Text version
SYSTEM CERTIFICATION PROCEDURES
AND CRITERIA MANUAL FOR
DEEP SUBMERGENCE SYSTEMS
THIS DOCUMENT SUPERSEDES: NAVSEA P-9290
DISTRIBUTION STATEMENT A:
Approved for Public Release; Distribution is Unlimited
PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND
SS800-AG-MAN-010/P-9290
REVISION A
0910-LP-018-2840 3 NOVEMBER 1998
CHANGE 2 - 7 MAY 2014
THIS PAGE INTENTIONALLY LEFT BLANK
A CHANGE 2
SS800-AG-MAN-010/P-9290
LIST OF EFFECTIVE PAGES
Date of Original pages is: 3 November 1998
Original 116
Total Number of pages in this publication is 374 consisting of the following:
Page Change Page Change Number Number Number Number
Title Page ............................. CHANGE 2
List of Effective Pages .......... CHANGE 2
Change Record ..................... ORIGINAL i through xxii ......................... CHANGE 2 xxiii through xxiv ................... CHANGE 1
1-1 through 1-10 ................... CHANGE 1
2-1 through 2-2 ..................... CHANGE 1
2-3 through 2-4 ...................... ORIGINAL
2-5 through 2-10 ................... CHANGE 1
2-11 through 2-14 ................. CHANGE 2
2-15 through 2-18 ................. CHANGE 1
3-1 through 3-12 ................... CHANGE 1
3-13 through 3-32 ................. CHANGE 2
3-33 through 3-36 ................. CHANGE 1
3-37 through 3-38 ................. CHANGE 2
4-1 through 4-6 ..................... CHANGE 1
4-7 through 4-8 ..................... CHANGE 2
4-9 through 4-12 ................... CHANGE 1
4-13 through 4-14 ................. CHANGE 2
5-1 through 5-4 ..................... CHANGE 1
5-5 through 5-6 ..................... CHANGE 2
5-7 through 5-8 ..................... CHANGE 1
A-1 through A-2 .................... CHANGE 1
A-3 through A-6 ..................... ORIGINAL
A-7 through A-8 .................... CHANGE 1
A-9 through A-10 ................... ORIGINAL
B-1 through B-6 ..................... ORIGINAL
B-7 through B-12 .................. CHANGE 1
CHANGE 2 B
LIST OF EFFECTIVE PAGES (CONT’D)
Page Change Page Change Number Number Number Number
B-13 through B-16 ................. ORIGINAL
B-17 through B-18 ................ CHANGE 2
B-19 through B-24 ................. ORIGINAL
B-25 through B-32 ................ CHANGE 2
B-33 through B-34 ................. ORIGINAL
B-35 through B-36 ................ CHANGE 1
B-37 through B-38 ................ CHANGE 2
B-39 through B-44 ................. ORIGINAL
C-1 through C-2 ................... CHANGE 1
C-3 through C-6 .................... ORIGINAL
D-1 through D-2 .................... ORIGINAL
E-1 through E-2 .................... CHANGE 1
E-3 through E-8 ..................... ORIGINAL
E-9 through E-10 .................. CHANGE 2
E-11 through E-12 ................. ORIGINAL
F-1 through F-2 .................... CHANGE 1
F-3 through F-4 ..................... ORIGINAL
F-5 through F-16 .................. CHANGE 1
F-17 through F-26 ................ CHANGE 2
F-27 through F-32 ................ CHANGE 1
G-1 through G-6 ................... CHANGE 1
H-1 through H-22 .................. ORIGINAL
H-23 through H-24................ CHANGE 1
H-25 through H-34................. ORIGINAL
I-1 through I-4 ....................... CHANGE 1
I-5 through I-6 ....................... CHANGE 2
I-7 through I-16 ..................... CHANGE 1
J-1 through J-4 ..................... CHANGE 1
J-5 through J-8 ...................... ORIGINAL
K-1 through K-6 ..................... ORIGINAL
K-7 through K-8 .................... CHANGE 1
K-9 through K-10 ................... ORIGINAL
K-11 through K-12 ................ CHANGE 1
K-13 through K-18 ................. ORIGINAL
K-19 through K-20 ................ CHANGE 1
K-21 through K-24 ................. ORIGINAL
K-25 through K-26 ................ CHANGE 1
K-27 through K-28 ................ CHANGE 2
K-29 through K-30 ................ CHANGE 1
K-31 through K-38 ................. ORIGINAL
C CHANGE 2
LIST OF EFFECTIVE PAGES (CONT’D)
Page Change Page Change Number Number Number Number
K-39 through K-40 ................ CHANGE 1
K-41 through K-42 ................. ORIGINAL
K-43 through K-44 ................ CHANGE 1
K-45 through K-46 ................. ORIGINAL
K-47 through K-48 ................ CHANGE 1
K-49 through K-50 ................. ORIGINAL
L-1 through L-2 ..................... CHANGE 2
L-3 through L-8 ...................... ORIGINAL
M-1 through M-4 ................... CHANGE 1
INDEX 1 – INDEX 10 ........... CHANGE 2
INDEX 11 – INDEX 12 ......... CHANGE 1
INDEX 13 – INDEX 14 ......... CHANGE 2
INDEX 15 – INDEX 16 ......... CHANGE 1
INDEX 17 – INDEX 20 ......... CHANGE 2
INDEX 21 – INDEX 22 ......... CHANGE 1
SS800-AG-MAN-010/P-9290
RECORD OF CHANGES
CHANGE
NO.
