Attachment_14_-_NAVSEA_SS80-AG-MAN-010P-9290_REV_A.pdf

PDF 352 KB Posted

Attached to
Charter for one (1) U. S. Flagged, Jones Act-Qualified surface support vessel for the U. S. West Coast
Solicitation number
N62387-15-R-2020
Issued by

About this file

Attachment 14

View the file

Other files

File Type Posted
Attachment_7_Min_Vessel_Requirements_Rev_4.xlsx XLSX spreadsheet
N62387-15-R-2020_Amend_4.doc DOC document
Attachment_12_-_Amended_ICD_7411192.pdf PDF
N62387-15-R-2020_Amend_3.doc DOC document
Attachment_13_-_SS521-AA-MAN-010_REV_2.pdf PDF
Attachment_7_Min_Vessel_Requirements_Rev_3.xlsx XLSX spreadsheet
Q_AND_A__5_SRDRS.pdf PDF
Q_AND_A__4__SRDRS.pdf PDF
Attachment_3_Basic_Pricing_Data_Rev_2.xlsx XLSX spreadsheet
Attachment_1_Govt_Furnished_Property.pdf PDF
N62387-15-R-2020_Amend_0002.doc DOC document
Attachment_7_Min_Vessel_Requirements_Rev_2.xlsx XLSX spreadsheet
Q_AND_A__3__SRDRS.pdf PDF
Attachment_7_Minimum_Vessel_Requirements_Rev_1.xlsx XLSX spreadsheet
Attachment_3_Basic_Pricing_Data_Rev_1.xlsx XLSX spreadsheet
N62387-15-R-2020_Amend_0001.doc DOC document
Q_AND_A__2__SRDRS.pdf PDF
Q_AND_A__1__SRDRS.pdf PDF
10c_-_Baxter_Bolts_PATTERN.Doc DOC document
Attachment_3_-_Basic_Pricing_Data.xlsx XLSX spreadsheet
Attachement_2_-_Wage_D.pdf PDF
Attachment_11_-_594-6395636.pdf PDF
10d_-_SRDRS_Baxter_bolt_std_struct_detail.pdf PDF
Attachment_4_-_SF_LLL.pdf PDF
Attach_7_Minimum_Vessel_Requirements.xlsx XLSX spreadsheet
Attachment_9_-_ICD_7411191_Rev_E_.pdf PDF
10a_-_SRDRS_Deck_Socket_Capacity_Calc.pdf PDF
Attachment_8_(DD254_SRDRS_SAN_DIEGO)_(2).pdf PDF
Attachment_5_-_PP_Questionnaire.docx DOCX document
N62387-15-R-2020.doc DOC document
Attachment_1_-_Gov't_Furnished_Property.xlsx XLSX spreadsheet
10b_-_SRDRS_Baxter_Install.pdf PDF
Attachment_6_-_PP_Data_Sheet.doc DOC document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYSTEM CERTIFICATION PROCEDURES

AND CRITERIA MANUAL FOR

DEEP SUBMERGENCE SYSTEMS

THIS DOCUMENT SUPERSEDES: NAVSEA P-9290

DISTRIBUTION STATEMENT A:

Approved for Public Release; Distribution is Unlimited

PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND

SS800-AG-MAN-010/P-9290

REVISION A

0910-LP-018-2840 3 NOVEMBER 1998

CHANGE 2 - 7 MAY 2014

THIS PAGE INTENTIONALLY LEFT BLANK

A CHANGE 2

SS800-AG-MAN-010/P-9290

LIST OF EFFECTIVE PAGES

Date of Original pages is: 3 November 1998

Original 116

Total Number of pages in this publication is 374 consisting of the following:

Page Change Page Change Number Number Number Number

Title Page ............................. CHANGE 2

List of Effective Pages .......... CHANGE 2

Change Record ..................... ORIGINAL i through xxii ......................... CHANGE 2 xxiii through xxiv ................... CHANGE 1

1-1 through 1-10 ................... CHANGE 1

2-1 through 2-2 ..................... CHANGE 1

2-3 through 2-4 ...................... ORIGINAL

2-5 through 2-10 ................... CHANGE 1

2-11 through 2-14 ................. CHANGE 2

2-15 through 2-18 ................. CHANGE 1

3-1 through 3-12 ................... CHANGE 1

3-13 through 3-32 ................. CHANGE 2

3-33 through 3-36 ................. CHANGE 1

3-37 through 3-38 ................. CHANGE 2

4-1 through 4-6 ..................... CHANGE 1

4-7 through 4-8 ..................... CHANGE 2

4-9 through 4-12 ................... CHANGE 1

4-13 through 4-14 ................. CHANGE 2

5-1 through 5-4 ..................... CHANGE 1

5-5 through 5-6 ..................... CHANGE 2

5-7 through 5-8 ..................... CHANGE 1

A-1 through A-2 .................... CHANGE 1

A-3 through A-6 ..................... ORIGINAL

A-7 through A-8 .................... CHANGE 1

A-9 through A-10 ................... ORIGINAL

B-1 through B-6 ..................... ORIGINAL

B-7 through B-12 .................. CHANGE 1

CHANGE 2 B

LIST OF EFFECTIVE PAGES (CONT’D)

Page Change Page Change Number Number Number Number

B-13 through B-16 ................. ORIGINAL

B-17 through B-18 ................ CHANGE 2

B-19 through B-24 ................. ORIGINAL

B-25 through B-32 ................ CHANGE 2

B-33 through B-34 ................. ORIGINAL

B-35 through B-36 ................ CHANGE 1

B-37 through B-38 ................ CHANGE 2

B-39 through B-44 ................. ORIGINAL

C-1 through C-2 ................... CHANGE 1

C-3 through C-6 .................... ORIGINAL

D-1 through D-2 .................... ORIGINAL

E-1 through E-2 .................... CHANGE 1

E-3 through E-8 ..................... ORIGINAL

E-9 through E-10 .................. CHANGE 2

E-11 through E-12 ................. ORIGINAL

F-1 through F-2 .................... CHANGE 1

F-3 through F-4 ..................... ORIGINAL

F-5 through F-16 .................. CHANGE 1

F-17 through F-26 ................ CHANGE 2

F-27 through F-32 ................ CHANGE 1

G-1 through G-6 ................... CHANGE 1

H-1 through H-22 .................. ORIGINAL

H-23 through H-24................ CHANGE 1

H-25 through H-34................. ORIGINAL

I-1 through I-4 ....................... CHANGE 1

I-5 through I-6 ....................... CHANGE 2

I-7 through I-16 ..................... CHANGE 1

J-1 through J-4 ..................... CHANGE 1

J-5 through J-8 ...................... ORIGINAL

K-1 through K-6 ..................... ORIGINAL

K-7 through K-8 .................... CHANGE 1

K-9 through K-10 ................... ORIGINAL

K-11 through K-12 ................ CHANGE 1

K-13 through K-18 ................. ORIGINAL

K-19 through K-20 ................ CHANGE 1

K-21 through K-24 ................. ORIGINAL

K-25 through K-26 ................ CHANGE 1

K-27 through K-28 ................ CHANGE 2

K-29 through K-30 ................ CHANGE 1

K-31 through K-38 ................. ORIGINAL

C CHANGE 2

LIST OF EFFECTIVE PAGES (CONT’D)

Page Change Page Change Number Number Number Number

K-39 through K-40 ................ CHANGE 1

K-41 through K-42 ................. ORIGINAL

K-43 through K-44 ................ CHANGE 1

K-45 through K-46 ................. ORIGINAL

K-47 through K-48 ................ CHANGE 1

K-49 through K-50 ................. ORIGINAL

L-1 through L-2 ..................... CHANGE 2

L-3 through L-8 ...................... ORIGINAL

M-1 through M-4 ................... CHANGE 1

INDEX 1 – INDEX 10 ........... CHANGE 2

INDEX 11 – INDEX 12 ......... CHANGE 1

INDEX 13 – INDEX 14 ......... CHANGE 2

INDEX 15 – INDEX 16 ......... CHANGE 1

INDEX 17 – INDEX 20 ......... CHANGE 2

INDEX 21 – INDEX 22 ......... CHANGE 1

SS800-AG-MAN-010/P-9290

RECORD OF CHANGES

CHANGE

NO.

DATE

TITLE OR BRIEF

DESCRIPTION

ENTERED BY

THIS PAGE INTENTIONALLY LEFT BLANK

i CHANGE 2

TABLE OF CONTENTS

Chapter 1: General Information ............................................................ 1-1

1.1 Introduction ........................................................................................................ 1-1

1.2 Background ....................................................................................................... 1-1

1.2.1 History ......................................................................................................... 1-1

1.2.2 Lessons Learned ......................................................................................... 1-2

1.3 Certification Definitions ...................................................................................... 1-3

1.3.1 Deep Submergence System ....................................................................... 1-3

1.3.2 Deep Submergence System Personnel ...................................................... 1-3

1.3.3 Scope of Certification .................................................................................. 1-3

1.3.4 Certification Program Plan .......................................................................... 1-4

1.3.5 Scope of Certification Notebook .................................................................. 1-4

1.3.6 Surveys ....................................................................................................... 1-4

1.3.7 Objective Quality Evidence ......................................................................... 1-4

1.3.8 Certification Survey Plan ............................................................................. 1-5

1.3.9 Certification Package .................................................................................. 1-5

1.3.10 Certification ............................................................................................... 1-5

1.3.11 Authorization for Manned Use ................................................................... 1-5

1.3.12 Letter of Certification ................................................................................. 1-5

1.3.13 Initial Certification ...................................................................................... 1-6

1.3.14 Sustaining Certification ............................................................................. 1-6

1.3.15 Prohibition Against Manned Operations .................................................... 1-6

1.3.16 Suspension of Certification ........................................................................ 1-6

1.3.17 Letter of Suspension of Certification ......................................................... 1-6

1.3.18 Reinstatement of Certification (Re-Certification) ....................................... 1-7

1.3.19 Functional Audits ....................................................................................... 1-7

1.3.20 Technical Assistance Review (Tech Assist) .............................................. 1-7

1.4 Principal Participants ......................................................................................... 1-7

1.5 Deep Submergence Systems Oversight Board (DSSOB) ................................. 1-8

1.6 Basis for Initial DSS Certification ....................................................................... 1-9

1.7 DSS Certification Process ................................................................................. 1-9

1.8 Documentation Hierarchy .................................................................................. 1-9

CHANGE 2 ii

Chapter 2: The System Certification Process ..................................... 2-1

2.1 Introduction ........................................................................................................ 2-1

2.2 Application for Initial Certification ....................................................................... 2-1

2.2.1 Plan of Action and Milestones ..................................................................... 2-2

2.2.2 System Safety Program Plan ...................................................................... 2-2

2.2.3 Proposed Certification Program Plan (CPP) ............................................... 2-6

2.2.4 Proposed Scope of Certification .................................................................. 2-7

2.2.4.1 Scope of Certification ............................................................................ 2-8

2.2.4.2 Scope of Certification Notebook ............................................................ 2-9

2.2.4.3 Memorandum of Understanding ............................................................ 2-9

2.2.5 Certification Survey Plan ........................................................................... 2-10

2.3 Approval of System SOC Documents .............................................................. 2-10

2.4 Departure From Specification .......................................................................... 2-10

2.4.1 Processing Departures From Specification ............................................... 2-11

2.4.2 DFS Administrative Control and Records .................................................. 2-12

2.5 Technical Certification Requirements .............................................................. 2-14

2.6 Certification Package ....................................................................................... 2-14

2.7 Internal Certification Survey ............................................................................. 2-14

2.8 SCA Surveys ................................................................................................... 2-14

2.9 Operational Demonstration .............................................................................. 2-15

2.10 Issuance of Certification ................................................................................ 2-15

2.11 Sustaining Certification .................................................................................. 2-16

2.12 Modifications .................................................................................................. 2-16

2.13 Suspension of Certification ............................................................................ 2-16

2.14 Functional Audits ........................................................................................... 2-17

2.15 Process For Changing The Manual ............................................................... 2-17

2.15.1 Change Submittal .................................................................................... 2-17

2.15.2 Change Status Accounting ...................................................................... 2-17

2.15.3 Manual Distribution ................................................................................. 2-18

Chapter 3: Requirements for Certification ........................................... 3-1

3.1 Introduction ........................................................................................................ 3-1

3.2 Design and Configuration Management ............................................................ 3-1

3.2.1 Summary Description of the DSS ................................................................ 3-2 iii CHANGE 2

3.2.2 Design Parameters ..................................................................................... 3-2

3.2.3 Subsystem Descriptions .............................................................................. 3-3

3.2.4 Design Analysis and Calculations ............................................................... 3-4

3.2.4.1 Design Calculations ............................................................................... 3-4

3.2.4.2 Stress Analysis ...................................................................................... 3-5

3.2.5 Drawings ..................................................................................................... 3-6

3.2.6 Operability and Maintainability .................................................................... 3-7

3.2.7 Justification of Materials .............................................................................. 3-7

3.2.8 Toxic and Flammable Materials .................................................................. 3-7

3.2.9 Atmosphere Analysis .................................................................................. 3-8

3.2.10 Vacuum in Manned and Floodable Spaces ............................................... 3-9

3.2.11 System Safety Program ............................................................................ 3-9

3.3 Material Control ................................................................................................. 3-9

3.3.1 Definition of Material SOC Control Divisions ............................................. 3-10

3.3.1.1 Material Control Division A .................................................................. 3-10

3.3.1.2 Material Control Division B .................................................................. 3-10

3.3.1.3 Material Control Division C .................................................................. 3-11

3.3.2 Material Procurement ................................................................................ 3-11

3.3.3 Material Marking and Traceability ............................................................. 3-11

3.3.3.1 MCD A Material Marking and Traceability ........................................... 3-11

3.3.3.2 MCD B Material Marking and Traceability ........................................... 3-12

3.3.3.3 MCD C Material Marking and Traceability ........................................... 3-12

3.3.4 Receipt Inspection ..................................................................................... 3-12

3.3.4.1 MCD A Receipt Inspection .................................................................. 3-12

3.3.4.2 MCD B Receipt Inspection .................................................................. 3-13

3.3.4.3 MCD C Receipt Inspection .................................................................. 3-14

3.3.5 Verification of Completion of Required Testing ......................................... 3-14

3.3.6 Installation Verification .............................................................................. 3-14

3.3.6.1 Installation Verification Requirement for MCD A, B and C Material ..... 3-14

3.3.7 Material Transfer ....................................................................................... 3-14

3.3.7.1 Material Certification Maintained ......................................................... 3-14

3.3.7.2 Material Certification Lapsed (DSS/Ship In Inactivation Availability) ... 3-15

3.3.7.3 Material Recertification Required ......................................................... 3-17

3.4 Fabrication Process Control ............................................................................ 3-17

CHANGE 2 iv

3.4.1 Work Procedures ...................................................................................... 3-18

3.4.2 Welding Procedures .................................................................................. 3-18

3.4.3 Brazing Procedures ................................................................................... 3-19

3.4.4 Pipe Bending Procedures ......................................................................... 3-19

3.4.5 Cleaning Procedures ................................................................................. 3-19

3.5 Quality Assurance............................................................................................ 3-20

3.5.1 Design and Drawing Control ..................................................................... 3-21

3.5.2 Fabrication and Manufacturing Control ..................................................... 3-21

3.5.3 Testing and Inspection Control .................................................................. 3-22

3.5.4 Calibration ................................................................................................. 3-22

3.5.5 Audits ........................................................................................................ 3-23

3.6 Test Performance ............................................................................................ 3-23

3.6.1 Development Tests ................................................................................... 3-23

3.6.2 Quality Assurance Tests ........................................................................... 3-24

3.6.3 System Operation, Integration and Proof Tests ........................................ 3-24

3.6.3.1 Proof, Builder's Pre-Trial or Pre-Sea Trial Tests .................................. 3-24

3.6.3.2 Structural Testing ................................................................................ 3-24

3.6.3.3 Fluid System Testing ........................................................................... 3-24

3.6.3.4 Cleanliness Testing ............................................................................. 3-25

3.6.3.5 Electrical Testing ................................................................................. 3-25

3.6.3.6 Inclination Testing ................................................................................ 3-27

3.6.3.7 Access to Vital Equipment ................................................................... 3-27

3.7 Operational Demonstration and Trials Stage (Builder’s Trials or Sea Trials) ... 3-27

3.7.1 Certification/Re-Certification Dive ............................................................. 3-30

3.7.2 Emergency Surfacing ................................................................................ 3-31

3.7.3 Test Dive Deficiencies ............................................................................... 3-31

3.7.4 Manned Use of One Atmosphere DSSs in Pursuit of Certification (or Reinstatement of Certification) ............................................................................ 3-32

3.8 Operating and Emergency/Casualty Procedures ............................................. 3-33

3.8.1 Operating Manual ...................................................................................... 3-34

3.9 Maintenance Procedures ................................................................................. 3-35

3.9.1 Maintenance Requirement Card ............................................................... 3-35

3.9.2 SOC Planned Maintenance Documentation .............................................. 3-36

3.10 Record Retention Requirements ................................................................... 3-37 v CHANGE 2

Chapter 4: On-Site Certification Survey ............................................... 4-1

4.1 Introduction ........................................................................................................ 4-1

4.2 Types of Surveys ............................................................................................... 4-1

4.2.1 Initial Certification Survey ............................................................................ 4-1

4.2.2 Sustaining Certification Survey ................................................................... 4-1

4.2.2.1 Sustaining Certification Survey Periodicity ............................................ 4-2

4.2.3 Reinstatement of Certification Survey ......................................................... 4-2

4.2.4 End-Of-Availability Survey ........................................................................... 4-2

4.2.5 Internal Surveys .......................................................................................... 4-2

4.2.5.1 Internal Survey Periodicity ..................................................................... 4-3

4.3 Preparation For Survey ...................................................................................... 4-3

4.3.1 Scheduling of SCA Surveys ........................................................................ 4-3

4.3.1.1 Work Completion Requirements ............................................................ 4-3

4.3.1.2 Maintenance Requirement Status ......................................................... 4-4

4.3.1.3 Testing Procedure Status ...................................................................... 4-4

4.3.1.4 Departure Status ................................................................................... 4-4

4.3.1.5 Certification Survey Plan ....................................................................... 4-6

4.3.1.6 Personnel .............................................................................................. 4-6

4.4 Survey Team Personnel .................................................................................... 4-6

4.5 Certification Survey Cards ................................................................................. 4-6

4.6 Survey Guidelines ............................................................................................. 4-8

4.7 Operational Demonstration ................................................................................ 4-8

Chapter 5: Sustaining Certification ...................................................... 5-1

5.1 Introduction ........................................................................................................ 5-1

5.2 Qualification Policy ............................................................................................ 5-1

5.3 Responsibilities .................................................................................................. 5-1

5.3.1 Program Manager and SCA Responsibilities .............................................. 5-2

5.3.2 Sustaining Activity Responsibilities ............................................................. 5-2

5.3.3 Industrial Facility/Supervising Authority Responsibilities ............................. 5-3

5.4 Sustaining Certification Control Procedures ...................................................... 5-4

5.4.1 Re-entry Control .......................................................................................... 5-4

5.4.2 Work Procedures ........................................................................................ 5-4

5.4.3 Planned Maintenance Procedures .............................................................. 5-5

CHANGE 2 vi

5.4.4 Temporary Modifications ............................................................................. 5-6

5.5 Test and Trials Stage ......................................................................................... 5-7

5.6 Sustaining Certification Survey .......................................................................... 5-7

5.7 Operating Limits ................................................................................................ 5-7

5.8 Continuation of Certification ............................................................................... 5-7

APPENDIX A: Categorization of SOC Materials and Components ... A-1

A.1 INTRODUCTION ............................................................................................... A-1 A.2 CATEGORY 1 MATERIALS .............................................................................. A-1 A.3 CATEGORY 2 MATERIALS .............................................................................. A-4

A.3.1 Structural Materials ..................................................................................... A-4 A.4 CATEGORY 3 MATERIALS .............................................................................. A-5

A.4.1 Pressure Hull/Vessel and Other Structural Materials .................................. A-6 A.5 VIEWING WINDOW MATERIALS ..................................................................... A-7 A.6 FLOTATION MATERIALS ................................................................................. A-7 A.7 HYDRAULIC SYSTEM FLUIDS ........................................................................ A-8 A.8 ELECTRICAL/ELECTRONIC SYSTEM MATERIALS ....................................... A-8

A.9 FAIRING AND MISCELLANEOUS NONSTRUCTURAL MATERIALS .............. A-9

A.10 LIFE SUPPORT SYSTEM MATERIALS ......................................................... A-9

APPENDIX B: Design Factors for Deep Submergence Systems ...... B-1

B.1 INTRODUCTION ............................................................................................... B-1 B.2 STRUCTURAL DESIGN CONSIDERATIONS .................................................. B-1

B.2.1 Fatigue ........................................................................................................ B-2 B.2.2 Fracture Toughness .................................................................................... B-3

B.3 DESIGN STRENGTH PARAMETERS OF EXTERNALLY LOADED PRESSURE

HULLS/VESSELS, HARD STRUCTURES ............................................................... B-4

B.3.1 Inelastic Stability ......................................................................................... B-5 B.3.2 Elastic Stability ............................................................................................ B-5 B.3.3 Stress Analysis ........................................................................................... B-5 B.3.4 Verification of Calculated Collapse Pressure .............................................. B-6

B.3.4.1 Testing Procedures/Test Instrumentation ............................................. B-7 B.3.5 Verification of As-Built Strength (Proof Test) .............................................. B-7

B.3.5.1 Proof Testing Procedures/Instrumentation ............................................ B-8 vii CHANGE 2

B.4 DESIGN STRENGTH PARAMETERS OF INTERNALLY LOADED PRESSURE

VESSELS/HARD STRUCTURES ............................................................................. B-8

B.4.1 Stress Analysis ........................................................................................... B-9 B.4.2 Verification of Calculated Design Operating Pressure ................................ B-9

B.4.2.1 Testing Procedures/Test Instrumentation ........................................... B-10

B.5 MISCELLANEOUS PRESSURE VESSELS AND HARD STRUCTURES ....... B-10

B.6 DESIGN OF PENETRATIONS INTO AND THROUGH THE PRESSURE HULL

ENVELOPE ............................................................................................................ B-10

B.6.1 Piping Penetrations ................................................................................... B-11 B.6.2 Electrical Penetrations .............................................................................. B-11 B.6.3 Viewports .................................................................................................. B-11 B.6.4 Hatches/Closures ..................................................................................... B-12 B.6.5 Seals ......................................................................................................... B-12

B.7 MATERIAL SELECTION ................................................................................. B-13 B.7.1 Corrosion Resistance ............................................................................... B-13

B.7.1.1 Electrolytic Corrosion .......................................................................... B-13 B.7.1.2 Stress Corrosion ................................................................................. B-14

B.7.2 Toxicity...................................................................................................... B-14 B.7.3 Flammability .............................................................................................. B-14

B.8 FABRICATION ................................................................................................ B-15 B.8.1 Fabrication, Welding and Brazing ............................................................. B-15 B.8.2 Threaded Fasteners ................................................................................. B-15 B.8.3 Locking Devices for Mechanical Fasteners............................................... B-16 B.8.4 Protective Finishes ................................................................................... B-16

B.9 NAVAL ARCHITECTURE DESIGN ................................................................. B-16 B.9.1 Stability and Equilibrium ........................................................................... B-16

B.9.1.1 Inclining Experiments and Trim Dives for Submersibles and Submerged Habitats ............................................................................................................ B-17

B.9.2 Additional Conditions ................................................................................ B-18 B.10 DESIGN OF PIPING SYSTEMS ................................................................... B-18

B.10.1 Piping System Flexibility ......................................................................... B-19 B.10.2 Piping Systems Component Structural Design Consideration ................ B-20

B.10.2.1 Categories of Stress .......................................................................... B-21 B.10.3 Design of Piping Systems and Components ........................................... B-22 B.10.4 Hoses and Umbilical (Deck Shelters, Etc.) ............................................. B-23

CHANGE 2 viii

B.10.5 Special Considerations for Oxygen Systems .......................................... B-24 B.10.6 Piping System Design Verification .......................................................... B-25 B.10.7 Relief Valves ........................................................................................... B-25

B.11 DESIGN OF ELECTRICAL SYSTEMS ......................................................... B-25 B.11.1 Power Requirements .............................................................................. B-25

B.11.1.1 Batteries ............................................................................................ B-25 B.11.2 Wiring Methods ....................................................................................... B-25 B.11.3 Ungrounded System ............................................................................... B-27 B.11.4 Fault Current Protection .......................................................................... B-27 B.11.5 Electrical Shock Hazards ........................................................................ B-27 B.11.6 Insulation Considerations ........................................................................ B-28 B.11.7 Electrical Connectors and Penetrators ................................................... B-28

B.11.7.1 Electrical Connectors ........................................................................ B-28 B.11.7.2 Electrical Penetrators ........................................................................ B-29 B.11.7.3 Electrical Hull Penetrator Protection .................................................. B-29

B.11.8 Lighting Systems .................................................................................... B-29 B.11.9 Instrumentation ....................................................................................... B-29 B.11.10 Communication Systems ...................................................................... B-30 B.11.11 Heating Systems ................................................................................... B-30

B.12 PROPULSION SYSTEM ............................................................................... B-30 B.13 HUMAN ENGINEERING ............................................................................... B-30

B.13.1 Sound Levels .......................................................................................... B-30 B.13.2 Thermal Control ...................................................................................... B-31

B.14 LIFE SUPPORT SYSTEM ............................................................................. B-31 B.14.1 Life Support System Design Specification .............................................. B-32

B.14.1.1 Closed Circuit Life Support Design Specification .............................. B-32 B.14.1.2 Open Circuit Life Support Design Specification................................. B-33

B.14.2 Breathing Gas System General Design Considerations ......................... B-33 B.14.3 Breathing Gas Equipment Considerations .............................................. B-35

B.14.3.1 Breathing Gas Compressors ............................................................. B-35 B.14.3.2 Stored Breathing Gas Supply ............................................................ B-36 B.14.3.3 Carbon Dioxide Removal .................................................................. B-37 B.14.3.4 Breathing Gas Relief Valves ............................................................. B-38 B.14.3.5 Instrumentation ................................................................................. B-38 ix CHANGE 2

B.15 OPERATIONAL CONTROL SYSTEMS ........................................................ B-40 B.15.1 Control Power Supply ............................................................................. B-40 B.15.2 Control Actuators .................................................................................... B-41

B.16 FIRE PROTECTION SYSTEM ...................................................................... B-42 B.17 NAVIGATION SYSTEMS .............................................................................. B-42 B.18 FOOD AND WATER SUPPLY ...................................................................... B-42 B.19 WASTE SYSTEMS ....................................................................................... B-42 B.20 RESCUE/RETRIEVAL SYSTEMS ................................................................ B-43 B.21 HANDLING SYSTEMS .................................................................................. B-43

APPENDIX C: Testing Parameters for Permanently or Temporarily Mounted External Implodable and Explodable Items C-1

C.1 INTRODUCTION .............................................................................................. C-1 C.2 DEFINITIONS .................................................................................................. C-3

C.3 DETERMINATION OF WHETHER OR NOT AN EXPLODABLE OR

IMPLODABLE IS CRITICAL OR NONCRITICAL .................................................... C-4

C.4 TESTING REQUIRED FOR NONCRITICAL IMPLODABLE/EXPLODABLE

VOLUMES ............................................................................................................... C-5

C.5 TESTING NECESSARY FOR CRITICAL IMPLODABLE VOLUMES .............. C-5

C.6 TESTING NECESSARY FOR CRITICAL EXPLODABLE VOLUMES .............. C-6

C.7 TEST RECORD OQE REQUIRED FOR CRITICAL IMPLODABLE AND

EXPLODABLE VOLUMES ...................................................................................... C-6

APPENDIX D: Testing Parameters for Explodable Items due to Decompression ............................................................. D-1

D.1 INTRODUCTION .............................................................................................. D-1 D.2 DESCRIPTION AND ORIENTATION ............................................................... D-1 D.3 TEST PROCEDURE ........................................................................................ D-1 D.4 POROUS OR VENTED COMPONENTS ......................................................... D-2

APPENDIX E: DSS Breathing Gas and Atmospheric Requirements E-1

E.1 INTRODUCTION ............................................................................................... E-1 E.2 BREATHING GAS CONSUMPTION ................................................................. E-1 E.3 SURFACE BREATHING AIR REQUIREMENTS .............................................. E-2

E.3.1 Surface Oxygen Requirements ................................................................... E-3 E.3.2 Carbon Dioxide Production and Toxic Effects ............................................. E-5

CHANGE 2 x

E.3.3 Carbon Dioxide Removal ............................................................................ E-6 E.3.4 Carbon Dioxide Levels ................................................................................ E-7

E.4 ATMOSPHERIC CONTAMINANTS .................................................................. E-8 E.5 CARBON MONOXIDE LEVELS ........................................................................ E-8 E.6 DECOMPRESSION CONSIDERATIONS ......................................................... E-8 E.7 BREATHING GAS ALGORITHMS .................................................................... E-9

E.7.1 Conversion Factors ..................................................................................... E-9 E.7.2 Steady Oxygen Production and Removal Process ................................... E-10 E.7.3 Carbon Dioxide Buildup With No Removal Process ................................. E-10 E.7.4 Steady Contaminant Introduction And Removal Process ......................... E-10 E.7.5 No Contaminant Introduction But Constant Removal Process .................. E-11 E.7.6 Expected Contamination From a Volatile Solvent ..................................... E-11

APPENDIX F: General Guidelines for Control of Atmospheric Contaminants in Manned DSS ..................................... F-1

F.1 INTRODUCTION ............................................................................................... F-1

F.2 DSS FACTORS EFFECTING ATMOSPHERE CONTROL ............................... F-1

F.2.1 Mission Duration ......................................................................................... F-1 F.2.2 Atmospheric Pressure ................................................................................. F-2 F.2.3 Material Density .......................................................................................... F-3 F.2.4 Atmospheric Temperature ........................................................................... F-3 F.2.5 Atmospheric Control Equipment ................................................................. F-3 F.2.6 Cleanliness ................................................................................................. F-3

F.3 CONTROLLING AND MONITORING CONTAMINANTS .................................. F-3 F.3.1 Background ................................................................................................. F-3 F.3.2 Controlling Personnel Contaminants ........................................................... F-4 F.3.3 Controlling and Monitoring Breathing Gas Purity ........................................ F-5 F.3.4 Controlling and Monitoring Gaseous Contaminants in Breathing Gas Systems ................................................................................................................ F-6 F.3.5 Monitoring Gaseous Contaminants in the DSS ........................................... F-7

F.3.5.1 Unmanned DSS Atmospheric Testing ................................................... F-7 F.3.5.2 Manned DSS Atmospheric Testing ....................................................... F-9

F.4 CONTROLLING AND MONITORING NON-METALLIC MATERIAL ................. F-9

F.4.1 Non-Metallic Material List .......................................................................... F-10 F.4.2 Non-Metallic Material Off-Gas Testing ...................................................... F-10 xi CHANGE 2

F.4.3 Non-Metallic Material Off-Gas Test Report ............................................... F-11 F.4.4 Non-Metallic Material Qualification ............................................................ F-12

F.4.4.1 Initial Qualification Process ................................................................. F-13 F.4.4.2 Vendor Qualified Materials .................................................................. F-13 F.4.4.3 Lot Sampled Materials ......................................................................... F-14

F.5 IDENTIFYING CONTAMINANTS .................................................................... F-14 F.5.1 Physical Nature of Contaminants .............................................................. F-15 F.5.2 Medical Effects of Contaminants ............................................................... F-16 F.5.3 Target Compound Lists ............................................................................. F-18 F.5.4 Target Compound List Approval ............................................................... F-19 F.5.5 Breathing Gas System and Manned Space Off-Gas Test Report ............. F-20

F.6 EVALUATING OFF-GAS AND ATMOSPHERIC ANALYSIS RESULTS ......... F-20

F.7 LABORATORIES PERFORMING ANALYSES ............................................... F-21 F.8 FLAMMABILITY TESTING .............................................................................. F-28

F.8.1 Flammability Test Equipment .................................................................... F-29 F.8.2 Material Sample Test Documentation Requirements ................................ F-30 F.8.3 Alternate Procedure for Complete Assemblies ......................................... F-30

APPENDIX G: General Guidelines for Cleaning Breathing Gas Systems ......................................................................... G-1

G.1 INTRODUCTION ............................................................................................. G-1 G.2 REFERENCES ................................................................................................ G-1

G.2.1 Military Standards ...................................................................................... G-1 G.2.2 Commercial Specifications ........................................................................ G-1 G.2.3 Other ......................................................................................................... G-1

G.3 SYSTEM AND COMPONENT CLEANLINESS CONCERNS .......................... G-2

G.4 CLEANING METHODS AND MATERIALS ...................................................... G-3

G.4.1 Approved Cleaning Agents ........................................................................ G-3 G.4.2 Cleaning Processes .................................................................................. G-3 G.4.3 Commercial Oxygen Cleaning Specifications ............................................ G-4

G.5 POST CLEANING GAS ANALYSIS ................................................................. G-4 G.6 MAINTAINING THE SYSTEM IN A CLEAN CONDITION ................................ G-4

G.6.1 Providing a Clean Gas .............................................................................. G-4 G.6.2 Maintaining Cleanliness During Maintenance and Repairs ....................... G-5

CHANGE 2 xii

APPENDIX H: Design Guidelines for DSS Handling Systems .......... H-1

H.1 INTRODUCTION .............................................................................................. H-1 H.2 DEFINITIONS .................................................................................................. H-1 H.3 DESIGN CRITERIA AND GUIDELINES .......................................................... H-2

H.3.1 Equipment Design Criteria ......................................................................... H-2 H.3.1.1 Types of Loads .................................................................................... H-3 H.3.1.2 Environmental Considerations ............................................................. H-3

H.3.1.2.1 Sea State ....................................................................................... H-4 H.3.1.2.2 Air and Water Temperature ........................................................... H-4 H.3.1.2.3 Precipitation ................................................................................... H-4 H.3.1.2.4 Wind Velocity ................................................................................. H-4 H.3.1.2.5 Ocean Currents ............................................................................. H-4 H.3.1.2.6 Corrosion ....................................................................................... H-5

H.3.1.3 System Considerations ........................................................................ H-5 H.3.2 Human Engineering and Operational Design Considerations .................... H-5

H.3.2.1 Emergency Conditions and Reduced Operating Capability ................. H-6 H.4 DESIGN AND TESTING REQUIREMENTS .................................................... H-6

H.4.1 Load Bearing Component Requirements .................................................. H-7 H.4.1.1 Load Bearing Component Design ........................................................ H-7

H.4.1.1.1 Design Factors of Safety ............................................................... H-7 H.4.1.2 Submission of Drawings and Calculations for Load Bearing Components .......................................................................................................................... H-9 H.4.1.3 System Testing for Load Bearing Components.................................. H-10

H.4.2 Hydraulic and Pneumatic System Requirements ..................................... H-14 H.4.2.1 System Design ................................................................................... H-14 H.4.2.2 System Testing .................................................................................. H-15

H.4.2.2.1 Hydrostatic Testing Requirements ............................................... H-15 H.4.2.2.2 System Tightness Testing Requirements .................................... H-16 H.4.2.2.3 Maintenance Testing Requirements ............................................ H-17

H.4.2.3 Relief and Counter-Balance Valves ................................................... H-18 H.4.2.4 Cleaning, Flushing, and Preservation ................................................ H-19

H.4.3 Electrical Power Requirements and Controls .......................................... H-19 H.4.3.1 System Design ................................................................................... H-19 H.4.3.2 System Testing .................................................................................. H-20 xiii CHANGE 2

H.4.3.2.1 Maintenance Testing Requirements ............................................ H-20 H.5 CERTIFICATION REQUIREMENTS .............................................................. H-21

H.5.1 Initial and Sustaining Certification Requirements .................................... H-21 H.5.2 Certification Surveys ................................................................................ H-25 H.5.3 Suspension of Certification ...................................................................... H-26

APPENDIX I: Re-Entry Control Procedures ........................................ I-1

I.1 INTRODUCTION ................................................................................................. I-1 I.1.1 Work Procedures .......................................................................................... I-1

I.2 RE-ENTRY CONTROL IMPLEMENTATION RESPONSIBILITIES ..................... I-2

I.3 REC CLOSEOUT ................................................................................................ I-3

I.3.1 REC Closeout via Deep Dive Test Forms or DFSs ....................................... I-3 I.3.2 REC Closeout with Incomplete Work ............................................................ I-3 I.3.3 Deep Dive DFS and Test Form Depth Restrictions ....................................... I-4

I.4 RE-ENTRY CONTROL FORM AND INSTRUCTION MATRIX ............................ I-5 I.5 RE-ENTRY CONTROL LOG ............................................................................... I-5

I.6 RE-ENTRY CONTROL RECORD RETENTION REQUIREMENTS .................... I-6

I.7 EXCEPTIONS TO RE-ENTRY CONTROL .......................................................... I-6

APPENDIX J: DSS Pipe and Piping Components Pressure Testing Requirements ................................................................. J-1

J.1 INTRODUCTION ............................................................................................... J-1 J.2 RESTRICTIONS ................................................................................................ J-1 J.3 DEFINITIONS .................................................................................................... J-1 J.4 TEST PRESSURE TOLERANCES .................................................................... J-3 J.5 TEST PRESSURE DURATION ......................................................................... J-3 J.6 HYDROSTATIC TESTING REQUIREMENTS ................................................... J-3 J.7 JOINT TIGHTNESS TESTING REQUIREMENTS ............................................. J-4 J.8 SEAT TIGHTNESS TESTING REQUIREMENTS .............................................. J-5 J.9 PRESSURE DROP TESTING REQUIREMENTS ............................................. J-6 J.10 OBJECTIVE QUALITY EVIDENCE ................................................................. J-6

APPENDIX K: Certification Survey Plan ............................................. K-1

K.1 INTRODUCTION ............................................................................................... K-1 K.2 CERTIFICATION SURVEY PLAN DEVELOPMENT ......................................... K-1

CHANGE 2 xiv

K.2.1 Proposed Certification Survey Plan ............................................................ K-2 K.2.2 Certification Survey Plan Review ................................................................ K-2

K.3 CERTIFICATION SURVEY PLAN FORMAT AND CONTENT ..........................

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .