About this file
This pre-solicitation notice announces a forthcoming request for proposal for an indefinite delivery indefinite quantity multiple award global contingency construction contract with the Department of the Navy Naval Facilities Engineering Command. The contract will provide construction, design/build, and related engineering services in response to natural disasters, humanitarian assistance, conflict, or similar emergencies. The Navy intends to award approximately four contracts for a base year plus four one-year options with a total maximum value of $500 million across all contracts. The minimum guarantee for each contract is $25,000. Task orders will be competed among awardees on a best value basis. The notice provides details such as the NAICS code, small business participation goals, incumbent contractors and value of the current contract, evaluation factors, and point of contact information. The RFP is expected to be released on January 10, 2018 with proposals due on the date specified in the solicitation.
Amendment_0002_Final.pdf
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR4991248
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is being issued to make changes to the solicitation and address questions.
The due date for proposals has not changed.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 47
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247017R6016
X 9B. DATED (SEE ITEM 11)
07-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Mar-2018
CODE
COMMANDER NAVFAC ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247017R6016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
This amendment is being issued to make the following changes to the solicitation and address questions.
1) On Page 8 of the solicitation, paragraph 8.4, change to read as follows:
From:
Senior Project Manager.
Responsibilities include directing work associated with contract task orders. Duties include ensuring effective execution of projects, controlling project schedule and budget, recommending changes to improve project efficiency and effectiveness, justifying change orders, tracking materials and resources, coordinating subcontractors' work, complying with normal safety and health procedures, ensuring compliance with contract/task order requirements, following/implementing approved project work plans or specifications, A qualified individual shall have an undergraduate degree in engineering or be a graduate of a construction management program. A minimum of 7 years of construction management experience Quality Control (QC) Program Manager.
Responsibilities include developing, maintaining, and enforcing the QC program. The QC manager shall have 5 years of QC experience managing large construction and/or natural disaster recovery projects.
To:
Senior Project Manager.
Responsibilities include directing work associated with contract task orders. Duties include ensuring effective execution of projects, controlling project schedule and budget, recommending changes to improve project efficiency and effectiveness, justifying change orders, tracking materials and resources, coordinating subcontractors' work, complying with normal safety and health procedures, ensuring compliance with contract/task order requirements, following/implementing approved project work plans or specifications, A qualified individual shall have an undergraduate degree in engineering or be a graduate of a construction management program. A minimum of 7 years of construction management experience.
Quality Control (QC) Program Manager.
Responsibilities include developing, maintaining, and enforcing the QC program. The QC manager shall have 5 years of QC experience managing large construction and/or natural disaster recovery projects.
2) On page 121 of the solicitation, Factor 5, Past Performance (i) change paragraph 3 to read as follows:
AMENDMENT 0001 LANGUAGE FROM:
Also include performance recognition documents received within the last three years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition. For performance recognition documents to be considered under this factor, they are required to be dated and contain the signature and position of the individual signing. Further, performance recognition documents solicited especially for the purposes of this factor may be considered less favorable than documents contemporaneously received for the work performed.
TO:
Also include performance recognition documents received within the last three five years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition for Factor 1 (Corporate Experience) projects only. For performance recognition documents to be considered under this factor, they are required to be dated and contain the signature and position of the individual signing. Further, performance recognition documents solicited especially for the purposes of this factor may be considered less favorable than documents contemporaneously received for the work performed.
3) On page 10, paragraph 8.4, Personnel Duties, Desired Experience, and Qualifications; change the Junior Engineer to read as follows:
FROM:
Junior Engineer
Responsibilities include preparing technical submittals and providing consultations as required. Duties include assisting the Mid-Level and Senior Engineer in carrying out project work, and assisting the Project Superintendent/Construction Site Manager in interpretation of engineering data. A qualified individual shall have an undergraduate degree from an engineering program, professional registration, and have a minimum of 3 years of experience in the appropriate technical discipline.
TO:
Junior Engineer
Responsibilities include preparing technical submittals and providing consultations as required. Duties include assisting the Mid-Level and Senior Engineer in carrying out project work, and assisting the Project Superintendent/Construction Site Manager in interpretation of engineering data. A qualified individual shall have an undergraduate degree from an engineering program, professional registration, and have a minimum of 3 years of experience in the appropriate technical discipline.
4) On page 126 of the solicitation, paragraph (1), change to read as follows:
FROM:
(1) Offerors shall propose hourly ceiling rates for direct (unburdened-no overhead, G&A, etc.) labor for all labor categories listed in Attachment JL.2, Cost Reimbursable Direct Labor Hourly Ceiling Rates, for the base year and each option year. Each required labor category in the solicitation shall be provided by either the prime contractor (including JVs) or a key subcontractor. The ceiling rates proposed will be the maximum allowable rates that can be proposed or charged under task orders issued during the ordering period of any contract awarded as a result of this solicitation. The labor categories and labor rates identified in Attachment JL.2 will become part of the contract. These are not bid rates. Labor rates proposed for individual task orders may be less and should be in accordance with the offeror’s disclosed estimating system practices and, if applicable, forward pricing rate agreements. Labor rates proposed for task orders shall not exceed the maximum ceiling rates established in the contract under JL.2.
TO:
(1) Offerors shall propose hourly ceiling rates for direct (unburdened-no overhead, G&A, etc.) labor for all labor categories listed in Attachment JL.2(REV 1), Cost Reimbursable Direct Labor Hourly Ceiling Rates, (*in accordance with the notes on JL.2(REV 1), for the base year and each option year. Each required labor category in the solicitation shall be provided by either the prime contractor (including JVs) or a key subcontractor. The ceiling rates proposed will be the maximum allowable rates that can be proposed or charged under task orders issued during the ordering period of any contract awarded as a result of this solicitation. The labor categories and labor rates identified in Attachment JL.2(REV 1) will become part of the contract. These are not bid rates. Labor rates proposed for individual task orders may be less and should be in accordance with the offeror’s disclosed estimating system practices and, if applicable, forward pricing rate agreements. Labor rates proposed for task orders shall not exceed the maximum ceiling rates established in the contract under JL.2(REV 1).
5) On page 116, Volume I: Non-cost (Technical Factors and Past Performance), remove the word “resumes” and delete the “listing of team members” page limitation as follows:
Volume 1: Non-cost (Technical Factors and Past Performance): Submit one (1) original, six (6) copies in 8-1/2 x 11 format, font size 11-12. Tables and charts can be in landscape format, font size 10. Offerors may submit a one page organizational chart as required under Technical Factor 2 in 11x17 format, font size 10. Each 11x17 page submitted will count as one (1) page. Proposals will be submitted in three ring binders and tabbed appropriately by major evaluation factor. Double sided pages are encouraged to conserve paper. In addition, submit a complete copy of the non-cost proposal on CD (bookmark all sections the same as the tabs in paper copies). The document should be submitted as both an Adobe Acrobat file (.pdf) and as an MS Word file. (Note: Cover page, letters of commitment, JV agreements, and past performance questionnaires may be submitted in Adobe only). Additionally, it is acceptable to have multiple MS Word files that are organized on the CD by subfolders instead of submitting one MS Word file.) Proposal submission is limited to 125 175 pages. Note that letters of commitment and Joint Venture/teaming/partnership agreements, resumes, CPAR evaluations, and past performance questionnaires are not applied against the overall page limit. Note that letters of commitment and Joint Venture/teaming/partnership agreements, resumes, CPAR evaluations, past performance questionnaires, ISR’s, Attachments JL.9, JL.10 and JL.11 are not applied against the overall page limit. Further, tabs, introductory sheets (e.g. Table of Contents, List of Figures, List of Acronyms), a one-page coversheet to identify the contractor and the proposal, and the listings of team member’s corporate names and point of contact information are not applied against the overall page limit. The coversheet and listing of team members shall be limited to two pages in total (one page each). There is no page limitation for the introductory sheets. All information provided on the introductory sheets is not evaluated. Offerors are requested to number the pages consecutively for each factor. Within the tabs for the factors, only the pages that are applied to the overall page limit should contain consecutive page numbers. If a form that is provided as a JL attachment in this solicitation is a form that is applied to the overall page number limit, a page number should be added to the form. Any pages in excess of the maximum limits stated herein shall be removed and not evaluated.
6) Delete Paragraph H-20 on page 35 of the solicitation.
7) Section L, (3) Factor 3: Safety, Paragraph (4) Technical Approach for Safety, Page 119; change the paragraph to read as follows:
Technical Approach for Safety: Describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors. The offeror shall submit a narrative that fully describes the safety management system that they will use to oversee the safety compliance and performance of self-performed and subcontractor performed work. The offeror will describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels. Additionally, the contactor will describe their methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. The technical approach to safety narrative shall be limited to two double-sided pages.
8) Delete Attachment JL.2 and JL.2A.
9) Insert Attachment JL.2 and JL.2A(REV 1).
10) Delete Attachment JL.6 (REV 1).
11) Insert Attachment JL.6 (REV 2).
12) The Revised Factor 4, Small Business Utilization provided as an attachment in Amendment 0001 is now incorporated into the sollicitation.
N62470-17-R-6016 GLOBAL CONTINGENCY CONSTRUCTION CONTRACT, NAVFAC ATLANTIC
AMENDMENT 0002
QUESTIONS AND ANSWERS
Question 1. The JL.2 and 2A forms have labor categories listed that are not direct charge to projects and are part of the contracts indirect rate structures. How is the contractor to propose on these rates? Are we to leave that rate blank and add a note saying “Part of Overhead”?
Answer: See revised Attachment JL.2 and JL.2A (REV 1) attached to this amendment.
Question 2. Factor 5, Past Performance allows for the "submission of performance recognition documents received within the last three years…". Considering that Factor 1, Corporate Experience allows the use of "projects similar in size, scope and complexity to the work anticipated under this contract and completed within the past ten (10) years of the date of issuance of this RFP.", will the Government align these two factors by allowing the submission of performance recognition documents received in the last ten years?
Answer: See this amendment for changes to the third paragraph under Factor 5, Past Performance (i).
Question 3. H-10 states "for cost-type contracts with fixed-price construction subcontracts over $35,000, the prime contractor is required to obtain from each of its construction subcontractors performance and payment protection…” Clause H-20 sets the threshold as $30,000. Please clarify.
Answer: This amendment deletes paragraph H-20 on page 35 of the solicitation.
Question 4. Paragraph 8.4 - It appears that the descriptions for the senior Project Manager and Quality Control (QC) Program Manager have been combined. Please clarify the roles and qualifications for each of position.
Answer: See change to Paragraph 8.4 in this amendment.
Question 5. Factor 5. Past Performance,( i) , the third paragraph states “Also include performance recognition documents received within the last three years such as awards award fee determinations, customer letters of commendation, and any other forms of performance recognition." Please confirm that these may apply to projects other than those that were submitted in Factor 1 Corporate Experience.
Answer: See change to the third paragraph under Factor 5, Past Performance (i) in this amendment.
Question 6. Factor 5. Past Performance, (i), The Offeror is prohibited from submitting a PPQ for a Corporate Experience project, if a CCASS is available. However, PPQ's often contain comments similar to what may be found in a customer letter of commendation. In view of the question above, please consider allowing submission of PPQs as additional performance recognition.
Answer: No.
Question 7. Page 8, Personnel Requirements. The RFP reads: "The labor categories below are the ONLY labor categories that will be permitted under the contract. However, if it is determined that a labor category not listed below is required for a task order, the Contractor shall obtain prior written approval at time of proposal submission from the Contract Administrator listed under Section G-1 of the contract.
Question: The labor categories do not include a project controls position typically used for cost control on a CPAF type task orders (this is not a function of an Accountant type).
Would the government consider adding a project controls positions to the labor categories to minimize the additional administrative requirement to add the position at the time of the proposal?
Answer: No.
Question 8. On page 10, 8.4 Personnel Duties, Desired Experience, and Qualifications, The RFP reads: Junior Engineer; Responsibilities include preparing technical submittals and providing consultations as required. Duties include assisting the Mid-Level and Senior Engineer in carrying out project work, and assisting the Project Superintendent/Construction Site Manager in interpretation of engineering data. A qualified individual shall have an undergraduate degree from an engineering program, professional registration, and have a minimum of 3 years of experience in the appropriate technical discipline.
Question. For a junior engineer to have a professional registration is highly unlikely. Junior engineers don't normally have the necessary years of experience working under a registered engineer to obtain their registration.
Can the government reconsider the professional registration for junior engineers?
Answer: This amendment removes the professional registration requirement for Junior Engineers.
Question 9. Reference Attachment JL.7, All Year Tabs – The Accounting Technician II and Accounting Technician III labor categories do not show hours assigned to them. Is this an oversight and hours should have been assigned to these categories or should no hours be assigned to these labor categories?
Answer: See revised Attachment JL.7 (rev1) attached to Amendment 0001.
Question 10. Section L, Page 116, Section 2. Proposal Format, Volume 1: Non-cost (Technical Factors and Past Performance): Instructions on page 116 of the RFP state that ‘Proposal submission is limited to 125 pages. Note that letters of commitment and Joint Venture/teaming/partnership agreements, resumes, CPAR evaluations, and past performance questionnaires are not applied against the overall page limit." We do not see a request for resumes in the Section L instructions. Please confirm that resumes are not required as part of the submittal.
Answer: This amendment removes the word “resumes” and deletes the “listing of team members” page limitation in Section L, Page 116, Section 2, Proposal Format, Volume 1: Non-cost (Technical Factors and Past Performance.
Question 11. Section L, 2. Proposal Format, Volume 1, Page 116, RFP states: Excluded from the page limit are:
letters of commitment, JV/teaming agreements, resumes, CPAR evaluations, past performance questionnaires, tabs, introductory sheets (e.g. Table of Contents, List of Figures, List of Acronyms), a one-page coversheet to identify the contractor and the proposal, and the listings of team member’s corporate names and point of contact information.
The coversheet and listing of team members shall be limited to two pages in total (one page each).
Question: Because the teaming approach for any given team can vary greatly, we feel there should not be a page limit for this information. We request removal of the 1-page limit to the listing of team members (which limits the team).
Answer: This amendment deletes the “listing of team members” page limitation.
Question 12. Section L, (3) Factor 3: Safety, (4) Technical Approach for Safety, Page 119; We request allowance of 3 pages (instead of the 2-page limit) in this technical approach for safety to adequately provide information you request.
Answer: This amendment changes the technical approach to the safety narrative limit to two double-sided pages.
This page change does NOT change the 175 page limit.
Question 13. Section L, Factor 3, Safety; Section L, Factor 3, Safety, Technical Approach for Safety, Limit 2 pages.
NAVFAC has added an additional topic from the previous RFP issued in 2012 but has maintained the same page count. Would NAVFAC consider adding one additional page to adequately address the section requirements and the new requirement of methodology for an effective prevention program?
Answer: This amendment changes the technical approach to the safety narrative limit to two double-sided pages.
This page change does NOT change the 175 page limit.
Question 14. Would the Government please clarify whether a project completed before the RFP close date (but still ongoing at the date of RFP issuance) would be accepted for corporate experience/past performance?
Answer: See page 140, Factor 5, Past Performance, Paragraph 2 of the solicitation. “A recent project is defined as one that has been completed in the past 10 years as of the date of issuance of the solicitation.”
Question 15. Is the requirement to include performance recognition documents specific to the five projects identified in Factor 1 (Corporate Experience)? If so, would the Government remove the requirement for this recognition to have been received within the last three years in order to match the definition of recency for corporate experience projects?
Answer: See this amendment for changes to the third paragraph under Factor 5, Past Performance (i).
Question 16. H-21, Security Requirements: Individual task orders may require a Facilities Security Clearance and/or personnel with appropriate security clearances. In such instances, the requirements will be identified in the task order request for proposal. Would NAVFAC award a contract to a prime contractor who does not hold an FSC, or is this a mandatory requirement to win a contract?
Answer: No, a Facilities Security Clearance is not mandatory for contract award.
Question 17. Under Section C, paragraph 8.1, the RFP states that “the contractor shall furnish such resumes to the contracting officer upon request.” However, in paragraph L-3.2 (proposal format), the RFP states that “letters of commitment and Joint Venture/teaming/partnership agreements, resumes, CPAR evaluations, past performance questionnaires, ISR’s, Attachments JL.9, JL.10 and JL.11 are not applied against the overall page limit,” implying that resumes are expected to be submitted. Are resumes expected to be submitted in the proposal? If so, for which job categories and where should they appear?
Answer: This amendment removes the word “resumes” from paragraph L-3.2 (proposal format) on page 116 of the solicitation.
Question 18: For the forms in Volume 2, may we put proposal-specific headers and footers on these forms for consistency and ease of proposal review, as well as restriction on disclosure and use of data statements?
Answer: Yes.
Question 19. Responses to several of the pending questions will have significant impact on proposal. We respectfully request a minimum of 2 weeks from the date the last question is answered until the proposal is due.
Answer: No.
Question 20. Attachment JL.6 (Rev 1) deleted the 2014 column for OCONUS rates and added FY2018 Year-to-Date column. However, the CONUS rates section still include columns for FY2014, FY2015, FY2016 and FY2017, but without the FY2018 Year-to-Date column as shown for OCONUS rates. Please indicate whether or not the intention is to delete the 2014 column for CONUS rates and include a column for FY2018 Year-to-Date as shown in the attachment for Rev.1 OCONUS rates.
Answer: This Amendment replaces JL.6(REV1) with JL.6(Rev 2).
Question 21. Contract Period of Performance: For pricing purposes, what should offerors assume for a contract start date?
Answer: Refer to page 122 of the solicitation, Volume 2: Cost Proposal, Seciton I, Standard Form 33—Tab I.
Question 22. Current CPARS evaluation forms rate contractors on different evaluation areas, but do not provide an overall rating for the contractor. How will the Navy evaluate CPARS that have different ratings for some of the areas? Specifically, will Navy attempt to average the different evaluation areas, use the lowest evaluation area, or use different method? If different method, please provide details.
Answer: Refer to page 140 of the solicitation, (5) Factor 5, Past Performance: Basis of Evaluation.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
Section C - Descriptions and Specifications
SCOPE OF WORK
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
SCOPE OF WORK
SCOPE OF WORK
This procurement is for a multiple award contract for global contingency construction. Approximately 4 contracts will be awarded as a result of this solicitation. The contracts are for a base year and four (4) one-year option periods. The total five-year (base and four, one-year options) estimated construction cost is not to exceed $500,000,000.00 for all contracts. The minimum guarantee for each contract is $25,000.00 over the life of the contract. This will be an Indefinite-Delivery/Indefinite-Quantity (IDIQ) type contract with provisions for the placement of either Cost-Plus–Award-Fee or Firm-Fixed-Price (FFP) orders.
After award of the initial contracts, task orders will be issued in accordance with the regulations set forth at FAR
16.505. Placement procedures for task orders will insure that all awardees are given fair consideration for task order requirements. Selection procedures will be tailored based on the nature of the task order requirements and selection may be based on a variety of methods including best value, low priced-technically acceptable or low price. Where applicable, each request for submission in conjunction with placing a task order will state the method of selection.
Specific evaluation factors will be identified in the request for submission. In some instances, the price evaluation for placement of a task order may be based on the Offeror’s current G&A, overhead, and Forward Rate Pricing Agreement not to exceed the proposed ceiling rates incorporated into the contract. Contractors may elect not to submit on all task order requirements; however, the contractor must notify the contracting officer in writing when a Contractor elects not to submit on a particular task order requirement. In all instances, the Government reserves the right to issue a unilateral task order directing a contractor to perform a particular project within the scope of the contract. In all such cases, contractors are obligated to perform the work required in accordance with the terms and conditions of the contract
The work includes providing supervision, equipment, materials, labor, travel and all means necessary to provide the Navy and the Navy on behalf of Department of Defense (DOD), or other Federal agencies when authorized, an immediate response for civilian construction contract capability. The contract will provide construction, design/build construction, and related engineering services in response to natural disasters, humanitarian assistance, conflict, or projects with similar characteristics, and other urgent requirements. The work also includes the capability to set up and operate Material Liaison Office (MLO) at a deployed site in support of Naval Construction Force operations.
The Contractors may be tasked to participate in military exercises. Work may include occasional projects to ensure readiness to perform under emergency situations.
Work will be predominately construction. The Contractors, in support of the construction effort, may be required to provide initial Base Operating Support (BOS) Services, which will be incidental to construction efforts. Should the need arise for incidental emergency services under this contract, NAVFAC Facilities Services Contract/Base Operating Support templates will be used which are performance-based and comply with Office of Management and Budget’s and DOD’s performance-based services. These services are primarily anticipated in support of facilities overseas, but may also be ordered for work in the United States in support of disaster recovery efforts and other contingency operations. The Service Contract Act and other applicable clauses will be incorporated by individual task order, as necessary, for stateside work.
Construction critical response during an emergency will primarily support aid for natural disasters, military conflict or humanitarian aid. Early mobilization and start up construction is the utmost goal of this procurement. The potentially massive logistics of moving people, materials, and equipment for numerous and simultaneous projects and work sites will require flexibility and extensive management and coordination. The Contractor shall be required to work very closely and in detail with Navy procurement, planning, and program officials. The goals and planned actions may be developed through Contractor and Navy iterative discussions. The contract is not meant to necessarily eliminate all other construction procurements surrounding a situation, but is to provide a critical action response and continued momentum in providing recovery or support.
The intent of the contract is to have maximum flexibility in construction and related planning, design, engineering, and construction material logistics. The following are types of construction products the Contractor could be required to provide: (The list is not all-inclusive).
Dredging Airfield runway construction and/or repair Airfield facilities construction Administrative and educational facilities Hardened facilities and personnel bunkers Electric power plant Electric power distribution systems Communication facilities Water treatment plant Sewage treatment plant Enemy containment and processing facilities Water well drilling Stabilization Building Envelope Repairs Fencing Garbage disposal / recycling facilities Transportation depots for materials Warehouse facilities for construction materials Warehouse facilities for other customers Facilities for berthing and billeting Facilities for equipment dispatch, repair, decontamination Ammunition storage facilities Rail facilities Bridges Causeways
Medical clinics/field hospitals Road construction (asphalt, concrete, engineered fill) Soils engineering Fire fighting facilities and distribution systems Pier and Waterfront construction Petroleum handling pier facilities Petroleum storage facilities *Chemical, Biological, and Radiological area decontamination *Environmental restoration Operations of power generation, concrete and asphalt plants, etc.
* The contractor may be required to perform long term and/or controlled clean-up of sites in austere and/or contingency environments. Contractors will not be “first responders”. The Contractor may be required to respond to multiple requests for environmental support at various sites. These services may include actions, such as, but not limited to, the following: Performing remedial and/or removal actions; expedited and emergency response actions at sites; facility operation, maintenance and instruction; developing work plans; range clean up and closure; performing site characterizations, groundwater characterization studies; Anti-terrorist/force protection (ATFP) hazmat release incident response (not first responder) and remediation of ATFP related hazmat such as anthrax or any chemical, biological or radiological (CBR) agent.
TECHNICAL REQUIREMENTS
1. The Global Contingency Construction (GCC) contract is envisioned to operate in a variety of environments that will require the Contractor to flexibly apply technical and other standards as required by the situation and the individual Task Orders as issued.
2. At all times during execution of work under this contract the contractor will be required to control the quality of the work, and manage the safety of the workers accomplishing work under this contract.
3. Construction tasks may range from very expedient or expeditionary efforts not intended for long-term use to complex, permanent facilities. Therefore, for construction tasks, the decision as to the applicability of common industry and government standards and guide specifications will be made by the Contracting Officer. The following specific General Requirements Sections from the Uniform Facilities Guide Specifications (UFGS) are incorporated into this contract and may found at the following website: https://www.wbdg.org. Specific text for each section is included below. Each of these sections is hereby incorporated in the basic contract but may be further modified if necessary by Task Order.
3.1 Quality Control
3.1.1 For construction tasks under this contract, UFGS Section 01 45 00.05 20, DESIGN AND CONSTRUCTION QUALITY CONTROL (as modified and included herein) will apply. Under certain circumstances, specific provisions of Section 01 45 00.05 20 may be modified. Such modifications will be incorporated into the applicable Task Order. The Contractor is required to submit an overall contract Contractor Quality Control (CQC) Plan, which conforms to the requirements of Section 01 45 00.05 20 within 30 calendar days of award and prior to the issuance of the first task order under this contract. Additionally, a CQC plan addressing the particular aspects of each project by Definable Features of Work will be required for each individual task order.
3.1.2 For services related work under this contract, the Contractor may be required to submit a Quality Control (QC) Management plan for each such Task Order. The specific requirements will be incorporated into the applicable Task Order(s). The QC Management Plan and program for services requires an effective and efficient means of identifying and correcting performance problems that may arise throughout the entire scope of operations. The Contractor's QC program shall address:
Accurate documentation of work processes, procedures, and output measures.
A systematic procedure for assessing compliance with performance objectives and standards.
Accurate documentation of quality inspections conducted throughout the execution of work.
Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
Services related tasks are not required to be addressed in the Construction Quality Control plan in previous paragraph.
3.2 Safety and Occupational Health Requirements
3.2.1 For construction tasks under this contract, UFGS Section 01 35 26.05 20, GOVERNMENT SAFETY REQUIREMENTS FOR DESIGN-BUILD (as modified and included herein) applies. The Contractor is required to submit an overall contract Safety Plan, which meets the requirements of USACE EM-385-1-1 and Section 01 35
26.05 20. Additionally, a Safety Plan/Accident Prevention Plan with appropriate Activity Hazard Analyses will be required to address specific hazards and controls by Definable Feature of Work for each individual Task Order.
3.2.2 For services related work under this contract, safety and occupational health requirements will be incorporated into the applicable Task Orders.
3.3 Network Analysis Schedules
For construction tasks under this contract, UFGS Section 01 32 17.05 20, NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD (as modified and included herein) applies. NAS may not be required for every Task Order. The use of NAS will be determined by the Contracting Officer for each Task Order.
3.4 For construction tasks under this contract, any additional submittal requirements will be defined in each Task Order. Allowance to proceed, based on submittal actions defined in Section 01 45 00.05 20, DESIGN AND CONSTRUCTION QUALITY CONTROL, will be addressed by the Contracting Officer for each Task Order.
4. Design requirements for this contract range from minimal design to full design. Design, when required by the Contracting Officer and unless specified otherwise by the Contracting Officer, shall be in accordance with the technical requirements of this contract. For design tasks under this contract, design and design documents shall comply with the requirements of each such Task Order and UFGS SECTION 01 33 10.05 20, DESIGN SUBMITTAL PROCEDURES (as modified and included herein). Each such task order will define what design development submittals are required. Provide electronic design submittals in accordance with Section 01 33 10.05 20.
5. Provide As-Built drawings in accordance with NFAS 5252.236-9310, Record Drawings. In addition, when Contractor design is required by the task order, provide record drawings in accordance with the design requirements.
6. Provide a list of materials for items that manufacturer information and product data cannot readily be identified after item is installed and for future maintenance, repair, or replacement purposes. Typical items include: Roofing, architectural insulation, special wall coverings, special floor coverings, special ceiling coverings, carpet, or light fixtures. Designations shall be keyed to the areas and spaces depicted on the task order drawing. Provide the following information: Material Designation, Specification Section, Manufacturer, Material Used (Manufacturer’s Designation), and Where Used.
7. When required by the Contracting Officer for the Task Order, prepare Form DD1354 "Transfer and Acceptance of Military Real Property,” for new construction, demolition, and any construction on an existing facility that adds new parts, items, or systems that are not maintenance or repair; e.g. replacement of windows, replacement of roofs, replacement of an exterior utility, adding an AC system, adding exterior lighting, etc. Include any additional assets/improvements/alterations from the Draft DD Form 1354. Contact the Contracting Officer for any project specific information necessary to complete the DD Form 1354.
7.1 For information purposes, a blank DD Form 1354 (fill-able) in ADOBE (PDF) may be obtained at the following web site: http://www.dtic.mil/whs/directives/forms/eforms/dd1354.pdf.
Instructions for completing the form is provided in UFC 1-300-08, available at the following location:
https://www.wbdg.org/FFC/DOD/UFC/ufc_1_300_08_2009_c2.pdf.
8. PERSONNEL REQUIREMENTS
The educational and experience qualifications of all personnel listed under paragraph 8.4 must meet the contract minimum qualification standards for the respective labor category that they are proposed under. These qualifications shall become the standard for these personnel performing under the contract. The contractor shall be bound by these standards throughout the contract.
8.1 Review of Resumes
The Government reserves the right to review the resumes of any contractor employees listed under paragraph 8.4 and performing under the contract, solely for the purposes of ascertaining their qualifications relative to the personnel qualifications terms of the contract set forth under paragraph 8.4 below. Accordingly, the contractor shall furnish such resumes to the contracting officer upon request. Federal employees, military or civilian, shall not be employed by the contractor in performance of any work under the contract (i.e., during off-duty hours, regular hours, or while on annual leave).
8.2 Contractor Work Force Responsibility
The contractor shall organize, furnish, maintain, supervise, and direct a work force which, within the limitations of the provisions of the contract, is thoroughly capable and qualified to effectively perform the work set forth in the contract.
8.3 Personnel
The contractor shall provide personnel to perform the following positions. See paragraph 8.4 for duties and minimum required qualifications. All personnel proposed/performing the required duties under the below positions shall meet the minimum qualifications for that position.
The labor categories below are the ONLY labor categories that will be permitted under the contract. However, if it is determined that a labor category not listed below is required for a task order, the Contractor shall obtain prior written approval at time of proposal submission from the Contract Administrator listed under Section G-1 of the contract. The request, with supporting documentation, including ceiling rate for requested labor category, shall be submitted through the Task Order Ordering Officer/Contracting Officer to the Contract Administrator. If approval is granted by the Contract Administrator, the labor category will be approved for use on the specific task order. If it is determined that there would be a need to use the labor category under other task orders, the Contract Administrator may incorporate the labor category into the basic contract.
Program Manager Sr. Project Manager Quality Control Program Manager Safety and Health Program Manager Contract Administrative Manager Contract Administrator Accountant II and III Accounting Technician II and III Administrative Assistant Project Task Order Manager Senior, Mid-Level and Junior Electrical Engineer Senior, Mid-Level and Junior Mechanical Engineer Senior, Mid-Level and Junior Structural Engineer Senior, Mid-Level and Junior Environmental Engineer Senior, Mid-Level and Junior Civil Engineer Project Scheduler Senior and Mid-Level Cost Estimator Site Construction Manager Site Safety and Health Officer Site Quality Assurance (QA) Manager
8.4 Personnel Duties, Desired Experience, and Qualifications
Program Manager.
Responsible for definition of objectives and policies related to program tasks. Initiates review of the overall effectiveness and adherence to these policies in the achievement of program task objectives. Oversite of daily operations and performance of program. Responsible for the planning, staffing, business-development activities, controlling project costs and quality control and interfaces with management. A qualified individual for this position shall have a Bachelor’s degree in Engineering/Technical or Business from an accredited college in related discipline, with 10 years of experience managing or overseeing large task order contracts which may involve multiple concurrent projects at multiple locations.
Senior Project Manager.
Responsibilities include directing work associated with contract task orders. Duties include ensuring effective execution of projects, controlling project schedule and budget, recommending changes to improve project efficiency and effectiveness, justifying change orders, tracking materials and resources, coordinating subcontractors' work, complying with normal safety and health procedures, ensuring compliance with contract/task order requirements, following/implementing approved project work plans or specifications, A qualified individual shall have an undergraduate degree in engineering or be a graduate of a construction management program. A minimum of 7 years of construction management experience Quality Control (QC) Program Manager.
Responsibilities include developing, maintaining, and enforcing the QC program. The QC manager shall have 5 years of QC experience managing large construction and/or natural disaster recovery projects.
Senior Project Manager.
Responsibilities include directing work associated with contract task orders. Duties include ensuring effective execution of projects, controlling project schedule and budget, recommending changes to improve project efficiency and effectiveness, justifying change orders, tracking materials and resources, coordinating subcontractors' work, complying with normal safety and health procedures, ensuring compliance with contract/task order requirements, following/implementing approved project work plans or specifications, A qualified individual shall have an undergraduate degree in engineering or be a graduate of a construction management program. A minimum of 7 years of construction management experience.
Quality Control (QC) Program Manager.
Responsibilities include developing, maintaining, and enforcing the QC program. The QC manager shall have 5 years of QC experience managing large construction and/or natural disaster recovery projects.
Safety and Health Program Manager.
Responsibilities include implementing and overseeing the contractor's safety and health program and plans. Must possess working knowledge of applicable federal, state, and local occupation safety and health regulations. A qualified individual shall have formal education and training in occupational safety and health and a minimum of 5 years of working experience.
Contract Administrative Manager.
Responsibilities include administering, negotiating and managing contract task orders for construction and services with respect to contractual matters. Duties include ensuring compliance with applicable federal, DOD, and Navy regulations and policies, as well as the contract terms and conditions; maintaining an adequate purchasing system, which includes overseeing procurement of subcontractors; maintaining an adequate estimating system, which includes ensuring the adequacy of proposals; tracking costs; and interfacing with Navy contracts personnel regarding contractual matters. A qualified individual for this position shall have an undergraduate degree in business administration or in an appropriate related field, with 7 years of federal contracting experience (either working with the Government or for a DOD contractor). This individual shall have experience in cost plus award fee contracts.
Contract Administrator Responsibilities include administering and managing contract task orders for construction and services with respect to contractual matters. Duties include ensuring compliance with applicable federal, DOD, and Navy regulations and policies, as well as the contract terms and conditions; utilizing an adequate purchasing system, which includes overseeing procurement of subcontractors; utilizing an adequate estimating system, which includes ensuring the adequacy of proposals; and tracking costs. A qualified individual for this position shall have an undergraduate degree in business administration or in an appropriate related field, with 5 years of federal contracting experience (either working with the Government or for a DOD contractor). This individual shall have experience in cost plus award fee contracts.
Accountant II Responsibilities include knowledge and use of industry practices, techniques, and standards. Duties include applying and analyzing accounting principles on contracts, processes, practices and procedures with Federal Acquisition Regulations (FAR) and Cost Accounting Standards (CAS) interpretations; ensuring continued approved status of businesses processes and systems required to do business with the U.S. Government; interacting with federal regulatory agencies and internal personnel while investigating and resolving US and foreign government procurement regulatory compliance issues; preparing reports of findings and recommendations to management and negotiating rate agreements. A qualified individual for this position shall have an undergraduate degree in an accounting with 3 years’ experience or a Master’s degree with 1 year of experience, experience can be substituted for education requirements.
Accountant III Responsibilities include complete understanding and application of principles, concepts, practices, and standards.
Duties include applying and analyzing accounting principles on contracts, processes, practices and procedures with Federal Acquisition Regulations (FAR) and Cost Accounting Standards (CAS) interpretations; ensuring continued approved status of businesses processes and systems required to do business with the U.S. Government; interacting with federal regulatory agencies and internal personnel while investigating and resolving US and foreign government procurement regulatory compliance issues; preparing reports of findings and recommendations to management and negotiating rate agreements. A qualified individual for this position shall have an undergraduate degree in an accounting with 7 years’ experience or a Master’s degree with 5 years of experience, experience can be substituted for education requirements.
Accounting Technician II Responsibilities include full knowledge and understanding of the general aspects of the job with a broad understanding of detailed aspects. Duties consist of performing a variety of general accounting support tasks such as verifying accuracy of invoices and other accounting documents or records; updating and maintaining accounting journals, ledgers and other records detailing financial business transactions (i.e. accounts receivable, disbursements, expense vouchers, payrolls, receipts, and accounts payable); entering data into computer systems using defined computer programs; complying data and preparing a variety of reports; reconciling records with company employees and/or external customers; making recommendations to resolve discrepancies and investigating questionable data.