26-2435 OPS.xlsx

XLSX spreadsheet 179 KB Posted

Attached to
Equipment Operations, Maintenance, and Repair Services at Joint Base Pearl harbor Hickam, Hawaii (JBPHH).
Solicitation number
N6247827R2535
Issued by

About this file

This is a Schedule of Work and pricing template for a federal maintenance and repair services contract at Joint Base Pearl Harbor Hickam, Hawaii. The contract covers equipment operations, maintenance, and repair services across multiple military installations including CNRH (Commander Navy Region Hawaii), PHNSY (Pearl Harbor Naval Shipyard), MCBH (Marine Corps Base Hawaii), and NAVFAC HI, with a total contract value of $499,400.00 over the base period plus four one-year option periods and one six-month option to extend.

The pricing structure is divided into recurring and non-recurring work across 15 Equipment Line Items (ELINs). Recurring work includes monthly emergency, urgent, and routine service orders, along with preventive maintenance tasks at varying frequencies (daily, weekly, monthly, quarterly, semi-annual, and annual) for systems such as boilers and unfired pressure vessels, clear water rinse facilities, generators, vehicle wash racks, capstans, compressed air systems, liquid nitrogen storage facilities, wastewater instrumentation, autoclaves, and chilled water systems. Non-recurring work consists of unit-priced labor (UPL) at 2,620 hours and direct material/construction equipment at $1.00 per delivery order (DO), with each period budgeted at $90,800.00 for non-recurring costs. The base period and each option period are priced identically at $90,800.00, with the six-month option to extend priced at $45,400.00. All recurring line items are currently listed at $0.00 and require contractor pricing submissions. The solicitation references Annex 1502000 specifications and multiple attachment documents detailing service requirements and technical specifications for each equipment category.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule

SCHEDULE OF WORK
(TO BE COMPLETED AND SUBMITTED WITH THE OFFER)

ITEM NO. SUPPLIES/SERVICES AMOUNT

0001BASE PERIOD - RECURRING WORK
Price to perform Recurring work, for the 12-month Base Period, in accordance with all the terms of this contract.$- 0
0002BASE PERIOD - NON-RECURRING WORK
Price to perform Non-Recurring work, for the 12-month Base Period, in accordance with all the terms of this contract.EST$$ 90,800.00
TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS
(CLINs) 0001 AND 0002 (BASE PERIOD)$90,800.00
0003OPTION PERIOD ONE - RECURRING WORK
Price to perform Recurring work, for the 12-month Option Period One, in accordance with all the terms of this contract.$- 0
0004OPTION PERIOD ONE - NON-RECURRING WORK
Price to perform Non-Recurring work, for the 12-month Option Period One, in accordance with all the terms of this contract.EST$90,800.00
TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS
(CLINs) 0003 AND 0004 (OPTION PERIOD ONE)$90,800.00
0005OPTION PERIOD TWO - RECURRING WORK
Price to perform Recurring work, for the 12-month Option Period Two, in accordance with all the terms of this contract.$- 0
0006OPTION PERIOD TWO - NON-RECURRING WORK
Price to perform Non-Recurring work, for the 12-month Option Period Two, in accordance with all the terms of this contract.EST$90,800.00
TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS
(CLINs) 0005 AND 0006 (OPTION PERIOD TWO)$90,800.00
0007OPTION PERIOD THREE - RECURRING WORK
Price to perform Recurring work, for the 12-month Option Period Three in accordance with all the terms of this contract.$- 0
0008OPTION PERIOD THREE - NON-RECURRING WORK
Price to perform Non-Recurring work, for the 12-month Option Period Three in accordance with all the terms of this contract.EST$90,800.00
TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS
(CLINs) 0007 AND 0008 (OPTION PERIOD THREE)$90,800.00
0009OPTION PERIOD FOUR - RECURRING WORK
Price to perform Recurring work, for the 12-month Option Period Four in accordance with all the terms of this contract.$- 0
0010OPTION PERIOD FOUR - NON-RECURRING WORK
Price to perform Non-Recurring work, for the 12-month Option Period Four in accordance with all the terms of this contract.EST$90,800.00
TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS
(CLINs) 0009 AND 0010 (OPTION PERIOD FOUR)$90,800.00
0011OPTION TO EXTEND SERVICES- RECURRING WORK
Price to perform Recurring work, for the 6-month Option to Extend Services in accordance with all the terms of this contract$- 0
0012OPTION TO EXTEND SERVICES - NON-RECURRING WORK
Price to perform non-recurring work, for the 6-month Option to Extend Services, in accordance with all the terms of this contract.EST$45,400.00
TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS
(CLINs) 0011 AND 0012 (OPTION TO EXTEND SERVICES)$45,400.00
TOTAL PRICE FOR CONTRACT LINE ITEM NUMBERS
(CLINs) 0001 THROUGH 0012$499,400.00

