View the file

Other files

File Type Posted
N6247321R3430_RFIs_072121.xlsx XLSX spreadsheet
TC-A-101_072121.pdf PDF
A0003_072121.pdf PDF
MCIWEST G6 CPR (OSP) Section 271300 (Signed) May 7 2018.pdf PDF
MCIWEST G6 CPR (PDS) Section 271400 (Signed) May 7 2018.pdf PDF
N6247321R3430_RFIs_071321.xlsx XLSX spreadsheet
3.09 - COM JOC Section J Exhibit D Safety Data R1_071321.docx DOCX document
MCIWEST G6 CPR (ISP) Section 271500 (Signed) May 7 2018.pdf PDF
A0002_071321.pdf PDF
N6247321R3430_RFIs_070721.xlsx XLSX spreadsheet
N6247321R3430_A0001_070721.pdf PDF
N6247321R3430_061821.pdf PDF
3-09 - COM JOC Section J Attachment J-C.7 Coefficient Example.pdf PDF
3-09 - COM JOC Section J Attachment J-C9-2 SA 20064 PE2098M and PE18416M CATEX.pdf PDF
3-09 - COM JOC Section J Exhibit D Safety Data.docx DOCX document
3-09 - COM JOC Section J Attachment J-C.1 - J-C.6 (REV May21)_EBB_R1 KMK.pdf PDF
4-XX - COM JOC Section L Attachment L-2 Project Forecast.doc DOC document
3-09 - COM JOC Section J Attachment J-C.8 Wage Determination.pdf PDF
3-09 - COM JOC Section J Exhibit B Recent Relevant Experience.docx DOCX document
4-XX - COM JOC Section L EXHIBIT H Bid ELINs.xlsx XLSX spreadsheet
4-XX - COM JOC Section L Attachment L-4 RFI Form.xlsx XLSX spreadsheet
3-09 - COM JOC Section J Attachment J-C.9-3 EXHIBIT G Bid ELINs (Seed Project).xlsx XLSX spreadsheet
3-09 - COM JOC Section J Exhibit E PPQ.docx DOCX document
3-09 - COM JOC Section J Exhibit C Management Approach.docx DOCX document
3-09 - COM JOC Section J Attachment J-C.9 SOW.pdf PDF
4-XX - COM JOC Section L Attachment L-3 DBIDs Roster.xlsx XLSX spreadsheet
3-09 - COM JOC Section J Attachment J-C.9-1 SA16291 PE18416M CATEX.pdf PDF
3-09 - COM JOC Section J Exhibit F Surety Form.docx DOCX document
3-09 - COM JOC Section J Exhibit A Financial Questionnaire.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

X

X

X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X x

X

X

X

X

X

X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X x

TELECOM SITE PLAN - BEQ

A

M

NAVFAC DRAWING NO.

SHEET OF

NAVFAC DRAWING NUMBERS WILL BE ASSIGNED

SEPARATELY TO EACH PROJECT FOR RECORD DRAWINGS

P-1067 BEQ

SB

C

N62473-10-C-5005

SB-T-102

TE

LE

C O

M M

U N

IC

A

TI

O

N S

S

IT

E P

LA

N

SIGNATURESIGNATURE

W E

S

Work Order Name / Number P1093

Man Hole Name: MH-41-0 / Route 2

W E

S

Work Order Name / Number P1093

Man Hole Name: MH-41-1 / Route 2

/1

/2

:3 7:

A

M

C O

M M

U N

IC

A

TI

O

N S

D

IS

TR

IB

U

TI

O N

F A

C

IL

IT

Y

NAVFAC DRAWING NO.

SHEET OF

NAVFAC DRAWING NUMBERS WILL BE ASSIGNED

SEPARATELY TO EACH PROJECT FOR RECORD DRAWINGS

P-1016 RECON

TC

TC-T-001

C

H N

O

LO

G Y

S Y

M B

O

LS

A N

D A

B B

R E

V

IA

TI

O

N S

/1

/2

:3 7:

A

M

C O

M M

U N

IC

A

TI

O

N S

D

IS

TR

IB

U

TI

O N

F A

C

IL

IT

Y

NAVFAC DRAWING NO.