DATE
TITLE OR BRIEF
DESCRIPTION
ENTERED BY
THIS PAGE INTENTIONALLY LEFT BLANK
i CHANGE 2
TABLE OF CONTENTS
Chapter 1: General Information ............................................................ 1-1
1.1 Introduction ........................................................................................................ 1-1
1.2 Background ....................................................................................................... 1-1
1.2.1 History ......................................................................................................... 1-1
1.2.2 Lessons Learned ......................................................................................... 1-2
1.3 Certification Definitions ...................................................................................... 1-3
1.3.1 Deep Submergence System ....................................................................... 1-3
1.3.2 Deep Submergence System Personnel ...................................................... 1-3
1.3.3 Scope of Certification .................................................................................. 1-3
1.3.4 Certification Program Plan .......................................................................... 1-4
1.3.5 Scope of Certification Notebook .................................................................. 1-4
1.3.6 Surveys ....................................................................................................... 1-4
1.3.7 Objective Quality Evidence ......................................................................... 1-4
1.3.8 Certification Survey Plan ............................................................................. 1-5
1.3.9 Certification Package .................................................................................. 1-5
1.3.10 Certification ............................................................................................... 1-5
1.3.11 Authorization for Manned Use ................................................................... 1-5
1.3.12 Letter of Certification ................................................................................. 1-5
1.3.13 Initial Certification ...................................................................................... 1-6
1.3.14 Sustaining Certification ............................................................................. 1-6
1.3.15 Prohibition Against Manned Operations .................................................... 1-6
1.3.16 Suspension of Certification ........................................................................ 1-6
1.3.17 Letter of Suspension of Certification ......................................................... 1-6
1.3.18 Reinstatement of Certification (Re-Certification) ....................................... 1-7
1.3.19 Functional Audits ....................................................................................... 1-7
1.3.20 Technical Assistance Review (Tech Assist) .............................................. 1-7
1.4 Principal Participants ......................................................................................... 1-7
1.5 Deep Submergence Systems Oversight Board (DSSOB) ................................. 1-8
1.6 Basis for Initial DSS Certification ....................................................................... 1-9
1.7 DSS Certification Process ................................................................................. 1-9
1.8 Documentation Hierarchy .................................................................................. 1-9
CHANGE 2 ii
Chapter 2: The System Certification Process ..................................... 2-1
2.1 Introduction ........................................................................................................ 2-1
2.2 Application for Initial Certification ....................................................................... 2-1
2.2.1 Plan of Action and Milestones ..................................................................... 2-2
2.2.2 System Safety Program Plan ...................................................................... 2-2
2.2.3 Proposed Certification Program Plan (CPP) ............................................... 2-6
2.2.4 Proposed Scope of Certification .................................................................. 2-7
2.2.4.1 Scope of Certification ............................................................................ 2-8
2.2.4.2 Scope of Certification Notebook ............................................................ 2-9
2.2.4.3 Memorandum of Understanding ............................................................ 2-9
2.2.5 Certification Survey Plan ........................................................................... 2-10
2.3 Approval of System SOC Documents .............................................................. 2-10
2.4 Departure From Specification .......................................................................... 2-10
2.4.1 Processing Departures From Specification ............................................... 2-11
2.4.2 DFS Administrative Control and Records .................................................. 2-12
2.5 Technical Certification Requirements .............................................................. 2-14
2.6 Certification Package ....................................................................................... 2-14
2.7 Internal Certification Survey ............................................................................. 2-14
2.8 SCA Surveys ................................................................................................... 2-14
2.9 Operational Demonstration .............................................................................. 2-15
2.10 Issuance of Certification ................................................................................ 2-15
2.11 Sustaining Certification .................................................................................. 2-16
2.12 Modifications .................................................................................................. 2-16
2.13 Suspension of Certification ............................................................................ 2-16
2.14 Functional Audits ........................................................................................... 2-17
2.15 Process For Changing The Manual ............................................................... 2-17