Sheet1 ELIN Customer Requirement LOA

x001CNRHBoilers and UPVs1LFBoilers and UPVsxSent to customer
x002CNRH HickamClear Water Rinse1LFClear Water RinsexSent to customer (combined with Vehicle Racks LOA)
x003CNRH PHNSYGenerator Stack testing1LFGnerator Stack testingxSent to Customer
x004CNRH HickamVehicle Wash Rack1LFVehcle Wash Rack and Vehicle Service RackxSent to customer with clear water rinse LOA
x005CNRH HickamVehicle Service RackSent to customer with clear water rinse LOA
x006CNRH PHNSYBoilers and UPVs1LFBoilers and UPVs, Liquid NitrogenxSent to Customer
x007CNRH PHNSYCapstans1LFCapstansxSent to Customer
x008PHNSYCompressed Air (LPACs)1SFLPACsPHNSY
x009CNRH PHNSYLiquid Nitrogen Storage Facility and Liquid Nitrogen GeneratorSent to Customer
x010MCBHBoilers and UPVs1SFBoilers and UPVs, Wastewater Instrumentation, GeneratorsSent to MCBH
x011MCBHWastewater InstrumentationSent to MCBH
x012CNRHWastewater Instrumentation1LFWastewater InstrumentationCNRH
x013NAVFAC HIAutoclave1LFAutoclaveSent to Customer
x014MCBHGeneratorsSent to MCBH
x015PHNSYChilled Water and Elysator1SFChilled Water and ElysatorSent to Customer

Sheet2

A001 CNRH Boilers and UPVs
12$ 1,263.00$ 15,156.00$ 1,452.4522$ 66.029$ 594.1812$ 7,130.21
12$ 1,025.00$ 12,300.00$ 1,178.7522$ 53.589$ 482.2212$ 5,786.59
12$ 867.00$ 10,404.00$ 997.0522$ 45.329$ 407.8812$ 4,894.61
12$ 17,480.00$ 209,760.00$ 20,102.0022$ 913.739$ 8,223.5512$ 98,682.55
12$ 8,204.00$ 98,448.00$ 9,434.6022$ 428.859$ 3,859.6112$ 46,315.31
12$ 7,866.00$ 94,392.00$ 9,045.9022$ 411.189$ 3,700.6012$ 44,407.15
4$ 7,866.00$ 31,464.00$ 9,045.9022$ 411.189$ 3,700.604$ 14,802.38
1$ 7,190.00$ 7,190.00$ 8,268.5022$ 375.849$ 3,382.571$ 3,382.57
1$ 7,190.00$ 7,190.00$ 8,268.5022$ 375.849$ 3,382.571$ 3,382.57
1$ 28,757.00$ 28,757.00$ 33,070.5522$ 1,503.219$ 13,528.861$ 13,528.86
$ 24,802.921$ 24,802.92
12$ 1,996.00$ 23,952.00$ 2,295.408$ 286.929$ 2,582.3312$ 30,987.90
$ 89,704.00$ 539,013.00$ 298,103.61
A002 CNRH Clear Water Rinse Facility
12$ 74.00$ 888.00$ 85.10
12$ 74.00$ 888.00$ 85.10
12$ 74.00$ 888.00$ 85.10
24$ 2,125.00$ 51,000.00$ 2,443.75
$ 53,664.00
A003 CNRH Generators Stack Testing
1$ 85,896.00$ 85,896.00$ 98,780.40
$ 85,896.00
A004 Vehicle Wash Rack
12$ 74.00$ 888.00$ 85.10
12$ 74.00$ 888.00$ 85.10
12$ 74.00$ 888.00$ 85.10
1$ 77,167.00$ 77,167.00$ 88,742.05
$ 79,831.00
A005 Vehicle Service Rack
12$ 74.00$ 888.00$ 85.10
12$ 74.00$ 888.00$ 85.10
12$ 74.00$ 888.00$ 85.10
1$ 25,725.00$ 25,725.00$ 29,583.75
$ 28,389.00
A006 PHNSY Boilers and UPVs
12$ 476.00$ 5,712.00$ 547.403$ 182.471$ 182.4712$ 2,189.60
12$ 476.00$ 5,712.00$ 547.403$ 182.471$ 182.4712$ 2,189.60
12$ 476.00$ 5,712.00$ 547.403$ 182.471$ 182.4712$ 2,189.60
12$ 7,022.00$ 84,264.00$ 8,075.303$ 2,691.771$ 2,691.7712$ 32,301.20
12$ 1,194.00$ 14,328.00$ 1,373.103$ 457.701$ 457.7012$ 5,492.40
12$ 1,550.00$ 18,600.00$ 1,782.503$ 594.171$ 594.1712$ 7,130.00
4$ 5,178.00$ 20,712.00$ 5,954.703$ 1,984.901$ 1,984.904$ 7,939.60
1$ 5,606.00$ 5,606.00$ 6,446.903$ 2,148.971$ 2,148.971$ 2,148.97
1$ 23,244.00$ 23,244.00$ 26,730.603$ 8,910.201$ 8,910.201$ 8,910.20
1$ 9,246.00$ 9,246.00$ 10,632.903$ 3,544.301$ 3,544.301$ 3,544.30
$ 5,316.451$ 5,316.45
12$ 801.00$ 9,612.00$ 921.153$ 307.051$ 307.0512$ 3,684.60
$ 202,748.00$ 83,036.52
A007 PHNSY Capstans
12$ 626.00$ 7,512.00$ 719.90
12$ 626.00$ 7,512.00$ 719.90
12$ 626.00$ 7,512.00$ 719.90
2$ 23,902.00$ 47,804.00$ 27,487.30
2$ 13,366.00$ 26,732.00$ 15,370.90
2$ 9,992.00$ 19,984.00$ 11,490.80
$ 117,056.00

A008 LPACs

12$ 664.00$ 7,968.00$ 763.604$ 190.905$ 954.5012$ 11,454.00
12$ 664.00$ 7,968.00$ 763.604$ 190.905$ 954.5012$ 11,454.00
12$ 664.00$ 7,968.00$ 763.604$ 190.905$ 954.5012$ 11,454.00
1$ 429,026.00$ 429,026.00$ 493,379.904$ 123,344.971$ 123,344.971$ 123,344.97
1$ 20,399.00$ 20,399.00$ 23,458.854$ 5,864.711$ 5,864.711$ 5,864.71
$ 163,571.69
A009 Liquid Nitrogen Storag Facility and Liquid Nitrogen Generator
12$ 269.00$ 3,228.00$ 309.35
12$ 269.00$ 3,228.00$ 309.35
12$ 269.00$ 3,228.00$ 309.35
2$ 2,113.00$ 4,226.00$ 2,429.95
1$ 2,113.00$ 2,113.00$ 2,429.95
2$ 2,113.00$ 4,226.00$ 2,429.95
1$ 2,113.00$ 2,113.00$ 2,429.95
1$ 2,191.00$ 2,191.00$ 2,519.65
$ 24,553.00
A010 MCBH Boilers and UPVs
12$ 587.00$ 7,044.00$ 675.05
12$ 587.00$ 7,044.00$ 675.05
12$ 587.00$ 7,044.00$ 675.05
12$ 8,034.00$ 96,408.00$ 9,239.10
12$ 1,650.00$ 19,800.00$ 1,897.50
12$ 2,588.00$ 31,056.00$ 2,976.20
4$ 5,174.00$ 20,696.00$ 5,950.10
1$ 7,112.00$ 7,112.00$ 8,178.80
1$ 7,112.00$ 7,112.00$ 8,178.80
1$ 11,853.00$ 11,853.00$ 13,630.95
1$ 20,446.43$ 20,446.43$ 20,446.43
12$ 1,996.00$ 23,952.00$ 2,295.40
$ 259,567.43
A011 MCBH Wastewater Instrumentation
12$ 402.00$ 4,824.00$ 462.3050$ 9.2553$ 490.0412$ 5,880.46
12$ 402.00$ 4,824.00$ 462.3050$ 9.2553$ 490.0412$ 5,880.46
12$ 402.00$ 4,824.00$ 462.3050$ 9.2553$ 490.0412$ 5,880.46
4$ 8,790.00$ 35,160.00$ 10,108.5036$ 280.7935$ 9,827.714$ 39,310.83
2$ 8,790.00$ 17,580.00$ 10,108.5014$ 722.0418$ 12,996.642$ 25,993.29
12$ 6,000.0012$ 72,000.00
$ 67,212.00$ 154,945.49
A012 CNRH Wastewater Instrumentation
12$ 9.250$ 9.259$ 83.2512$ 999.00
12$ 9.250$ 9.259$ 83.2512$ 999.00
12$ 9.250$ 9.259$ 83.2512$ 999.00
1207$ 2,100.0012$ 25,200.00
40$ - 09$ - 04$ - 0
2$ 202.170$ 202.179$ 1,819.532$ 3,639.06
$ 4,169.28$ 31,836.06
A013 NAVFAC HI Autoclave
12$ 74.00$ 888.00$ 85.10$ 85.10
12$ 74.00$ 888.00$ 85.10$ 85.10
12$ 74.00$ 888.00$ 85.10$ 85.10
2$ 1,385.00$ 2,770.00$ 1,592.754$ 398.19
1$ 3,070.00$ 3,070.00$ 3,530.50$ 3,530.50
1$ 3,070.00$ 3,070.00$ 3,530.50$ 3,530.50
1$ 3,070.00$ 3,070.00$ 3,530.50$ 3,530.50
$ 14,644.00
12$ 309.008$ 309.3512$ 3,712.20
12$ - 08$ 309.3512$ 3,712.20
12$ - 08$ 309.3512$ 3,712.20
12$ 525.008$ 4,200.0012$ 50,400.00
12$ 950.008$ 7,600.004$ 30,400.00
12$ 4,700.008$ 37,600.001$ 37,600.00
12$ 420.008$ - 0
A015 Chilled Water And Elysators
1212$ 200.0012$ 2,400.00
1212$ 85.0012$ 1,020.00
1212$ 85.0012$ 1,020.00
4$ 5,040.004$ 20,160.00
$ 5,410.00$ 24,600.00

Base Recurring

ATTACHMENT J-0200000-14OFFERER PROPOSED UNIT PRICE Enter proposed unit price in this column. Price will automatically copy to the UNIT PRICE cell rounded to two decimal places.
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62478-26-2435
EXHIBIT A
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES FOR - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A015
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
A001CNRH - Boilers and Unfired Pressure Vessels (UPVs)
A001AAProvide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A001ABProvide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A001ACProvide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A001ADPerform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
A001AEPerform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
A001AFPerform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
A001AGPerform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.24Q$ - 0$ - 0
A001AHPerform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
A001AJPerform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
A001AKRESERVED
A001ALRESERVED
A001AMProvide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.3.112M$ - 0$ - 0
SubTotal - CNRH - Boilers and Unfired Pressure Vessels (UPVs)$ - 0
0.00
A002CNRH HICKAM - Clear Water Rinse Facility
A002AAProvide response and performance to Emergency Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A002ABProvide response and performance to Urgent Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A002ACProvide performance for Routine Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A002ADPerform Semi-Monthly Preventive Maintenance on Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.2.424SM$ - 0$ - 0
SubTotal - CNRH HICKAM - Clear Water Rinse Facility$ - 0
0.00
A003CNRH PHNSY - Generators Stack Testing
A003AAPerform annual Gas Turbine Generator Stack Emmission Testing IAW Annex 1502000 Spec Item 3.2.71A$ - 0$ - 0
SubTotal - CNRH PHNSY - Generators Stack Testing$ - 0
0.00
A004CNRH HICKAM - Vehicle Wash Rack0.00
A004AAProvide response and performance to Emergency Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A004ABProvide response and performance to Urgent Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A004ACProvide performance for Routine Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A004ADPerform annual Preventive Maintenance for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.2.111A$ - 0$ - 0
SubTotal - CNRH HICKAM - Vehicle Wash Rack$ - 0
0.00
A005CNRH HICKAM - Vehicle Service Rack0.00
A005AAProvide response and performance to Emergency Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A005ABProvide response and performance to Urgent Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A005ACProvide performance for Routine Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A005ADPerform Annual Preventive Maintenance for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.2.111A$ - 0$ - 0
SubTotal - CNRH HICKAM - Vehicle Service Rack$ - 0
0.00
A006CNRH PHNSY - Boilers and Unfired Pressure Vessels (UPVs)0.00
A006AAProvide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A006ABProvide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A006ACProvide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A006ADPerform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
A006AEPerform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
A006AFPerform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
A006AGPerform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.24Q$ - 0$ - 0
A006AHPerform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
A006AJPerform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
A006AKRESERVED
A006ALRESERVED
A006AMProvide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.4.112M$ - 0$ - 0
SubTotal - CNRH PHNSY - Boilers and Unfired Pressure Vessels (UPVs)$ - 0
0.00
A007CNRH PHNSY - CAPSTANS0.00
A007AAProvide response and performance to Emergency Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A007ABProvide response and performance to Urgent Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A007ACProvide performance for Routine Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A007ADPerform Semi-Annual Preventive Maintenance on Capstans IAW Annex 1502000 Spec Item 3.2.32SA$ - 0$ - 0
A007AEPerform Semi-Annual Preventive Maintenance on Trolleys IAW Annex 1502000 Spec Item 3.2.92SA$ - 0$ - 0
A007AFPerform Semi-Annual Preventive Maintenance on Truss Brows with Electric Winches IAW Annex 1502000 Spec Item 3.2.102SA$ - 0$ - 0
SubTotal - CNRH PHNSY - CAPSTANS$ - 0
0.00
A008PHNSY - Compressed Air Systems (LPAC)
A008AAProvide response and performance to Emergency Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A008ABProvide response and performance to Urgent Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A008ACProvide performance for Routine Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A008ADPerform Annual Overhaul Maintenance on Compressed Air Systems (LPAC) IAW Annex 1502000 Spec Item 3.2.5.11A$ - 0$ - 0
A008AEPerform Annual inspections on Compressed Air Systems (LPAC) IAW Annex 1502000 Spec Item 3.2.5.11A$ - 0$ - 0
RESERVED$ - 0
0.00
A009CNRH PHNSY - Liquid Nitrogen Storage Facility and Liquid Nitrogen Generator
A009AAProvide response and performance to Emergency Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A009ABProvide response and performance to Urgent Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A009ACProvide performance for Routine Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A009ADPerform Semi-Annual Preventive Maintenance on Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Items 3.2.8 & 3.2.8.12SA$ - 0$ - 0
A009AEPerform annual Preventive Maintenance on Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Items 3.2.8 & 3.2.8.11A$ - 0$ - 0
A009AFPerform semiannual Testing, Inspection, and Certification - Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.2.82SA$ - 0$ - 0
A009AGPerform Annual Testing, Inspection, and Certification - Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.2.81A$ - 0$ - 0
A009AHRESERVED
SubTotal - CNRH PHNSY - Liquid Nitrogen Storage Facility and Liquid Nitrogen Generator$ - 0
0.00
A010MCBH - Boilers and Unfired Pressure Vessels (UPVs)0.00
A010AAProvide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A010ABProvide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A010ACProvide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A010ADPerform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
A010AEPerform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
A010AFPerform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
A010AGPerform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.24Q$ - 0$ - 0
A010AHPerform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
A010AJPerform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
A010AKRESERVED
A010ALRESERVED
A010AMProvide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.4.112M$ - 0$ - 0
SubTotal - MCBH - Boilers and Unfired Pressure Vessels (UPVs)$ - 0
0.00
A011MCBH - Wastewater Instrumentation0.00
A011AAProvide response and performance to Emergency Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A011ABProvide response and performance to Urgent Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A011ACProvide performance for Routine Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A011ADPerform Quarterly Calibration - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.64Q$ - 0$ - 0
A011AEPerform Semi-Annual Calibration - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.62SA$ - 0$ - 0
A011AFPerform Sewer Line Clearing IAW Annex 1502000 Spec Item 3.2.6.1 and Attachment J-1502000-0712M$ - 0$ - 0
SubTotal - MCBH - Wastewater Instrumentation$ - 0
A012CNRH - Wastewater Instrumentation0.00
A012AAProvide response and performance to Emergency Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A012ABProvide response and performance to Urgent Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A012ACProvide performance for Routine Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A012ADPerform Monthly Calibration and Maintenance - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.612M$ - 0$ - 0
A012AEPerform Semi-Annual Calibration and Maintenance - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.62SA$ - 0$ - 0
SubTotal - CNRH - Wastewater Instrumentation$ - 0
0.00
A013NAVFAC HI - Autoclave0.00
A013AAProvide response and performance to Emergency Service Orders for Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A013ABProvide response and performance to Urgent Service Orders for Autoclave IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A013ACProvide performance for Routine Service Orders for Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A013ADPerform Quarterly Preventive Maintenance - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.14Q$ - 0$ - 0
A013AEPerform Annual certifications - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.11A$ - 0$ - 0
A013AFPerform Annual pressure check - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.11A$ - 0$ - 0
A013AGPerform Annual temperature device calibration - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.11A$ - 0$ - 0
SubTotal - NAVFAC HI - Autoclave$ - 0
A014MCAS- Generators0.00
A014AAProvide response and performance to Emergency Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A014ABProvide response and performance to Urgent Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A014ACProvide response and performance to Routine Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A014ADPerform Monthly Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-1412M$ - 0$ - 0
A014AEPerform Quarterly Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-144Q$ - 0$ - 0
A014AFPerform Annual Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-141A$ - 0$ - 0
SubTotal - MCBH - Generator$ - 0
A015PHNSY - Chilled Water and Elysator0.00
A015AAProvide response and performance to Emergency Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
A015ABProvide response and performance to Urgent Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
A015ACProvide response and performance to Routine Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
A015ADPerform quarterly Preventive Maintenance on Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.2.13 and Attachment J-1502000-154Q$ - 0$ - 0
SubTotal - PHNSY - Chilled Water and Elysator$ - 0

TOTAL PRICE FOR CONTRACT LINE ITEM 0001 $ - 0

&"Times New Roman,Regular"&10 14-26-2435 J-0200000-14, Page &P of &N

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Base Non-Recurring

ATTACHMENT J-0200000-14 OFFERER

PROPOSED UNIT

PRICE Enter proposed unit price in this column. Price will automatically copy to the UNIT PRICE cell rounded to two decimal places.

EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #RFP No. N62478-26-2435
EXHIBIT A
Line Item 0002 Nonrecurring Work Price - Base Period
PROVIDE PRICES TO PERFORM NONRECURRING WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A701
ELINDescriptionDescription ExtendedEst. QtyUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.

2,620HR$ - 0$ - 0
A701Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order.90,800DO$ 1.00$ 90,800.00
TOTAL LINE ITEMS ELINs A700 through A701$ 90,800.00
(Enter this amount into Section B, Item No. 0002, Net Amount)

(1) The Government will compensate the Contractor based on negotiated amount for the required parts, components, material, and equipment, and not the extended price amount shown in this schedule

(2) Not to Exceed Labor Price amount shown in Unit Price column

&"Times New Roman,Regular"&10 14-26-2435 J-0200000-14, Page &P of &N

OY1 Recurring

ATTACHMENT J-0200000-15OFFERER PROPOSED UNIT PRICE Enter proposed unit price in this column. Price will automatically copy to the UNIT PRICE cell rounded to two decimal places.
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62478-26-2435
EXHIBIT B
Line Item 0003 Recurring Work - Option Period One
PROVIDE PRICES FOR - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B015
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
B001CNRH - Boilers and Unfired Pressure Vessels (UPVs)
B001AAProvide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B001ABProvide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B001ACProvide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B001ADPerform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
B001AEPerform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
B001AFPerform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
B001AGPerform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.24Q$ - 0$ - 0
B001AHPerform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
B001AJPerform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
B001AKPerform Biennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.11B$ - 0$ - 0
B001ALPerform Triennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.11T$ - 0$ - 0
B001AMProvide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.3.112M$ - 0$ - 0
SubTotal - CNRH - Boilers and Unfired Pressure Vessels (UPVs)$ - 0
0.00
B002CNRH HICKAM - Clear Water Rinse Facility
B002AAProvide response and performance to Emergency Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B002ABProvide response and performance to Urgent Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B002ACProvide performance for Routine Service Orders for Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B002ADPerform Semi-Monthly Preventive Maintenance on Clear Water Rinse Facility IAW Annex 1502000 Spec Item 3.2.424SM$ - 0$ - 0
SubTotal - CNRH HICKAM - Clear Water Rinse Facility$ - 0
0.00
B003CNRH PHNSY - Generators Stack Testing
B003AAPerform annual Gas Turbine Generator Stack Emmission Testing IAW Annex 1502000 Spec Item 3.2.71A$ - 0$ - 0
SubTotal - CNRH PHNSY - Generators Stack Testing$ - 0
0.00
B004CNRH HICKAM - Vehicle Wash Rack0.00
B004AAProvide response and performance to Emergency Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B004ABProvide response and performance to Urgent Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B004ACProvide performance for Routine Service Orders for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B004ADPerform annual Preventive Maintenance for Vehicle Wash Rack IAW Annex 1502000 Spec Item 3.2.111A$ - 0$ - 0
SubTotal - CNRH HICKAM - Vehicle Wash Rack$ - 0
0.00
B005CNRH HICKAM - Vehicle Service Rack0.00
B005AAProvide response and performance to Emergency Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B005ABProvide response and performance to Urgent Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B005ACProvide performance for Routine Service Orders for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B005ADPerform Annual Preventive Maintenance for Vehicle Service Rack IAW Annex 1502000 Spec Item 3.2.111A$ - 0$ - 0
SubTotal - CNRH HICKAM - Vehicle Service Rack$ - 0
0.00
B006CNRH PHNSY - Boilers and Unfired Pressure Vessels (UPVs)0.00
B006AAProvide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B006ABProvide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B006ACProvide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B006ADPerform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
B006AEPerform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
B006AFPerform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
B006AGPerform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.24Q$ - 0$ - 0
B006AHPerform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
B006AJPerform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
B006AKPerform Biennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.11B$ - 0$ - 0
B006ALPerform Triennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.11T$ - 0$ - 0
B006AMProvide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.4.112M$ - 0$ - 0
SubTotal - CNRH PHNSY - Boilers and Unfired Pressure Vessels (UPVs)$ - 0
0.00
B007CNRH PHNSY - CAPSTANS0.00
B007AAProvide response and performance to Emergency Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B007ABProvide response and performance to Urgent Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B007ACProvide performance for Routine Service Orders for Capstans, Trolleys, and Truss Brows with Winches IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B007ADPerform Semi-Annual Preventive Maintenance on Capstans IAW Annex 1502000 Spec Item 3.2.32SA$ - 0$ - 0
B007AEPerform Semi-Annual Preventive Maintenance on Trolleys IAW Annex 1502000 Spec Item 3.2.92SA$ - 0$ - 0
B007AFPerform Semi-Annual Preventive Maintenance on Truss Brows with Electric Winches IAW Annex 1502000 Spec Item 3.2.102SA$ - 0$ - 0
SubTotal - CNRH PHNSY - CAPSTANS$ - 0
0.00
B008PHNSY - Compressed Air Systems (LPAC)
B008AAProvide response and performance to Emergency Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B008ABProvide response and performance to Urgent Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B008ACProvide performance for Routine Service Orders for Compressed Air Systems IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B008ADPerform Annual Overhaul Maintenance on Compressed Air Systems (LPAC) IAW Annex 1502000 Spec Item 3.2.5.11A$ - 0$ - 0
B008AEPerform Annual inspections on Compressed Air Systems (LPAC) IAW Annex 1502000 Spec Item 3.2.5.11A$ - 0$ - 0
SubTotal - PHNSY - Compressed Air Systems (LPAC)$ - 0
0.00
B009CNRH PHNSY - Liquid Nitrogen Storage Facility and Liquid Nitrogen Generator
B009AAProvide response and performance to Emergency Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B009ABProvide response and performance to Urgent Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B009ACProvide performance for Routine Service Orders for Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B009ADPerform Semi-Annual Preventive Maintenance on Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Items 3.2.8 & 3.2.8.12SA$ - 0$ - 0
B009AEPerform annual Preventive Maintenance on Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Items 3.2.8 & 3.2.8.11A$ - 0$ - 0
B009AFPerform semiannual Testing, Inspection, and Certification - Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.2.82SA$ - 0$ - 0
B009AGPerform Annual Testing, Inspection, and Certification - Liquid Nitrogen Storage Facility & Liquid Nitrogen Generator IAW Annex 1502000 Spec Item 3.2.81A$ - 0$ - 0
B009AHReplace ASME pressure relief assemblies on the APPS 160 & 525 Gallon outside tanks once every three years IAW Attachment J-1502000-091T$ - 0$ - 0
SubTotal - CNRH PHNSY - Liquid Nitrogen Storage Facility and Liquid Nitrogen Generator$ - 0
0.00
B010MCBH - Boilers and Unfired Pressure Vessels (UPVs)
B010AAProvide response and performance to Emergency Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B010ABProvide response and performance to Urgent Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B010ACProvide performance for Routine Service Orders for Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B010ADPerform Daily Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
B010AEPerform Weekly Maintenance on Gas and Oil Fired Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
B010AFPerform Monthly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.212M$ - 0$ - 0
B010AGPerform Quarterly Operational Checks on Steam Boilers and Unfired Pressure Vessels (UPVs) IAW Annex 1502000 Spec Item 3.2.24Q$ - 0$ - 0
B010AHPerform Annual Testing, Inspection, and Certification - Steam Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
B010AJPerform Annual Testing, Inspection, and Certification - Gas and Oil Fired Boilers and UPV IAW Annex 1502000 Spec Item 3.3.11A$ - 0$ - 0
B010AKPerform Biennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.11B$ - 0$ - 0
B010ALPerform Triennial Testing, Inspection, and Certification - Boiler and UPV IAW Annex 1502000 Spec Item 3.3.11T$ - 0$ - 0
B010AMProvide Boiler Water Testing and Treatment Services IAW Annex 1502000 Spec Item 3.4.112M$ - 0$ - 0
SubTotal - MCBH - Boilers and Unfired Pressure Vessels (UPVs)$ - 0
0.00
B011MCBH - Wastewater Instrumentation0.00
B011AAProvide response and performance to Emergency Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B011ABProvide response and performance to Urgent Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B011ACProvide performance for Routine Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B011ADPerform Quarterly Calibration - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.64Q$ - 0$ - 0
B011AEPerform Semi-Annual Calibration - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.62SA$ - 0$ - 0
B011AFPerform Sewer Line Clearing IAW Annex 1502000 Spec Item 3.2.6.1 and Attachment J-1502000-0712M$ - 0$ - 0
SubTotal - MCBH - Wastewater Instrumentation$ - 0
B012CNRH - Wastewater Instrumentation0.00
B012AAProvide response and performance to Emergency Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B012ABProvide response and performance to Urgent Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B012ACProvide performance for Routine Service Orders for Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B012ADPerform Monthly Calibration and Maintenance - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.612M$ - 0$ - 0
B012AEPerform Semi-Annual Calibration and Maintenance - Wastewater Instrumentation IAW Annex 1502000 Spec Item 3.2.62SA$ - 0$ - 0
SubTotal - CNRH - Wastewater Instrumentation$ - 0
0.00
B013NAVFAC HI - Autoclave0.00
B013AAProvide response and performance to Emergency Service Orders for Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B013ABProvide response and performance to Urgent Service Orders for Autoclave IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B013ACProvide performance for Routine Service Orders for Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B013ADPerform Quarterly Preventive Maintenance - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.14Q$ - 0$ - 0
B013AEPerform Annual certifications - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.11A$ - 0$ - 0
B013AFPerform Annual pressure check - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.11A$ - 0$ - 0
B013AGPerform Annual temperature device calibration - Autoclave, Sterilizer IAW Annex 1502000 Spec Item 3.2.11A$ - 0$ - 0
SubTotal - NAVFAC HI - Autoclave$ - 0
B014MCAS- Generators0.00
B014AAProvide response and performance to Emergency Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B014ABProvide response and performance to Urgent Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B014ACProvide response and performance to Routine Service Orders for Generator system at MCBH IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B014ADPerform Monthly Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-1412M$ - 0$ - 0
B014AEPerform Quarterly Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-144Q$ - 0$ - 0
B014AFPerform Annual Preventive Maintenance on Generator systems at MCBH IAW Annex 1502000 Spec Item 3.2.12 and Attachment J-1502000-141A$ - 0$ - 0
SubTotal - MCBH - Generator$ - 0
B015PHNSY - Chilled Water and Elysator0.00
B015AAProvide response and performance to Emergency Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.112M$ - 0$ - 0
B015ABProvide response and performance to Urgent Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.212M$ - 0$ - 0
B015ACProvide response and performance to Routine Service Orders for Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.1.312M$ - 0$ - 0
B015ADPerform quarterly Preventive Maintenance on Elysator system at PHNSY B-S1182 IAW Annex 1502000 Spec Item 3.2.13 and Attachment J-1502000-154Q$ - 0$ - 0
SubTotal - PHNSY - Chilled Water and Elysator$ - 0

TOTAL PRICE FOR CONTRACT LINE ITEM 0003 $ - 0

&"Times New Roman,Regular"&10 14-26-2435 J-0200000-15, Page &P of &N

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .