Part 6 ATTACHMENT H5- ASBESTOS INSPECTION REPORT.pdf

PDF 53 KB Posted

Attached to
Building 201 Repair by Replacement
Solicitation number
N6247020R6018
Issued by

View the file

Other files

File Type Posted
PART 6 A0_TOC REVISION 2.pdf PDF
PART 6 ATTACHMENT Q_BUILDING 201 EQUIPMENT.pdf PDF
Amnd 0005 20R6018 Final.pdf PDF
20-0002 PART 3 Buildings 115 and 201 Repair by Replacement Revision 2.pdf PDF
20-0002 PART 2 Rev 2.pdf PDF
Amnd 0004 20R6018 Final.pdf PDF
PART 6 ATTACHMENT P_PAD DETAIL.pdf PDF
Amnd 0003 20R6018 Final.pdf PDF
20-0002 PART 3 Buildings 115 and 201 Repair by Replacement Revision 1.pdf PDF
PART 6 A0_TOC REVISION 1.pdf PDF
Amnd 0002 20R6018 Final.pdf PDF
PART 6 ATTACHMENT B_SITE PLAN REVISION 1.pdf PDF
20-0002 Part 4 Revision 1.pdf PDF
PART 6 ATTACHMENT O1_MCIEAST-MCB CAMLEJO 11320.2.pdf PDF
Part 2-Building 201 Repair by Replacement.pdf PDF
PART 6 ATTACHMENT O2_MCO 11000.11A.pdf PDF
Part 5-Building 201 Repair by Replacement.pdf PDF
Amnd 0001 20R6018 Final.pdf PDF
20-0002 PART 2.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
PART 6 ATTACHMENT A7_BLDG. 115 FIRE PROTECTION 2009 AS-BUILT.pdf PDF
20-0002 Part 4.pdf PDF
PART 6 ATTACHMENT K_EXAMPLE SCREEN WALL.pdf PDF
PART 6 ATTACHMENT G_DoD Minimum Antiterrorism Standards Checklist.pdf PDF
RFP N6247020R6018.pdf PDF
PART 6 ATTACHMENT D_MCBCL SIGNS STANDARDS-GRAPHICS.pdf PDF
PART 6 ATTACHMENT H2_Bldg. 201 FAP Information.pdf PDF
PART 6 ATTACHMENT B_SITE PLAN.pdf PDF
PART 6 ATTACHMENT A5_95-1466 - Renovate Bldg. 201 Fitness Center.pdf PDF
PART 6 ATTACHMENT H1_Bldg. 115 FAP Information.pdf PDF
PART 6 ATTACHMENT F_MCBCL BEAP.pdf PDF
PART 6 ATTACHMENT M_MCO 5530.14A.pdf PDF
PART 6 ATTACHMENT A4_05-6763 - Renovate Bldg. 115.pdf PDF
20-0002 PART 3 Buildings 115_201 Repair by Replacement.pdf PDF
Part 6 ATTACHMENT E -20-0002 GENERAL NOTES.pdf PDF
PART 6 ATTACHMENT A3_95-1468- Renovate Area Gyms (Bldgs.115 and 201).pdf PDF
PART 6 ATTACHMENT J_MCBCL ELEC DESIGN GUIDE 5.4.20.pdf PDF
PART 6 ATTACHMENT C_ADA CHECKLIST FOR EXISTING BLDGS.pdf PDF
PART 6 ATTACHMENT L_ELECTRICAL MECHANICAL DRAWINGS.pdf PDF
PART 6 ATTACHMENT A9_05-7682 RENOVATE STEAM SYSTEM BUILDING 201.pdf PDF
PART 6 ATTACHMENT N_MCBCL BASEWIDE MNS-FACP CONSTRUCTION REQUIREMENTS.pdf PDF
PART 6 ATTACHMENT I_MCBCL MECH DESIGN GUIDE 7.17.pdf PDF
PART 6 ATTACHMENT A2_09-0093 Fire Alarm System (Bldgs. 115 and 201).pdf PDF
20-0002 PART 5.pdf PDF
PART 6 ATTACHMENT A1_87-9299 BLDGS. 115 and 201.pdf PDF
PART 6 ATTACHMENT H3_ASBESTOS AND LEAD BASED MATERIALS ASSUMPTION.pdf PDF
PART 6 ATTACHMENT A8_P-1449B ENERGY EFFICIENCY IMPROVEMENTS (BLDG. 115).pdf PDF
PART 6 ATTACHMENT A6_86-5589-Construct Racquetball Courts(Bldg. 201andS204).pdf PDF
PART 6 A0_TOC.pdf PDF
PART 6 ATTACHMENT A10_P-1449B ENERGY EFFICIENCY IMPROVEMENTS (BLDG. 201).pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS INSPECTION REPORT of:

Building # 201

MCB CAMP LEJEUNE

Tuesday, June 30, 2020

Print Date

Tuesday, June 30, 2020 Page 1 of 8Print Date:

INSPECTION SUMMARY

BLDG #:

OCCUPANT:

YEAR BUILT:

BUILDING COMMENTS:

GYMNASIUM

HAZ RANK 3/GREEN [AH JUL2015]

WINDOW GLAZING ON GABLE WINDOW

JUL2015

ACM GLAZING PRESENT, DEBRIS HAS BEEN REMOVED

OCT2013

GLAZING DEBRIS FALLING TO GROUND LEVEL, REMOVAL RECOMMENDED

DEC08

CONFIRMATION OF NO ACM IDENTIFIED

MAY06

CONFIRMATION OF PVS. AS NON ACM

OCT02

NO CHANGE FROM PREVIOUS INSPECTION

OCT99

TRACE ASBESTOS DETECTED IN LEVELING COMPOUND, ROOFING MATERIALS ASSUMED

ASBESTOS MANAGER: 910-451-5837

Friable ACM(s) identified

Non-friable ACM(s) identified

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date

NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

NOTIFICATION OF ACM IN BUILDING

WINDOW GLAZING MATERIAL 2 SFNORTH CENTER AWNING DEBRIS (FROM

CURVED PICTURE WINDOW ABOVE)

8/11/2010

WINDOW GLAZING MATERIAL 4 SFNORTH CENTER AWNING DEBRIS (FROM

CURVED PICTURE WINDOW ABOVE)

10/22/2013

WINDOW GLAZING MATERIAL 2 SFNORTH CENTER AWNING DEBRIS (FROM

CURVED PICTURE WINDOW ABOVE)

7/15/2015

Tuesday, June 30, 2020 Page 2 of 8Print Date:

12" BLUE FLOOR TILE AND ADHESIVE SECOND FLOOR SOUTHWEST

(CHECKERED w/HM05) 10/14/1999

RUBBER MAT ADHESIVE NORTH CENTER ENTRY AND

GYMNASIUM FLOORING

2/1/2000

TAR PAPER, BLACK ATTIC ROOFING DEBRIS (PREVIOUS

ROOFING)

10/12/2002

DRYWALL AND JOINT MATERIAL FIRST FLOOR NORTH END, SOUTH END

EAST;

SECOND FLOOR NORTH END OFFICES/

ROOMS AND CORRIDOR; NORTH END

STAIRWELLS; GYMNASIUM

10/14/1999

2'x2' CEILING TILE, FIRST FLOOR NORTHWEST OFFICE, SOUTH CENTRAL ROOMS; SECOND

FLOOR SOUTHWEST ROOM

10/14/1999

BASE COVE/MASTIC, NORTHEAST ENTRY FOYER 10/14/1999

SHINGLE ROOFING EXTERIOR GROUND DEBRIS, EAST

CENTER (PREVIOUS ROOFING)

12/4/2008

12" WHITE FLOOR TILE AND ADHESIVE SECOND FLOOR SOUTHWEST

(CHECKERED w/HM04)

10/14/1999

12" BLACK FLOOR TILE AND ADHESIVE NORTHEAST FOYER (CHECKERED WITH

HM01)

10/14/1999

12" WHITE FLOOR TILE AND ADHESIVE NORTHEAST FOYER (CHECKERED WITH

HM02)

10/14/1999

TEXTURED PAINT GYMNASIUM WALLS THROUGHOUT 10/12/2002

DRYWALL AND JOINT MATERIAL NORTH AND SOUTH END WALLS

THROUGHOUT

10/14/1999

12" BLUE FLOOR TILE AND ADHESIVE SOUTH END STAGE AREA CENTRAL

ROOMS

10/14/1999

EXTERIOR CAULKING, SOUTHEAST CRAWLSPACE ENTRANCE 12/4/2008

PLASTER WALLS NORTHWEST LOCKER ROOM;

SOUTHWEST AND SOUTHEAST GYM

ENTRY FOYERS

2/1/2000

ASPHALT SHINGLE AND TAR PAPER ROOFING SYSTEM 10/14/1999

STAIR TREAD/MASTIC NORTH AND SOUTH END STAIRWELLS

THROUGHOUT

2/1/2000

PLASTER PATCH SOUTHEAST CRAWLSPACE ENTRANCE 12/4/2008

EXTERIOR CAULKING, METAL ENTRY DOORS 8/11/2010

PIPE INSULATION DEBRIS SOUTHWEST EXTERIOR STEAM PIT 8/11/2010

INTERIOR CAULKING, SECOND FLOOR NORTH WINDOWS 8/11/2010

WALLBOARD/ SHEATHING NORTH CENTRAL EXTERIOR (FALSE

BRICK)

12/4/2008

LAGGING PAPER ON FIBERGLASS SOUTHWEST EXTERIOR STEAM PIT 8/11/2010

BASE COVE/MASTIC, NORTHEAST ENTRY FOYER 12/4/2008

12" BLUE FLOOR TILE AND ADHESIVE SOUTH END STAGE AREA CENTRAL

ROOMS

8/11/2010

12" BLUE FLOOR TILE AND ADHESIVE SECOND FLOOR SOUTHWEST

(CHECKERED w/HM05)

8/11/2010

Tuesday, June 30, 2020 Page 3 of 8Print Date:

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

HEALTH ASPECTS:

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos Program Manager.

REPORTS OF DAMAGE:

Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:

ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.

RECORDKEEPING:

CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837

12" WHITE FLOOR TILE AND ADHESIVE NORTHEAST FOYER (CHECKERED WITH

HM02)

8/11/2010

12" BLACK FLOOR TILE AND ADHESIVE NORTHEAST FOYER (CHECKERED WITH

HM01)

8/11/2010

12" WHITE FLOOR TILE AND ADHESIVE SECOND FLOOR SOUTHWEST

(CHECKERED w/HM04)

8/11/2010

BASE COVE/MASTIC, NORTHEAST ENTRY FOYER 10/21/2002

EXTERIOR CAULKING, ROOF FLASHINGS; METAL WINDOWS;

SOUTHEAST CRAWLSPACE ENTRANCE

8/11/2010

ASPHALT SHINGLE AND TAR PAPER ROOFING SYSTEM 10/21/2002

BASE COVE/MASTIC, NORTHEAST ENTRY FOYER 5/19/2006

ASPHALT SHINGLE AND TAR PAPER PREVIOUS ROOFING SYSTEM, ATTIC

DEBRIS

5/19/2006

DRYWALL AND JOINT MATERIAL NORTH AND SOUTH END WALLS

THROUGHOUT

8/11/2010

Tuesday, June 30, 2020 Page 4 of 8Print Date:

SAMPLES COLLECTED

Sample Sample Date

HA Sample Location Chr

Amo

Oth

Description

201-01-01 10/14/199901 NE FOYER 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

201-0101QC 10/14/199901 NE FOYER 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

201-01-02 10/14/199901 NE FOYER 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

201-01-03 10/14/199901 NE FOYER 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

201-01-40 8/11/201001 NE SNACK BAR 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

201-02-01 10/14/199902 NE FOYER 0 0 012" BLACK FLOOR TILE

AND ADHESIVE

201-0201QC 10/14/199902 NE FOYER 0 0 012" BLACK FLOOR TILE

AND ADHESIVE

201-02-02 10/14/199902 NE FOYER 0 0 012" BLACK FLOOR TILE

AND ADHESIVE

201-02-03 10/14/199902 NE FOYER 0 0 012" BLACK FLOOR TILE

AND ADHESIVE

201-02-40 8/11/201002 NE SNACK BAR 0 0 012" BLACK FLOOR TILE

AND ADHESIVE

201-03-01 10/14/199903 SOUTH, EAST LG. RM 0 0 012" BLUE FLOOR TILE

AND ADHESIVE

DARK

201-0301QC 10/14/199903 SOUTH, EAST LG. RM 0 0 012" BLUE FLOOR TILE

AND ADHESIVE

DARK

201-03-02 10/14/199903 SOUTH CNTR STORAGE 0 0 012" BLUE FLOOR TILE

AND ADHESIVE

DARK

201-03-03 10/14/199903 SOUTH, EAST LG. RM 0 0 012" BLUE FLOOR TILE

AND ADHESIVE

DARK

201-03-40 8/11/201003 NE CLOSET 0 0 012" BLUE FLOOR TILE

AND ADHESIVE

DARK

201-04-01 10/14/199904 2ND FL SW 0 0 012" BLUE FLOOR TILE

AND ADHESIVE

LIGHT

201-0401QC 10/14/199904 2ND FL SW 0 0 012" BLUE FLOOR TILE

AND ADHESIVE

LIGHT

201-04-02 10/14/199904 2ND FL SW 0 0 012" BLUE FLOOR TILE

AND ADHESIVE

LIGHT

Tuesday, June 30, 2020 Page 5 of 8Print Date:

HA Sample Location Chr

Amo

Oth

Description

201-04-03 10/14/199904 2ND FL SW 0 0 012" BLUE FLOOR TILE

AND ADHESIVE

LIGHT

201-04-40 8/11/201004 2ND FL SW OFFICE 0 0 012" BLUE FLOOR TILE

AND ADHESIVE

LIGHT

201-05-01 10/14/199905 2ND FL SW 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

w/ BLUE STREAKS

201-05-02 10/14/199905 2ND FL SW 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

w/ BLUE STREAKS

201-05-03 10/14/199905 2ND FL SW 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

w/ BLUE STREAKS

201-0503QC 10/14/199905 2ND FL SW 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

w/ BLUE STREAKS

201-05-40 8/11/201005 2ND FL SW OFFICE 0 0 012" WHITE FLOOR TILE

AND ADHESIVE

w/ BLUE STREAKS

201-06-01 10/14/199906 SOUTH END, EAST CNTR RM 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

201-06-02 10/14/199906 NORTH END, NW LOCKER RM 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

201-06-03 10/14/199906 CNTR GYM AREA NW 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

201-06-40 8/11/201006 NW HEAD WALL 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

201-06-41 8/11/201006 GYM, NE WALL 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

201-06-42 8/11/201006 GYM, NW WALL 0 0 0DRYWALL AND JOINT

MATERIAL

WALLS

201-07-01 10/14/199907 NORTH END, NE STORAGE 0 0 0DRYWALL AND JOINT

MATERIAL

CEILINGS

201-07-02 10/14/199907 NORTH END, NW HEAD 0 0 0DRYWALL AND JOINT

MATERIAL

CEILINGS

201-07-03 10/14/199907 2ND FL NORTH CNTR

STORAGE

0 0 0DRYWALL AND JOINT

MATERIAL

CEILINGS

201-08-01 10/14/199908 SOUTH END, EAST CNTR LG.

RM

0 0 02'x2' CEILING TILE, FISSURED

201-0801QC 10/14/199908 SOUTH END, EAST CNTR LG.

RM

0 0 02'x2' CEILING TILE, FISSURED

201-08-02 10/14/199908 SOUTH END, SOUTH CNTR

STORAGE

0 0 02'x2' CEILING TILE, FISSURED

Tuesday, June 30, 2020 Page 6 of 8Print Date:

HA Sample Location Chr

Amo

Oth

Description

201-08-03 10/14/199908 SOUTH END, WEST CNTR LG.

RM

0 0 02'x2' CEILING TILE, FISSURED

201-09-00ri02 10/21/200209 N/A 9 9 9BASE COVE/MASTIC, WHITE

201-09-01 10/14/199909 NE FOYER 0 0 0BASE COVE/MASTIC, WHITE

201-0901QC 10/14/199909 NE FOYER 6 0 0BASE COVE/MASTIC, WHITE

201-09-02 10/14/199909 NE FOYER 0 0 0BASE COVE/MASTIC, WHITE

201-09-03 10/14/199909 NE FOYER 0 0 0BASE COVE/MASTIC, WHITE

201-09-20 5/19/200609 NE ENTRY 0 0 0BASE COVE/MASTIC, WHITE

201-09-30 12/4/200809 NE FOYER 0 0 0BASE COVE/MASTIC, WHITE

201-10-00 10/14/199910 NOT SAMPLED 1 1 1ASPHALT SHINGLE AND

TAR PAPER

201-10-00ri02 10/21/200210 N/A 1 1 1ASPHALT SHINGLE AND

TAR PAPER

201-10-20 5/19/200610 ATTIC, WEST CNTR SW 0 0 0ASPHALT SHINGLE AND

TAR PAPER

201-11-01 2/1/200011 SE STAIRS 0 0 0STAIR TREAD/MASTIC BLACK

201-11-02 2/1/200011 SE STAGE STAIRS 0 0 0STAIR TREAD/MASTIC BLACK

201-11-03 2/1/200011 NW STAIRS 0 0 0STAIR TREAD/MASTIC BLACK

201-12-01 2/1/200012 SW GYM FOYER 0 0 0PLASTER WALLS

201-12-02 2/1/200012 SE GYM FOYER 0 0 0PLASTER WALLS

201-12-03 2/1/200012 SE GYM FOYER 0 0 0PLASTER WALLS

201-12-04 2/1/200012 NW LOCKER RM 0 0 0PLASTER WALLS

201-12-05 2/1/200012 NW LOCKER RM 0 0 0PLASTER WALLS

201-13-01 2/1/200013 GYM, NE 0 0 0RUBBER MAT ADHESIVE BROWN

201-13-02 2/1/200013 GYM, SE 0 0 0RUBBER MAT ADHESIVE BROWN

201-13-03 2/1/200013 GYM, NW 0 0 0RUBBER MAT ADHESIVE BROWN

201-20-01 10/12/200220 SW OFFICE 0 0 0TEXTURED PAINT

Tuesday, June 30, 2020 Page 7 of 8Print Date:

HA Sample Location Chr

Amo

Oth

Description

201-21-01 10/12/200221 ATTIC, CNTR WEST 0 0 0TAR PAPER, BLACK

201-30-30 12/4/200830 NORTH CNTR EXT. 0 0 0WALLBOARD/

SHEATHING

GRAY

201-31-30 12/4/200831 EAST CNTR EXT. 0 0 0SHINGLE ROOFING DEBRIS

201-32-30 12/4/200832 SE CRSPC ENTRY 0 0 0PLASTER PATCH

201-33-30 12/4/200833 SE CRSPC ENTRY 0 0 0EXTERIOR CAULKING, WHITE

201-33-40 8/11/201033 NORTH AWNING, NW FLASH 0 0 0EXTERIOR CAULKING, WHITE

201-33-41 8/11/201033 NORTH CNTR WINDOW 0 0 0EXTERIOR CAULKING, WHITE

201-33-42 8/11/201033 NORTH AWNING, NE FLASH 0 0 0EXTERIOR CAULKING, WHITE

201-33-43 8/11/201033 NE SIDE WINDOW 0 0 0EXTERIOR CAULKING, WHITE

201-33-44 8/11/201033 NW SIDE WINDOW 0 0 0EXTERIOR CAULKING, WHITE

201-33-45 8/11/201033 SW EXT. STEAM PIT FLASH 0 0 0EXTERIOR CAULKING, WHITE

201-40-40 8/11/201040 2ND FL NORTH CNTR

WINDOW

0 0 0INTERIOR CAULKING, WHITE

201-41-00ri15 7/15/201541 N/A 9 9 9WINDOW GLAZING

MATERIAL

GRAY

201-41-00ri19 10/22/201341 N/A 9 9 9WINDOW GLAZING

MATERIAL

GRAY

201-41-40 8/11/201041 NORTH CNTR AWNING TOP

WEST

3 0 0WINDOW GLAZING

MATERIAL

GRAY

201-41-41 8/11/201041 NORTH CNTR AWNING TOP

EAST

3 0 0WINDOW GLAZING

MATERIAL

GRAY

201-42-40 8/11/201042 NORTH CNTR DOORS 0 0 0EXTERIOR CAULKING, GRAY

201-42-41 8/11/201042 SW DOUBLE DOORS 0 0 0EXTERIOR CAULKING, GRAY

201-43-40 8/11/201043 SW EXT. STEAM PIT 0 0 0PIPE INSULATION

DEBRIS

WHITE

201-44-40 8/11/201044 SW EXT. STEAM PIT 0 0 0LAGGING PAPER ON

FIBERGLASS

Tuesday, June 30, 2020 Page 8 of 8Print Date:

File details come from the government source that posted it. Updated .