2.15.1 Change Submittal .................................................................................... 2-17
2.15.2 Change Status Accounting ...................................................................... 2-17
2.15.3 Manual Distribution ................................................................................. 2-18
Chapter 3: Requirements for Certification ........................................... 3-1
3.1 Introduction ........................................................................................................ 3-1
3.2 Design and Configuration Management ............................................................ 3-1
3.2.1 Summary Description of the DSS ................................................................ 3-2 iii CHANGE 2
3.2.2 Design Parameters ..................................................................................... 3-2
3.2.3 Subsystem Descriptions .............................................................................. 3-3
3.2.4 Design Analysis and Calculations ............................................................... 3-4
3.2.4.1 Design Calculations ............................................................................... 3-4
3.2.4.2 Stress Analysis ...................................................................................... 3-5
3.2.5 Drawings ..................................................................................................... 3-6
3.2.6 Operability and Maintainability .................................................................... 3-7
3.2.7 Justification of Materials .............................................................................. 3-7
3.2.8 Toxic and Flammable Materials .................................................................. 3-7
3.2.9 Atmosphere Analysis .................................................................................. 3-8
3.2.10 Vacuum in Manned and Floodable Spaces ............................................... 3-9
3.2.11 System Safety Program ............................................................................ 3-9
3.3 Material Control ................................................................................................. 3-9
3.3.1 Definition of Material SOC Control Divisions ............................................. 3-10
3.3.1.1 Material Control Division A .................................................................. 3-10
3.3.1.2 Material Control Division B .................................................................. 3-10
3.3.1.3 Material Control Division C .................................................................. 3-11
3.3.2 Material Procurement ................................................................................ 3-11
3.3.3 Material Marking and Traceability ............................................................. 3-11
3.3.3.1 MCD A Material Marking and Traceability ........................................... 3-11
3.3.3.2 MCD B Material Marking and Traceability ........................................... 3-12
3.3.3.3 MCD C Material Marking and Traceability ........................................... 3-12
3.3.4 Receipt Inspection ..................................................................................... 3-12
3.3.4.1 MCD A Receipt Inspection .................................................................. 3-12
3.3.4.2 MCD B Receipt Inspection .................................................................. 3-13
3.3.4.3 MCD C Receipt Inspection .................................................................. 3-14
3.3.5 Verification of Completion of Required Testing ......................................... 3-14
3.3.6 Installation Verification .............................................................................. 3-14
3.3.6.1 Installation Verification Requirement for MCD A, B and C Material ..... 3-14
3.3.7 Material Transfer ....................................................................................... 3-14
3.3.7.1 Material Certification Maintained ......................................................... 3-14
3.3.7.2 Material Certification Lapsed (DSS/Ship In Inactivation Availability) ... 3-15
3.3.7.3 Material Recertification Required ......................................................... 3-17
3.4 Fabrication Process Control ............................................................................ 3-17
CHANGE 2 iv
3.4.1 Work Procedures ...................................................................................... 3-18
3.4.2 Welding Procedures .................................................................................. 3-18
3.4.3 Brazing Procedures ................................................................................... 3-19
3.4.4 Pipe Bending Procedures ......................................................................... 3-19
3.4.5 Cleaning Procedures ................................................................................. 3-19
3.5 Quality Assurance............................................................................................ 3-20
3.5.1 Design and Drawing Control ..................................................................... 3-21
3.5.2 Fabrication and Manufacturing Control ..................................................... 3-21
3.5.3 Testing and Inspection Control .................................................................. 3-22
3.5.4 Calibration ................................................................................................. 3-22
3.5.5 Audits ........................................................................................................ 3-23
3.6 Test Performance ............................................................................................ 3-23
3.6.1 Development Tests ................................................................................... 3-23
3.6.2 Quality Assurance Tests ........................................................................... 3-24
3.6.3 System Operation, Integration and Proof Tests ........................................ 3-24
3.6.3.1 Proof, Builder's Pre-Trial or Pre-Sea Trial Tests .................................. 3-24
3.6.3.2 Structural Testing ................................................................................ 3-24
3.6.3.3 Fluid System Testing ........................................................................... 3-24
3.6.3.4 Cleanliness Testing ............................................................................. 3-25
3.6.3.5 Electrical Testing ................................................................................. 3-25
3.6.3.6 Inclination Testing ................................................................................ 3-27
3.6.3.7 Access to Vital Equipment ................................................................... 3-27
3.7 Operational Demonstration and Trials Stage (Builder’s Trials or Sea Trials) ... 3-27
3.7.1 Certification/Re-Certification Dive ............................................................. 3-30
3.7.2 Emergency Surfacing ................................................................................ 3-31
3.7.3 Test Dive Deficiencies ............................................................................... 3-31
3.7.4 Manned Use of One Atmosphere DSSs in Pursuit of Certification (or Reinstatement of Certification) ............................................................................ 3-32
3.8 Operating and Emergency/Casualty Procedures ............................................. 3-33
3.8.1 Operating Manual ...................................................................................... 3-34
3.9 Maintenance Procedures ................................................................................. 3-35
3.9.1 Maintenance Requirement Card ............................................................... 3-35
3.9.2 SOC Planned Maintenance Documentation .............................................. 3-36
3.10 Record Retention Requirements ................................................................... 3-37 v CHANGE 2
Chapter 4: On-Site Certification Survey ............................................... 4-1
4.1 Introduction ........................................................................................................ 4-1
4.2 Types of Surveys ............................................................................................... 4-1
4.2.1 Initial Certification Survey ............................................................................ 4-1
4.2.2 Sustaining Certification Survey ................................................................... 4-1
4.2.2.1 Sustaining Certification Survey Periodicity ............................................ 4-2
4.2.3 Reinstatement of Certification Survey ......................................................... 4-2
4.2.4 End-Of-Availability Survey ........................................................................... 4-2
4.2.5 Internal Surveys .......................................................................................... 4-2
4.2.5.1 Internal Survey Periodicity ..................................................................... 4-3
4.3 Preparation For Survey ...................................................................................... 4-3
4.3.1 Scheduling of SCA Surveys ........................................................................ 4-3
4.3.1.1 Work Completion Requirements ............................................................ 4-3
4.3.1.2 Maintenance Requirement Status ......................................................... 4-4
4.3.1.3 Testing Procedure Status ...................................................................... 4-4
4.3.1.4 Departure Status ................................................................................... 4-4
4.3.1.5 Certification Survey Plan ....................................................................... 4-6
4.3.1.6 Personnel .............................................................................................. 4-6
4.4 Survey Team Personnel .................................................................................... 4-6
4.5 Certification Survey Cards ................................................................................. 4-6
4.6 Survey Guidelines ............................................................................................. 4-8
4.7 Operational Demonstration ................................................................................ 4-8
Chapter 5: Sustaining Certification ...................................................... 5-1
5.1 Introduction ........................................................................................................ 5-1
5.2 Qualification Policy ............................................................................................ 5-1
5.3 Responsibilities .................................................................................................. 5-1
5.3.1 Program Manager and SCA Responsibilities .............................................. 5-2
5.3.2 Sustaining Activity Responsibilities ............................................................. 5-2
5.3.3 Industrial Facility/Supervising Authority Responsibilities ............................. 5-3
5.4 Sustaining Certification Control Procedures ...................................................... 5-4
5.4.1 Re-entry Control .......................................................................................... 5-4
5.4.2 Work Procedures ........................................................................................ 5-4
5.4.3 Planned Maintenance Procedures .............................................................. 5-5
CHANGE 2 vi
5.4.4 Temporary Modifications ............................................................................. 5-6
5.5 Test and Trials Stage ......................................................................................... 5-7
5.6 Sustaining Certification Survey .......................................................................... 5-7
5.7 Operating Limits ................................................................................................ 5-7
5.8 Continuation of Certification ............................................................................... 5-7
APPENDIX A: Categorization of SOC Materials and Components ... A-1
A.1 INTRODUCTION ............................................................................................... A-1 A.2 CATEGORY 1 MATERIALS .............................................................................. A-1 A.3 CATEGORY 2 MATERIALS .............................................................................. A-4
A.3.1 Structural Materials ..................................................................................... A-4 A.4 CATEGORY 3 MATERIALS .............................................................................. A-5
A.4.1 Pressure Hull/Vessel and Other Structural Materials .................................. A-6 A.5 VIEWING WINDOW MATERIALS ..................................................................... A-7 A.6 FLOTATION MATERIALS ................................................................................. A-7 A.7 HYDRAULIC SYSTEM FLUIDS ........................................................................ A-8 A.8 ELECTRICAL/ELECTRONIC SYSTEM MATERIALS ....................................... A-8
A.9 FAIRING AND MISCELLANEOUS NONSTRUCTURAL MATERIALS .............. A-9
A.10 LIFE SUPPORT SYSTEM MATERIALS ......................................................... A-9
APPENDIX B: Design Factors for Deep Submergence Systems ...... B-1
B.1 INTRODUCTION ............................................................................................... B-1 B.2 STRUCTURAL DESIGN CONSIDERATIONS .................................................. B-1
B.2.1 Fatigue ........................................................................................................ B-2 B.2.2 Fracture Toughness .................................................................................... B-3
B.3 DESIGN STRENGTH PARAMETERS OF EXTERNALLY LOADED PRESSURE
HULLS/VESSELS, HARD STRUCTURES ............................................................... B-4
B.3.1 Inelastic Stability ......................................................................................... B-5 B.3.2 Elastic Stability ............................................................................................ B-5 B.3.3 Stress Analysis ........................................................................................... B-5 B.3.4 Verification of Calculated Collapse Pressure .............................................. B-6
B.3.4.1 Testing Procedures/Test Instrumentation ............................................. B-7 B.3.5 Verification of As-Built Strength (Proof Test) .............................................. B-7
B.3.5.1 Proof Testing Procedures/Instrumentation ............................................ B-8 vii CHANGE 2
B.4 DESIGN STRENGTH PARAMETERS OF INTERNALLY LOADED PRESSURE
VESSELS/HARD STRUCTURES ............................................................................. B-8
B.4.1 Stress Analysis ........................................................................................... B-9 B.4.2 Verification of Calculated Design Operating Pressure ................................ B-9
B.4.2.1 Testing Procedures/Test Instrumentation ........................................... B-10
B.5 MISCELLANEOUS PRESSURE VESSELS AND HARD STRUCTURES ....... B-10
B.6 DESIGN OF PENETRATIONS INTO AND THROUGH THE PRESSURE HULL
ENVELOPE ............................................................................................................ B-10
B.6.1 Piping Penetrations ................................................................................... B-11 B.6.2 Electrical Penetrations .............................................................................. B-11 B.6.3 Viewports .................................................................................................. B-11 B.6.4 Hatches/Closures ..................................................................................... B-12 B.6.5 Seals ......................................................................................................... B-12
B.7 MATERIAL SELECTION ................................................................................. B-13 B.7.1 Corrosion Resistance ............................................................................... B-13
B.7.1.1 Electrolytic Corrosion .......................................................................... B-13 B.7.1.2 Stress Corrosion ................................................................................. B-14
B.7.2 Toxicity...................................................................................................... B-14 B.7.3 Flammability .............................................................................................. B-14
B.8 FABRICATION ................................................................................................ B-15 B.8.1 Fabrication, Welding and Brazing ............................................................. B-15 B.8.2 Threaded Fasteners ................................................................................. B-15 B.8.3 Locking Devices for Mechanical Fasteners............................................... B-16 B.8.4 Protective Finishes ................................................................................... B-16
B.9 NAVAL ARCHITECTURE DESIGN ................................................................. B-16 B.9.1 Stability and Equilibrium ........................................................................... B-16
B.9.1.1 Inclining Experiments and Trim Dives for Submersibles and Submerged Habitats ............................................................................................................ B-17
B.9.2 Additional Conditions ................................................................................ B-18 B.10 DESIGN OF PIPING SYSTEMS ................................................................... B-18
B.10.1 Piping System Flexibility ......................................................................... B-19 B.10.2 Piping Systems Component Structural Design Consideration ................ B-20
B.10.2.1 Categories of Stress .......................................................................... B-21 B.10.3 Design of Piping Systems and Components ........................................... B-22 B.10.4 Hoses and Umbilical (Deck Shelters, Etc.) ............................................. B-23
CHANGE 2 viii
B.10.5 Special Considerations for Oxygen Systems .......................................... B-24 B.10.6 Piping System Design Verification .......................................................... B-25 B.10.7 Relief Valves ........................................................................................... B-25
B.11 DESIGN OF ELECTRICAL SYSTEMS ......................................................... B-25 B.11.1 Power Requirements .............................................................................. B-25
