page &P of &N
OY1 Recurring
| ATTACHMENT J-0200000-15 | OFFERER PROPOSED UNIT PRICE Enter proposed unit price in this column. Price will automatically copy to the UNIT PRICE cell rounded to two decimal places. |
| EXHIBIT LINE ITEM NUMBERS | |
| SOLICITATION/CONTRACT # N62478-26-2435 | |
| EXHIBIT B |
| Line Item 0003 Recurring Work - Option Period One | ||||||
| PROVIDE PRICES FOR - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs B001 through B015 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| B001 | CNRH - Boilers and Unfired Pressure Vessels (UPVs) | |||||
| B001AA | Provide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| B001AB | Provide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| B001AC | Provide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| B001AD | Perform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| B001AE | Perform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| B001AF | Perform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| B001AG | Perform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 4 | Q | $ - 0 | $ - 0 | |
| B001AH | Perform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| B001AJ | Perform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| B001AK | Perform Biennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | B | $ - 0 | $ - 0 | |
| B001AL | Perform Triennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | T | $ - 0 | $ - 0 | |
| B001AM | Provide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.3.1 | 12 | M | $ - 0 | $ - 0 | |
| SubTotal - CNRH - Boilers and Unfired Pressure Vessels (UPVs) | $ - 0 | |||||
| 0.00 | ||||||
| B002 | CNRH HICKAM - Clear Water Rinse Facility | |||||
| B002AA | Provide response and performance to Emergency Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| B002AB | Provide response and performance to Urgent Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| B002AC | Provide performance for Routine Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| B002AD | Perform Semi-Monthly Preventive Maintenance on Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.2.4 | 24 | SM | $ - 0 | $ - 0 | |
| SubTotal - CNRH HICKAM - Clear Water Rinse Facility | $ - 0 | |||||
| 0.00 | ||||||
| B003 | CNRH PHNSY - Generators Stack Testing | |||||
| B003AA | Perform annual Gas Turbine Generator Stack Emmission Testing IAW Annex 1502000 Spec Item 3.2.7 | 1 | A | $ - 0 | $ - 0 | |
| SubTotal - CNRH PHNSY - Generators Stack Testing | $ - 0 | |||||
| 0.00 | ||||||
| B004 | CNRH HICKAM - Vehicle Wash Rack | 0.00 | ||||
| B004AA | Provide response and performance to Emergency Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| B004AB | Provide response and performance to Urgent Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| B004AC | Provide performance for Routine Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| B004AD | Perform annual Preventive Maintenance for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.2.11 | 1 | A | $ - 0 | $ - 0 | |
| SubTotal - CNRH HICKAM - Vehicle Wash Rack | $ - 0 | |||||
| 0.00 | ||||||
| B005 | CNRH HICKAM - Vehicle Service Rack | 0.00 | ||||
| B005AA | Provide response and performance to Emergency Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| B005AB | Provide response and performance to Urgent Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| B005AC | Provide performance for Routine Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| B005AD | Perform Annual Preventive Maintenance for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.2.11 | 1 | A | $ - 0 | $ - 0 | |
| SubTotal - CNRH HICKAM - Vehicle Service Rack | $ - 0 | |||||
| 0.00 | ||||||
| B006 | CNRH PHNSY - Boilers and Unfired Pressure Vessels (UPVs) | 0.00 | ||||
| B006AA | Provide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| B006AB | Provide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| B006AC | Provide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| B006AD | Perform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| B006AE | Perform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| B006AF | Perform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| B006AG | Perform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 4 | Q | $ - 0 | $ - 0 | |
