SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
ADDITIONAL INFORMATION
Questions for N61340-11-R-0039
Question 0007:
Is the contractor required to submit the entire Volume 3, Past Performance (1 original paper, 4 paper copies, and 1CD) IAW Section L and M requirements within two (2) weeks after RFP release date of 16 March 2011 (thus submission of Past Performance Volume on 30 March 2011)? If not, then what information is required to be sent on this date? Is the verbiage in the RFP that states “it is requested” and “should be submitted” a specific “requirement” and “shall be submitted” or just a request that it should be? Is the information that is being “requested” that “should” be submitted referencing the MS Word chart in Section L, Part B, Para 3.6 – Past Performance Data Requirements – and that this is the only information assumed to be due with the two weeks of the RFP release date? What is the reference to the Past Performance information submitted as per paragraph 4.1 and 4.2 – what Section or Part is being referenced to 4.1 and 4.2?
Answer 0007:
If an offeror chooses to submit Volume 3 two weeks after the RFP release date, it should be the entire Volume 3 (1 Paper Original, 4 Paper Copies/1 CD), not just one copy. If an offeror does not have any changes to Volume 3, which was submitted early, offerors are not required to submit another Volume 3 with its final proposal submission. If an offeror has additional information that was not in the submitted Volume 3, please resubmit the entire volume with its final proposal submission.
Question 0008:
What is the tenure of the incumbent workforce covered by the CBA?
Answer 0008:
Information is not available and will not be requested by the Government as we consider it to be proprietary to the incumbent.
Question 0009:
Please confirm that Attachment 5 contains the most up-to-date CBA in effect between the incumbent and the union.
Answer 0009:
Attached via amendment 03 is the latest CBA (Attachment 5) as of 18 January 2011.
Question 0010:
1. What type of ATE is the Electronics Technician III required to support (i.e. CASS, RADCOM, HTS, etc.).
2. Is the Electronics Technician III required to support multiple Navy work centers (i.e. 640, 69A/B, etc.)?
Answer 0010:
Reference: RFP SOW Chg 2 to paragraphs 4.4.17.9 & 2.2, RFP Amendment 003.
1. Currently ATE supports: F/A-18 Mission Computers Test Set, F/A-18 Intercommunications Test Set, F/A-18 Flight Control Sensor Panel Test Set, F/A-18 Up Front Panel Test Set and the APS-80 RADAR test set.
2. Yes. When there is relatively low throughput requirements in work center X5A (Automated Test Equipment), the Government reserves the right to assign these workers to augment the Avionics/Armament (AV/ARM) Division work centers to augment high back log.
Question 0011:
1. Are contractor personnel required to perform functions as NAMP program managers as outlined in COMNAVAIRFORINST 4790.2, Chapters 3, 7 and 10?
2. If, so what programs are to be managed by contractor personnel or are there Navy programs and identical contractor managed programs?
Answer 0011:
Reference: COMNAVFORINST 4790.2, Chapters 3, 7, 10; RFP SOW Chg 2 to paragraph 4.4.17.1.b, RFP Amendment 003
1. Yes
2. The Contractor shall be the sole program manager for the following NAMP programs: Aviator’s Breathing Oxygen (ABO), Fuel Surveillance, HAZMAT, Aircrew Life Support Systems (ALSS), Battery Safety and Aircraft Tire and Wheel (I-Level). The following areas currently have dual (separate Navy and separate contractor) NAMP management: QA Audit, Aircraft Confined Space, Tool Control, Tire and Wheel (O-level), FOD, and Explosives Handling (for ALSS).
Question 0012:
1. Does “maintenance support on assigned non-IMRL within established capabilities” include Material Handling Equipment (MHE)?
2. What does non-IMRL include?
3. Is MHE support required?
Answer 0012:
Reference: RFP SOW Chg 2 to paragraph 4.4.17.13.a, RFP Amendment 003
1. Yes
2. Regarding paragraph 4.4.17.13.a, non-IMRL refers to FRCMA-PAX’s two Command-owned, electric 6K forklifts.
3. Yes, contractor maintenance support is limited to performing Preventive/Planned Maintenance for the two Command 6K forklifts utilizing OEM manuals.
Question 0013:
1. What type of WHE is involved: (i.e. mobile cranes that fall under NAVAIR 00-80T-119 or bridge cranes that fall under NAVFAC P307 or both?
Answer 0013:
Reference: RFP SOW Chg 2 to paragraphs 2.2 & 4.3.5.17.d, RFP Amendment 003; RFP SOW Chg 2 paragraph 4.6 (SEWS), RFP Amendment 003.
1. It applied to Mobile cranes: A/S32M-14; A/S32M-19; A/S32M-24; A/S32K-1D/E; A/S 32M-20 AND A/S32A-44 which are covered in the NA-00-80T-119 and the two 6k Command forklifts. Building 301 and 177 have bridge cranes which fall under NAVFAC P-307 and are not the contractor’s maintenance responsibility.
Question 0014:
1. It is requested that the Government query the International Association of Machinists and Aerospace Workers, District 4, Local Lodge 4, at PAX River to provide the number employees that are certified as CDI/CDQAR.
Answer 0014:
Information is not available and will not be requested by the Government as we consider it to be proprietary to the incumbent.
Question 0015:
1. Is employee drug testing mandated as a requirement for this proposal?
Answer 0015:
No. Drug testing is not a requirement of the solicitation. The successful offeror will be required to comply with the terms of FAR 52.223-7 Drug-Free Workplace and DFARS 252.223-7004 Drug-Free Work Force.
Question 16:
1. It is requested that the Government query the International Association of Machinists and Aerospace Workers, District 4, Local Lodge 4, at PAX River to provide a breakdown of employees that are currently under the Standard Medical Plan for “Family Coverage” and those covered under the Standard Medical Plan for “Employee Only or Employee Plus One Dependent”.
Answer 0016:
Information is not available and will not be requested by the Government as we consider it to be proprietary to the incumbent.
Question 0017:
1. Are contractor personnel required to perform functions as NAMP program managers as outlined in COMNAVAIRFORINST 4790.2, Chapters 3, 7 and 10?
2. If, so what programs are to be managed by contractor personnel or are there Navy programs and identical contractor managed programs?
Answer 0017 Reference: COMNAVFORINST 4790.2, Chapters 3, 7, 10; RFP SOW Chg 2 to paragraph 4.4.17.1.b, RFP Amendment 003
1. Yes
2. The Contractor shall be the sole program manager for the following NAMP programs: Aviator’s Breathing Oxygen (ABO), Fuel Surveillance, HAZMAT, Aircrew Life Support Systems (ALSS), Battery Safety and Aircraft Tire and Wheel (I-Level). The following areas currently have dual (separate Navy and separate contractor) NAMP management: QA Audit, Aircraft Confined Space, Tool Control, Tire and Wheel (O-level), FOD, and Explosives Handling (for ALSS). Duplicate same as 011, with wrong reference.
Question 18:
1. What type of WHE is involved: (i.e. mobile cranes that fall under NAVAIR 00-80T-119 or bridge cranes that fall under NAVFAC P307 or both?
2. What WHE will the Contractor’s WHE Certifying Official be required to certify?
Answer 0018:
Reference: RFP SOW Chg 2 to paragraph 2.2 & 4.3.5.17.d, RFP Amendment 003; RFP Amendment 003; RFP SOW Chg 2 paragraph 4.6 (SEWS), RFP Amendment 003.
1. It applied to Mobile cranes: A/S32M-14; A/S32M-19; A/S32M-24; A/S32K-1D/E; A/S 32M-20 AND A/S32A-44 which are covered in the NA-00-80T-119 and the two 6k Command forklifts. Building 301 and 177 have bridge cranes which fall under NAVFAC P-307 and are not the contractor’s maintenance responsibility.
2. Mobile cranes: A/S32M-14; A/S32M-19; A/S32M-24; A/S32K-1D/E; A/S 32M-20 AND A/S32A-44 which are covered in the NA-80T-119. The CMSS contractor Weight Handling Equipment Certifying Official inspects WHE and provides the test results to the Maintenance Officer for certification.
Question 0019:
The collective bargaining agreement associated with the RFP breaks down the vacation benefits as follows:
1. Less than 5 years or less vested service
2. More than 5 years, but less than 14 years vested service
3. More than 14 years vested service
What is the number or percentage of incumbent employees in each category?
Answer 0019:
Information is not available and will not be requested by the Government as we consider it to be proprietary to the incumbent. Neither the contractor nor any subcontractor under the contract shall pay any service employee performing any of the contract work, regardless of whether such employee was employed under the predecessor contract, less than the wages and fringe benefits provided for in the collective bargaining agreement, to which such employee would have been entitled if employed under the predecessor contract. See FAR clause 52.222-41(f), "Service Contract Act of 1965 (Nov 2007)."
Question 0020:
Is the 130 hours of Premium time per year expected to be a total included for each CBA covered Full time employee, or is the 130 hour total expected to be divided across all CBA Full Time employees equally?
Answer 0020:
Reference: RFP SOW Chg 2 to paragraph 4.5 & 4.5.5, RFP Amendment 003
1. The allowance of Premium Time is divided across all employees, but not equally. The time applies to any on-site contractor labor category the COR authorizes and tasks to provide premium labor. A labor category, such as Aircraft Mechanic, may be tasked with most premium labor hours, while another category, such as Supply Clerk, may not be tasked with any premium labor hours. The quantity of actual premium labor hours to be used for each category is unknown at this time.
Question 0021:
Will the incumbent (DynCorp) be paying out to each employee their unused vested vacation when DynCorp’s Prime Contract terminates, thus resulting in each employee starting with zero vested vacation under the successor contractor?
Or, Will the unused vested vacation liability transfer over to the successor contractor? If so, will DynCorp be required to compensate the successor contractor for the cost of the unused vested vacation liability?
Answer 0021:
Neither the contractor nor any subcontractor under the contract shall pay any service employee performing any of the contract work, regardless of whether such employee was employed under the predecessor contract, less than the wages and fringe benefits provided for in the collective bargaining agreement, to which such employee would have been entitled if employed under the predecessor contract. See FAR clause 52.222-41(f), "Service Contract Act of 1965 (Nov 2007)."
Attached via amendment 03 is the latest CBA (Attachment 5) as of 18 January 2011.
Question 0022:
After January 1, 2011, are the overtime hours worked included in the hourly Flexible Benefit Credit paid to employees covered under the CBA?
Answer 0022:
Neither the contractor nor any subcontractor under the contract shall pay any service employee performing any of the contract work, regardless of whether such employee was employed under the predecessor contract, less than the wages and fringe benefits provided for in the collective bargaining agreement, to which such employee would have been entitled if employed under the predecessor contract. See FAR clause 52.222-41(f), "Service Contract Act of 1965 (Nov 2007)."
Attached via amendment 03 is the latest CBA (Attachment 5) as of 18 January 2011.
Question 0023:
Question: For the purpose of developing pricing, would the Government agree that the wages identified in the CBA with the effective date of 1-11-11 are the rates that should be used for this proposal? Can the Government confirm which CBA rates and benefits are to be used for pricing for this effort (assumption is the as of 1-11-11 versus the “current rate”).