SHEET OF

NAVFAC DRAWING NUMBERS WILL BE ASSIGNED

SEPARATELY TO EACH PROJECT FOR RECORD DRAWINGS

P-1016 RECON

TC

TC-T-002

C

H N

O

LO

G Y

R

IS

E R

D

IA

G R

A M

A

B

A

B

OSPGB

TYP.

CABLE

VAULT

A

B

1 2 3

W

W

A

B

1 2 3

TMGB

1V 2V

14TYP. (10)

HOT AISLE

COLD AISLE

HOT AISLE

COLD AISLE

TYP. (12)

A-01A-02A-03A-04A-05

B-01B-02B-03B-04B-05

C-01C-02C-03C-04C-05

IDS

TC-T-002

TC-T-002

TC-T-002

PROPOSED 55'

MONOPOLE

LOCATION

TELECOM

ROOM

BATTERY

STORAGE

ROOM

MDF

TC-T-002

TC-T-002

TC-T-002

NIC

NIC

3' - 2"

MEGB

SEE TC-E-00317

FSP FACP

(2) 48VDC 2400AH BATTERY STRINGS EACH WITH

(24) 1000G51 GNB ABSOLYTE VRLA BATTERY

MODULES (EXIDE # 241235601 OR EQUAL) WITH

SPILL CONTAINMENT TRAY AND ABSORBTION

PILLOWS - TOTAL (2) HOUR BATTERY RESERVE AT

1698 AMPS

1. THE OSPGB SHALL BE A COPPER BAR A MINIMUM OF 1/4" THICK X 4" WIDE X 20"

LONG PRE-DRILLED AND TAPPED FOR TWO-HOLE LUGS, WITH STAINLESS STEEL

MOUNTING BRACKETS AND INSULATED STANDOFFS.

2. CONNECTIONS TO THE GROUND BAR SHALL BE MADE WITH CRIMP TYPE TWO

HOLE COMPRESSION LUG SYSTEM CONNECTORS WITH PROPERLY IDENTIFIED

TAGS. A MINIMUM #1/0 AWG GROUNDING ELECTRODE CONDUCTOR SHALL BE

INSTALLED BETWEEN THE OSPGB AND THE GROUND RING.

3. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE CONNECTED DIRECTLY TO

THE GROUND RING AT THE CLOSEST POINT BY EXOTHERMIC WELD WITH NO

CONNECTION SHALL BE MADE BETWEEN THE TELECOMMUNICATIONS MAIN

GROUNDING BUSBAR (TMGB), THE AC POWER MAIN SERVICE GROUND, AND THE

OSPGB.

4. ALL VERTICAL AND HORIZONTAL CABLE RACKS SHALL BE BONDED TOGETHER

WITH A MINIMUM #6 AWG CONDUCTOR OR A BRAIDED WIRE EQUIVALENT TO

FORM A CONTINUOUSLY CONNECTED SYSTEM THROUGHOUT THE VAULT. THE

CONTINUOUSLY CONNECTED CABLE RACK SYSTEM SHALL BE GROUNDED WITH A

PRIMARY CONNECTION TO THE OSPGB.

5. AT LEAST ONE CONTINUOUS GROUND BUS SYSTEM (CABLE OR BRAID), RUNNING

THE FULL LENGTH OF THE CABLE RACK SYSTEM, EITHER INDEPENDENT FROM

THE RACK GROUNDING SYSTEM OR COMBINED WITH THE CABLE RACK GROUND

WIRE, SHALL BE USED TO GROUND THE SPLICE CASE CONDUCTIVE OUTSIDE

PLANT CABLE SHEATHS. THE CABLE RACK SUPPORTS SHALL NOT BE USED AS

THE MEANS FOR GROUNDING THE SPLICE CASE CONDUCTIVE OUTSIDE PLANT

CABLE SHEATHS; HOWEVER, THE CABLE RACK CAN BE USED TO FASTEN AND

SECURE THE SPLICE CASE BUS SYSTEM. THE SPLICE CASE CABLE SHEATH

GROUND BUS SYSTEM SHALL BE CONNECTED DIRECTLY TO THE OSPGB WITH A

MINIMUM #6 AWG CONDUCTOR.

6. THE CONNECTION OF THE CABLE SHEATH BUS SYSTEM, CONNECTIONS OF THE

CABLE SHEATHS TO THE CABLE SHEATH BUS SYSTEM, AND THE RACK BONDING

JUMPERS MUST BE MADE WITH NEC APPROVED CLAMPING TYPE CONNECTORS.

THE UNISTRUT RACK MUST BE CLEANED OF ALL PAINT, COATINGS, OR RESIDUE

BEFORE SECURING THE CABLE SHEATH BUS SYSTEM AND RACK BONDING

JUMPERS.

7. NO BONDING JUMPERS FROM OUTSIDE PLANT CABLE SHEATHS TO THE INSIDE

PLANT TIP CABLES SHALL BE USED. (I.E. NO CONNECTION SHALL BE MADE IN

SPLICE CASE TO BOND THE OUTSIDE PLANT CABLE SHEATHS AND INSIDE PLANT

TIP CABLES). TIP CABLE SHIELDS SHALL BE GROUNDED ON THE VERTICAL CABLE

BLOCKS GROUND SYSTEM ON THE MAIN DISTRIBUTION FRAME (MDF).

GROUNDING GENERAL NOTES:

SITE OSP TELECOM CONDUITS. SEE SITE ELECTRICAL

PLAN FOR QUANTITY AND SIZES. BOND ALL CONDUITS TO

OSPGB IN CABLE VAULT.

PROVIDE NEW OSPGB AT +6'-6"[1981mm] AFF, UON.

PROVIDE A MINIMUM #1/0 AWG GROUNDING ELECTRODE

CONDUCTOR WITH EXOTHERMIC WELD TO THE BUILDING

GROUND RING. SEE GROUNDING NOTES ON THIS SHEET

FOR ADDITIONAL INFORMATION.

PROVIDE A 5" WIDE x 144" LONG [127mm X 3658mm] SLOT

THROUGH FLOOR AS SHOWN FOR TELECOM COPPER (TIP

CABLE) PATHWAY TO THE TELECOM ROOM ABOVE. FIRE

STOP AND SEAL ALL PENETRATIONS AS REQUIRED BY

THE FIRE SUPPRESSION SYSTEM CONTRACTOR.

PROVIDE 5" WIDE X 12" LONG [127mm X 305mm] SLOT

THROUGH FLOOR AS INDICATED ON PLANS FOR TELECOM

FIBER PATHWAY TO THE VAULT BELOW. PROVIDE 12"

WIDE CABLE TRAY RUN VERTICALLY UP WALL FROM

FLOOR TO CABLE TRAY ABOVE. FIRE STOP AND SEAL ALL

PENETRATIONS AS REQUIRED BY THE FIRE

SUPPRESSION SYSTEM CONTRACTOR.

PROVIDE FULL HEIGHT WALL MOUNT CABLE HOOK

SUPPORTS 24" [610mm] ON CENTER VERTICALLY ON BOTH

SIDES OF CABLE VAULT FOR VAULT CABLING SUPPORT,

SPLICE CASE MOUNTING, SERVICE LOOP SUPPORTS AND

GROUNDING. GROUND SUPPORTS TO OSP GROUND RING

WITH #6AWG GROUND WIRE.

PROVIDE 2" PVC CONDUIT SLEEVE ADJACENT TO OSPGB

(+6'-6" AFF) IN VAULT THROUGH VAULT WALL FOR OSPGB

GROUND WIRE CONNECTION TO BUILDING GROUND RING.

SEAL ALL PENETRATIONS.

PROVIDE (4) 4" [102mm] CONDUIT KNOCKOUT WINDOWS AT +8'-6" [2591mm] AFF, UON, FOR WAVEGUIDE CONNECTIONS

TO NEW MONOPOLE TOWER.

PROVIDE NEWTON (OR EQUAL) MDF FRAME FOR COPPER

OSP ENTRANCE PROTECTORS AND CABLING

TERMINATIONS. PROVIDE AND INSTALL THE MDF FRAME

AND EMERSON R399 CENTRAL OFFICE ENTRANCE

PROTECTORS (OR APPROVED EQUAL) FOR ALL INCOMING

TIP COPPER PAIRS. PROVIDE AND INSTALL TIP CABLES

INTO VAULT VIA CONDUIT PENETRATIONS IN FLOOR AND

SPLICE TO INCOMING COPPER PAIRS (PROVIDED AND

INSTALLED BY CONTRACTOR) IN NEW SPLICE CASES IN

CABLE VAULT. CONTRACTOR TO PROVIDE #4 AWG

BONDING CONDUCTOR FROM ENTRANCE PROTECTORS

TO TMGB ON LEVEL 1. TEST AND LABEL ALL

TERMINATIONS. SEE DIAGRAM ON SHEET 1\TC-T-002.

PROVIDE 6" WIDE DOUBLE SIDED VERTICAL CABLE

MANAGERS BETWEEN EACH RACK AND AT RACK ROW

ENDS.

PROVIDE NEW TMGB AT +7'-0"[2134mm] AFF, UON. SEE

DETAIL CD-T-500. SEE GROUNDING NOTES ON THIS SHEET

AND GROUNDING DIAGRAM TC-E-003 FOR ADDITIONAL

INFORMATION.

PROVIDE 2-TIER 15" WIDE [381mm] CEILING SUPPORTED CABLE RUNWAY SYSTEMS - (1) AT +8'-0" [2438mm] AFF FOR LOW VOLTAGE PATHWAYS, AND (1) AT +10'-0" [3048mm]

FOR POWER CABLING PATHWAYS. BRACE AND GROUND

AS REQUIRED.

PROVIDE 2-TIER 12" WIDE [305mm] CEILING SUPPORTED CABLE RUNWAY SYSTEMS - (1) AT +8'-0" [2438mm] AFF FOR LOW VOLTAGE PATHWAYS, AND (1) AT +10'-0" [3048mm]

FOR POWER CABLING PATHWAYS. BRACE AND GROUND

AS REQUIRED.

PROVIDE 1-TIER 8" WIDE [203mm] CEILING SUPPORTED CABLE RUNWAY SYSTEMS - (1) AT +8'-0" [2438mm] AFF FOR

LOW VOLTAGE PATHWAYS. BRACE AND GROUND AS

REQUIRED.

PROVIDE (13) SEISMIC TELECOM RACKS (CPI OR

APPROVED EQUAL - GR-63 NEBS CORE) FOR

GOVERNMENT FURNISHED AND INSTALLED ACTIVE

EQUIPMENT. PROVIDE #6AWG GROUND WIRE FROM EACH

RACK TELECOM BUSBAR TO #1/0 GROUND BUS ABOVE

RACKS. TEST AND LABEL ALL TERMINATIONS.

STUB UP (1) 4" CONDUIT 3" ABOVE SLAB FROM EXISTING

ADN FACILITY FOR SECURITY CABLING PATHWAY

(CABLING BY GOV'T CONTRACTOR). COORDINATE EXACT

LOCATION WITH BASE PHYSICAL SECURITY PRIOR TO

ROUGH-IN.

PROVIDE #2AWG GROUND RING AROUND TOP PERIMETER

OF THE VAULT FOR OSP GROUND CONNECTIONS.

PROVIDE GROUND CONNECTIONS FROM SPLICE CASES

TO GROUND RING WITH #6AWG CONNECTIONS.

PROVIDE 1" CONDUIT AT +7'-6" THROUGH WALL TO

BATTERY STORAGE ROOM FOR TELECOM BACKBONE

BOND (TBB) CONDUTCOR PATHWAY.

KEY NOTES:

1. SEE INTERIOR FURNITURE PLANS FOR FINAL

FURNITURE DEVICE LOCATIONS. COORDINATE

WITH FURNITURE SHOP DRAWINGS PRIOR TO

ROUGH-IN.

2. ALL DISCIPLINES MUST COORDINATE WITH EACH

OTHER AND REFER TO ALL ARCHITECTURAL

COORDINATION PLANS BEFORE ATTEMPTING ANY

WORK.

3. SEE COMMON DRAWINGS ON SHEETS CD-T-500,

CD-T-501, AND CD-T-502 FOR ADDITIONAL PROJECT

DETAILS THAT MAY BE RELATED TO THIS SHEET.

4. COORDINATE ALL IDS, ACS AND CCTV DEVICE

AND SECURITY PANEL AND CABINET LOCATIONS

WITH BASE PHYSICAL SECURITY PRIOR TO

ROUGH-IN.

5. THE PAGING SYSTEM FOR THIS BUILDING IS PART

OF THE D40 FA/MNS SCOPE OF WORK. SEE

FA/MNS DRAWINGS FOR SPEAKERS AND PAGING

SYSTEM INTERFACE AND CONTROLS.

6. ALL DEVICES SHALL BE NEW AND BY

CONTRACTOR UNLESS OTHERWISE NOTED.

GENERAL NOTES:

RCDD

GREGORY O'STRANDER

REG. NO 12631

EXPIRES 12-31-12

REG

IST

ER

ED

CO

MM

UNICATIONS DISTRIBUTION

DESIGNER

BICSI RCDD APPROVED

SIGNATURESIGNATURE

A

B

C

D

A

B

C

D

1 2 3 4 5

1 2 3 4 5

N62473-10-C-5005

N

AV

FA

C

S O

U

TH

W

ES

T

FY

AR

EA

A N

G

LI

C O

, R

EC

O N

B

EQ

C

O M

PL

EX

P-

B

EQ

, P

-1

R

EC

O

N C

O M

M U

N

IT

Y

P-1016 RECONP-1016 RECON

P-

B

EQ

, P

-1

R

EC

O

N C

O M

M U

N

IT

Y

/7

/2

9:

:0

A

M

TC-T-101

C O

M M

U N

IC

A

TI

O

N S

D

IS

TR

IB

U

TI

O N

F A

C

IL

IT

Y

TC

1S T

FL

O

O R

T E

LE

C

O M

P

LA

N

1/4" = 1'-0"

CABLE VAULT TELECOM PLAN

1/4" = 1'-0"

COMMUNICATION DISTRIBUTION FACILITY TELECOM PLAN

0' 1' 2' 4' 6' 10'

1 2 3

B

1 2 3

BATTERY

STORAGE

ROOM

TELECOM

ROOM

4" CONDUIT FROM EXISTING ADN FOR SECURITY

1. SEE INTERIOR FURNITURE PLANS FOR FINAL

FURNITURE DEVICE LOCATIONS. COORDINATE

WITH FURNITURE SHOP DRAWINGS PRIOR TO

ROUGH-IN.

2. ALL DISCIPLINES MUST COORDINATE WITH EACH

OTHER AND REFER TO ALL ARCHITECTURAL

COORDINATION PLANS BEFORE ATTEMPTING ANY

WORK.

3. SEE COMMON DRAWINGS ON SHEETS CD-T-500,

CD-T-501, AND CD-T-502 FOR ADDITIONAL PROJECT

DETAILS THAT MAY BE RELATED TO THIS SHEET.

4. COORDINATE ALL IDS, ACS AND CCTV DEVICE

AND SECURITY PANEL AND CABINET LOCATIONS

WITH BASE PHYSICAL SECURITY PRIOR TO

ROUGH-IN.

5. THE PAGING SYSTEM FOR THIS BUILDING IS PART

OF THE D40 FA/MNS SCOPE OF WORK. SEE

FA/MNS DRAWINGS FOR SPEAKERS AND PAGING

SYSTEM INTERFACE AND CONTROLS.

6. ALL DEVICES SHALL BE NEW AND BY

CONTRACTOR UNLESS OTHERWISE NOTED.

GENERAL NOTES:

PROVIDE J-BOX AND 1" CONDUIT ONLY FOR

GOVERNMENT FURNISHED, GOVERNMENT INSTALLED

(GFGI) CEILING MOUNTED DOME CCTV CAMERA AND

CABLING BACK TO CCTV CABINET FOR

SURVEILLANCE SYSTEM BY (DEVICE AND CABLING BY

SECURITY CONTRACTOR).

PROVIDE 2" x 4" FLUSH J-BOX AT +44" AFF

(UNSECURED SIDE OF DOOR) FOR GFGI CARD

READER. (DEVICE AND CABLING BY SECURITY

CONTRACTOR). SEE DOOR DETAIL 1\TC-T-111.

PROVIDE 2" x 4" FLUSH J-BOX AT +54" AFF (SECURED

SIDE OF DOOR) FOR GFGI KEYPAD. (DEVICE AND

CABLING BY SECURITY CONTRACTOR). SEE DOOR

DETAIL 1\TC-T-111.

PROVIDE 2" X 4" FLUSH J-BOX AND CONDUIT ROUGH-

IN AT +48" [1219mm] AFF, UON, WITH 1" [25mm]

CONDUIT TO IDS PANEL FOR IDS DURESS ALARM

(DEVICE AND CABLING BY SECURITY CONTRACTOR).

PROVIDE 4" X 4" J-BOX SURFACE MOUNTED ON

CENTERLINE 6" ABOVE DOOR FOR GFGI DOOR

SWITCH (BMS). (DEVICE AND CABLING BY SECURITY

CONTRACTOR). SEE DOOR DETAIL 1\TC-T-111.

PROVIDE 8" X 8" FLUSH J-BOX AT +108" FOR GFGI IDS

PANEL CONNECTIONS. (DEVICE AND CABLING BY

SECURITY CONTRACTOR).

SEE DOOR DETAIL 1\TC-T-111.

PROVIDE 4" X 4" FLUSH J-BOX FOR GFGI PIR DEVICE.

(DEVICE AND CABLING BY SECURITY CONTRACTOR).

SEE DOOR DETAIL 1\TC-T-111.

PROVIDE LOCKABLE ENCLOSURE FOR CCTV

EQUIPMENT. SEE 2\CD-T-002. COORDINATE WITH

PHYSICAL SECURITY/OFFICER PRIOR TO ROUGH-IN.

KEY NOTES:

RCDD

GREGORY O'STRANDER

REG. NO 12631

EXPIRES 12-31-12

REG

IST

ER

ED

CO

MM

UNICATIONS DISTRIBUTION

DESIGNER

BICSI RCDD APPROVED

SIGNATURESIGNATURE

A

B

C

D

A

B

C

D

1 2 3 4 5

1 2 3 4 5

N62473-10-C-5005

N

AV

FA

C

S O

U

TH

W

ES

T

FY

AR

EA

A N

G

LI

C O

, R

EC

O N

B

EQ

C

O M

PL

EX

P-

B

EQ

, P

-1

R

EC

O

N C

O M

M U

N

IT

Y

P-1016 RECONP-1016 RECON

P-

B

EQ

, P

-1

R

EC

O

N C

O M

M U

N

IT

Y

/7

/2

9:

:1

A

M

TC-T-111

C O

M M

U N

IC

A

TI

O

N S

D

IS

TR

IB

U

TI

O N

F A

C

IL

IT

Y

TC

1S T

FL

O

O R

S Y

S

TE

M S

P

LA

N

0' 1' 2' 4' 6' 10'

1/4" = 1'-0"

COMMUNICATION DISTRIBUTION FACILITY SYSTEMS PLAN

R

N O

R T

E L

C

A B

I N

E T

S

E M

E R

S O

N

R

A C

K R

R

A/C UNIT

J

J B

J B

J

J B

A

U

I T

A

U

I T

J B

BKBD

1 & 3

2 & 4

JB JB

CABLE SLOT CABLE SLOT

678911 10

SEE SHEET 3 FOR

VAULT LAYOUT

C S

C S

CS1

C

S

CS11

C S

C S

C

S

C S

CS9

CS10

CS7

CS4

CS5

PRESSURE

SYSTEM

A

A

BKBDBKBD

A

B

C,D

E

F

I

J

G, H

6 7 8 9 10 11

SEE SHEET 3 FOR

VAULT LAYOUT

A

SOUTH WALL DETAIL

SCALE: N.T.S.

V1 V3 V4V2 V5 V6 V7 V8 V9 V10 V11 V12 V13 V14 V15 V16 V17 V18 V19

CABLE SLOT

CABLE SLOT

CT6

CT3

CT11

CT1

MDF MDF

B

L O

C K

B

L O

C K

MDF

(EMPTY)

BKBD

BKBD

K,L,M,N,O

P,Q,R,S

I,J

E, F

A

B

C

D

E

F

A

B

C

D

E

F

123456789

123456789

SERVICE LOOP

SERVICE LOOP AROUND

PERIMETER OF BUILDING

BUILDING DIMENSIONS

SURVEYED: 3/22/12 COORDINATES: 33° 17' 21.04" N, 117° 26' 29.59" W

ENTRANCE DIA: DOOR HEIGHT: 10'-5" WIDTH: 20'-2" LENGTH: 16'-1"

DUCTS:6" 6-11

DUCTS:4" 1-4

INNERDUCTS: 8,9

FABRIC INNERDUCT: N/A

FULL DUCT

FABRIC INNERDUCT

SPARE DUCT

SEMI-FULL DUCT

INNERDUCT

GROUND ROD

GROUND CABLE

COAX CABLE

FIBER OPTIC CABLE

COPPER CABLE

UNKNOWN CABLE TYPE

BUILDING FOLD-OUT

GROUND

SPLITTER =

ABANDONED CABLE =

COPPER SPLICE =

FIBER SPLICE =

S

ABAN

CS

FS

CABLE TRAY =

JUNCTION BOX =

PUNCH BLOCK =

CT

JB

PB

TELECOMMUNICATIONS

= TMGB

MAIN GROUNDING BUSBAR

DUCTS:2" 5

MAIN DISTRIBUTION FRAME = MDF

TELECOMMUNICATIONS

ELECTRICAL METALLIC TUBING =

= TGB

EMT

GROUNDING BUSBAR

SEE SHEET 2 OF 3 FOR PHOTOS

C

D

E

F

A

B

C

D

E

F

123456789

123456789

WEST WALL

SERVICE LOOP

SERVICE LOOP AROUND

PERIMETER OF BUILDING

BUILDING DIMENSIONS

SURVEYED: 3/22/12 COORDINATES: 33° 17' 21.04" N, 117° 26' 29.59" W

ENTRANCE DIA: 4'-8" X 4'-0" HEIGHT: 4'-0" WIDTH: 4'-8" LENGTH: 4'-0"

DUCTS:6" 6-23

INNERDUCTS: 8,9,19

FULL DUCT

FABRIC INNERDUCT

SPARE DUCT

SEMI-FULL DUCT

INNERDUCT

GROUND ROD

GROUND CABLE

COAX CABLE

FIBER OPTIC CABLE

COPPER CABLE

UNKNOWN CABLE TYPE

BUILDING FOLD-OUT

GROUND

SPLITTER =

ABANDONED CABLE =

COPPER SPLICE =

FIBER SPLICE =

S

ABAN

CS

FS

CABLE TRAY =

JUNCTION BOX =

PUNCH BLOCK =

CT

JB

PB

TELECOMMUNICATIONS

= TMGB

MAIN GROUNDING BUSBAR

FABRIC INNERDUCT: N/A

MAIN DISTRIBUTION FRAME = MDF

TELECOMMUNICATIONS

ELECTRICAL METALLIC TUBING =

= TGB

EMT

GROUNDING BUSBAR

A/C UNIT AND JUNCTION BOXES

ON WEST WALL

MDF ON SOUTH WALL

A/C UNIT AND JUNCTION BOXES

ON NORTH WALL

DUCTS 1 THROUGH 4

ON EAST WALL

MDF ON SOUTH WALL

SOUTH WALL

EAST WALLNORTH WALL

A/C UNIT AND JUNCTION BOXES

ON EAST WALL

File details come from the government source that posted it. Updated .