| B006AH | Perform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| B006AJ | Perform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| B006AK | Perform Biennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | B | $ - 0 | $ - 0 | |
| B006AL | Perform Triennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | T | $ - 0 | $ - 0 | |
| B006AM | Provide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.4.1 | 12 | M | $ - 0 | $ - 0 | |
| SubTotal - CNRH PHNSY - Boilers and Unfired Pressure Vessels (UPVs) | $ - 0 | |||||
| 0.00 | ||||||
| B007 | CNRH PHNSY - CAPSTANS | 0.00 | ||||
| B007AA | Provide response and performance to Emergency Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| B007AB | Provide response and performance to Urgent Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| B007AC | Provide performance for Routine Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| B007AD | Perform Semi-Annual Preventive Maintenance on Capstans IAW Annex 1502000 Spec Item 3.2.3 | 2 | SA | $ - 0 | $ - 0 | |
| B007AE | Perform Semi-Annual Preventive Maintenance on Trolleys IAW Annex 1502000 Spec Item 3.2.9 | 2 | SA | $ - 0 | $ - 0 | |
| B007AF | Perform Semi-Annual Preventive Maintenance on Truss Brows with Electric Winches IAW Annex 1502000 Spec Item 3.2.10 | 2 | SA | $ - 0 | $ - 0 | |
| SubTotal - CNRH PHNSY - CAPSTANS | $ - 0 | |||||
| 0.00 | ||||||
| B008 | PHNSY - Compressed Air Systems (LPAC) | |||||
| B008AA | Provide response and performance to Emergency Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| B008AB | Provide response and performance to Urgent Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| B008AC | Provide performance for Routine Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| B008AD | Perform Annual Overhaul Maintenance on Compressed Air Systems (LPAC) IAW Annex 1502000 Spec Item 3.2.5.1 | 1 | A | $ - 0 | $ - 0 | |
| B008AE | Perform Annual inspections on Compressed Air Systems (LPAC) IAW Annex 1502000 Spec Item 3.2.5.1 | 1 | A | $ - 0 | $ - 0 | |
| SubTotal - PHNSY - Compressed Air Systems (LPAC) | $ - 0 | |||||
| 0.00 | ||||||
| B009 | CNRH PHNSY - Liquid Nitrogen Storage Facility and Liquid Nitrogen Generator | |||||
| B009AA | Provide response and performance to Emergency Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| B009AB | Provide response and performance to Urgent Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| B009AC | Provide performance for Routine Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| B009AD | Perform Semi-Annual Preventive Maintenance on Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Items 3.2.8 & 3.2.8.1 | 2 | SA | $ - 0 | $ - 0 | |
| B009AE | Perform annual Preventive Maintenance on Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Items 3.2.8 & 3.2.8.1 | 1 | A | $ - 0 | $ - 0 | |
| B009AF | Perform semiannual Testing, Inspection, and Certification - Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.2.8 | 2 | SA | $ - 0 | $ - 0 | |
| B009AG | Perform Annual Testing, Inspection, and Certification - Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.2.8 | 1 | A | $ - 0 | $ - 0 | |
| B009AH | Replace ASME pressure relief assemblies on the APPS 160 & 525 Gallon outside tanks once every three years IAW Attachment J-1502000-09 | 1 | T | $ - 0 | $ - 0 | |
| SubTotal - CNRH PHNSY - Liquid Nitrogen Storage Facility and Liquid Nitrogen Generator | $ - 0 | |||||
| 0.00 | ||||||
| B010 | MCBH - Boilers and Unfired Pressure Vessels (UPVs) | |||||
| B010AA | Provide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| B010AB | Provide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| B010AC | Provide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| B010AD | Perform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| B010AE | Perform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| B010AF | Perform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 12 | M | $ - 0 | $ - 0 | |
| B010AG | Perform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.2 | 4 | Q | $ - 0 | $ - 0 | |
| B010AH | Perform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| B010AJ | Perform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | A | $ - 0 | $ - 0 | |
| B010AK | Perform Biennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | B | $ - 0 | $ - 0 | |
| B010AL | Perform Triennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.1 | 1 | T | $ - 0 | $ - 0 | |
