This document provides details regarding a solicitation for a Global Contingency Construction Contract to be awarded by the Naval Facilities Engineering Command. The solicitation seeks proposals for an Indefinite Delivery Indefinite Quantity Multiple Award Contract with a maximum value of $500 million over a five year period including a base year and four option years. Awards will be made to approximately four contractors to provide construction and related engineering services for emergency response, humanitarian assistance, and other contingency operations worldwide on short notice. Services include general construction along with some base operating support. Proposals are due as indicated in the solicitation to be released on January 10, 2018. Evaluation will utilize best value tradeoff procedures. The incumbent contracts awarded in 2013 have a combined maximum value of $800 million and are being replaced by this solicitation.

REV(1)_ATTCHMENT_JL7_AND_JL7A_COST_MODEL_AND_SUMMARY.xlsx

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

CONUS
BASE YEAR DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site QA Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

CONUS BASE YEAR INDIRECT COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.
OCONUS BASE YEAR DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site QA Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OCONUS Base Year Indirect Costs

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.

SOLICITATION N62470-17-R-6016

ATTCHMENT JL.7 (REV. 1)

COST MODEL

OPY 1

CONUS
OPTION YEAR 1 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site QA Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OPTION YEAR 1 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.
OCONUS OPTION YEAR 1 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site QA Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OCONUS OPTION YEAR 1 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.

SOLICITATION N62470-17-R-6016

COST MODEL

OPY 2

CONUS
OPTION YEAR 2 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site QA Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OPTION YEAR 2 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.
OCONUS OPTION YEAR 2 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site QA Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OCONUS OPTION YEAR 2 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.

SOLICITATION N62470-17-R-6016

COST MODEL

OPY 3

CONUS
OPTION YEAR 3 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site QA Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OPTION YEAR 3 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.
OCONUS OPTION YEAR 3 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site QA Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OCONUS OPTION YEAR 3 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.

SOLICITATION N62470-17-R-6016

COST MODEL

OPY 4

CONUS
OPTION YEAR 4 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site QA Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OPTION YEAR 4 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.
OCONUS OPTION YEAR 4 DIRECT LABOR COST
Labor CategoryRateHOURSHOURSHome TotalField Total
Program Manager$x100$
Sr. Project Manager$x250$
Quality Control Program Manager$x100$
Safety and Health Program Manager$x40$
Contract Administrative Manager$x50$
Contract Administrator$x50$
Accountant II$x60$
Accountant III$x5$
Accounting Technician II$x20$
Accounting Technician III$x10$
Administrative Assistant$x40$
Project Task Order Manager$x300$
Sr. Electrical Engineer$x20$
Mid Electrical Engineer$x40$
Jr. Electrical Engineer$x10$
Sr. Mechanical Engineer$x20$
Mid Mechanical Engineer$x40$
Jr. Mechanical Engineer$x10$
Sr. Structural Engineer$x20$
Mid Structural Engineer$x40$
Jr. Strucutural Engineer$x10$
Sr. Environmental Engineer$x20$
Mid Environmental Engineer$x40$
Jr. Environmental Engineer$x10$
Sr. Civil Engineer$x20$
Mid Civil Engineer$x40$
Jr. Civil Engineer$x10$
Project Scheduler$x80$
Sr. Cost Estimator$x20$
Mid Cost Estimator$x40$
Site Construction Manager$x1000$
Site Safety and Health Officer$x1000$
Site QA Manager$x1000$
Total (Home)$
Total (Field)$
Total Hours (Home and Field)151530004515

OCONUS OPTION YEAR 4 DIRECT LABOR COST

Direct LaborHome1,515hours$
Field3,000hours$
FringeHome%x$$
Field%x$$
OverheadHome%x$$
Field%x$$

Equipment costs accumulated on an hourly basis (Low Value Equipment or LVE) % x hours $

Other Direct Costs $10,000

Travel $20,000

Subcontracts $10,000,000

G&AHome%x$$
Field%x$$
ODC's%x$$
Subs%x$$
FCCOMHome OH%x$$
Home G&A%x$$
Field OH%x$$
Field G&A%x$$
ODC G&A%x$$
Subs G&A%x$$

JV Mark-up (if applicable) % $ $

Award Fee*Fee%x$$
TOTAL$
Notes:
1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.7 FORM. *
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
8. Offeror shall utilize listed labor categories and input unburdened ceiling labor rates from Attachment JL.2 *
9. The offeror shall propose their ceiling award fee percentage for the base and each option year, for both CONUS and OCONUS. Award Fee shall not be applied to travel, Contractor Acquired Property, Facilities Capital Cost of Money, award fee on cost reimbursable subcontractor's cost at any tier, direct charged local, state etc. taxes, and any JV fees/mark-ups.
10. This form shall be submitted by the Prime, each member of a Joint Venture entity, each cost reimbursable subcontractor and (if necessary) each cost center that will be used in performance of the contract.
* With regards to NOTES 1 and 8: If any listed labor category is included in the offerors indirect rate, the offeror shall enter zero "0" for the labor rate on the cost model. Do not change the hours. The offeror must include a note indicating which labor categories are not 'direct charged'. Additionally, during the life of the contract, the labor categories specified as indirect charges will not be direct charged on any task order.

SOLICITATION N62470-17-R-6016

COST MODEL

JL7A Sum Cost Model for Multipl

ATTACHMENT JL.7A, N62470-17-R-6016
SUMMARY COST MODEL FOR MULTIPLE OFFERORS FOR BASE YEAR
Total Cost Model Value for Base Year% of workTotal Value of Base Year based on % of Work
Company JV1 or Prime (CONUS)$0.00$0.00
Company JV2 (or Cost Reimb. Sub) (CONUS)$0.00$0.00
Total for CONUS$0.00
Company JV1 (OCONUS)$0.00$0.00
Company JV2 (or Cost Reimb. Sub) (OCONUS)$0.00$0.00
Total for OCONUS$0.00

TOTAL VALUE OF COST MODEL FOR BASE YEAR $0.00

Note 1: For evaluation purposes, the Government will utilize the percentages listed on Attachment JL.4 (Distribution of Work) and will then analyze the cost model by adding the total presented for CONUS work to the total for OCONUS work (this will be performed for the base and each options year) to arrive at a TOTAL COST MODEL VALUE (PER YEAR)
Note 2: In the event an offeror utilizes multiple cost centers, the cost model will be filled out for each cost center expected to be utilized in the performance of this contract. For evaluation purposes, the cost center with the highest "Total" price for the cost model (total price is the addition of the CONUS and OCONUS totals), will be utilized.
ATTACHMENT JL.7A, N62470-17-R-6016
SUMMARY COST MODEL FOR MULTIPLE OFFERORS FOR OPTION YEAR 1
Total Cost Model Value for Option Year 1% of workTotal Value of Base Year based on % of Work
Company JV1 or Prime (CONUS)$0.00$0.00
Company JV2 (or Cost Reimb. Sub) (CONUS)$0.00$0.00
Total for CONUS$0.00
Company JV1 (OCONUS)$0.00$0.00
Company JV2 (or Cost Reimb. Sub) (OCONUS)$0.00$0.00
Total for OCONUS$0.00

TOTAL VALUE OF COST MODEL FOR OPTION YEAR 1 $0.00

Note 1: For evaluation purposes, the Government will utilize the percentages listed on Attachment JL.4 (Distribution of Work) and will then analyze the cost model by adding the total presented for CONUS work to the total for OCONUS work (this will be performed for the base and each options year) to arrive at a TOTAL COST MODEL VALUE (PER YEAR)
Note 2: In the event an offeror utilizes multiple cost centers, the cost model will be filled out for each cost center expected to be utilized in the performance of this contract. For evaluation purposes, the cost center with the highest "Total" price for the cost model (total price is the addition of the CONUS and OCONUS totals), will be utilized.
ATTACHMENT JL.7A, N62470-17-R-6016
SUMMARY COST MODEL FOR MULTIPLE OFFERORS FOR OPTION YEAR 2
Total Cost Model Value for Option Year 2% of workTotal Value of Base Year based on % of Work
Company JV1 or Prime (CONUS)$0.00$0.00
Company JV2 (or Cost Reimb. Sub) (CONUS)$0.00$0.00
Total for CONUS$0.00
Company JV1 (OCONUS)$0.00$0.00
Company JV2 (or Cost Reimb. Sub) (OCONUS)$0.00$0.00
Total for OCONUS$0.00

TOTAL VALUE OF COST MODEL FOR OPTION YEAR 2 $0.00

Note 1: For evaluation purposes, the Government will utilize the percentages listed on Attachment JL.4 (Distribution of Work) and will then analyze the cost model by adding the total presented for CONUS work to the total for OCONUS work (this will be performed for the base and each options year) to arrive at a TOTAL COST MODEL VALUE (PER YEAR)
Note 2: In the event an offeror utilizes multiple cost centers, the cost model will be filled out for each cost center expected to be utilized in the performance of this contract. For evaluation purposes, the cost center with the highest "Total" price for the cost model (total price is the addition of the CONUS and OCONUS totals), will be utilized.
ATTACHMENT JL.7A, N62470-17-R-6016
SUMMARY COST MODEL FOR MULTIPLE OFFERORS FOR OPTION YEAR 3
Total Cost Model Value for Option Year 3% of workTotal Value of Base Year based on % of Work
Company JV1 or Prime (CONUS)$0.00$0.00
Company JV2 (or Cost Reimb. Sub) (CONUS)$0.00$0.00
Total for CONUS$0.00
Company JV1 (OCONUS)$0.00$0.00
Company JV2 (or Cost Reimb. Sub) (OCONUS)$0.00$0.00
Total for OCONUS$0.00

TOTAL VALUE OF COST MODEL FOR OPTION YEAR 3 $0.00

Note 1: For evaluation purposes, the Government will utilize the percentages listed on Attachment JL.4 (Distribution of Work) and will then analyze the cost model by adding the total presented for CONUS work to the total for OCONUS work (this will be performed for the base and each options year) to arrive at a TOTAL COST MODEL VALUE (PER YEAR)
Note 2: In the event an offeror utilizes multiple cost centers, the cost model will be filled out for each cost center expected to be utilized in the performance of this contract. For evaluation purposes, the cost center with the highest "Total" price for the cost model (total price is the addition of the CONUS and OCONUS totals), will be utilized.
ATTACHMENT JL.7A, N62470-17-R-6016
SUMMARY COST MODEL FOR MULTIPLE OFFERORS FOR OPTION YEAR 4
Total Cost Model Value for Option Year 4% of workTotal Value of Base Year based on % of Work
Company JV1 or Prime (CONUS)$0.00$0.00
Company JV2 (or Cost Reimb. Sub) (CONUS)$0.00$0.00
Total for CONUS$0.00
Company JV1 (OCONUS)$0.00$0.00
Company JV2 (or Cost Reimb. Sub) (OCONUS)$0.00$0.00
Total for OCONUS$0.00

TOTAL VALUE OF COST MODEL FOR OPTION YEAR 4 $0.00

Note 1: For evaluation purposes, the Government will utilize the percentages listed on Attachment JL.4 (Distribution of Work) and will then analyze the cost model by adding the total presented for CONUS work to the total for OCONUS work (this will be performed for the base and each options year) to arrive at a TOTAL COST MODEL VALUE (PER YEAR)
Note 2: In the event an offeror utilizes multiple cost centers, the cost model will be filled out for each cost center expected to be utilized in the performance of this contract. For evaluation purposes, the cost center with the highest "Total" price for the cost model (total price is the addition of the CONUS and OCONUS totals), will be utilized.

SOLICITATION N62470-17-R-6016

ATTACHMENT JL.7A

SUMMARY COST MODEL (i.e. JV ENTITY WITH TWO FIRMS OR PRIME WITH COST REIMBURSABLE SUBCONTRACTOR)