Answer 0023:
The offers should use the wage and fringe benefits for the period effective 1-01-11in the CBA.
Attached via amendment 03 is the latest CBA (Attachment 5) as of 18 January 2011.
Question 0024:
Question: Will the current incumbent contractor be accomplishing an inventory prior to contract award, as well as during transition?
Question: Will the incumbent contractor work with the winning contractor to coordinate and schedule inventory prior to five (5) days prior to CSD?
Answer 0024:
Reference: SOW paragraphs 3.1.1.a (amendment 003) and 3.1.4; Exhibit A: CDRL A001 and A002
1. Yes, however it may not be a total (wall to wall) inventory. CDRL A001 and A002 annex allows for a total or subset inventory. IMRL and Non-IMRL items that will be inventoried by the Contractor at mobilization will be restricted to the subset of items in the “X” work centers (Contractor supported work centers). The Contractor may elect to do a total inventory.
2. The Government can encourage the incumbent, but cannot mandate inventory concurrency. SOW paragraph 3.1.1.a allows the mobilizing Contractor to observe maintenance service of the incumbent on a not-to-interfere basis. SOW paragraph 3.1.4 specifies Contractor requirement for CDRL A001 and A002 IMRL/Non-IMRL inventories during the Mobilization period.
Question 0025:
The RFP states: “It is the responsibility of the Contractor to ensure all its personnel are trained and certified as required by directives prior to providing CMSS under this contract.”
Question: Of the current, incumbent personnel, hired by the incoming contractor, will their certifications be honored during the phase in period if the certifications are current and valid, without expiration?
Answer 0025:
Reference: SOW paragraphs 4.3.3.2, 3.1.1.b and 4.5.7.3 (amendment 003).
Per the SOW paragraph 4.3.3.2, the Contractor is responsible for “certifying” all its employees. The Government will accept the mobilizing contractor’s certifications of present, incumbent certified employees providing the criteria/requirements for the employee’s certification has not expired at the time of the new contractor’s certification. Employee qualifications must be accepted by the COR and PCO.
Question 0026:
Areas in RFP. In the SOW it calls for the contractor to have CDI/CDQAR for inspection of contractor accomplished work.
Question: Will the contractor be the sole authorizing authority of these individuals or will the USG review the qualifications prior to these individuals being appointed to these positions?
Answer 0026:
Reference: SOW paragraph 4.3.4.2 and SOW paragraph 4.3.4.3 (amendment 003)
As part of the Contractors quality assurance plan, the contractor shall be the sole authority for qualifying Contractor CDI/CDQAR personnel.
Question 27:
The RFP states: “CACs cannot be issued until the Contractor provides proof to the COR and CVS-Trusted Agent that Contractor personnel have been vetted (i.e., passed a National Agency Check with Inquiries (NACI) security background investigation and had a favorable return/acceptance of finger prints by the Federal Bureau of Investigation(FBI). “
Question: Will the Government accept the contractors pre-employment background checks to fulfill this requirement or is a different, specific –installation background investigation required? Currently, our pre-employment background check contains the following: verification of: Social Security, Previous residences – last 7 yrs, National Access Search (e.g. Sex Offenders), Terrorist Watch List, and Federal Criminal investigation last 7 years.
Answer 27:
Reference: SOW paragraph 4.3.1.2; Exhibit A Annex to CDRL 0006 (Std Form SF-85P). Directive-Type Memorandum (DTM) 08-003, “Next Generation Common Access Card (CAC) Implementation Guidance”
No. Procedures specified in SOW paragraph 4.3.1.2 apply. Refer to http://www.cac.mil/assets/pdfs/DTM-08-003.pdf for added assistance.
Question 0028:
The RFP states: “Contractor shall comply with Navy Safety requirements (during cleaning, paint removal, priming and painting) to prevent injury to personnel and damage to USG equipment.”
Question: What are the current toxic substance exposures levels in the paint shop in regards to OSHA 29cfr 1910 Subpart Z? If employees exposures to determined substances are reported to be above the Permissible Exposure Levels set by OSHA will the cost of required Periodic Industrial Hygiene Monitoring and employee required medical surveillance be provided as cost reimbursable by the Government (e.g. hexavelant chromium)
Answer 0028:
The paint facility in buildings 307 and 3202 both exceed all requirements for ventilation under OSHA 29 CFR 1910.107. Enforcement of OSHA requirements for Contractor employees shall be the responsibility of the Contractor and shall include PPE, the Respirator Program, and any costs associated with medical surveillance/evaluation (e.g., painters, Paint Shop X55). The Government will perform the Periodic Industrial Hygiene Surveys of applicable work spaces (e.g., areas with high noise potential, areas requiring ventilation, etc.).
Question 0029:
The RFP states: “The USG will provide all tools (except hand tools…)”
Question: Due to personal tools (hand tools), the current CBA states that the contractor is liable for stolen/lost/misplaced tools up to a certain dollar amount. What type of secure storage will be provided for contractor’s tool boxes?
Answer 0029:
Reference: SOW paragraphs 4.2.3, 4.3.4.3, 4.3.4.1 and 2.2 (Amendment 003; Document: FRCMA-PAX LCP- Tool Control Program) The Government will provide secure lockable spaces for tools. All personal and Contractor provided hand tools brought into a Government work center shall be controlled under the same tool control accountability and directives as Government tools (i.e., tool control). Loss or misplaced tools in a work center is a serious violation of tool control and potential FOD hazard. All work spaces are locked during non-work shift hours with the exception of Hanger 301. Hanger 301 has a military-manned duty office that serves as a controlled, single-point of entry. Within Hanger 301 in the GSE compound, there is a lockable caged area where the contractor’s roll-around tool boxes are stored during off shift hours. The first line of defense is personal responsibility/prevention and the application of prudent personal security measures (i.e., using a quality lock on personal tool boxes). Tool control is a required part of the Contractor Safety and Quality Assurance plans/training.
