CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOTS I-V ASK \* MERGEFORMAT |
| TDP ______ |
| TM ______ |
| OTHER: LOGISTICS DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| FRCMA-PAX CMSS |
| N61340-11-R-0039 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A012 |
| TECHNICAL REPORT – STUDY/SERVICES |
| Contractor Maintenance Support Services (CMSS) Measurement and Manning Summary |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MISC-80508B |
| SOW Para 3.1.4, 3.2.5, 4.7.2 & Part 5 |
NAWCTSD PJM
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| SEE BLK 16 |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| SEE BLK 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
SEE BLK 16
| Reg |
| Repro |
| 16. REMARKS |
| NAWCTSD PCO |
1. BLK 4: ONLY DID PARAGRAPH 3 (C).(2) APPLIES. REFER TO ANNEX SPREADSHEET WORKSHEETS PART I (COVER) , PART 2 (MSF), PART 3 (QAF), PART 4 (MANNING) AND PART 6 (PREMIUM TIME) FOR REPORT FORMAT. PRIVACY ACT AND PERSONAL INFORMATION PROTECTION REQUIREMENTS AND MARKINGS APPLY FOR MANNING REPORT.
2. BLK 4: DELETE PARA 2. SUBMISSION SHALL BE IN MICROSOFT @ EXCEL 2003 OR LATER SPREADSHEET FORMAT.
3. BLK 12: FIRST SUBMISSION SHALL BE DUE THE 20THTH OF EACH MONTH IN THE MOBILIZATION PHASE. REPORTS DURING THE MOBILIZATION PHASE SHALL ONLY INCLUDE ANNEX SPREADSHEET WORKSHEET PARTS 1 (COVER) AND PART 4 (MANNING).
4. BLK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE NLT THE 5TH WORKING DAY OF EACH MONTH AFTER CONTRACTOR SUPPORT DATE (CSD) . PART 4 (MANNING) SHALL ALSO BE SUBMITTED AS REQUIRED WHEN THERE IS A GAIN OR LOSS OF AN ON-SITE CONTRACTOR EMPLOYEE. IT SHALL BE DUE WITHIN 24 HRS OF THE GAIN OR LOSS.
5. THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION.
6. BLK 14: SUBMISSION SHALL BE AN ELECTRONIC ENCRYPTED COPY SENT VIA EMAIL. EMAIL SUBJECT LINE SHALL INCLUDE CONTRACT NUMBER, CDRL DATA ITEM NUMBER. CONTRACT/CDRL TITLE, AND DATE OF REPORT. (E.G. N61340-11-C-0000 T- A012 FRCMAPAX MOB REPORT – 20 MAY11). EMAIL ADDRESSES FOR BLOCK 14 DISTRIBUTIONS ARE PROVIDED IN THE CONTRACT SCHEDULE SECTION J. FILES SHALL BE ENCRYPTED USING WINZIP AES 256-BIT ENCRYPTION.
7. BLK 9: DISTIBUTION D (FOR PARTS 1, 2, 3, & 6): DISTRIBUTION TO DOD AND DOD CONTRACTORS ONLY (ADMINISTRATIVE/RECOMPETE OR OPERATIONAL USE ONLY), (10 NOV 2009). DISTRIBUTION E (PART 4-MANNING) : DISTRIBUTION TO DOD COMPONENTS ONLY (ADMINISTRATIVE OR OPERATIONAL USE ONLY), (10 NOV 2009). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (NAWCTSD PCO, CODE 25332), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
NAWCTSD PJM
FRCMA PAX COR
FRCMA-PAX ACOR
FRCMA TYCOM
| 15. TOTAL ▬▬▬▬► |
| 0 |
| 0 |
| 5 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| L. DANIELS, NAWCTSD PJM |
| 28 mar 2011 |
| B. HICKS, NAWC TSD PDX |
| 28 mar 2011 |
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 1 of 2 Pages
ANNEX TO CDRL A012
MONTHLY CMSS MEASUREMENT AND MANPOWER REPORT
REPORT FORMAT. This report shall use the formats in the following spreadsheet’s worksheets Part I, II, III, IV and VI:
PART 1 COVER SHEET
PART 2 MSF MEASUREMENT
PART 3 QA MEASUREMENT
PART 4 MANNING REPORT
PART 6 PREMIUM TIME SUMMARY
_1362824027.xls Pt 1 CDRL Cover
PART 1: COVER SHEET Ver 15 Feb 11
Title: FRCMA-PAX Monthly Measurement Report Contractor Maintenance Support Hours Measurement and Manning Report
Contract #: N61340-11-C-xxxx
Report Period: 1-31 May 2010
CDRL #: A010 NOTE: GOVT ONLY/FOUO RELATIVE TO THE FRCMA-PAX CONTRACT.
Contractor: ABC Inc [ ] CONTAINS PRIVACY ACT STATEMENT DATA - SAFEGAURD RQRD
Contractor Signature: Date: Email: Phone:
John Contractor, Site Mgr ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks:
COR Signature: Date: Email: Phone:
Bill COR, FRCMA-Pax ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks (note any attachments):
Contractor Summary of Contractor Milestones/ Accomplishments/ Comments:
CHECK APPLICABLE CONTENTS OF THIS REPORT:
[ X ] PART 1 COVER SHEET *
[ X ] PART 2 MSF MEASUREMENT *
[ X ] PART 3 QA MEASUREMENT *
[ X ] PART 4 MANNING REPORT *
[ ] PART 5 CVS STATUS * AND **
[ X ] PART 6 PREMIUM TIME REPORT
[ ] Other_____________
NOTE * : NOTE: PRIVACY ACT INFORMATION statement SAFEGAURDS . If transmitted electronically. It must be encrypted using WINZIP AES 256-BIT encryption
NOTE ** : ALL REPORT DATA WILL AND SHALL BE STORED IN A SECURE MANNER.
ALL REPORT DATA IS FOUO AND NOT FOR DISTRIBUTION OUTSIDE CDRL DISTRIBUTION LIST. ALL OUTSIDE REQUESTS MUST GO
THROUGH NAWCTSD ORL FREEDOM OF INFORMATION ACT PROCESS.
xxx@ctxtcom
Pt 2 MSF Measurement
PART 2: MSH REPORT
Title: FRCMA-PAX Monthly Measurement Report Ver 15 Feb 11
Contract #/Name: N61340-11-C-xxxx / ABC, Inc Contractor Maintenance Support Factor Measurement Report
Report Period: 1-31 May 2010
CDRL #: A010 NOTE: GOVT ONLY/FOUO RELATIVE TO THE FRCMA-PAX CONTRACT.
Contractor Signature: Date: Email: Phone:
John Contractor, Site Mgr ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks:
COR Signature: Date: Email: Phone:
Bill COR, FRCMA-Pax ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks (note any attachments):
LOT MSF ARCHIVE:
Summary: Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
MSH =
Cumulative MSF =
Workdays in Report Perod (days): 21
Monthly MSH FACTOR: Std Sched. MSH for Report Period (Hrs)= 168
NAME Work Ctr: Position/Qual/ Certif Title On-site Maint Hrs: Training Hrs: Vacation / Sick Lv Hrs: Other Hrs: MSHF (Failure/ No show) Hrs: Premium Time Hrs Rprt Period Total SMSH Hrs: MSHF (%) Remarks: (Notecompleted vacation/sick times)
SAMPLE, Fed 0F8 AMI 100.0 34.0 24.0 8.0 2.0 1.0 169 98.8% 8 hrs off CO authorized closure
1 0.0 N/A
2 0.0 N/A
3 0.0 N/A
4 0.0 N/A
5 0.0 N/A
6 0.0 N/A
7 0.0 N/A
8 0.0 N/A
9 0.0 N/A
10 0.0 N/A
11 0.0 N/A
12 0.0 N/A
13 0.0 N/A
14 0.0 N/A
15 0.0 N/A
16 0.0 N/A
17 0.0 N/A
