3-09 - COM JOC Section J Attachment J-C.9-3 EXHIBIT G Bid ELINs (Seed Project).xlsx

XLSX spreadsheet 39 KB Posted

Attached to
CAMP PENDLETON JOC FOR DEMOLITION, REPAIR AND REPLACEMENT OF TELECOMMUNICATIONS OUTSIDE PLANT AND STRUCTURED CABELING THROUGHOUT MARINE CORPS BASE CAMP PENDLETON, CALIFORNIA
Solicitation number
N6247321R3430
Issued by

View the file

Other files

File Type Posted
N6247321R3430_RFIs_072121.xlsx XLSX spreadsheet
TC-A-101_072121.pdf PDF
A0003_072121.pdf PDF
MCIWEST G6 CPR (OSP) Section 271300 (Signed) May 7 2018.pdf PDF
MCIWEST G6 CPR (PDS) Section 271400 (Signed) May 7 2018.pdf PDF
N6247321R3430_RFIs_071321.xlsx XLSX spreadsheet
3.09 - COM JOC Section J Exhibit D Safety Data R1_071321.docx DOCX document
MCIWEST G6 CPR (ISP) Section 271500 (Signed) May 7 2018.pdf PDF
A0002_071321.pdf PDF
N6247321R3430 RFI Diagrams and Pictures.pdf PDF
N6247321R3430_RFIs_070721.xlsx XLSX spreadsheet
N6247321R3430_A0001_070721.pdf PDF
N6247321R3430_061821.pdf PDF
3-09 - COM JOC Section J Attachment J-C.7 Coefficient Example.pdf PDF
3-09 - COM JOC Section J Attachment J-C9-2 SA 20064 PE2098M and PE18416M CATEX.pdf PDF
3-09 - COM JOC Section J Exhibit D Safety Data.docx DOCX document
3-09 - COM JOC Section J Attachment J-C.1 - J-C.6 (REV May21)_EBB_R1 KMK.pdf PDF
4-XX - COM JOC Section L Attachment L-2 Project Forecast.doc DOC document
3-09 - COM JOC Section J Attachment J-C.8 Wage Determination.pdf PDF
3-09 - COM JOC Section J Exhibit B Recent Relevant Experience.docx DOCX document
4-XX - COM JOC Section L EXHIBIT H Bid ELINs.xlsx XLSX spreadsheet
4-XX - COM JOC Section L Attachment L-4 RFI Form.xlsx XLSX spreadsheet
3-09 - COM JOC Section J Exhibit E PPQ.docx DOCX document
3-09 - COM JOC Section J Exhibit C Management Approach.docx DOCX document
3-09 - COM JOC Section J Attachment J-C.9 SOW.pdf PDF
4-XX - COM JOC Section L Attachment L-3 DBIDs Roster.xlsx XLSX spreadsheet
3-09 - COM JOC Section J Attachment J-C.9-1 SA16291 PE18416M CATEX.pdf PDF
3-09 - COM JOC Section J Exhibit F Surety Form.docx DOCX document
3-09 - COM JOC Section J Exhibit A Financial Questionnaire.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

ATTACHMENT J-C.9-3 EXHIBIT G: BID ELINs (Seed Project)
Job Order Contract Number: N62473-21-R-3430Project Address: Camp Pendleton & NWS FallbrookContact Name:
Task Order Number: PTO X001Task Order Duration: N/AContact Number:
Project Name: CAMP PENDLETON COM JOCEstimate Dated:Revision: 0.0
ELINTask Description-Pre-Priced Line Items Base YearMaterialLaborEquipmentCost Per Ft /UnitQtyUnitTotal MaterialTotal LaborTotal EquipmentTotal Cost
A001OSP Underground/PathwaysQtyUnitMaterialLabor/Equip
A001AAInstall 2-4" Schedule 40 Conduit to a depth of 36 inches. Backfill trench 12 inches, install locate tape, complete backfill of trench and compact to 90% compaction. Rod and rope conduit, plug empty conduit. Per foot.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A001ABInstall 2-4" Schedule 40 Conduit to a depth of 36 inches. Backfill trench 12 inches, install locate tape, complete backfill of trench and compact to 90% compaction. Rod and rope conduit, plug empty conduit. For runs over 1000'. Per foot.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A001ACInstall 4-4" Schedule 40 Conduit to a depth of 36 inches. Backfill trench 12 inches, install locate tape, complete backfill of trench and compact to 90% compaction. Rod and rope conduit, plug empty conduit. Per foot.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A001ADInstall 4-4" Schedule 40 Conduit to a depth of 36 inches. Backfill trench 12 inches, install locate tape, complete backfill of trench and compact to 90% compaction. Rod and rope conduit, plug empty conduit. For runs over 1000'. Per foot.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A001AEInstall 8-4" Schedule 40 Conduit to a depth of 36 inches. Backfill trench 12 inches, install locate tape, complete backfill of trench and compact to 90% compaction. Rod and rope conduit, plug empty conduit. Per foot.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A001AFInstall 8-6" Schedule 40 Conduit to a depth of 36 inches. Backfill trench 12 inches, install locate tape, complete backfill of trench and compact to 90% compaction. Rod and rope conduit, plug empty conduit. Per foot.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A001AGInstall 4' X 4'X 4' Precast hand hole with ladder, ground rod, racking, and direct traffic rated lid. Utilize 1 foot of gravel base for drainage. Level, backfill, and compact accordingly. Install gravel consisting of 3/4 inch aggregate, 1 inch deep X 4 feet on the surface around the hand hole.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A001AHInstall 4' X 4'X 4' Precast hand hole with ladder, ground rod, racking, and direct traffic rated lid. Utilize 1 foot of gravel base for drainage. Level, backfill, and compact accordingly. Install gravel consisting of 3/4 inch aggregate, 1 inch deep X 4 feet on the surface around the hand hole. Cost break for 5 hand holes or more in a single mobilization effort.$ - 0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
