Exhibit K Coefficients Worksheet (2).xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Metro San Diego Electrical Job Order Contract Under NAICS 238210
Solicitation number
N62473-20-R-0012
Issued by

View the file

Other files

File Type Posted
QA 0012 UPDATED FEB 5 2020.pdf PDF
QA 0012.pdf PDF
N6247320R0012 Amendment 0002.pdf PDF
QA 0012 Updated Jan 30 2020 PDF
Exhibit M Electrical JOC NAICS 238210 PTO0001 Updated Jan 30 2020.xlsx XLSX spreadsheet
Wage Determinations San Diego County Jan 27 2020.pdf PDF
Q&A 0012.pdf PDF
EXH M ELECTRICAL JOC NAICS 238210 PTO 0001(2).xlsx XLSX spreadsheet
Amendment 0001_N6247320R0012.pdf PDF
Exhibit A - Offeror Team Composition and Management.docx DOCX document
UPDATED Exhibit B - Experience - Offeror.docx DOCX document
N6247320R0012 RFP.pdf PDF
Exhibit F Surety Form.docx DOCX document
Exhibit E Financial Questionnaire.docx DOCX document
Exhibit D Safety Data.docx DOCX document
REVISED Exhibit H GENERIC UFGS Guides for projects.docx DOCX document
SAN DIEGO COUNTY WD 122719.pdf PDF
Exhibit C - PPQ.docx DOCX document
EXH M ELECTRICAL JOC NAICS 238210 PTO 0001.xlsx XLSX spreadsheet
EXHIBIT K COEFFICIENT WORKSHEET with profit language 072418.docx DOCX document
Exhibit G Revised RFI Form.docx DOCX document
Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

EXHIBIT K – COEFFICIENT BREAKDOWN FORMPrimary Point of Contact
PRE-PRICED COSTSMATERIALSLABOREQUIPMENTAMOUNT
RS MEANS BARE COST (PRESUMED ANNUAL AMOUNT)$2,520,000.00$1,400,000.00$80,000.00$4,000,000.00Stephanie Scannell
stephanie.scannell@navy.mil
WORKER'S COMP INSURANCE15%$210,000.00Phone Number 619-532-4693
AVERAGE FIXED LABOR OVERHEAD16%$224,000.00
PROJECT OVERHEAD PRE-PRICED8%$112,000.00Secondary Point of Contact
MATERIAL MARKUP5%$126,000.00
EQUIPMENT MARKUP5%$4,000.00Chad Slade
SUBTOTAL$676,000.00chad.a.slade@navy.mil
GENERAL AND ADMINISTRATIVE8%$112,000.00Phone Number 6195324135
PROFIT5%5%5%$200,000.00
TOTAL$988,000.00
COEFFICIENT FACTOR (TOTAL DIVIDED BY PRESUMED ANNUAL AMOUNT)0.247
RS MEANS BARE COST ADJUSTMENT (PRODUCTION/DISCOUNT - FACTOR)0.9
PRE-PRICED COEFFICIENT1.147

NON PRE-PRICED BARE COSTS (PRESUMED ANNUAL AMOUNT) $252,000.00 $140,000.00 $8,000.00 $400,000.00

WORKER'S COMP INSURANCE15%$21,000.00
AVERAGE FIXED LABOR OVERHEAD16%$22,400.00
PROJECT OVERHEAD NON PRE-PRICED18%$25,200.00
MATERIAL MARKUP5%$12,600.00
EQUIPMENT MARKUP5%$400.00
SUBTOTAL$81,600.00
GENERAL AND ADMINISTRATIVE8%$11,200.00
PROFIT5%5%5%$20,000.00
TOTAL$112,800.00
BARE COST$400,000.00
COEFFICIENT FACTOR (TOTAL DIVIDED BY BARE COST)0.282
NON-PRE-PRICED BARE COST ADJUSTMENT (PRODUCTION/DISCOUNT - FACTOR)1
NON PRE-PRICED COEFFICIENT1.282
Offerors should fully understand "at a minimum" what is to be included in the coefficient. Section B of the RFP, and more specifically paragraphs B.2 OFFEROR'S COEFFICIENT AND PRE-PRICED WORK (and its subparagraphs) and B.3 NON PRE-PRICED WORK (and its subparagraphs) define the requirements for the pre-priced and non-pre-priced coefficients.
The amounts shown above are based on the presumption that the Contractor has an annual billing amount of $4,000,000 and up. The amounts listed herein are fictitious as are the cost items. These examples should not be construed to be minimum or maximum, or even normal, amounts. Cost items should be added, removed, or separated as the Offeror deems necessary to demonstrate a detailed breakdown of coefficient cost. Any Offeror edits to the form must be explained in detail in the Offeror’s proposal.
NOTE: The profit percentage proposed by the contractor on this form to be included in its pre-priced and non-pre-priced coefficients shall be binding and shall be the maximum profit rate the Contractor will be allowed to propose for all task orders and/or subsequent modifications issued under this contract.
The Contractor may propose a lower profit rate when responding to an individual task order request (or subsequent modifications) based on the tasks identified in the request. Profit will be negotiated on an individual Task Order and modification basis, but shall never exceed the maximum profit rate proposed by the Contractor on this form. The maximum profit rate shall be binding even if the DFARS 215.404-73 ALTERNATE STRUCTURED APPROACH PROFIT WORKSHEET would result in a higher profit. The maximum profit rate shall not be construed as a “fixed” profit percentage for all Task Orders or Modification actions issued under this contract. If DFARS 215.404-73 ALTERNATE STRUCTURED APPROACH PROFIT WORKSHEET calculations indicate a lower profit rate is merited, the lower profit percentage shall be applied.