Question 0030:
1. Will the Government provide NTE (Not to Exceed) amounts for Section B CLINs 1100, 2100, 3100, 4100 and 5100 (Over and Above Work Requests) and CLINs 1200, 2200, 3200, 4200 and 5200 (Travel) or should these CLINs be designated as NSP for proposal purposes?
Answer 0030:
These CLINS are not to be priced at the time of proposal submission.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
EXHIBITS/ATTACHMENTS
Document Type
Description
Date
Attachment 1
Statement of Work
04/21/11
Attachment 2
Quality Assurance Surveillance Plan (QASP)
NAS Patuxent River, MD
Attachment 3
Wage Baseline Form
Attachment 4
NAWCTSD 4330/60 Data Item Transmittal form
Attachment 5
CBA
01/18/11 Attachment 6
Wage Determination No. 2005-2103
06/15/10 Attachment 7A
CPARS Update Questionnaire
Attachment 7B
Past Performance Questionnaire
Attachment 8
Question/Response Form
Attachment 9
Over and Above Work Request (OAWR)
Attachment 10
DD254 - DoD Contract Security Classification
Specification
Attachment 11
Premium Time Request/Authorization Form
Attachment 12
On-site Manning Chart (RFP)
Attachment 13
Contract Data Requirements List (CDRL) Distribution List
Exhibit A
DD 1423-1 – Contract Data Requirements List
EXHIBIT A:
| CDRL#: |
| Title: |
| Subtitle: |
| DID # & CDRL ANNEX FILE |
| A001 |
| Technical Report – Study/Services |
| IMRL Inventory Report |
| DI-Misc-80508B & |
CDRL A001 ANNEX IMRL
| A002 |
| Technical Report – Study/Services |
| Non-IMRL / Plant Property & Contractor Property Inventory Report |
| DI-Misc-80508B |
| A003 |
| Technical Report – Study/Services |
| Contractor Quality Assurance Plan |
| DI-Misc-80508B |
| A004 |
| Technical Report – Study/Services |
| Contractor Safety Plan |
| DI-Misc-80508B |
| A005 |
| Technical Report – Study/Services |
| Information Technology (IT) Personnel Security Report |
| DI-Misc-80508B |
| A006 |
| Technical Report – Study/Services |
| CVS-TA/CAC Status Report |
| DI-Misc-80508B & CDRL A006 ANNEX Std Form SF 85P |
| A007 |
| Technical Report – Study/Services |
| Monthly Maintenance Plan Inputs |
| DI-Misc-80508B |
| A009 |
| Progress Status and Management Report |
| Daily Equipment (Bench) Status Report |
| DI-Mgmt-80227 |
| A010 |
| Progress Status and Management Report |
| Maintenance Action Summary Report |
| DI-Mgmt-80227 |
| A011 |
| Technical Report – Study/Services |
| Contract Funding Status Report |
| DI-Misc-80508B |
| A012 |
| Technical Report – Study/Services |
| Contractor Maintenance Support Services (CMSS) Performance and Manning Summary |
| DI-Misc-80508B |
| A013 |
| Conference Minutes |
| Conference Minutes |
| DI-Admin-81250A |
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
CONTENT OF PROPOSAL
L-1
CONTENT OF PROPOSALS (SERVICES) (FEB 2011)
PART A GENERAL INSTRUCTIONS
1.0 GENERAL
Offerors are required to submit sufficient information concerning the following to enable Government personnel to fully ascertain capabilities of the offeror to perform the requirements. The proposal must be sufficient in detail and scope to permit evaluation and provide the evaluators a clear understanding of the offeror’s approach, expertise, experience and capability as required by the solicitation. All proposals must clearly and convincingly demonstrate that the offeror has a thorough understanding of the requirements, associated risks and is able, willing and competent to devote the resources necessary to meet the requirements and has valid and practical solutions for all requirements and potential risk areas. Respond to all requirements of the solicitation. Do not alter or rearrange the solicitation. The burden of proof for all the evaluation factors identified in this solicitation rests with the offeror. The offerors are advised that the Government may incorporate into the final contract enhancing features included in the Offeror’s proposal deemed beneficial to the Government. With the exception of the Price volume, no cost or pricing information should appear in any other volume. Alternate proposals are not acceptable.
In presenting material in the proposal, the offeror is advised that quality of information is more important than quantity. Clarity, brevity, and logical organization should be emphasized during proposal preparation. It is the responsibility of the offeror to present enough information to allow the various work efforts, support, and management approaches, as well as price, to be meaningfully evaluated without discussions. Though the Government reserves the right to hold discussions, award may be based upon initial offers. Statements that the prospective offeror understands, can or will comply with the specifications, and paraphrasing the requirements or parts thereof without supporting information are considered inadequate and may render a rating of unsatisfactory. For the purpose of this acquisition, relevance is defined as something that has a logical connection with the matter under consideration. Such aspects of relevance include the type of effort (e.g. development, production, repair), the type of requirements (e.g. weapon systems, information systems, engineering services, scheduled depot maintenance), service similarity, service complexity, contract type, contract dollar value, the division of the company that will perform the work, and participation of Principal Subcontractors, Team Members, or Critical Team Members.
The offeror must include any data necessary to illustrate the adequacy of the various assumptions, approaches, and solutions to problems. Failure to clearly and positively address a specific factor may be considered a deficiency. There is no need to repeat information in more than one volume if an overlap exists; the detailed information must be included in the most logical place and summarized and referenced in other areas. Unnecessarily elaborate brochures or other presentation materials beyond that sufficient to present a complete and effective proposal is neither necessary nor desired.
Offerors are expected to comply with all requirements of the RFP. The Government advises offerors that taking exception or deviating from any term or condition of the RFP may make an offer unacceptable, and the offeror ineligible for award, unless the RFP expressly authorizes such an exception or deviation with regard to that specific term or condition. The Government may consider any exception or deviation to any term or condition of the RFP that is not expressly authorized by the RFP to be a deficiency, as defined in FAR 15.001.
Throughout these instructions, “Principal Subcontractors” are defined as a subcontractor who provides at least 20% of the proposed total price (excluding the offeror’s profit/fee), for the contract. Team Members are the entities that make up a joint venture or any other partnership or teaming arrangement that is formed for the purpose of responding to this solicitation. Critical team members are entities of the offeror that perform a critical function in the performance of the resulting contract, whether it is technical or financial, and/or have important roles in any high or medium risk areas identified in the offeror’s proposal.
2.0 PROPOSAL FORMAT
Written proposals must be formatted using a Times New Roman 12 pt normal font (no reduction permitted), single-spaced with 1-inch margins all around, and formatted for standard 8.5 x 11 inch paper. All pages should be numbered with section and page numbers. When foldout pages are used they must not exceed 11 x 17 inches and will be counted as 1 page. Drawings may be provided separately and may be any size but should be folded to approximately 8.5 x 11 inch standard size and will count as 1 page. Graphs shall be presented in no smaller than a 10 pt font and should contain a grid, which allows values to be read directly from the graph to the same accuracy that a 10 x 10 to the ½ inch grid provides. Graphic resolution should be consistent with the purpose of the data presented.
The offeror will provide one complete copy of the written proposal to the PCO as electronic files fully compatible with Microsoft Office 2000 and for information not supported by MS Office products, with the latest Adobe Acrobat reader on a CD-ROM. The offeror will ensure that the Price Volume is provided on a separate CD-ROM. Each CD-ROM is to be labeled for content and the Offeror’s name. If a discrepancy exists between the original paper copy of the proposal and the disk copy, the paper copy will take precedence.
The offeror must present its proposal information in a manner that facilitates a one to one comparison between the information presented and this Proposal Instruction. Proposal information must be structured such that its paragraph number/letter is identical to the Proposal Instructions paragraph number to which it is responding, although the offeror may add lower tier subparagraphs. The offeror must provide reasons it will not provide information for a particular paragraph. The proposal information instructions are structured by paragraph numbers where first, second, third and fourth parts correspond to the volume, book, section, and element, etc., in offeror’s proposal.
3.0 PROPOSAL CONTENT AND VOLUMES
Each volume of the proposal shall be submitted as one original and additional copies as specified in the table below. Submission of all volumes of the Original proposal to the address provided in section 4.0. will determine timeliness of receipt. Page limitations for each volume if any, are also specified in the table below as follows (title and table of contents pages do not count towards page limit). Proposal pages beyond a specified maximum limit, if any, will not be reviewed as part of the evaluation.
| Volume Number |
| Volume Title |
| Written Page Limit |
| Copies Required |
| 1 |
| EXECUTIVE SUMMARY |
| 10* |
| 1 Paper Original/1 Paper Copy /1 CD |
| 2 |
| TECHNICAL/MANAGEMENT |
| 50** |
| 1 Paper Original/5 Paper Copies/1 CD |
| 3 |
| PAST PERFORMANCE |
| Unlimited |
| 1 Paper Original/4 Paper Copies/1 CD |
| 4 |
| PRICE |
| Unlimited |
| 1 Paper Original/2 Paper Copies/1 CD |
| 5 |
| EXCEPTIONS, DEVIATIONS |
| Unlimited |
| 1 Paper Original/2 Paper Copies/1 CD |
AND WAIVERS
*Subparagraph iii of Part B, Volume I, “Executive Summary,” does not count toward Written Page Limit.
**Manning Charts (Attachment 12), Lists of Figures/Tables/Illustrations and Acronyms, and Key Personnel Resumes do not count toward Written Page Limit.
Each volume must contain the following information:
Cover and title page
Title of proposal and proposal number as applicable
Offeror’s name, address and POC
RFP number
Proposal volume/book number
Copy number
Table of Contents (The table of contents must provide sufficient detail to enable easy location of important elements)
Use tabs and dividers The offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators’ review of the offeror’s proposal. The CRM should be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information. The offeror’s CRM may be identical to the example below or revised such as to add columns to indicate the page number on which information may be found, identify where other relevant information in the proposal is located. The CRM does not count against any of the proposal page limitations.
EXAMPLE OF A CROSS REFERENCE MATRIX (CRM)
| Section L – Proposal Instructions |
| Government PWS/SOW |
| Section M – Evaluation Factor |
| Offeror’s Proposal Reference |
| CLIN Reference |
| Volume 2 Technical |
| Example: Para 3.1 |
Note: This column shall address all paragraphs in Sections xx and xy of the Performance Specification
| 2.A |
| Provide reference to your Proposal Volume I - Technical. Example: Refer to appropriate page number in your written proposal |
Volume 2 Technical
Volume 2 Technical
4.0 PROPOSAL SUBMISSION:
Clearly mark all packages with the solicitation number. The submission date for all Volumes shall be no later than 2:00 pm Eastern Daylight Time (EDT), 02 May 2011 . However, it is requested that the Volume 3, Past Performance information should be submitted two (2) weeks after the RFP release date to coincide with past performance questionnaires being sent out as identified in Part B, paragraph 3.0.
Proposals shall be submitted via United States Postal Service or through a commercial carrier to the address provided below. Proposals are not to be submitted by facsimile or electronically via email.
Naval Air Warfare Center Training Systems Division (NAWCTSD)
John J. Warren, AIR-2.5.3.3.2 12350 Research Parkway
Orlando, FL 32826-3275
Primary POC: John J. Warren, Contract Specialist, AIR-2.5.3.3.2, Phone: 407-380-4556
Alternate POC: Kathleen Dougherty, Contracting Officer, AIR-2.5.3.3.2, Phone: 407-380-8189
The outside shipping container shall be marked with the Request for Proposal number N61340-11-R-0039.
IMPORTANT NOTICE: All packages entering the Consolidated Mail Facility onboard the Naval Air Warfare Center Training Systems Division are being scanned. If the contents of the box/package contains electronic components or media, or otherwise should not be scanned because of potential damage to the contents, the sender/vendor shall mark the box/package with a “DO NOT SCAN” sticker.
Submission of telegraphic, facsimile, or electronic commerce offers is not authorized for this solicitation. Proposals shall be submitted either by mail or hand carried as specified below. If the Proposal or Final Proposal Revision (if and when a Final Proposal Revision is requested) is hand carried, the offeror shall notify the cognizant Contract Specialist at least one (1) business day prior to the closing date/time specified in Section L, Part A, paragraph 4.0 or as specified in the amendment/letter requesting Final Proposal Revisions. Offerors will be required to supply the Contract Specialist (or alternate POC listed in Section L, Part A, paragraph 4.0) with the name, citizenship, and telephone number of all the individuals that will be present to hand deliver the proposal in order to prepare the necessary Visit Request(s) prior to arrival. Hand deliveries shall be made to the following address: Naval Air Warfare Center Training Systems Division (NAWCTSD), DeFlorez Building, 12350 Research Parkway, Orlando, FL 32826. NAWCTSD is a secure facility and all visitors will be stopped by security personnel upon entrance. Only authorized visitors will be permitted to enter. Upon admittance, offerors are required to report to the lobby of the DeFlorez Building and contact the cognizant Contract Specialist to accept the proposal submission (a telephone is available in the lobby to place calls within the building). Please note center security personnel are not authorized to accept proposals. Do NOT use the Bid Box in or near the Business Information Center to deposit hand carried proposals. The Contract Specialist will provide the offeror with documentation reflecting the date and time the proposal submission was received for the offeror’s record.
5.0 SOLICITATION QUESTIONS
The Contract Specialist is the sole point of contact for this acquisition. Address any questions, concerns, or requests for clarification you may have, in writing, to:
NAWCTSD
John J. Warren, AIR-2.5.3.3.2
12350 Research Parkway
Orlando, FL 32826-3275
Email: john.j.warren@navy.mil Questions regarding this solicitation shall be submitted in writing utilizing RFP Attachment 8. It is requested that each question reference the applicable document, paragraph, and page. Questions containing proprietary information shall not be submitted because for all questions answered by the Government, answers will be provided to all potential offerors via an amendment to the solicitation. All questions must be submitted no later than 2:00 PM EST, 15 days prior to the deadline for proposal submission. Written questions may be submitted by electronic mail and addressed to the point of contact identified above.
The Government reserves the right not to respond to any questions received concerning this solicitation after the question receipt date above. Accordingly, Offerors are encouraged to carefully review all solicitation requirements and submit questions to the Government early in the proposal cycle. It is not anticipated that the closing date for receipt of offers will be extended.
6.0 PRE-PROPOSAL CONFERENCE/SITE VISIT
(a) A Pre-Proposal Conference/Site Visit will be conducted as follows:
Site POC/Address/
Pre-Proposal Conference/Site Visit
Location:
email/Phone/Fax:
Date/Time/Bldg
Patuxent River, MD Byron Gundacker
06 April 2011/0900 a.m.
Hanger 301, Suite 203W
Hanger 301, Suite 203W
Patuxent River, MD 20670-1612 byron.gundaker@navy.mil
(301) 342-0644 (phone)
(301) 342-3385 (fax)
(b) All prospective offerors are urged to attend the Pre-Proposal Conference/Site Visit. However, each company is restricted to three (3) attendees at the Pre-Proposal Conference/Site Visit. Exact building/room number location for the Pre-Proposal Conference/Site Visit (if changed from above) will be provided by the POC in paragraph (a) above upon receipt of visitor requests (see paragraph (c) below for Visit Request information). Subcontractor requests are to be requested through the Prime Contractor and Subcontractor attendees count toward the limit of three attendees.
(c) In order to attend the Pre-Proposal Conference/Site Visit, each offeror shall submit visit requests for those company officials who will attend. Send electronic Visit Requests for the Pre-Proposal Conference/Site Visit a minimum of five (5) business days prior to the scheduled visit to the POC listed in paragraph 6.0(a) above.
(d) Questions generated at the Pre-Proposal Conference/Site Visit shall be submitted in writing IAW paragraph 5.0 above. At no time will the Government answer questions regarding the solicitation to a single potential offeror without providing the answer to all potential offerors. The Government will not engage in “side-bar” question and answer sessions with any individual or potential offeror. Questions submitted formerly (by the date noted in paragraph 5.0) will be answered and distributed to offerors through RFP amendment.
(e) Failure of a prospective offeror to attend the conference or to submit any questions will be construed to mean that the offeror fully understands all requirements of the solicitation. Prospective offerors are advised that the conference will be held solely for the purpose of explaining the specifications and terms and conditions of this solicitation. The Pre-Proposal Conference/Site Visit will be the only opportunity afforded to any prospective offeror to visit the site. All prospective offerors are advised that this solicitation will remain unchanged at the conclusion of the conference, unless this solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgement and receipt of any such amendment shall be applicable. In no event will failure to attend the conference constitute grounds for a claim after award of the contract.
(f) The Government is not responsible for, nor will the Government pay, any portion of the costs associated with attendance at the respective site visit by prospective contractor personnel.
7.0 PROPOSAL PACKAGING:
The offerors shall package the proposal volumes in cartons or equivalent packaging containers in the most efficient manner possible grouping like volumes to the maximum extent possible. Also each carton shall be single person portable. However, the Master Set, as described below, shall be packaged separately and marked as the Master Set. Each box should include a packing slip detailing the contents to include the volume number, title, and copy number. Also, each box should be stamped or marked “For Official Use Only” and “Source Selection Information -- See FAR-2.101 and 3.104”. The Master Set shall include all original proposal volumes including the original/signed documents submitted as part of Volume 1 Executive Summary.
8.0 CLASSIFIED DATA
All proposals must be UNCLASSIFIED.
9.0 SOLICITATION CHANGES
For any changes and additional information for the solicitation please go to website:
http://nawctsd.navair.navy.mil/EBusiness/BusOps/Index.cfm http://www.fbo.gov
PART B SPECIFIC INSTRUCTIONS
1.0 VOLUME 1 –EXECUTIVE SUMMARY
Note: This volume shall not contain any reference to cost or price aspects of the offer.
The purpose of the Executive Summary is to provide the evaluators with an overview of the Offeror’s proposal and strategy. The Offeror shall include the following in this volume:
i.
A concise abstract of the offeror’s strategy for each of the evaluation criteria contained in the solicitation.
ii.
Offeror Summary Table: The offeror shall complete the table below. The offeror should include all subcontractors and team members who will be involved with the performance or management of the program work and should list all sites where the work will be performed. If a teaming or subcontracting arrangement is proposed, identify the work share, distribution elements, and ratios that each contractor will perform using the table below. Also provide a definition of the legal relationship between the entities if it is other than a Prime/subcontractor relationship.
Contractor Name
(Indicate Prime, Team Member or Sub)
| Place of Performance/DUNs #, if applicable |
| Brief Work Description and/or Program Responsibility |
| % of Total Proposed Price |
iii.
Signed SF33 for basic solicitation and each amendment iv.
Signed Representations, Certifications and Acknowledgements contained in Section K and OnLine Representations and Certifications Application (ORCA) reference v.
Affirmation of no Exceptions, Deviations or Waivers if Volume 6 is not being submitted as part of the proposal.
vi.
Government Agency Information. Provide the points of contact, including mailing address, telephone number, email address, facility code/UIC, for the offeror’s Defense Contract Management Agency (DCMA), Defense Contract Audit Agency (DCAA), and Government Pay offices. This information shall also be included for each subcontractor proposed.
vii.
Period of Acceptance. The offeror shall include an acceptance period stating how long the offeror agrees to honor the proposed prices. This period shall be, at a minimum, 120 calendar days from the date specified for receipt of offers.
viii.
Completion of Clause 5252.201-9502 CONTRACTOR’S AUTHORIZED CONTRACT COORDINATOR AND TECHNICAL LIAISON (NAVAIR)(OCT 2005) found in Section G.
2.0 VOLUME 2 - TECHNICAL/MANAGEMENT
Note: This volume shall not contain any reference to cost or price aspects of the offer.
The offeror shall provide all information and data required to conduct a thorough and complete technical/managerial evaluation. The offeror shall address the following elements in the proposal:
The Technical/Management volume of the proposal shall include a title page, table of contents, list of figures/tables/illustrations, and a list of acronyms (if not used in the SOW).
2.1 Elements
2.1.1 Understanding of the SOW.
The offeror shall provide a clear, concise overview that demonstrates it has a sound understanding of the SOW’s requirements and a sound understanding of all the governing documents/instructions/directives/requirements and their applications. The offeror shall present its understanding of :
- Work center requirements
- Safety requirements
- Quality Control/Assurance requirements
- Inventory requirements
- Security requirements (i.e., security clearances/CAC-CVS/ IT/OPSEC)
- Reports and CDRLs requirements (content, applicable period, periodicity, and recipient(s))
2.1.2 Manning/Staffing.
2.1.2.1 Manning/Staffing Level. In its proposal, the offeror shall fully complete and provide a separate On-Site Manning Chart (RFP Section J, Attachment 12) for the Mobilization Phase, LOT I from Contract Support Date (CSD) to the end of LOT I, and all subsequent LOTS. For LOTS with identical data, one chart may be submitted (i.e., the one On-Site Manning Chart would apply for each LOT II-V). All data blocks on the On-site Manning Charts shall be completed. Any abbreviations shall be identified. The offeror shall describe its manning approach and rational. The offeror shall describe how premium time requirements will be met.
2.1.2.2 Key Personnel Resumes. The offeror shall identify and include in its proposal resumes for each person the offeror will employ to fill each specific key personnel position identified in the SOW. The offeror shall include written letters of intent for employment from each proposed key personnel individual.
2.1.2.3 Qualifications and Certification. The offeror’s proposal shall identify how it will ensure stability and uninterrupted on-site Contractor Maintenance Support Service performance. The offeror’s proposal shall identify its approach/plan for ensuring fulfillment of personnel qualifications and certifications per SOW requirements. The approach/plan shall include a remedial plan that addresses poor/declining contractor employee performance. The offeror’s proposal shall identify how it will ensure qualified and certified personnel are provided in the event of the employee loss and in the case of an incumbent employee from the previous contract not returning to work for the offeror. If part-time personnel are proposed, the offeror’s proposal shall delineate how expertise and continuity will be maintained.
2.1.2.4 Training. The offeror’s proposal shall identify its plan for training new workforce personnel. The offeror shall identify any training approach that will ensure initially-hired and current workforce expertise is maintained and/or improved. The offeror’s proposal shall identify its plan for ensuring its workforce is trained and kept current with the expertise necessary to meet the requirements of the SOW. The offeror’s proposal shall specify how it will ensure the necessary expertise will be provided in instances when modification of equipment or addition of added equipment causes maintenance changes and/or new documentation procedures.
2.1.3 Corporate On-site and Subcontractor Structure/Plan/Authority. The offeror’s proposal shall clearly delineate the offeror’s corporate support structure, organization, and define lines and level of authority in support of this contract effort (a flow chart may be used). The offeror’s proposal shall clearly identify the use and extent of subcontractors. The offeror shall specify the legal nature of any agreements/working relationships between the prime and a subcontractor, the degree of subcontractor effort compared to the prime, and delineation of how managerial/supervisory responsibilities and authority will apply to prime and subcontractor personnel. The offeror (prime) shall address how it will meet the requirements of this contract in the event of the loss of its subcontractor. If the prime uses a subcontractor, the offeror shall explain how and why it selected its subcontractor(s) and how the prime/subcontractor relationship will be managed to ensure cohesive integration into the overall management approach. The offeror shall specify how the lines or authority and communications between the Contractor (prime and subcontractors) and the site will optimize expedient responsiveness and cooperation. The proposal shall include the offeror’s understanding of how Government representatives (NAWCTSD, FRCMA-PAX) and offeror’s corporate communications and interface will functionally occur.
2.1.4 Recruitment and Retention. The offeror shall provide its plan/approach to retain experienced employees/subject matter experts and managers/supervisors to meet SOW requirements and retain site performance stability. The offeror shall provide a plan for how it will minimize loss of performance caused by short notice losses/termination of workforce personnel. The offeror shall identify any procedures or approaches/plans for attracting and retaining highly-skilled workforce personnel.
2.1.5 Mobilization and Transition Plans. The offeror shall provide Mobilization and Transition plans. The plans shall include a plan-of-action and milestones (POA&M) that includes all SOW requirements for each of the phases (i.e., key dates/events, training/certification, personnel resumes, reports/CDRLs, security clearances/CAC-CVS/ IT/OPSEC/NMCI account requirements, inventories, meetings, personnel on-site dates, start/end dates, and cognizant action point-of-contact).
2.1.6 Risk Mitigation Strategy. The offeror’s proposal shall identify potential problems/pitfalls that could impact performance/services associated with this effort and describe specific actions of how the offeror intends to minimize the pitfall impact, to include the following:
Description of the problem/pitfall; Risk assessment of degree of risk the problem posses; and Offeror’s mitigation and control impact, and how SOW requirements will be fulfilled.
3.0 VOLUME 3: PAST PERFORMANCE
3.1 General
The offeror shall identify contracts whose performance is within five years of this proposal submission date and contains efforts similar to those efforts, e.g., tasks, contract type, location, contract dollar value, etc., required by this solicitation for you, your principal subcontractors, and critical team members. Commercial contracts may be included. List the contracts from the most relevant to the least relevant. In general, recent performance will be considered more relevant than older performance. When possible, these contracts should include at least five of the most relevant contracts for the Prime Contractor, three of the most relevant contracts for each Critical Team Member, and two of the most relevant contracts for each Principal Subcontractor (as defined in Paragraph I, General Instructions). If proposing as a joint venture/single legal entity (JV/SLE), the offeror should provide 5 past performance references for the JV/SLE. If less than 5 past performance references are available for the JV/SLE, each member of the JV/SLE should individually submit 5 references in addition to their JV/SLE references.
3.2 For each contract identified, provide contract data, relevancy, past performance and systemic improvement information as described below. Demonstrate the relevancy of the Offeror’s, and if applicable, the Offeror’s principal subcontractors’ or critical team members’ past performance and systemic improvements with respect to the solicitation requirements. For each past performance problem identified, describe the status of the systemic improvement efforts and, where applicable, demonstrate the impact that the systemic improvement effort had on resolving the problem such that it would not reoccur.
3.3 For contracts that have CPARs that are more than 6 months old, i.e., the completion date is more than 6 months before the due date for this Past Performance Volume; the offeror will forward a copy of the CPARs Update Questionnaire (Attachment 7A) to that contract customer’s Program Manager. For all contracts identified which do not have CPARs, the offeror will forward a copy of the Past Performance Questionnaire (Attachment 7B) to that contract customer’s PCO, Administrative Contracting Officer, Program Manager or other point of contact with knowledge and familiarity of the contract. All questionnaires shall be forwarded within two weeks from the RFP release date with enough lead-time so that responses can be received by the Government concurrent with the Government’s receipt of the offeror’s Past Performance information submitted as per paragraph 4.1 and 4.2 The offeror shall include instructions for the customers to send the completed questionnaires via e-mail to John J. Warren, at Email; john.j.warren@navy.mil or via fax number 407-380-8406. This submittal information is provided at the top of the questionnaires to facilitate the offeror’s effort in meeting these instructions.
3.4 Offerors shall provide written consent from their principal subcontractors and critical team members that will allow the Government to…