View the file

Other files

File Type Posted
21R3429_A0011_091421.pdf PDF
21R3429_A0010_082621.pdf PDF
21R3429_Boilers_RFI_GR_082621.xlsx XLSX spreadsheet
21R3429_A0009_082321.pdf PDF
21R3429_Boilers_RFI_GR_082321.xlsx XLSX spreadsheet
21R3429_Boilers_RFI_GR_082021 - R1.xlsx XLSX spreadsheet
21R3429_Boilers_RFI_GR_082021.xlsx XLSX spreadsheet
21R3429_A0007_082021.pdf PDF
21R3429_Boilers_RFI_GR_081821.xlsx XLSX spreadsheet
21R3429_A0006_081821.pdf PDF
05a - Exhibit A - Financial Questionnaire R1.docx DOCX document
21R3429_Boilers_RFI_GR_081621.xlsx XLSX spreadsheet
CA2020210001 Mod 11 080621.pdf PDF
MCBCP_43402_Report_Asbestos_Lead_0513.pdf PDF
53415 Asbuilt 1.pdf PDF
21R3429_A0004_081621.pdf PDF
Install Solar Heating Systems Basewide - 1977.pdf PDF
Repl of SP Solar H-Sys Basewide - 1984.pdf PDF
53415 Asbuilt 4.pdf PDF
53415 Asbuilt 3.pdf PDF
21R3429_A0005_081621.pdf PDF
21R3429_A0003_080321.pdf PDF
21R3429_Boilers_RFI Government Response_080321.xlsx XLSX spreadsheet
21R3429_A0002_080221.pdf PDF
21R3429_Boilers_RFI Government Response_080221.xlsx XLSX spreadsheet
21R3429_A0001_072821.pdf PDF
05b - Exhibit B - Recent Relevant Experience.docx DOCX document
07a - WO 10966175_Offer Schedule_072021.pdf PDF
05c - Exhibit C - Management Approach.docx DOCX document
05a - Exhibit A - Financial Questionnaire.docx DOCX document
00 - MACC Frequently Asked Questions.pdf PDF
05e - Exhibit E - Past Performance.docx DOCX document
000 - 21R3429 Solicitation_072021.pdf PDF
07 - WO 10966175 Seed Project RFP PARTS 2-6_v6.pdf PDF
05f - Exhibit F - Surety Form.docx DOCX document
06c - Offerors Team Consent Form.doc DOC document
06a - DBIDs Roster.xlsx XLSX spreadsheet
05d - Exhibit D - Safety.docx DOCX document
06b - RFI Form.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A0008

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6247321R3429

X 9B. DATED (SEE ITEM 11)

20-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Aug-2021

CODE

NAVFAC SOUTHWEST

CAMP PENDLETON FEAD/CODE ROPCN

MARINE CORPS BASE CAMP PENDLETON

PO BOX 555229 BLDG 22101

CAMP PENDLETON CA 92055-5229

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247321R3429

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

A0008 In accordance with the terms and conditions of the Solicitation N6247321R3429, this Amendment (0008) is hereby issued and incorporates the following changes to the subject solicitation dated July 20, 2021.

1. RFIs 1 through 104, and 106 through 107 are included as attachment 21R3429 Boilers_RFI_GR_082021- R1.

2. As a result of this Amendment (0008) the Proposal Due Date/Time is being changed as follows:

FROM

August 26, 2021 at 6:00 PM (PST)

TO

August 27, 2021 at 6:00 PM (PST)

PROPOSAL MUST BE SUBMITTED VIA DOD SAFE. TO REQUEST A DOD SAFE LINK TO

SUBMIT PROPOSAL, REQUEST LINK BY EMAILING KELLEE.KRAUSE@NAVY.MIL.

Contractor must state their acknowledgement of this Amendment (0008) as part of the proposal submission.

All other paragraphs, provisions, clauses and conditions of this solicitation remain unchanged.

(End of Summary of Changes)