View the file

Other files

File Type Posted
21R3429_A0011_091421.pdf PDF
21R3429_A0010_082621.pdf PDF
21R3429_Boilers_RFI_GR_082621.xlsx XLSX spreadsheet
21R3429_A0009_082321.pdf PDF
21R3429_Boilers_RFI_GR_082321.xlsx XLSX spreadsheet
21R3429_A0008_082021.pdf PDF
21R3429_Boilers_RFI_GR_082021 - R1.xlsx XLSX spreadsheet
21R3429_Boilers_RFI_GR_082021.xlsx XLSX spreadsheet
21R3429_A0007_082021.pdf PDF
21R3429_Boilers_RFI_GR_081821.xlsx XLSX spreadsheet
21R3429_A0006_081821.pdf PDF
05a - Exhibit A - Financial Questionnaire R1.docx DOCX document
21R3429_Boilers_RFI_GR_081621.xlsx XLSX spreadsheet
CA2020210001 Mod 11 080621.pdf PDF
MCBCP_43402_Report_Asbestos_Lead_0513.pdf PDF
53415 Asbuilt 1.pdf PDF
21R3429_A0004_081621.pdf PDF
Install Solar Heating Systems Basewide - 1977.pdf PDF
Repl of SP Solar H-Sys Basewide - 1984.pdf PDF
53415 Asbuilt 4.pdf PDF
53415 Asbuilt 3.pdf PDF
21R3429_A0005_081621.pdf PDF
21R3429_A0003_080321.pdf PDF
21R3429_Boilers_RFI Government Response_080321.xlsx XLSX spreadsheet
21R3429_A0002_080221.pdf PDF
21R3429_A0001_072821.pdf PDF
05b - Exhibit B - Recent Relevant Experience.docx DOCX document
07a - WO 10966175_Offer Schedule_072021.pdf PDF
05c - Exhibit C - Management Approach.docx DOCX document
05a - Exhibit A - Financial Questionnaire.docx DOCX document
00 - MACC Frequently Asked Questions.pdf PDF
05e - Exhibit E - Past Performance.docx DOCX document
000 - 21R3429 Solicitation_072021.pdf PDF
07 - WO 10966175 Seed Project RFP PARTS 2-6_v6.pdf PDF
05f - Exhibit F - Surety Form.docx DOCX document
06c - Offerors Team Consent Form.doc DOC document
06a - DBIDs Roster.xlsx XLSX spreadsheet
05d - Exhibit D - Safety.docx DOCX document
06b - RFI Form.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI (pre-award) Form_For KTR

SOLICITATION: N62473-21-R-3429 (AND PTO X001)

BOILERS AND MECHANICAL MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), MCB CAMP PENDLETON

DOCUMENT DATE: 02 AUGUST 2021

TO BE FILLED OUT BY THE BIDDING KTRTO BE FILLED OUT BY THE GOV'T
RFI #RFP Part #Chapter or SectionSub-Section #CLARIFICATION REQUESTRFI reason from KTR's PerspectiveComment [fill out if "Other" was chosen, specify reason(s)]RFI Topic most closely relevant to:Government ResponseDATE RECEIVEDDATE TO KTRAmendment Number
1Part 1Chapter-1Basis of Award; Factor 1We have completed 35 Boiler projects at MCBCP as a General Contractor; can the Past Performance requirement of 70% Self Performance be met showing notable experience?Other; Please specify in the next columnOur team's experience on with the boiler requirements of CPR could show greater or equal experience.ContractingRFP Past Performance requirements remain unchanged. A relevant project past performance requirement is that "boiler work was at least 70% self-performed by the offeror on at least two (2) of the past-performance projects."7/27/218/2/21A0002
2Part 1Chapter-1Basis of Award; FactorThe RFP calls for a Calif. Contractor's License as this is a federal project can this requirement be waived?Intent needs clarificationContractingThis requirement is not being waived at this time.7/27/218/2/21A0002
3What is the correct bid bond amount for the project? Box 13B requires Bid Guarantee. Page 4 - section 6e states project is $20,000,000 but minimum guarantee is $5,000.00. Page 116 Instruction to Bidders section 2 states "bid guarantee in the contract minimum guarantee amount of $2,000"The bid guarantee shall be in the amount of the contract minimum guarantee of $5,000.00.7/28/218/2/21A0002
4From whom do we get 12-digit "Request Code" to "Drop-off Files" at https://safe.apps.mil? Page 116 "ELECTRONIC PROPOSAL SUBMISSION INSTRUCTIONS" note a "Request Code" is required to used DoD SAFE.DoD SAFE Code shall be requested from Kellee Krause at kellee.krause@navy.mil.7/28/218/2/21A0002
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100

Drop Down List

RFI Topic Relevant to:RFP Part #RFI Reason (for QA) - from KTR perspecrive
Architectural-relatedPart 1Outdated Reference
Civil EngineeringPart 2Conflicting Information
ContractingPart 3Attachments are referenced but missing/not provided
Electrical EngineeringPart 4Intent needs clarification
EnvironmentalPart 5Typo
Fire ProtectionPart 6Other; Please specify in the next column
Geotechnical EngineeringIf "Others" - include info under Column E Clarification Request
Interior Design
Landscape
Mechanical Engineering
Structural Engineering
Other/Unsure
SCIF/SAPF
Crane
Elevators
ATFP

File details come from the government source that posted it. Updated .