Exhibit M Electrical JOC NAICS 238210 PTO0001 Updated Jan 30 2020.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Metro San Diego Electrical Job Order Contract Under NAICS 238210
Solicitation number
N62473-20-R-0012
Issued by

View the file

Other files

File Type Posted
QA 0012 UPDATED FEB 5 2020.pdf PDF
QA 0012.pdf PDF
N6247320R0012 Amendment 0002.pdf PDF
QA 0012 Updated Jan 30 2020 PDF
Wage Determinations San Diego County Jan 27 2020.pdf PDF
Q&A 0012.pdf PDF
Exhibit K Coefficients Worksheet (2).xlsx XLSX spreadsheet
EXH M ELECTRICAL JOC NAICS 238210 PTO 0001(2).xlsx XLSX spreadsheet
Amendment 0001_N6247320R0012.pdf PDF
Exhibit A - Offeror Team Composition and Management.docx DOCX document
UPDATED Exhibit B - Experience - Offeror.docx DOCX document
N6247320R0012 RFP.pdf PDF
Exhibit F Surety Form.docx DOCX document
Exhibit E Financial Questionnaire.docx DOCX document
Exhibit D Safety Data.docx DOCX document
REVISED Exhibit H GENERIC UFGS Guides for projects.docx DOCX document
SAN DIEGO COUNTY WD 122719.pdf PDF
Exhibit C - PPQ.docx DOCX document
EXH M ELECTRICAL JOC NAICS 238210 PTO 0001.xlsx XLSX spreadsheet
EXHIBIT K COEFFICIENT WORKSHEET with profit language 072418.docx DOCX document
Exhibit G Revised RFI Form.docx DOCX document
Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRE-PRICED ITEM DESCRIPTIONMEANS ITEM #QTY #QTY UNITNATIONAL AVERAGE MATERIAL (MATL) UNIT COSTMATL TOTAL COSTNATIONAL AVERAGE LABOR UNIT COSTLABOR TOTAL COSTNATIONAL AVERAGE EQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
Gypsum wallboard, repairs, minimum labor/equipment charge0901701090001Job$ - 0$ - 0$ 213.00$ 213.00$ - 0$ - 0$ - 0$ - 0
Ceiling demolition, suspended ceiling, mineral fiber, on suspension system, remove090505101250320S.F.$ - 0$ - 0$ 0.56$ 179.20$ - 0$ - 0$ - 0$ - 0
Flooring demolition, vinyl or rubber cove base, straight section09050520085060L.F.$ - 0$ - 0$ 0.34$ 20.40$ - 0$ - 0$ - 0$ - 0
Flooring demolition, vinyl composition tile, 12" x 12"090505200900320S.F.$ - 0$ - 0$ 0.67$ 214.40$ - 0$ - 0$ - 0$ - 0
Wall base, rubber, straight or cove, standard colors, 4" high, 1/8" thick09651313110060L.F.$ 1.43$ 85.80$ 1.26$ 75.60$ - 0$ - 0$ - 0$ - 0
Flooring, vinyl composition tile, 12" x 12" x 1/16"096519197000320S.F.$ 1.23$ 393.60$ 0.79$ 252.80$ - 0$ - 0$ - 0$ - 0
Paints & coatings, walls & ceilings, interior, minimum labor/equipment charge0991237299001Job$ - 0$ - 0$ 178.00$ 178.00$ - 0$ - 0$ - 0$ - 0
Selective demolition, blinds, interior, horizontal or vertical1205051049207L.F.$ - 0$ - 0$ 2.25$ 15.75$ - 0$ - 0$ - 0$ - 0
Blinds, interior, horizontal, solid color, stock, 1" aluminum slats12211313002050S.F.$ 5.80$ 290.00$ 0.72$ 36.00$ - 0$ - 0$ - 0$ - 0
Tension structure, 12' x 14', for roll-up door, add1331235005001Ea.$ 6,925.00$ 6,925.00$ 745.00$ 745.00$ - 0$ - 0$ - 0$ - 0
Pipe, steel, black, threaded, 1" diameter, schedule 40, Spec. A-53, includes coupling and clevis hanger assembly sized for covering, 10' OC22111344058016L.F.$ 7.80$ 124.80$ 9.75$ 156.00$ - 0$ - 0$ - 0$ - 0
Conduit, electric metallic tubing (EMT), 1/2" to 1" diameter, electrical demolition, remove conduit to 10' high, including fittings & hangers2605051002001400L.F.$ - 0$ - 0$ 1.25$ 1,750.00$ - 0$ - 0$ - 0$ - 0
Junction boxes, 4" square & octagon, electrical demolition, remove, including removal of supports and terminations26050510172036Ea.$ - 0$ - 0$ 6.15$ 221.40$ - 0$ - 0$ - 0$ - 0
Wire, THW-THWN-THHN, #12, electrical demolition, removed from in place conduit, to 15' high26050510184042C.L.F.$ - 0$ - 0$ 8.90$ 373.80$ - 0$ - 0$ - 0$ - 0
Fluorescent fixtures, interior, 4 lamp, 2' x 4', electrical demolition, remove, recessed drop-in, to 15' high, including supports & whips2605051021404Ea.$ - 0$ - 0$ 32.50$ 130.00$ - 0$ - 0$ - 0$ - 0
Fluorescent fixtures, interior, 4 lamp, 4' x 4', electrical demolition, remove, recessed drop-in, to 15' high, including supports & whips26050510216036Ea.$ - 0$ - 0$ 49.00$ 1,764.00$ - 0$ - 0$ - 0$ - 0
Wire connector, screw type, #18 to #12260519350020108Ea.$ 0.07$ 7.56$ 2.04$ 220.32$ - 0$ - 0$ - 0$ - 0
Wire, copper, stranded, 600 volt, #12, type THWN-THHN, normal installation conditions in wireway, conduit, cable tray26051990120042C.L.F.$ 10.60$ 445.20$ 44.50$ 1,869.00$ - 0$ - 0$ - 0$ - 0
Junction boxes, steel channel, 3 channel26052920475036Ea.$ 65.00$ 2,340.00$ 41.00$ 1,476.00$ - 0$ - 0$ - 0$ - 0
Electric metallic tubing (EMT), 1/2" diameter, to 10' high, incl 2 terminations, 2 field bend elbows, 11 beam clamps, and 11 couplings per 100 LF2605331350001400L.F.$ 0.76$ 1,064.00$ 2.89$ 4,046.00$ - 0$ - 0$ - 0$ - 0
Interior LED fixtures, linear, suspended mounted, 74 watt, two light bar 4' long, incl lamps, mounting hardware and connections2651135530204Ea.$ 335.00$ 1,340.00$ 86.00$ 344.00$ - 0$ - 0$ - 0$ - 0
Interior LED fixtures, high bay, surface mounted, round, 150 watt26511355400036Ea.$ 465.00$ 16,740.00$ 182.00$ 6,552.00$ - 0$ - 0$ - 0$ - 0
TOTALS$ 29,755.96$ 20,832.67$ - 0$ - 0
NON-PRE-PRICED ITEM DESCRIPTIONQTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
Air Pollution Control District (APCD) notification fee 501 SF to 2,000 SF1EACH$ 250.00$ 250.00
PREPRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)$ 50,588.63
CITY COST INDEX _109.0____ (_SAN DIEGO, CA WEIGHTED AVERAGE)_$4,552.98
SUBTOTAL (PREPRICED LINE TOTALS + CCI)$ 55,141.61
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT __7.75%_______$ 2,306.09
SUBTOTAL (PREPRICED LINE ITEMS + CCI + SALES TAX)$ 57,447.69THE PROVIDED UNIT PRICING IS BASED ON R. S. MEANS 2020 BASE DATA.
PRE-PRICED COEFFICIENT _______ (FROM EXHIBIT K WORKSHEET)DO NOT CHANGE THE UNIT PRICING OR SALES TAX PROVIDED.
TOTAL (PRE-PRICED LINE ITEMS + CCI + SALES TAX, LINE 58) + PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 58 X LINE 59)ERROR:#VALUE!ENTER YOUR EXHIBIT K COEFFICIENTS, COMPLETE THE CALCULATIONS FOR TOTAL TASK ORDER PRICE, AND RETURN.
NON PRE-PRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)$250.00
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT _7.75%_________$0.00
SUBTOTAL$250.00
NON-PRE-PRICED COEFFICIENT _____ (FROM EXHIBIT K WORKSHEET)
TOTAL (NON PRE-PRICED LINE ITEMS + SALES TAX, LINE 64) + NON-PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 64 X LINE 65)ERROR:#VALUE!
TOTAL TASK ORDER PRICE (LINE 60 + LINE 66)ERROR:#VALUE!
NOTE: USE OF THIS FORM IS MANDATORY. ANY MODIFICATION OF THIS FORM BY THE OFFEROR WILL RESULT IN THE OFFER BEING REJECTED AS NON-RESPONSIVE. IF AN OFFEROR BELIEVES THERE ARE PROBLEMS WITH THIS FORM, IT IS THE OFFEROR'S RESPONSIBILITY TO PROVIDE DOCUMENTATION OR EVIDENCE PRIOR TO SUBMISSION OF PROPOSALS TO ALLOW FOR GOVERNMENT REVIEW. THIS WILL BE THE BASIC FORMAT FOR ALL TASK ORDER PROPOSALS AFTER AWARD.