| B010AM | Provide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.4.1 | 12 | M | $ - 0 | $ - 0 | |
| SubTotal - MCBH - Boilers and Unfired Pressure Vessels (UPVs) | $ - 0 | |||||
| 0.00 | ||||||
| B011 | MCBH - Wastewater Instrumentation | 0.00 | ||||
| B011AA | Provide response and performance to Emergency Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 | |
| B011AB | Provide response and performance to Urgent Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 | |
| B011AC | Provide performance for Routine Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 | |
| B011AD | Perform Quarterly Calibration - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.6 | 4 | Q | $ - 0 | $ - 0 | |
| B011AE | Perform Semi-Annual Calibration - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.6 | 2 | SA | $ - 0 | $ - 0 | |
| B011AF | Perform Sewer Line Clearing IAW Annex 1502000 Spec Item 3.2.6.1 and Attachment J-1502000-07 | 12 | M | $ - 0 | $ - 0 | |
| SubTotal - MCBH - Wastewater Instrumentation | $ - 0 |
| B012 | CNRH - Wastewater Instrumentation | 0.00 | |||
| B012AA | Provide response and performance to Emergency Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 |
| B012AB | Provide response and performance to Urgent Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 |
| B012AC | Provide performance for Routine Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 |
| B012AD | Perform Monthly Calibration and Maintenance - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.6 | 12 | M | $ - 0 | $ - 0 |
| B012AE | Perform Semi-Annual Calibration and Maintenance - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.6 | 2 | SA | $ - 0 | $ - 0 |
| SubTotal - CNRH - Wastewater Instrumentation | $ - 0 | ||||
| 0.00 | |||||
| B013 | NAVFAC HI - Autoclave | 0.00 | |||
| B013AA | Provide response and performance to Emergency Service Orders for Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 |
| B013AB | Provide response and performance to Urgent Service Orders for Autoclave IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 |
| B013AC | Provide performance for Routine Service Orders for Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 |
| B013AD | Perform Quarterly Preventive Maintenance - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.1 | 4 | Q | $ - 0 | $ - 0 |
| B013AE | Perform Annual certifications - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.1 | 1 | A | $ - 0 | $ - 0 |
| B013AF | Perform Annual pressure check - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.1 | 1 | A | $ - 0 | $ - 0 |
| B013AG | Perform Annual temperature device calibration - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.1 | 1 | A | $ - 0 | $ - 0 |
| SubTotal - NAVFAC HI - Autoclave | $ - 0 |
| B014 | MCAS- Generators | 0.00 | |||
| B014AA | Provide response and performance to Emergency Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 |
| B014AB | Provide response and performance to Urgent Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 |
| B014AC | Provide response and performance to Routine Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 |
| B014AD | Perform Monthly Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-14 | 12 | M | $ - 0 | $ - 0 |
| B014AE | Perform Quarterly Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-14 | 4 | Q | $ - 0 | $ - 0 |
| B014AF | Perform Annual Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-14 | 1 | A | $ - 0 | $ - 0 |
| SubTotal - MCBH - Generator | $ - 0 |
| B015 | PHNSY - Chilled Water and Elysator | 0.00 | |||
| B015AA | Provide response and performance to Emergency Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.1 | 12 | M | $ - 0 | $ - 0 |
| B015AB | Provide response and performance to Urgent Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.2 | 12 | M | $ - 0 | $ - 0 |
| B015AC | Provide response and performance to Routine Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.3 | 12 | M | $ - 0 | $ - 0 |
| B015AD | Perform quarterly Preventive Maintenance on Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.2.13 and Attachment J-1502000-15 | 4 | Q | $ - 0 | $ - 0 |
| SubTotal - PHNSY - Chilled Water and Elysator | $ - 0 |
TOTAL PRICE FOR CONTRACT LINE ITEM 0003 $ - 0
&"Times New Roman,Regular"&10 14-26-2435 J-0200000-15, Page &P of &N
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .