View the file

Other files

File Type Posted
21R3429_A0011_091421.pdf PDF
21R3429_A0010_082621.pdf PDF
21R3429_Boilers_RFI_GR_082621.xlsx XLSX spreadsheet
21R3429_A0009_082321.pdf PDF
21R3429_Boilers_RFI_GR_082321.xlsx XLSX spreadsheet
21R3429_A0008_082021.pdf PDF
21R3429_Boilers_RFI_GR_082021 - R1.xlsx XLSX spreadsheet
21R3429_Boilers_RFI_GR_082021.xlsx XLSX spreadsheet
21R3429_A0007_082021.pdf PDF
21R3429_Boilers_RFI_GR_081821.xlsx XLSX spreadsheet
21R3429_A0006_081821.pdf PDF
05a - Exhibit A - Financial Questionnaire R1.docx DOCX document
21R3429_Boilers_RFI_GR_081621.xlsx XLSX spreadsheet
CA2020210001 Mod 11 080621.pdf PDF
MCBCP_43402_Report_Asbestos_Lead_0513.pdf PDF
53415 Asbuilt 1.pdf PDF
21R3429_A0004_081621.pdf PDF
Install Solar Heating Systems Basewide - 1977.pdf PDF
Repl of SP Solar H-Sys Basewide - 1984.pdf PDF
53415 Asbuilt 4.pdf PDF
53415 Asbuilt 3.pdf PDF
21R3429_A0005_081621.pdf PDF
21R3429_A0003_080321.pdf PDF
21R3429_Boilers_RFI Government Response_080321.xlsx XLSX spreadsheet
21R3429_A0002_080221.pdf PDF
21R3429_Boilers_RFI Government Response_080221.xlsx XLSX spreadsheet
21R3429_A0001_072821.pdf PDF
05b - Exhibit B - Recent Relevant Experience.docx DOCX document
07a - WO 10966175_Offer Schedule_072021.pdf PDF
05a - Exhibit A - Financial Questionnaire.docx DOCX document
00 - MACC Frequently Asked Questions.pdf PDF
05e - Exhibit E - Past Performance.docx DOCX document
000 - 21R3429 Solicitation_072021.pdf PDF
07 - WO 10966175 Seed Project RFP PARTS 2-6_v6.pdf PDF
05f - Exhibit F - Surety Form.docx DOCX document
06c - Offerors Team Consent Form.doc DOC document
06a - DBIDs Roster.xlsx XLSX spreadsheet
05d - Exhibit D - Safety.docx DOCX document
06b - RFI Form.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C

FACTOR 2 - MANAGEMENT APPROACH

PROJECT DATA SHEET

Submit Exhibit C (MANAGEMENT APPROACH) under Tab 2 of the Technical Proposal in accordance with solicitation submittal requirements. EXHIBIT C IS MANDATORY. Individual blocks on this form may be expanded; however, total page limit shall not exceed ten single-sided 8.5” x 11” pages using 12-point Times New Roman font.

1. Workload Management Plan: Provide the proposed plan that is detailed, specific, and demonstrates how the Offeror has the necessary capability to successfully manage surges in workload and perform multiple TO concurrently at various locations within the NAVFAC SW AOR.

1. Subcontractor Management Plan: Provide a detailed and structured plan with methods for monitoring and controlling subcontractors and methods to be implemented to correct poor performing subcontractors. Offeror shall address how it will ensure that high quality services are provided that meet or exceed contract requirements.

1. Quality Control Management Plan: Offeror shall provide a detailed and structured plan for addressing customer complaints and marginal or unsatisfactory performance. Offeror shall address quality control methods that will be implemented to ensure performance meets or exceeds contract requirements.

1. Self-Performance Management Plan: Offeror shall provide the proposed plan to ensure not more than 50% of the amount paid by the Government is for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50% subcontract amount that cannot be exceeded in accordance with FAR 52.219-14 Limitations on Subcontracting (Jan 2019) (DEVIATION 2019-O0003).