N6247321R3430_RFIs_072121.xlsx XLSX spreadsheet
TC-A-101_072121.pdf PDF
A0003_072121.pdf PDF
MCIWEST G6 CPR (OSP) Section 271300 (Signed) May 7 2018.pdf PDF
MCIWEST G6 CPR (PDS) Section 271400 (Signed) May 7 2018.pdf PDF
N6247321R3430_RFIs_071321.xlsx XLSX spreadsheet
3.09 - COM JOC Section J Exhibit D Safety Data R1_071321.docx DOCX document
MCIWEST G6 CPR (ISP) Section 271500 (Signed) May 7 2018.pdf PDF
N6247321R3430 RFI Diagrams and Pictures.pdf PDF
N6247321R3430_RFIs_070721.xlsx XLSX spreadsheet
N6247321R3430_A0001_070721.pdf PDF
N6247321R3430_061821.pdf PDF
3-09 - COM JOC Section J Attachment J-C.7 Coefficient Example.pdf PDF
3-09 - COM JOC Section J Attachment J-C9-2 SA 20064 PE2098M and PE18416M CATEX.pdf PDF
3-09 - COM JOC Section J Exhibit D Safety Data.docx DOCX document
3-09 - COM JOC Section J Attachment J-C.1 - J-C.6 (REV May21)_EBB_R1 KMK.pdf PDF
4-XX - COM JOC Section L Attachment L-2 Project Forecast.doc DOC document
3-09 - COM JOC Section J Attachment J-C.8 Wage Determination.pdf PDF
3-09 - COM JOC Section J Exhibit B Recent Relevant Experience.docx DOCX document
4-XX - COM JOC Section L EXHIBIT H Bid ELINs.xlsx XLSX spreadsheet
4-XX - COM JOC Section L Attachment L-4 RFI Form.xlsx XLSX spreadsheet
3-09 - COM JOC Section J Attachment J-C.9-3 EXHIBIT G Bid ELINs (Seed Project).xlsx XLSX spreadsheet
3-09 - COM JOC Section J Exhibit E PPQ.docx DOCX document
3-09 - COM JOC Section J Exhibit C Management Approach.docx DOCX document
3-09 - COM JOC Section J Attachment J-C.9 SOW.pdf PDF
4-XX - COM JOC Section L Attachment L-3 DBIDs Roster.xlsx XLSX spreadsheet
3-09 - COM JOC Section J Attachment J-C.9-1 SA16291 PE18416M CATEX.pdf PDF
3-09 - COM JOC Section J Exhibit F Surety Form.docx DOCX document
3-09 - COM JOC Section J Exhibit A Financial Questionnaire.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A0002

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Jul-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247321R3430

X 9B. DATED (SEE ITEM 11)

18-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Jul-2021

CODE

NAVFAC SOUTHWEST

CAMP PENDLETON FEAD/CODE ROPCN

MARINE CORPS BASE CAMP PENDLETON

PO BOX 555229 BLDG 22101

CAMP PENDLETON CA 92055-5229

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247321R3430

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

In accordance with the terms and conditions of the Solicitation N6247321R3430, this Amendment (0001) is hereby issued and incorporates the following changes to the subject solicitation dated June 18, 2021.

1. Attachment 3.09 - COM JOC Section J Exhibit D Safety Data is hereby removed and replaced in it’s entirety (3.09 – COM JOC Section J Exhibit D Safety Data R1_071321).

2. The answers to RFI’s (1) through (12) are attached (N6247321R3430_RFIs_071321).

3. As a result of this Amendment, the Proposal Due Date is hereby changed from July 19, 2021 at 12:00pm (PST), to July 26, 2021 at 12:00pm (PST).

Contractor must state their acknowledgement of this Amendment (0002) as part of the proposal submission.

All other paragraphs, provisions, clauses and conditions of this solicitation remain unchanged.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Section L Exhibit H 18-JUN-2021 Attachment 10 Section J Exhibit B 18-JUN-2021 Attachment 11 Section J Exhibit A 18-JUN-2021 Attachment 12 Section J Attachments J-

C.8

18-JUN-2021

Attachment 13 Section J Attachments J- C.1 - J-C.6

18-JUN-2021

Attachment 14 Section J Attachment J- C.9-3 Bid ELINs

18-JUN-2021

Attachment 15 Section J Attachment J- C.9-2

18-JUN-2021

Attachment 16 Section J Attachment J- C.9-1

18-JUN-2021

Attachment 17 Section J Attachment J- C.9

18-JUN-2021

Attachment 18 Section J Attachment J- C.7

18-JUN-2021

Attachment 2 Section L Attachment L-4 18-JUN-2021 Attachment 3 Section L Attachment L-3 18-JUN-2021

N6247321R3430

Attachment 4 Section L Attachment L-2 18-JUN-2021 Attachment 6 Section J Exhibit E 18-JUN-2021 Attachment 7 Section J Exhibit F 18-JUN-2021 Attachment 8 Section J Exhibit D 18-JUN-2021 Attachment 9 Section J Exhibit C 18-JUN-2021 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 N6247321R3430_RFIs_0

71321

13-JUL-2021

Attachment 2 3.09 - COM JOC Section J Exhibit D Safety Data R1

13-JUL-2021

Attachment 3 MCIWEST G6 CPR (ISP) Section 271500 (Signed) May 7, 2018

13-JUL-2021

Attachment 4 MCIWEST G6 CPR (OSP) Section 271300 (Signed) May 7, 2018

13-JUL-2021

Attachment 5 MCIWEST G6 CPR (PDS) Section 271400 (Signed) May 7, 2018

07-MAY-2021

(End of Summary of Changes)