18 0.0 N/A
19 0.0 N/A
20 0.0 N/A
21 0.0 N/A
22 0.0 N/A
23 0.0 N/A
24 0.0 N/A
25 0.0 N/A
26 0.0 N/A
27 0.0 N/A
28 0.0 N/A
29 0.0 N/A
30 0.0 N/A
31 0.0 N/A
32 0.0 N/A
33 0.0 N/A
34 0.0 N/A
35 0.0 N/A
36 0.0 N/A
37 0.0 N/A
38 0.0 N/A
39 0.0 N/A
40 0.0 N/A
41 0.0 N/A
42 0.0 N/A
43 0.0 N/A
44 0.0 N/A
45 0.0 N/A
46 0.0 N/A
47 0.0 N/A
48 0.0 N/A
49 0.0 N/A
50 0.0 N/A
51 0.0 N/A
52 0.0 N/A
53 0.0 N/A
54 0.0 N/A
55 0.0 N/A
56 0.0 N/A
57 0.0 N/A
58 0.0 N/A
59 0.0 N/A
60 0.0 N/A
61 0.0 N/A
62 0.0 N/A
63 0.0 N/A
64 0.0 N/A
65 0.0 N/A
66 0.0 N/A
67 0.0 N/A
68 0.0 N/A
69 0.0 N/A
70 0.0 N/A
71 0.0 N/A
72 0.0 N/A
73 0.0 N/A
74 0.0 N/A
75 0.0 N/A
76 0.0 N/A
77 0.0 N/A
78 0.0 N/A
0.0 N/A
SUMMARY: Contractor Maintenance Support Factor Measurement Report
TOTALS = 0.0 0.0 0.0 0.0 0.0 0.0 0.0 N/A
On-site Maint Hrs: Training Hrs: Vacation / Sick Lv Hrs: Other Hrs: MSHF (Failure/ No show) Hrs: Premium Time Hrs Total SMSH Hrs: MSHF (Failure) Hrs:
REPORT PERIOD MAINTENANCE SUPPORT FACTOR (MSF) = N/A
EXPLAIN IN REMARKS COLUMN
SAMPLE
SAMPLE
Pt 3 QA Measurement
PART 3: FQAF and NFQAF REPORT Ver 15 Feb 11
Title: FRCMA-PAX Monthly Measurement Report
Contract #/ Name: N61340-11-C-xxxx / ABC, Inc Quality Assurance Factor Report
Report Period: 1-31 May 2010 NOTE: GOVT ONLY/FOUO RELATIVE TO THE FRCMA-PAX CONTRACT.
CDRL #: A010
Contractor Signature: Date: Email: Phone:
John Contractor, Site Mgr ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks:
COR Signature: Date: Email: Phone:
Bill COR, FRCMA-Pax COR ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks (Note any attachments):
Monthly SAFETY OF FLIGHT QAF LOT FQAF ARCHIVE:
Work Center: FCN FCU FCD Report Period Work Ctr FQAF Cumulative FQAF to Date Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Monthly NON-SAFETY OF FLIGHT QAF: LOT NFQAF ARCHIVE:
Work Center: NFCN NFCU NFCD Report Period Work Ctr NFQAF Cumulative NFQAF to Date Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
ENTER FOR EACH WORK CENTER WHERE APPLICABLE
ENTER FOR EACH WORK CENTER WHERE APPLICABLE
Pt 4 Manning Report
PART 4: MANNING STATUS REPORT Ver 15 Feb 11
Title: FRCMA-PAX Monthly Measurement Report FRCMA-PAX MANNING STATUS REPORT
Contract #/ Name: N61340-11-C-xxxx/ ABC, Inc
Report Period: 1-31 May 2010 NOTE: PRIVACY ACT INFORMATION / PERSONAL IDENTITY INFO SAFEGAURDS MARKINGS REQRD.
CDRL #: A010 If transmitted electronically. It must be encrypted using WINZIP AES 256-BIT encryption
Contractor Signature: Date: Email: Phone:
John Contractor, Site Mgr ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks:
COR Signature: Date: Email: Phone:
Bill COR, FRCMA-Pax ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks (note any attachments):
Submit in order of Work Centers:
FY-__ CLIN/ SLIN: NAME (* New Hire/ ** Terminated) Work Ctr: Hire Aniv Date: On-Site Date: Qual/ Certif Title Planned Vacation/ Leave License and Certifictions w/Exp Dates CAC Card Exp Date Security Clearance (Y or N) /Exp date) Employment Termination Date: (ddmmmyy) Remarks: (Note vacation times; employment terminations dates; destruction/turn-in of CAC card)
1 SAMPLE, Fred X5O SM
2 X5O SMC
3 X5O SQI
4 X5O QI-AP
5 X5O QI-ALSS
6 X5O QI-AV
7 X5M ST-IMRL
8 X5M ST-IMRL
9 X5M ST-IMRL
10 X5M ST-IMRL
11 X5M ST-IMRL EXP
12 X5H/ X5S HMWS
13 X5H ST-H
14 X5H ST-H
15 X5S ASW
16 X5L /X5E EWS-56
17 X5L AM-T56
18 X5L AM-T56
19 X5L AM-T56
20 X5L AM-T56
21 X5L AM-T56
22 X5L AM-T56
23 X5L AM-T56
24 X5L AM-T56
25 X5L AM-T56
26 X5L AM-T56
27 X5L AM-T56
28 X5L PCC-T56
29 X5E ETTC
30 X5B/ X5A/ X5C AVWS
31 X5B ETBS
32 X5B ETBS
33 X5B ETBS
34 X5A ETATE
35 X5A ETATE
36 X5C ETCAL
37 X5C ETCAL
38 X58/ X5D/ X5F/ X5P ALSSWS
39 X58 ST-ALSS
40 X58 PCC-ALSS
41 X58 PCC-ALSS
42 X5D AM-ALSS
43 X5D AM-ALSS
44 X5D AM-ALSS
45 X5F AM-ALSS
46 X5F AM-ALSS
47 X5F AM-ALSS
48 X5F AM-ALSS
49 X5F AM-ALSS
50 X5F AM-ALSS
51 X5P AM-ALSS
52 X5P AM-ALSS
53 X5P AM-ALSS
54 X5T/ X55 TPWS
55 X5T AW
56 X5T AW
57 X5T AW
58 X55 PSWS2
59 X55 AP
60 X55 AP
61 X55 AP
62 X55 AP 2nd
63 X55 AP 2nd
64 X59 SEWS
65 X59 MVMSE
66 X59 MVMSE
67 X59 MVMSE
68 X59 MVMSE
69 X59 MVMSE
70 X59 MVMSE
71 X59 MVMSE
72 X59 MVMSE
73 X59 AWSE
74 X59 AWSE
75 X59 PCC-SE
Pt 5 CVS Status
PART 5: CVS SUMMARY REPORT Ver 08 Oct 10
Title: FRCMA-PAX Monthly Measurement Report NOTE: PRIVACY ACT INFORMATION / PERSONAL IDENTITY INFO SAFEGAURDS MARKINS REQRD.
Contract #: N61340-11-C-xxxx If transmitted electronically. It must be encrypted using WINZIP AES 256-BIT encryption
Report Period: 1-31 May 2010 FRCMA-PAX CVS SUMMARY REPORT
CDRL #: A010
Contractor: ABC, Inc NOTE: GOVT ONLY/FOUO RELATIVE TO THE FRCMA-PAX CONTRACT.
Contractor Signature: Date: Email: Phone:
John Contractor, Site Mgr ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks:
COR Signature: Date: Email: Phone:
Bill COR, FRCMA-Pax ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks (note any attachments):
CVS REGISTATION REQUEST FORM DATA:
SECTION I (Applicant Data) Section II: Elegibility Rqrmts Section III: Backgrd Vetting Section IV: Sponsor Responsibility
Active Issued CAC? (A,D,I,T) Purpose Last Name (In Alphabetical Order)) First Name MI Cadency Name SSN xxx-xx-xxxx Birth Date ddmmmyy EMAIL Address Personnel Category Card Exp Date ddmmmyy Contract End Date ddmmmyy State Applicable Rqrmt: Favorable FBI Fingerprint Chk? NACI Submitted to OPM? Approved / In DEERS? Termination Date ddmmmyy CAC Expire Date: ddmmmyyy Sponsor Name / Email/Phone Type and Date of NACI (BI) CAC Confiscated and Destroyed ddmmmyyy Destruction Confirmation POC
A = ACTIVE CAC
D = DESTROYED CAC
I = INPROCESS OF ACQUIRING CAC
T = TRANSFERRED CAC TO OTHER CVS TA
INITIAL, REISSUE, OR 6 MO REVERIFICATION
NAVY DOD CONTRACTOR, VOLUNTEER, Other FED AGENCY (specify)
USE DARK GRAY BACKGROUND FOR INACTIVE; LIST ACTIVE AND INACTIVE TOGETHER SEPARATELY
A=ACTIVE CAC; D=DESTROYED CAC
I= INPROCESS OF ACQUIRING CAC
T=TRANSFERRED CAC
TO OTHER CVS TA
ALPHABETICAL ORDER
PT 6 Premium Time Summary
Ver 15 Feb 11
PART 6: CONTRACTOR PREMIUM TIME SUMMARY
Title: FRCMA-PAX Monthly Measurement Report CONTRACTOR PREMIUM TIME SUMMARY
Contract #/Name: N61340-11-C-xxxx / ABC, Inc
Report Period: 1-31 May 2010
CDRL #: A010
Contractor Signature: Date: Email: Phone:
John Contractor, Site Mgr ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks:
COR Signature: Date: Email: Phone:
Bill COR, FRCMA-Pax ddmmmyy xxx@ctxtcom (###)###-#####
Signature: Remarks (note any attachments):
Work Center: Qualification Premium Time this Report Period (Hrs)) Cummulative Premium Time this LOT Period (hrs)
1 X5O SM
2 X5O SMC
3 X5O SQI
4 X5O QI-AP
5 X5O QI-ALSS
6 X5O QI-AV
7 X5M ST-IMRL
8 X5M ST-IMRL
9 X5M ST-IMRL
10 X5M ST-IMRL
11 X5M ST-IMRL EXP
12 X5H/ X5S HMWS
13 X5H ST-H
14 X5H ST-H
15 X5S ASW
16 X5L /X5E EWS-56
17 X5L AM-T56
18 X5L AM-T56
19 X5L AM-T56
20 X5L AM-T56
21 X5L AM-T56
22 X5L AM-T56
23 X5L AM-T56
24 X5L AM-T56
25 X5L AM-T56
26 X5L AM-T56
27 X5L AM-T56
28 X5L PCC-T56
29 X5E ETTC
30 X5B/ X5A/ X5C AVWS
31 X5B ETBS
32 X5B ETBS
33 X5B ETBS
34 X5A ETATE
35 X5A ETATE
36 X5C ETCAL
37 X5C ETCAL
38 X58/ X5D/ X5F/ X5P ALSSWS
39 X58 ST-ALSS
40 X58 PCC-ALSS
41 X58 PCC-ALSS
42 X5D AM-ALSS
43 X5D AM-ALSS
44 X5D AM-ALSS
45 X5F AM-ALSS
46 X5F AM-ALSS
47 X5F AM-ALSS
48 X5F AM-ALSS
49 X5F AM-ALSS
50 X5F AM-ALSS
51 X5P AM-ALSS
52 X5P AM-ALSS
53 X5P AM-ALSS
54 X5T/ X55 TPWS
55 X5T AW
56 X5T AW
57 X5T AW
58 X55 PSWS2
59 X55 AP
60 X55 AP
61 X55 AP
62 X55 AP 2nd
63 X55 AP 2nd
64 X59 SEWS
65 X59 MVMSE
66 X59 MVMSE
67 X59 MVMSE
68 X59 MVMSE
69 X59 MVMSE
70 X59 MVMSE
71 X59 MVMSE
72 X59 MVMSE
73 X59 AWSE
74 X59 AWSE
75 X59 PCC-SE
Sheet1