A001AIInstall 3' x 5' x 4' Precast hand hole with round metal traffic rated lid. Utilize 1 foot of gravel base for drainage. Include ground rod, racking, bond with #6. Level, backfill, and compact accordingly.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A001AJInstall 8' X 10 X 7' Precast Manhole with ladder, ground rod, and racking. Utilize 1 foot of gravel base for drainage. Level, backfill, and compact accordingly. Install gravel consisting of 3/4 inch aggregate, 1 inch deep X 4 feet on the surface around the manhole.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A001AKInstall 8' X 10 X 7' Precast Manhole with ladder, ground rod, and racking. Utilize 1 foot of gravel base for drainage. Level, backfill, and compact accordingly. Install gravel consisting of 3/4 inch aggregate, 1 inch deep X 4 feet on the surface around the manhole. Cost break for 5 man holes or more in a single mobilization effort.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A002OSP Underground/In Roadway
A002AAInstall 2-4" Schedule 40 Conduit to a depth of 36 inches in existing roadways. Saw cut Pavement, Slurry, Backfill trench 12 inches, install locate tape, complete backfill of trench, compact to 95% compaction, and Repave. Rod and rope conduit, plug empty conduit. Per foot.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A002ABInstall 2-4" Schedule 40 Conduit to a depth of 36 inches in existing roadways. Saw cut Pavement, Slurry, Backfill trench 12 inches, install locate tape, complete backfill of trench, compact to 95% compaction, and Repave. Rod and rope C\conduit, plug empty conduit. For runs over 1000'. Per foot.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A002ACInstall 4-4" Schedule 40 Conduit to a depth of 36 inches in existing roadways. Saw cut pavement, slurry, backfill trench 12 inches, install locate tape, complete backfill of trench, compact to 95% compaction, and repave. Rod and rope conduit, plug empty conduit. Per foot.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A002ADInstall 4-4" Schedule 40 Conduit to a depth of 36 inches in existing roadways. Saw cut pavement, slurry, backfill trench 12 inches, install locate tape, complete backfill of trench, compact to 95% compaction, and repave. Rod and rope conduit, plug empty conduit. For runs over 1000'. Per foot$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A002AEInstall 8-4" Schedule 40 Conduit to a depth of 36 inches in existing roadways. Saw cut pavement, slurry, backfill trench 12 inches, install locate tape, complete backfill of trench, compact to 95% compaction, and repave. Rod and rope conduit, plug empty conduit. Per foot.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A002AFInstall 8-6" Schedule 40 Conduit to a depth of 36 inches. Saw cut pavement, backfill trench 12 inches, install locate tape, complete backfill of trench and compact to 95% compaction, repave. Rod and rope conduit, plug empty conduit. Per foot.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A002AGInstall 4' X 4'X 4' Precast hand hole with ladder, ground rod, racking, and direct traffic rated lid. Utilize 1 foot of gravel base for drainage. Level, backfill, compact, and repave accordingly.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A002AHInstall 4' X 4'X 4' Precast hand hole with ladder, ground rod, racking, and direct traffic rated lid. Utilize 1 foot of gravel base for drainage. Level, backfill, compact, and repave accordingly. Cost break for 5 hand holes or more in a single mobilization effort.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A002AIInstall 3' x 5' x 4' Precast hand hole with round metal traffic rated lid. Utilize 1 foot of gravel base for drainage. Include ground rod, racking, bond with #6. Level, backfill, compact, and repave accordingly.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A002AJInstall 8' X 10' X 7' Precast Manhole with ladder, ground rod, and racking. Utilize 1 foot of gravel base for drainage. Level, backfill, compact, and repave accordingly.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A002AKInstall 8' X 10 X 7' Precast Manhole with ladder, ground rod, and racking. Utilize 1 foot of gravel base for drainage. Level, backfill, compact, and repave accordingly. Install gravel consisting of 3/4 inch aggregate, 1 inch deep X 4 feet on the surface around the manhole. Cost break for 5 man holes or more in single mobilization effort.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A003Install Maxcell In Existing Conduit