B.11.1.1 Batteries ............................................................................................ B-25 B.11.2 Wiring Methods ....................................................................................... B-25 B.11.3 Ungrounded System ............................................................................... B-27 B.11.4 Fault Current Protection .......................................................................... B-27 B.11.5 Electrical Shock Hazards ........................................................................ B-27 B.11.6 Insulation Considerations ........................................................................ B-28 B.11.7 Electrical Connectors and Penetrators ................................................... B-28
B.11.7.1 Electrical Connectors ........................................................................ B-28 B.11.7.2 Electrical Penetrators ........................................................................ B-29 B.11.7.3 Electrical Hull Penetrator Protection .................................................. B-29
B.11.8 Lighting Systems .................................................................................... B-29 B.11.9 Instrumentation ....................................................................................... B-29 B.11.10 Communication Systems ...................................................................... B-30 B.11.11 Heating Systems ................................................................................... B-30
B.12 PROPULSION SYSTEM ............................................................................... B-30 B.13 HUMAN ENGINEERING ............................................................................... B-30
B.13.1 Sound Levels .......................................................................................... B-30 B.13.2 Thermal Control ...................................................................................... B-31
B.14 LIFE SUPPORT SYSTEM ............................................................................. B-31 B.14.1 Life Support System Design Specification .............................................. B-32
B.14.1.1 Closed Circuit Life Support Design Specification .............................. B-32 B.14.1.2 Open Circuit Life Support Design Specification................................. B-33
B.14.2 Breathing Gas System General Design Considerations ......................... B-33 B.14.3 Breathing Gas Equipment Considerations .............................................. B-35
B.14.3.1 Breathing Gas Compressors ............................................................. B-35 B.14.3.2 Stored Breathing Gas Supply ............................................................ B-36 B.14.3.3 Carbon Dioxide Removal .................................................................. B-37 B.14.3.4 Breathing Gas Relief Valves ............................................................. B-38 B.14.3.5 Instrumentation ................................................................................. B-38 ix CHANGE 2
B.15 OPERATIONAL CONTROL SYSTEMS ........................................................ B-40 B.15.1 Control Power Supply ............................................................................. B-40 B.15.2 Control Actuators .................................................................................... B-41
B.16 FIRE PROTECTION SYSTEM ...................................................................... B-42 B.17 NAVIGATION SYSTEMS .............................................................................. B-42 B.18 FOOD AND WATER SUPPLY ...................................................................... B-42 B.19 WASTE SYSTEMS ....................................................................................... B-42 B.20 RESCUE/RETRIEVAL SYSTEMS ................................................................ B-43 B.21 HANDLING SYSTEMS .................................................................................. B-43
APPENDIX C: Testing Parameters for Permanently or Temporarily Mounted External Implodable and Explodable Items C-1
C.1 INTRODUCTION .............................................................................................. C-1 C.2 DEFINITIONS .................................................................................................. C-3
C.3 DETERMINATION OF WHETHER OR NOT AN EXPLODABLE OR
IMPLODABLE IS CRITICAL OR NONCRITICAL .................................................... C-4
C.4 TESTING REQUIRED FOR NONCRITICAL IMPLODABLE/EXPLODABLE
VOLUMES ............................................................................................................... C-5
C.5 TESTING NECESSARY FOR CRITICAL IMPLODABLE VOLUMES .............. C-5
C.6 TESTING NECESSARY FOR CRITICAL EXPLODABLE VOLUMES .............. C-6
C.7 TEST RECORD OQE REQUIRED FOR CRITICAL IMPLODABLE AND
EXPLODABLE VOLUMES ...................................................................................... C-6
APPENDIX D: Testing Parameters for Explodable Items due to Decompression ............................................................. D-1
D.1 INTRODUCTION .............................................................................................. D-1 D.2 DESCRIPTION AND ORIENTATION ............................................................... D-1 D.3 TEST PROCEDURE ........................................................................................ D-1 D.4 POROUS OR VENTED COMPONENTS ......................................................... D-2
APPENDIX E: DSS Breathing Gas and Atmospheric Requirements E-1
E.1 INTRODUCTION ............................................................................................... E-1 E.2 BREATHING GAS CONSUMPTION ................................................................. E-1 E.3 SURFACE BREATHING AIR REQUIREMENTS .............................................. E-2
E.3.1 Surface Oxygen Requirements ................................................................... E-3 E.3.2 Carbon Dioxide Production and Toxic Effects ............................................. E-5
CHANGE 2 x
E.3.3 Carbon Dioxide Removal ............................................................................ E-6 E.3.4 Carbon Dioxide Levels ................................................................................ E-7
E.4 ATMOSPHERIC CONTAMINANTS .................................................................. E-8 E.5 CARBON MONOXIDE LEVELS ........................................................................ E-8 E.6 DECOMPRESSION CONSIDERATIONS ......................................................... E-8 E.7 BREATHING GAS ALGORITHMS .................................................................... E-9
E.7.1 Conversion Factors ..................................................................................... E-9 E.7.2 Steady Oxygen Production and Removal Process ................................... E-10 E.7.3 Carbon Dioxide Buildup With No Removal Process ................................. E-10 E.7.4 Steady Contaminant Introduction And Removal Process ......................... E-10 E.7.5 No Contaminant Introduction But Constant Removal Process .................. E-11 E.7.6 Expected Contamination From a Volatile Solvent ..................................... E-11
APPENDIX F: General Guidelines for Control of Atmospheric Contaminants in Manned DSS ..................................... F-1
F.1 INTRODUCTION ............................................................................................... F-1
F.2 DSS FACTORS EFFECTING ATMOSPHERE CONTROL ............................... F-1
F.2.1 Mission Duration ......................................................................................... F-1 F.2.2 Atmospheric Pressure ................................................................................. F-2 F.2.3 Material Density .......................................................................................... F-3 F.2.4 Atmospheric Temperature ........................................................................... F-3 F.2.5 Atmospheric Control Equipment ................................................................. F-3 F.2.6 Cleanliness ................................................................................................. F-3
F.3 CONTROLLING AND MONITORING CONTAMINANTS .................................. F-3 F.3.1 Background ................................................................................................. F-3 F.3.2 Controlling Personnel Contaminants ........................................................... F-4 F.3.3 Controlling and Monitoring Breathing Gas Purity ........................................ F-5 F.3.4 Controlling and Monitoring Gaseous Contaminants in Breathing Gas Systems ................................................................................................................ F-6 F.3.5 Monitoring Gaseous Contaminants in the DSS ........................................... F-7
F.3.5.1 Unmanned DSS Atmospheric Testing ................................................... F-7 F.3.5.2 Manned DSS Atmospheric Testing ....................................................... F-9
F.4 CONTROLLING AND MONITORING NON-METALLIC MATERIAL ................. F-9
F.4.1 Non-Metallic Material List .......................................................................... F-10 F.4.2 Non-Metallic Material Off-Gas Testing ...................................................... F-10 xi CHANGE 2
F.4.3 Non-Metallic Material Off-Gas Test Report ............................................... F-11 F.4.4 Non-Metallic Material Qualification ............................................................ F-12
F.4.4.1 Initial Qualification Process ................................................................. F-13 F.4.4.2 Vendor Qualified Materials .................................................................. F-13 F.4.4.3 Lot Sampled Materials ......................................................................... F-14
F.5 IDENTIFYING CONTAMINANTS .................................................................... F-14 F.5.1 Physical Nature of Contaminants .............................................................. F-15 F.5.2 Medical Effects of Contaminants ............................................................... F-16 F.5.3 Target Compound Lists ............................................................................. F-18 F.5.4 Target Compound List Approval ............................................................... F-19 F.5.5 Breathing Gas System and Manned Space Off-Gas Test Report ............. F-20
F.6 EVALUATING OFF-GAS AND ATMOSPHERIC ANALYSIS RESULTS ......... F-20
F.7 LABORATORIES PERFORMING ANALYSES ............................................... F-21 F.8 FLAMMABILITY TESTING .............................................................................. F-28
F.8.1 Flammability Test Equipment .................................................................... F-29 F.8.2 Material Sample Test Documentation Requirements ................................ F-30 F.8.3 Alternate Procedure for Complete Assemblies ......................................... F-30
APPENDIX G: General Guidelines for Cleaning Breathing Gas Systems ......................................................................... G-1
G.1 INTRODUCTION ............................................................................................. G-1 G.2 REFERENCES ................................................................................................ G-1
G.2.1 Military Standards ...................................................................................... G-1 G.2.2 Commercial Specifications ........................................................................ G-1 G.2.3 Other ......................................................................................................... G-1
G.3 SYSTEM AND COMPONENT CLEANLINESS CONCERNS .......................... G-2
G.4 CLEANING METHODS AND MATERIALS ...................................................... G-3
G.4.1 Approved Cleaning Agents ........................................................................ G-3 G.4.2 Cleaning Processes .................................................................................. G-3 G.4.3 Commercial Oxygen Cleaning Specifications ............................................ G-4
G.5 POST CLEANING GAS ANALYSIS ................................................................. G-4 G.6 MAINTAINING THE SYSTEM IN A CLEAN CONDITION ................................ G-4
G.6.1 Providing a Clean Gas .............................................................................. G-4 G.6.2 Maintaining Cleanliness During Maintenance and Repairs ....................... G-5
CHANGE 2 xii
APPENDIX H: Design Guidelines for DSS Handling Systems .......... H-1
H.1 INTRODUCTION .............................................................................................. H-1 H.2 DEFINITIONS .................................................................................................. H-1 H.3 DESIGN CRITERIA AND GUIDELINES .......................................................... H-2
H.3.1 Equipment Design Criteria ......................................................................... H-2 H.3.1.1 Types of Loads .................................................................................... H-3 H.3.1.2 Environmental Considerations ............................................................. H-3
H.3.1.2.1 Sea State ....................................................................................... H-4 H.3.1.2.2 Air and Water Temperature ........................................................... H-4 H.3.1.2.3 Precipitation ................................................................................... H-4 H.3.1.2.4 Wind Velocity ................................................................................. H-4 H.3.1.2.5 Ocean Currents ............................................................................. H-4 H.3.1.2.6 Corrosion ....................................................................................... H-5
H.3.1.3 System Considerations ........................................................................ H-5 H.3.2 Human Engineering and Operational Design Considerations .................... H-5
H.3.2.1 Emergency Conditions and Reduced Operating Capability ................. H-6 H.4 DESIGN AND TESTING REQUIREMENTS .................................................... H-6
H.4.1 Load Bearing Component Requirements .................................................. H-7 H.4.1.1 Load Bearing Component Design ........................................................ H-7
H.4.1.1.1 Design Factors of Safety ............................................................... H-7 H.4.1.2 Submission of Drawings and Calculations for Load Bearing Components .......................................................................................................................... H-9 H.4.1.3 System Testing for Load Bearing Components.................................. H-10
H.4.2 Hydraulic and Pneumatic System Requirements ..................................... H-14 H.4.2.1 System Design ................................................................................... H-14 H.4.2.2 System Testing .................................................................................. H-15
H.4.2.2.1 Hydrostatic Testing Requirements ............................................... H-15 H.4.2.2.2 System Tightness Testing Requirements .................................... H-16 H.4.2.2.3 Maintenance Testing Requirements ............................................ H-17
H.4.2.3 Relief and Counter-Balance Valves ................................................... H-18 H.4.2.4 Cleaning, Flushing, and Preservation ................................................ H-19
H.4.3 Electrical Power Requirements and Controls .......................................... H-19 H.4.3.1 System Design ................................................................................... H-19 H.4.3.2 System Testing .................................................................................. H-20 xiii CHANGE 2
H.4.3.2.1 Maintenance Testing Requirements ............................................ H-20 H.5 CERTIFICATION REQUIREMENTS .............................................................. H-21
H.5.1 Initial and Sustaining Certification Requirements .................................... H-21 H.5.2 Certification Surveys ................................................................................ H-25 H.5.3 Suspension of Certification ...................................................................... H-26
APPENDIX I: Re-Entry Control Procedures ........................................ I-1
I.1 INTRODUCTION ................................................................................................. I-1 I.1.1 Work Procedures .......................................................................................... I-1
I.2 RE-ENTRY CONTROL IMPLEMENTATION RESPONSIBILITIES ..................... I-2
I.3 REC CLOSEOUT ................................................................................................ I-3
I.3.1 REC Closeout via Deep Dive Test Forms or DFSs ....................................... I-3 I.3.2 REC Closeout with Incomplete Work ............................................................ I-3 I.3.3 Deep Dive DFS and Test Form Depth Restrictions ....................................... I-4
I.4 RE-ENTRY CONTROL FORM AND INSTRUCTION MATRIX ............................ I-5 I.5 RE-ENTRY CONTROL LOG ............................................................................... I-5
I.6 RE-ENTRY CONTROL RECORD RETENTION REQUIREMENTS .................... I-6
I.7 EXCEPTIONS TO RE-ENTRY CONTROL .......................................................... I-6
APPENDIX J: DSS Pipe and Piping Components Pressure Testing Requirements ................................................................. J-1
J.1 INTRODUCTION ............................................................................................... J-1 J.2 RESTRICTIONS ................................................................................................ J-1 J.3 DEFINITIONS .................................................................................................... J-1 J.4 TEST PRESSURE TOLERANCES .................................................................... J-3 J.5 TEST PRESSURE DURATION ......................................................................... J-3 J.6 HYDROSTATIC TESTING REQUIREMENTS ................................................... J-3 J.7 JOINT TIGHTNESS TESTING REQUIREMENTS ............................................. J-4 J.8 SEAT TIGHTNESS TESTING REQUIREMENTS .............................................. J-5 J.9 PRESSURE DROP TESTING REQUIREMENTS ............................................. J-6 J.10 OBJECTIVE QUALITY EVIDENCE ................................................................. J-6
APPENDIX K: Certification Survey Plan ............................................. K-1
K.1 INTRODUCTION ............................................................................................... K-1 K.2 CERTIFICATION SURVEY PLAN DEVELOPMENT ......................................... K-1
CHANGE 2 xiv
K.2.1 Proposed Certification Survey Plan ............................................................ K-2 K.2.2 Certification Survey Plan Review ................................................................ K-2
K.3 CERTIFICATION SURVEY PLAN FORMAT AND CONTENT ..........................
This is the start of the file's text. The full file is on GovTribe.