A003AAInstall one 3" three cell max-cell inner-duct per foot up to 200'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A003ABInstall one 3" three cell max-cell inner-duct per foot from 200' to 1000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A003ACInstall one 3" three cell max-cell inner-duct per foot from 1000' to 5000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A003ADInstall three 3" three cell max-cell inner-duct per foot up to 200' in same conduit..$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A003AEInstall three 3" three cell max-cell inner-duct per foot from 200' to 1000' in same conduit..$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A003AFInstall three 3" three cell max-cell inner-duct per foot from 1000' to 5000' in same conduit..$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004Install PE-89 Copper In Existing Conduit
A004AAPer Ft Cost: Install 25 Pair/24 AWG PE-89 in Conduit. Install 25 Pair/PE-89 in conduit up to 200ft$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004ABPer Ft Cost: Install 25 Pair/24 AWG PE-89 in Conduit. Install 25 Pair/PE-89 in conduit from 200ft to 1000ft.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004ACPer Ft Cost: Install 25 Pair/24 AWG PE-89 in Conduit. Install 25 Pair/PE-89 in conduit 1000ft and above.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004ADPer Ft Cost: Install 50 Pair/24 AWG PE-89 in Conduit. Install 50 Pair/PE-89 in conduit up to 200ft$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004AEPer Ft Cost: Install 50 Pair/24 AWG PE-89 in Conduit. Install 50 Pair/PE-89 in conduit from 200ft to 1000ft.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004AFPer Ft Cost: Install 50 Pair/24 AWG PE-89 in Conduit. Install 50 Pair/PE-89 in conduit 1000ft and above.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004AGPer Ft Cost: Install 100 Pair/24 AWG PE-89 in Conduit. Install 100 Pair/PE-89 in conduit up to 200ft$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004AHPer Ft Cost: Install 100 Pair/24 AWG PE-89 in Conduit. Install 100 Pair/PE-89 in conduit from 200ft to 1000ft.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004AIPer Ft Cost: Install 100 Pair/24 AWG PE-89 in Conduit. Install 100 Pair/PE-89 in conduit 1000ft and above.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004AJPer Ft Cost: Install 200 Pair/24 AWG PE-89 in Conduit. Install 200 Pair/PE-89 in conduit from 200ft to 1000ft.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004AKPer Ft Cost: Install 300 Pair/24 AWG PE-89 in Conduit. Install 300 Pair/PE-89 in conduit from 200ft to 1000ft.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004ALPer Ft Cost: Install 400 Pair/24 AWG PE-89 in Conduit. Install 400 Pair/PE-89 in conduit from 200ft to 1000ft.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004AMPer Ft Cost: Install 600 Pair/24 AWG PE-89 in Conduit. Install 600 Pair/PE-89 in conduit up to 200ft$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004ANPer Ft Cost: Install 600 Pair/24 AWG PE-89 in Conduit. Install 600 Pair/PE-89 in conduit from 200ft to 1000ft.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004AOPer Ft Cost: Install 600 Pair/24 AWG PE-89 in Conduit. Install 600 Pair/PE-89 in conduit 1000ft and above.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004APPer Ft Cost: Install 900 Pair/24 AWG PE-89 in Conduit. Install 900 Pair/PE-89 in conduit 1000ft and above.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004AQPer Ft Cost: Install 2400 Pair/24 AWG PE-89 in Conduit. Install 2400 Pair/PE-89 in conduit up to 200ft$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004ARPer Ft Cost: Install 2400 Pair/24 AWG PE-89 in Conduit. Install 2400 Pair/PE-89 in conduit from 200ft to 1000ft.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A004ASPer Ft Cost: Install 2400 Pair/24 AWG PE-89 in Conduit. Install 2400 Pair/PE-89 in conduit 1000ft and above.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A005Install Mainframe 4486 Mainframe Connector with 50ft tail.
A005AASplice, install, wire wrap 100 pair copper to 4486 DP terminal block and label per standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A005ABSplice, install, wire wrap and additional 100 pair copper to 4486 DP terminal block and label per standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A006Install Building Entrance Terminal
A006AAProvide and install 710 Input to 110 Output style connector building entrance terminal (BET) with cover, splice chamber and 5 PIN - Heavy Duty Gas Tube - Surge Protection Modules. Splice 25 pair copper cable in BET splice chamber. Provide and Install up to 50 feet of 25 Pair Plenum Rated Back Bone Cable and a Category-3 25 Port Voice Patch Panel. Terminate this backbone cable on both ends. Utilize Telecommunications Room Cable tray/Velcro Straps and provide 10' Cable Slack. Terminate Back Bone Cable on Patch Panel to Pair 1 of every port utilizing T568A Wiring Scheme. Include testing continuity through BET from patch panel.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A006ABProvide and install 710 Input to 110 Output style connector building entrance terminal (BET) with cover, splice chamber and 5 PIN - Heavy Duty Gas Tube - Surge Protection Modules. Splice 50 pair copper cable in BET splice chamber. Provide and Install up to 50 feet of 50 Pair Plenum Rated Back Bone Cable and a Category-3 50 Port Voice Patch Panel. Terminate this backbone cable on both ends. Utilize Telecommunications Room Cable tray/Velcro Straps and provide 10' Cable Slack. Terminate Back Bone Cable on Patch Panel to Pair 1 of every port utilizing T568A Wiring Scheme. Include testing continuity through BET from patch panel.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A006ACProvide and install 710 Input to 110 Output style connector building entrance terminal (BET) with cover, splice chamber and 5 PIN - Heavy Duty Gas Tube - Surge Protection Modules. Splice 100 pair copper cable in BET splice chamber. Provide and Install up to 50 feet of 100 Pair Plenum Rated Back Bone Cable and two Category-3 50 Port Voice Patch Panels. Terminate this backbone cable on both ends. Utilize Telecommunications Room Cable tray/Velcro Straps and provide 10' Cable Slack. Terminate Back Bone Cable on Patch Panel to Pair 1 of every port utilizing T568A Wiring Scheme. Include testing continuity through BET from patch panel.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A006ADPer Ft Cost: Install 25 pair indoor rated copper tie cable & terminate on Category-3 voice patch panel Note: Patch Panel Cost Separate$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A006AEPer Ft Cost: Install 50 pair indoor rated copper tie cable & terminate on voice patch panel Note: Patch Panel Cost Separate$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A006AFPer Ft Cost: Install 100 pair indoor rated copper tie cable & terminate on Category-3 voice patch panel Note: Patch Panel Cost Separate$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A006AGProvide & Install 25 port Category-3 voice patch panel$ - 0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
A006AHProvide & Install 50 port Category-3 voice patch panel$ - 0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
A007Splice & Case PE-89 Copper Cable
A007AASplice 25 pair copper and install splice case. Rack splice case & ground in MH then label to meet required standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A007ABSplice 50 pair copper and install splice case. Rack splice case & ground in MH then label to meet required standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A007ACSplice 100 pair copper and install splice case. Rack splice case & ground in MH then label to meet required standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A007ADSplice additional 100 pair copper cable and increase case size appropriately$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A007AESplice 2400 pair copper and install splice case. Rack splice case & ground in MH then label to meet required standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A007AFReplace 2ea 4" Two Section End Plates Preformed Stainless Copper Case$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A007AGReplace 2ea 6 1/2" Two Section End Plates Preformed Stainless Copper Case$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A007AHReplace 2ea 8" Two Section End Plates Preformed Stainless Copper Case$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A007AIReplace 2ea 9 1/2" End Plates Preformed Stainless Copper Case$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A007AJReplace 2ea 12.5" Two Section End Plates Preformed Stainless Copper Case$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A008Test Copper Feed Cable
A008AAContinuity test 25 pair copper feed cable & provide test results.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A008ABContinuity test 50 pair copper feed cable & provide test results.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A008ACContinuity test 100 pair copper feed cable & provide test results.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A008ADContinuity test additional 100 pair copper feed cable & provide test results.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A008AEContinuity test 2400 pair copper feed cable & provide test results.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A008AFContinuity test additional 2400 pair copper feed cable & provide test results.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009Install PE-90 Single Mode Optical Fiber in Existing Conduit
A009AAInstall one 12-strand SM loose tube fiber in existing UG conduit through existing max-cell per foot up to 200'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009ABInstall one 12-strand SM loose tube fiber in existing UG conduit through existing max-cell from 200' to 1000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009ACInstall one 12-strand SM loose tube fiber in existing UG conduit through existing max-cell from 1000' to 5000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009ADInstall one 24-strand SM loose tube fiber in existing UG conduit through existing max-cell per foot up to 200'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AEInstall one 24-strand SM loose tube fiber in existing UG conduit through existing max-cell from 200' to 1000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AFInstall one 24-strand SM loose tube fiber in existing UG conduit through existing max-cell from 1000' to 5000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AGInstall one 36-strand SM loose tube fiber in existing UG conduit through existing max-cell from 200' to 1000'$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AHInstall one 36-strand SM loose tube fiber in existing UG conduit through existing max-cell from 200' to 1000'..$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AIInstall one 36-strand SM loose tube fiber in existing UG conduit through existing max-cell from 1000' to 5000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AJInstall one 48-strand SM loose tube fiber in existing UG conduit through existing max-cell per foot up to 200'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AKInstall one 48-strand SM loose tube fiber in existing UG conduit through existing max-cell from 200' to 1000'..$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009ALInstall one 48-strand SM loose tube fiber in existing UG conduit through existing max-cell from 1000' to 5000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AMInstall one 72-strand SM loose tube fiber in existing UG conduit through existing max-cell per foot up to 200'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009ANInstall one 72-strand SM loose tube fiber in existing UG conduit through existing max-cell from 200' to 1000'..$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AOInstall one 72-strand SM loose tube fiber in existing UG conduit through existing max-cell from 1000' to 5000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009APInstall one 96-strand SM loose tube fiber in existing UG conduit through existing max-cell per foot up to 200'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AQInstall one 96-strand SM loose tube fiber in existing UG conduit through existing max-cell from 200' to 1000'..$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009ARInstall one 96-strand SM loose tube fiber in existing UG conduit through existing max-cell from 1000' to 5000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009ASInstall one 144-strand SM loose tube fiber in existing UG conduit through existing max-cell up to 200'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009ATInstall one 144-strand SM loose tube fiber in existing UG conduit through existing max-cell per foot from 200' to 1000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AUInstall one 144-strand SM loose tube fiber in existing UG conduit through existing max-cell from 1000' to 5000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AVInstall one 288-strand SM loose tube fiber in existing UG conduit through existing max-cell up to 200'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AWInstall one 288-strand SM loose tube fiber in existing UG conduit through existing max-cell per foot from 200' to 1000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AXInstall one 288-strand SM loose tube fiber in existing UG conduit through existing max-cell from 1000' to 5000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AYInstall one 576-strand SM loose tube fiber in existing UG conduit through existing max-cell up to 200'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009AZInstall one 576-strand SM loose tube fiber in existing UG conduit through existing max-cell per foot from 200' to 1000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A009BAInstall one 576-strand SM loose tube fiber in existing UG conduit through existing max-cell from 1000' to 5000'.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A010Fiber Termination
A010AAInstall 12 factory polished SC connectors using a CCH pigtailed splice cassette and a 1U fiber housing. Label to meet standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A010ABInstall 24 factory polished SC connectors using CCH pigtailed splice cassettes and a 2U fiber housing. Label to meet standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A010ACInstall additional 12 factory polished SC connectors using a CCH pigtailed splice cassette with a 4U fiber housing. Label to meet standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A010ADInstall additional 12 factory polished SC connectors using a CCH pigtailed splice cassette. CCH Housing is separate cost.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A010AEInstall 12 factory polished SC connectors using a CCH pigtailed splice cassette and a WCH-02P wall mount housing$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A010AFInstall 144 factory polished SC connectors using CCH pigtailed splice cassettes and a CCH-04U housing$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A010AGProvide one SM Fiber Optic Patch Cord 1 Meter Length, terminations to be specified.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A010AHInstall 576 factory polished SC connectors using CCH pigtailed splice cassettes and CCH-04U housings.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A011Fiber Splicing
A011AASplice 12 strand SM fiber at MH location and install splice case. Label at MH location per standards. Install splice case per industry standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A011ABSplice 24 strand SM fiber at MH location and install splice case. Label at MH location per standards. Install splice case per industry standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A011ACSplice additional 12 strand SM fiber at MH location and install splice case. Label at MH location per standards. Install splice case per industry standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A011ADSplice 144 strand SM fiber at MH location and install splice case. Label at MH location per standards. Install splice case per industry standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A011AESplice additional 144 strand SM fiber at MH location and install splice case. Label at MH location per standards. Install splice case per industry standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A011AFSplice 576 strand SM fiber at MH location and install splice case. Label at MH location per standards. Install splice case per industry standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A011AGSplice additional 576 strand SM fiber at MH location and install splice case. Label at MH location per standards. Install splice case per industry standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A011AHInstall new 6.5" End Plate Preformed Dome Fiber Closure$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A011AIInstall new 9.5" End Plate Preformed Dome Fiber Closure$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A011AJInstall new end plate Coyote Fiber Closure$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A012Fiber Testing-Power Meter/Light Source
A012AATest 12 strand fiber in one direction with power meter in both 1310 nm and 1550 nm wavelengths and provide test reports.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A012ABTest 24 strand fiber in one direction with power meter in both 1310 nm and 1550 nm wavelengths and provide test reports.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A012ACTest additional 12 strand fiber in one direction with power meter in both 1310 nm and 1550 nm wavelengths and provide test reports.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A012ADTest 144 strand fiber in one direction with power meter in both 1310 nm and 1550 nm wavelengths and provide test reports.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A012AETest 576 strand fiber in one direction with power meter in both 1310 nm and 1550 nm wavelengths and provide test reports.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A013Fiber Testing-OTDR
A013AAOTDR test 12 strand SM fiber in one direction at 1310 nm and 1550 nm wavelengths and provide test reports$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A013ABOTDR test 24 strand SM fiber in one direction at 1310 nm and 1550 nm wavelengths and provide test reports$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A013ACOTDR test additional 12 strand SM fiber in one direction at 1310 nm and 1550 nm wavelengths and provide test reports$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A013ADOTDR test 144 strand SM fiber in one direction at 1310 nm and 1550 nm wavelengths and provide test reports$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A013AEOTDR test 576 strand SM fiber in one direction at 1310 nm and 1550 nm wavelengths and provide test reports$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014Build Out Telecommunications Room/Entrance Facility
A014AAInstall one sheet of 4' X 8' 3/4 inch fire-rated plywood backboard on wall. Mount one 19 inch relay rack with base insulator kit . Include two single double sided vertical and four single sided horizontal wire management. Install 12 inch ladder racking to achieve cabling pathway and provide three point bracing to meet seismic zone 4 requirements. Install TMGB using all UL listed materials, bond rack, ladder rack, and building entrance terminal with number six green stranded wire and two hole lugs for bonding connections. Install # 2 wire from TMGB to building electrical service ground. Install one dedicated circuit on a duplex 20 Amp-120 Volt AC, non-switch electrical outlet and one convenience outlet in close proximity to rack. Install horizontal 12 outlet (NEMA 5 -15R) network grade 3840 joule surge protector with 15A resettable circuit breaker and a NEMA 5-15P plug on the 19-inch rack. Installation shall meet all ANSI/TIA/EIA 568 standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014ABInstall one sheet of 4' X 8' 3/4 inch fire-rated plywood backboard on wall. Mount one fully enclosed wall mountable double hinged Nema 12 rated 24U swinging wall mount rack. Install TMGB using all UL listed materials, bond enclosure rack, and building entrance terminal with number six green stranded wire and two hole lugs for bonding connections. Install # 2 wire from TMGB to building electrical service ground. Install one dedicated circuit on a duplex 20 Amp-120 Volt AC, non-switch electrical outlet within the enclosure. Installation shall meet all ANSI/TIA/EIA 568 standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014ACInstall Four post Frame vertical and horizontal wire management and required 12 inch ladder racking (three points of seismic bracing). Install UL-listed TMGB, UL-listed lugs and Green 6 AWG ground wire to the rack, ladder racking, and building entrance terminal in accordance with EIA/TIA Standards. Install one-two (2) dedicated branch duplex 20 Amp-120 Volt AC, non-switch electrical outlet and one convenience outlet in close proximity to rack. Install 20 Amp-120 Volt-Surge Suppressed Horizontal Power distribution on the 19-inch rack.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014ADInstall 11/4 Inch inner duct within building. Labeled at each end supported every five feet above and below ceiling. Install Riser or Plenum Rated Back Bone Cables between Telecommunications Room up to 50 pair Category 3 and 12 Strand Single mode Optical Fiber. Terminate Cat. 3 on patch panels on each end, and Fiber on SC Duplex Fiber Panel Adapters in a separate 2U RIC.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014AEInstall Additional 3/4 inch Fire-rated plywood backboard.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014AFInstall Additional 19 " Relay Rack with insulation kit, 12 inch ladder rack and bond to existing ground.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014AGInstall seismic relay rack with vertical wire managers, isolation pad, power strip.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014AHInstall additional horizontal 12 outlet (NEMA 5 -15R) network grade 3840 joule surge protector with 15A resettable circuit breaker and a NEMA 5-15P plug.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014AIInstall TMGB per EIA/TIA standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014AJInstall TGB per EIA/TIA standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014AKInstall Main Building Ground$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014ALInstall (1) duplex electrical 15 AMP circuit.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014AMInstall 12" wire basket above ceiling as a pathway for cabling. Supported every 5 feet with 3/8 threaded rod. Provide proper grounding back to TMGB.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014ANInstall (1) one inch conduit stub up from 4S metal device box above ceiling into Plenum. Surface mounted.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014AOCore floor and install 4" sleeve through floor. Adhere to cable fill rates of 40%. Provide proper fire stopping to meet or exceed standards.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014APProvide Poke-Thru Flush Device Box and 4" Core for Voice/ Data (floor monument)$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014AQInstall one RG6 shielded Cable terminated at each end with F crimp on connectors. Cable will be placed into coax faceplate at the station side. Telecommunications room to specified location. Utilizing the cable tray within the telecommunications room and installing J-hooks throughout the rest of the pathway. Assume moderate level of difficulty with core drills and fire stopping as needed. Cable will be tested for continuity and opens shorts. Per 295 foot section.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014ARProvide and install a 1U horizontal front and rear wire manager for 19" relay rack.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014ASProvide and install a 2U horizontal front and rear wire manager for 19" relay rack.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A014ATProvide and install an 82" front and rear 6" vertical wire manager for 19" relay rack.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A015Building Entrance
A015AAInstall 2-4" Building Entrance Conduit. Extend Outside Plant Schedule 40 Conduits from concrete area outside of building. Core through foundation and sweep into Telephone Room using 45 degree sweeps, stub conduit 2-4 inches above floor. Patch and seal floor as necessary. Rod and rope conduit. Cap/Plug empty conduit.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A015ABInstall 2-4" conduits through side of the building into designated point of entry. Underground conduits shall sweep up into 18" x 18" x 8" NEMA 3R box with two 4" conduits leaving through back of the box through sidewall of building. Conduits through wall shall be fastened on each end of sleeve. Install plastic bushings for cable protection. All conduits shall be sealed with inflatable bags wrapped around cabling to prevent against moisture and foreign objects.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016Premise Wiring
A016AAInstallation environment is a warehouse with tall ceilings. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new j-hook pathway, at work area location install 8’ of 1” EMT down wall to CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Scissor lift may be required for work being performed at heights over 12 feet. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016ABInstallation environment is a warehouse with tall ceilings. Cost break for 10 or more locations (per drop) in single tasking. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new j-hook pathway, at work area location install 8’ of 1” EMT down wall to CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Scissor lift may be required for work being performed at heights over 12 feet. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016ACOffice environment is a concrete building with cabling installed in new 1” EMT conduit raceway. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new 1” EMT conduit to the work area location, and terminate in a CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016ADOffice environment is a concrete building with cabling installed in new 1” EMT conduit raceway. Cost break for 10 or more locations (per drop) in single tasking. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new 1” EMT conduit to the work area location, and terminated in a CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016AEOffice environment is a concrete building with cabling installed with j-hook or cable rings to the work area. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new j-hook pathway, and terminated in a CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016AFOffice environment is a concrete building with cabling installed with j-hook or cable rings to the work area. Cost break for 10 or more locations (per drop) in single tasking. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new j-hook pathway, and terminated in a CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016AGStandard office environment with 8’ to 10’ drop tile ceilings with j-hook or cable rings to the work area. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new j-hook pathway, and terminated in a CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016AHStandard office environment with 8’ to 10’ drop tile ceilings with j-hook or cable rings to the work area. Cost break for 10 or more locations (per drop) in single tasking. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new j-hook pathway, and terminated in a CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016AIOffice environment is a hard lid ceiling with cabling installed in new Surface Raceway (1.51 in. Width x .94 in Height), Color Ivory or White. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new use Panduit raceway from TR to the work area location, and terminated in a CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016AJOffice environment is a hard lid ceiling with cabling installed in new Surface Raceway (1.51 in. Width x .94 in Height), Color Ivory or White. Cost break for 10 or more locations (per drop) in single tasking. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new use Panduit raceway from TR to the work area location, and terminated in a CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016AKOffice environment is a hard lid ceiling with cabling installed in new 1” EMT conduit raceway. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new 1” EMT conduit to the work area location, and terminated in a CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016ALOffice environment is a hard lid ceiling with cabling installed in new 1” EMT conduit raceway. Cost break for 10 or more locations (per drop) in single tasking. Provide and install one blue Cat-6 plenum cable up to 295’ to support network services and one gray Cat-6 plenum cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new 1” EMT conduit to the work area location, and terminated in a CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016AMAdd 2 additional cables per outlet per above description (within section B016)$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016ANProvide 7' Cat-6 Patch Cord$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016AOProvide and install one Cat 6 48 port patch panel.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A016APProvide and install one Cat 6 24 port patch panel.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A017Premise Wiring-Shielded
A017AAInstallation environment is a warehouse with tall ceilings. Provide and install one blue Cat-6 plenum shielded cable up to 295’ to support network services and one gray Cat-6 plenum shielded cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 shielded patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new j-hook pathway, at work area location install 8’ of 1” EMT down wall to CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C shielded keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Scissor lift may be required for work being performed at heights over 12 feet. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A017ABInstallation environment is a warehouse with tall ceilings. Cost break for 10 or more locations (per drop) in single tasking. Provide and install one blue Cat-6 plenum shielded cable up to 295’ to support network services and one gray Cat-6 plenum shielded cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 shielded patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new j-hook pathway, at work area location install 8’ of 1” EMT down wall to CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C shielded keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Scissor lift may be required for work being performed at heights over 12 feet. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0
A017ACOffice environment is a concrete building with cabling installed in new 1” EMT conduit raceway. Provide and install one blue Cat-6 plenum shielded cable up to 295’ to support network services and one gray Cat-6 plenum shielded cable up to 295’ to support voice services from the existing TR (Telecom Room) to specified work area. Termination method shall be 568A type wiring configuration. The termination at the TR shall be on Cat-6 shielded patch panels for both voice and data cabling (patch panel cost separate). Cabling shall be routed on ladder rack in the TR. Cabling outside the TR shall be in new 1” EMT conduit to the work area location, and terminate in a CPR compliant box with two port faceplate and Cat-6 RJ-45 8P8C shielded keystone jacks in corresponding blue and gray. Assume moderate level of difficulty for conduit and coring plus install fire-stop. Test all cabling to meet EIA/TIA 568B and 2010 NMCI standards. Provide test results and redline drawings of install.$ - 0$ - 0$ - 0$ - 00Ea$ - 0$ - 0$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .